ML17279A466

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for May 1987.W/870605 Ltr
ML17279A466
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/31/1987
From: Hutchison L, Powers C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8708190210
Download: ML17279A466 (4)


Text

DOCKET NO.

UNIT NNlL WNP 2 DATE 6-1-87 k

lNIT SllJTDOMNS / flEDUCTIONS COMPLETED BY L.B. HUTCHISON BE%AT PERIOD HAY 19 87 TELER ONE (509) 377-2486 m~tmm", year HK iTnnE TViif mlE iitiim HETlliG '.'elBI IKPIIZAT

'7-04 4/10/8P S 744. 0 C 4 RC FUELXX REFUELING/HAINTENANCE OUTAGE CONTINUING a~m S~g I WNP-2 REHAINS SHUTDOWN FOR REFUELING SYSKH k COMPOhCNT

.=Forced A-Equip Failure - F-Adein 1-Hanual Exhibit F h H i-Sdmd 0-Haint or Test ~ G-Oper Error 2-Manual Scram Instructions for C-Ref ue ling H-Other 3-Iluto Scram Preparation 0-Regulatory Restriction E'ntry Sheet of'ata 4-Continued E-Of)erator Training 5-Aeduced Load Licensee Event Report h License Examination 9-Other (LEA) File (NllEG-0161)

OPERATINB D4TA REPORT WNP-2 Oi-Jun-87

1. DOCKET! 50-397 2 REPORTINB PERIODS Nay-87 OUTAGE + ON-LINE HOURS UTILITY CONTACT! LEON4RD HUTCHISON (509) 377-2486 4 LICENSED THERNAL POWER (MWt) t 3323 5 NAMEPLATE RATING (GROSS MWe) a 1200 9
6. DESIGN ELECTRICAL R4TING (NET NWe) s 1100 7- NAXIMUM DEPEND4BLE CAPACITY (GROSS MWe) z 1140
8. NAXINUM DEPENDABLE CAPACITY (NET NWe) ~ 1095 IF CHANGES OCCUR ABOVE SINCE LAST REPORT~ GIVE REASONSt
10. POWER TO WHICH RESTRICTED'F ANY (NET MWe) s

'11 'EASONS FOR RESTRICTIONS'F ANY!

MONTH YEAR CUMULATIVE 12 REPORT PERIOD HOURS 744 3623 21583.2 13 HOURS REACTOR CRITICAL 0 0 2248 1 15955.5 14 RX RESERVE SHTDWN HRS 0.0 0 0 340 4 15 HRS GENERATOR ON LZNE 0 0 2198 5 15359.4 16 UNIT RESERVE SHUTDOWN HOURS 0 0 0 0 381.7 17 GROSS THERMAL ENERGY (NWH) 0 5104872 38786052 18 GROSS ELECTRICAL ENERGY (NWH) 0 1710530 12929800

19. NET ELECTRICAL ENERGY (NWH) 0 1651917 12421888 20 UNIT BERVICE FACTOR 0 OX 60.7X 71 2/
21. UNIT AVAILABILITYFACTOR 0 OX 60.7X 72 9X 22 UNIT CAPACITY FACTOR (NDC NET) 0 OX 41 6X 52.6X 23 UNZT CAPACITY FACTOR (DER NET) 0 0/ 41 5X 52 3X
24. UNIT FORCED OUTAGE RATE 0 OX 7. 8X 7. 6%

25 FORCED OUTAGE HOURS 0 0 185 2 1260 5 26 SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPEqDATE~DURATION)t

27. IF CURRENTLY 8HUTDOWN ESTIMATED STARTUP DATEe &goJsg~

AVERAGE DAILYUNIT POWER U'.VEL DOCKET NO.

MNP-2 6-1-87 COMPLETED g Y LB Hutchi son TELEPHONE ('">"'""

MONTH t4AY 1987 DAY AVENGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (Meet) (MW+Ret) 12 13

~

4 INSTRUCTIONS On this form, 1ist the average daily ddt power level in M%'e~Xet for each day in the reports month. Compute to the nearest whole megawatt.

These Qgures will be used to plot a graph for each reporting month. Note that when maxfmum dependable capacity h used for the net eiecafcal nting of the unit, there may be occasions when ~ daily average power level exceeds the 100% Hne (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to esrpiaht the apparent anomaly.

O'ASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O. Box 968 ~ 3000 George Washington Way ~ Richland, Washington 99352 Docket No. 50-397 July 9, 1987 Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Sir:

Subject:

NUCLEAR PLANT NO. 2 MONTHLY OPERATING REPORT Transmitted herewith is the Monthly Operating Report for June 1987 as required by our Technical Specifications 6.9.1.6.

Very truly yours, di'(/'

C. M. Powers (M/D 927M)

WNP-2 Plant Manager CMP/lc Enclosure cc: Mr. John B. Martin- NRC, Region V Mr. Robert T. Dodds- NRC Site Representative Ms. Dottie Sherman- ANI, Farmington CT Mr. J. T. Wheelock- INPO Mr. Phil Ross NRC, Washington D.C.

rye