Monthly Operating Rept for Jan 1990 for Washington Nuclear Plant,Unit 2.W/900207 Ltr
ML17285B018
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/31/1990
From: Hutchison L, Powers C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9002220372
Download: ML17285B018 (7)


Text

ACCELERATED Dl BU'llON DEMONSTR "10N SYFI'EM REGULATO INFORMATION DISTRIBUTION TEM (RIDS)

DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION HUTCHISON,L.B. Washington Public Power Supply System Washington Public Power Supply System

'or POWERS,C.M.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly opera Jan 1990 for Washington Nuclear Plant, Unit 2 W/900207 1 r.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD5 LA 3 3 PD5 PD 1 1 SAMWORTH,R 1 1 INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 IRM TECH ADV 2 2 NRR/DLPQ/LPEB10 1 1 NRR/DOEA/OEAB11 1 1 NR+R~J3 g/ PBll 1 1 NUDOCS-ABSTRACT 1 1 REG FILE 1 1 RGN5 1 1 EXTERNAL EG&G S IMPSON I F 1 1 LPDR 1 1 NRC PDR 1 1 NSIC 1 1 NOIR TO ALL "RIDS" RECIPIENIS'IZASE HELP US TO REDUCE RASTB I CXNIACT THE DOCUMEÃZ COPZBOL DESK ROCN Pl-37 (EXT. 20079) TO ELIK2RTB KSR NAME PBGN DISTRIBUTION LISTS FOR DOCUMEMZS YOU DCSERT NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 29 ENCL 29

~ y I

WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 Docket No. 50-397 February 7, 1990 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Dear Sir:

SUBJECT:

NUCLEAR PLANT NO. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for January 1990 as required by our Technical Specifications 6.9.1.6.

Very Truly Yours, geA ~

C. M. Powers (M/D 927M)

WNP-2 Plant Manager CMP/lc Enclosure cc: Mr. J. B. Martin NRC Region V Mr. C. J. Bosted NRC Site Representative (901A)

Ms. Dottie Sherman ANI, Farmington CT Mr. J. T. Wheelock INPO Mr. W. H. Lovelace NRC, Washington D.C.

o A<2~

~oo &

'7002220372 90013k PDR R

ADDCK 05000397 PNU /yg I

(

L I I

OPERATING DATA REPORT WNP-2 01-Feb-90

1. DOCKET: 50-397
2. REPORTING PERIOD: Jan-90 OUTAGE + ON-LINE HOURS 744
3. UTILXTY CONTACT: LEONARD HUTCHISON (509) 377-2486
4. LICENSED THERMAL POWER (MWt): 3323
5. NAMEPLATE RATING (GROSS MWe): 1200.9
6. DESIGN ELECTRICAL RATING (NET MWe): 1100
7. MAXXMUM DEPENDABLE CAPACITY (GROSS MWe): 1140
8. MAXXMUM DEPENDABLE CAPACITY (NET MWe): 1095
9. IF CHANGES OCCUR ABOVE SINCE LAST REPORT, GIVE REASONS:
10. POWER TO WHICH RESTRICTED, IF ANY (NET MWe):

ll- REASONS FOR RESTRICTXONS, IF ANY: NONE MONTH YEAR CUMULATIVE

12. REPORT PERIOD HOURS 744 744 45008.2 13 HOURS REACTOR CRXTICAL 744.0 744.0 33819.3

'4.

RX RESERVE SHTDWN HRS 0.0 0.0 340.4

15. HRS GENERATOR ON LINE 744.0 744.0 32591.9
16. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 381.7
17. GROSS THERMAL ENERGY (MWH) 2362047 2362047 90706487
18. GROSS ELECTRICAL ENERGY (MWH) 788100 788100 30192050
19. NET ELECTRICAL ENERGY (MWH) 762483 762483 29048626
20. UNIT SERVICE FACTOR 100 '~o 100 '~o 72 '+o
21. UNIT AVAILABILITYFACTOR 100 '+o 100 0+o 73 '~o
22. UNIT CAPACITY FACTOR (MDC NET) 93. 6<o 93 '~o 58 9~o
23. UNXT CAPACITY FACTOR (DER NET) 93. 2~o 93 '~o 58 '~o
24. UNXT FORCED OUTAGE RATE 0. O~o 0. O~o 8. 4~o
25. FORCED OUTAGE HOURS 0.0 0.0 2996.2 26 ~ SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE I DATE I DURATION)

Refuel in outa e startin 4 13 90 for 45 da s.

27. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:

DOCKET NO. 50-397 UNIT NRf fL WNP-2 DRTE i@IT SIUTDOI'INS / REDUCTIONS COMPLETED OY LB HUTCHISON REPCAT PERIOD JAN 19 90 TELEPlfONE men th, year tHI K IH'T M<<ERIK Rll12l.~l Y I I .i~El' i I E 1/30/89 S 0 H 5 RB CON ROD Reduced power to perform a control rod sequence

'0-01P exchange SUht I WNP-2 Operated routinely in January with no outages and one Power Reduction as described above.

TYPE l fETf f00 SYSTEhf k COhfPOhCNT F-Forced R-Equi.p Failure F-Rdmin I-Manual Exhibit F h H S-ScllKl 0-Haint or Test ~ G-Oper Error 2-manual Scram Instructions for C-Re fue1lng H-Other 3-Iluto Scram Preparation 0-nequla tory Des triction 4-Continued Entry Sheet of'ata E-Operator Trafnkng 6 flop <ced Load Licensee Event Report h License Examination 9-Other (LiEA) File (NUAEG-0161)

VERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-397 UNIT WNP-2 DATE 2/1/90 COMPLETED BY LB HUTCHISON TELEPHONE (509) 377-2486 MONTH JANUARY DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POMER LEVEL (t~iwE-Net) (MwE-Net) 1076 17. 1070

2. 1077 18. 1070
3. 1068 l 9. 962 891 20. 1003 948 21. 1010 5.

1056 22. 1057 6.

1013 23. 1057 7.

1018 24. 1068 8.

1049 25. 1051 9.

1078 26. 1048 10.

1078 1026 27.

1068 28. 1011 12.

13. 1081 29 1048

'0.

14. 1079 728
15. 1072 ,31. 842
16. 1070 INSTRUCTIONS On this form, list the average daily unit power level in t';We-Net for each day in the reporting month. Compute to the nearest whole megawatt.

These figures will be used to plot a graph -for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100~

line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.