ML17279A466

From kanterella
Revision as of 00:58, 19 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Monthly Operating Rept for May 1987.W/870605 Ltr
ML17279A466
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/31/1987
From: Hutchison L, Powers C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8708190210
Download: ML17279A466 (4)


Text

k BE%AT PERIOD HAY 19 87 m~tmm", year HK iTnnE TViif mlE iitiim HETlliG'7-04 4/10/8P S 744.0 C 4 a~m lNIT SllJTDOMNS

/flEDUCTIONS DOCKET NO.UNIT NNlL WNP 2 DATE 6-1-87 COMPLETED BY L.B.HUTCHISON TELER ONE (509)377-2486'.'elBI IKPIIZAT RC FUELXX REFUELING/HAINTENANCE OUTAGE CONTINUING S~g I WNP-2 REHAINS SHUTDOWN FOR REFUELING.=Forced i-Sdmd-F-Adein G-Oper Error H-Other A-Equip Failure 0-Haint or Test~C-Ref ue ling 0-Regulatory Restriction E-Of)erator Training h License Examination 1-Hanual 2-Manual Scram 3-Iluto Scram 4-Continued 5-Aeduced Load 9-Other SYSKH k COMPOhCNT Exhibit F h H Instructions for Preparation of'ata E'ntry Sheet Licensee Event Report (LEA)File (NllEG-0161)

OPERATINB D4TA REPORT WNP-2 Oi-Jun-87 1.DOCKET!50-397 2 REPORTINB PERIODS UTILITY CONTACT!Nay-87 OUTAGE+ON-LINE HOURS LEON4RD HUTCHISON (509)377-2486 4 LICENSED THERNAL POWER (MWt)t 5 NAMEPLATE RATING (GROSS MWe)a 6.DESIGN ELECTRICAL R4TING (NET NWe)s 7-NAXIMUM DEPEND4BLE CAPACITY (GROSS MWe)z 8.NAXINUM DEPENDABLE CAPACITY (NET NWe)~IF CHANGES OCCUR ABOVE SINCE LAST REPORT~GIVE REASONSt 3323 1200 9 1100 1140 1095 10.POWER TO WHICH RESTRICTED'F ANY (NET MWe)s'11'EASONS FOR RESTRICTIONS'F ANY!12 REPORT PERIOD HOURS 13 HOURS REACTOR CRITICAL 14 RX RESERVE SHTDWN HRS 15 HRS GENERATOR ON LZNE 16 UNIT RESERVE SHUTDOWN HOURS 17 GROSS THERMAL ENERGY (NWH)18 GROSS ELECTRICAL ENERGY (NWH)19.NET ELECTRICAL ENERGY (NWH)20 UNIT BERVICE FACTOR 21.UNIT AVAILABILITY FACTOR 22 UNIT CAPACITY FACTOR (NDC NET)23 UNZT CAPACITY FACTOR (DER NET)24.UNIT FORCED OUTAGE RATE 25 FORCED OUTAGE HOURS MONTH 744 0 0 0.0 0 0 0 0 0 0 0 0 OX 0 OX 0 OX 0 0/0 OX 0 0 YEAR CUMULATIVE 3623 21583.2 2248 1 15955.5 0 0 340 4 2198 5 15359.4 0 0 381.7 5104872 38786052 1710530 12929800 1651917 12421888 60.7X 71 2/60.7X 72 9X 41 6X 52.6X 41 5X 52 3X 7.8X 7.6%185 2 1260 5 26 SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPEqDATE~DURATION)t 27.IF CURRENTLY 8HUTDOWN ESTIMATED STARTUP DATEe&go Jsg~

AVERAGE DAILY UNIT POWER U'.VEL DOCKET NO.MNP-2 6-1-87 COMPLETED g Y LB Hutchi son TELEPHONE ('">"'"" MONTH t4AY 1987 DAY AVENGE DAILY POWER LEVEL (Meet)DAY AVERAGE DAILY POWER LEVEL (MW+Ret)12 13~4 INSTRUCTIONS On this form, 1ist the average daily ddt power level in M%'e~Xet for each day in the reports month.Compute to the nearest whole megawatt.These Qgures will be used to plot a graph for each reporting month.Note that when maxfmum dependable capacity h used for the net eiecafcal nting of the unit, there may be occasions when~daily average power level exceeds the 100%Hne (or the restricted power level line).In such cases, the average daily unit power output sheet should be footnoted to esrpiaht the apparent anomaly.

O'ASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 968~3000 George Washington Way~Richland, Washington 99352 Docket No.50-397 July 9, 1987 Director Office of Resource Management U.S.Nuclear Regulatory Commission Washington, D.C.20555

Dear Sir:

Subject:

NUCLEAR PLANT NO.2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for June 1987 as required by our Technical Specifications 6.9.1.6.Very truly yours, di'(/'C.M.Powers (M/D 927M)WNP-2 Plant Manager CMP/lc Enclosure cc: Mr.John B.Martin-Mr.Robert T.Dodds-Ms.Dottie Sherman-Mr.J.T.Wheelock-Mr.Phil Ross NRC, Region V NRC Site Representative ANI, Farmington CT INPO NRC, Washington D.C.rye