ML17285B018

From kanterella
Revision as of 00:23, 19 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Monthly Operating Rept for Jan 1990 for Washington Nuclear Plant,Unit 2.W/900207 Ltr
ML17285B018
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/31/1990
From: Hutchison L, Powers C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9002220372
Download: ML17285B018 (7)


Text

ACCELERATED Dl BU'llON DEMONSTR"10N SYFI'EM REGULATO INFORMATION DISTRIBUTION TEM (RIDS)DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION HUTCHISON,L.B.

Washington Public Power Supply System POWERS,C.M.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly opera'or Jan 1990 for Washington Nuclear Plant, Unit 2 W/900207 1 r.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: RECIPIENT ID CODE/NAME PD5 LA SAMWORTH,R INTERNAL: ACRS AEOD/DSP/TPAB NRR/DLPQ/LPEB10 NR+R~J3 g/PBll REG FILE COPIES LTTR ENCL 3 3 1 1 10 10 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD5 PD AEOD/DOA IRM TECH ADV NRR/DOEA/OEAB11 NUDOCS-ABSTRACT RGN5 COPIES LTTR ENCL 1 1 1 1 2 2 1 1 1 1 1 1 EXTERNAL EG&G S IMPSON I F NRC PDR 1 1 1 1 LPDR NSIC 1 1 1 1 NOIR TO ALL"RIDS" RECIPIENIS'IZASE HELP US TO REDUCE RASTB I CXNIACT THE DOCUMEÃZ COPZBOL DESK ROCN Pl-37 (EXT.20079)TO ELIK2RTB KSR NAME PBGN DISTRIBUTION LISTS FOR DOCUMEMZS YOU DCSERT NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 29 ENCL 29

~y I WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington Way~Richland, Washington 99352 Docket No.50-397 February 7, 1990 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555

Dear Sir:

SUBJECT:

NUCLEAR PLANT NO.2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for January 1990 as required by our Technical Specifications 6.9.1.6.Very Truly Yours, geA~C.M.Powers (M/D 927M)WNP-2 Plant Manager CMP/lc Enclosure cc: Mr.Mr.Ms.Mr.Mr.J.B.Martin C.J.Bosted Dottie Sherman J.T.Wheelock W.H.Lovelace NRC Region V NRC Site Representative (901A)ANI, Farmington CT INPO NRC, Washington D.C.'7002220372 90013k PDR ADDCK 05000397 R PNU o A<2~~oo&/yg I (

L I I OPERATING DATA REPORT WNP-2 01-Feb-90 1.DOCKET: 50-397 2.REPORTING PERIOD: Jan-90 3.UTILXTY CONTACT: OUTAGE+ON-LINE HOURS LEONARD HUTCHISON (509)377-2486 744 4.LICENSED THERMAL POWER (MWt): 5.NAMEPLATE RATING (GROSS MWe): 6.DESIGN ELECTRICAL RATING (NET MWe): 7.MAXXMUM DEPENDABLE CAPACITY (GROSS MWe): 8.MAXXMUM DEPENDABLE CAPACITY (NET MWe): 9.IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS: 3323 1200.9 1100 1140 1095 10.POWER TO WHICH RESTRICTED, IF ANY (NET MWe): ll-REASONS FOR RESTRICTXONS, IF ANY: NONE 12.13'4.15.16.17.18.19.20.21.22.23.24.25.REPORT PERIOD HOURS HOURS REACTOR CRXTICAL RX RESERVE SHTDWN HRS HRS GENERATOR ON LINE UNIT RESERVE SHUTDOWN HOURS GROSS THERMAL ENERGY (MWH)GROSS ELECTRICAL ENERGY (MWH)NET ELECTRICAL ENERGY (MWH)UNIT SERVICE FACTOR UNIT AVAILABILITY FACTOR UNIT CAPACITY FACTOR (MDC NET)UNXT CAPACITY FACTOR (DER NET)UNXT FORCED OUTAGE RATE FORCED OUTAGE HOURS MONTH 744 744.0 0.0 744.0 0.0 2362047 788100 762483 100'~o 100'+o 93.6<o 93.2~o 0.O~o 0.0 YEAR CUMULATIVE 744 45008.2 744.0 33819.3 0.0 340.4 744.0 32591.9 0.0 381.7 2362047 90706487 788100 30192050 762483 29048626 100'~o 72'+o 100 0+o 73'~o 93'~o 58 9~o 93'~o 58'~o 0.O~o 8.4~o 0.0 2996.2 26~SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE I DATE I DURATION)Refuel in outa e startin 4 13 90 for 45 da s.27.IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:

REPCAT PERIOD JAN 19 90 men th, year i@IT SIUTDOI'INS

/REDUCTIONS DOCKET NO.50-397 UNIT NRf fL WNP-2 DRTE COMPLETED OY LB HUTCHISON TELEPlfONE tHI K IH'T M<<ERIK Rll12l.~l Y I I.i~El'i I E'0-01P 1/30/89 S 0 H 5 RB CON ROD Reduced power to perform a control rod sequence exchange SUht I WNP-2 Operated routinely in January with no outages and one Power Reduction as described above.TYPE F-Forced S-ScllKl R-Equi.p Failure 0-Haint or Test~C-Re f ue1lng 0-nequla tory Des triction E-Operator Trafnkng h License Examination F-Rdmin G-Oper Error H-Other l fETf f00 I-Manual 2-manual Scram 3-Iluto Scram 4-Continued 6 flop<ced Load 9-Other SYSTEhf k COhfPOhCNT Exhibit F h H Instructions for Preparation of'ata Entry Sheet Licensee Event Report (LiEA)File (NUAEG-0161)

VERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-397 UNIT WNP-2 DATE 2/1/90 MONTH JANUARY DAY AVERAGE DAILY POWER LEVEL (t~iwE-Net) 1076 17.COMPLETED BY LB HUTCHISON TELEPHONE (509)377-2486 DAY AVERAGE DAILY POMER LEVEL (MwE-Net)1070 2.3.5.6.7.8.9.10.12.13.14.15.16.1077 1068 891 948 1056 1013 1018 1049 1078 1078 1068 1081 1079 1072 1070 18.l 9.20.21.22.23.24.25.26.27.28.29'0.,31.1070 962 1003 1010 1057 1057 1068 1051 1048 1026 1011 1048 728 842 INSTRUCTIONS On this form, list the average daily unit power level in t';We-Net for each day in the reporting month.Compute to the nearest whole megawatt.These figures will be used to plot a graph-for each reporting month.Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100~line (or the restricted power level line).In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.