Letter Sequence Other |
---|
TAC:MF5346, Control Room Habitability (Approved, Closed) TAC:MF5347, Control Room Habitability (Approved, Closed) |
Results
Other: ML15104A782, ML15196A045, ML15196A115, ML16202A033, RS-15-193, Responds to NRC Requests for Additional Information, Set 5, Dated July 7, 2015 Related to the License Renewal Application, RS-15-194, Responds to NRC Requests for Additional Information, Set 6, Dated July 7, 2015 Related to the License Renewal Application, RS-15-305, Corrections to the License Renewal Application Dated December 9, 2014, RS-15-306, Submittal of 10 CFR 54.21(b) Annual Amendment to the License Renewal Application, RS-16-033, Update to Commitment 47 Related to the License Renewal Application, RS-16-068, Comments on the Safety Evaluation Report with Open Items, Related to the License Renewal Application, RS-16-128, Second 10 CFR 54.21(b) Annual Amendment to the License Renewal Application
|
MONTHYEARML15104A7822015-05-0808 May 2015 Scoping and Screening Methodology Audit Report Regarding LaSalle County Station, Units 1 and 2 Project stage: Other ML15111A1372015-05-14014 May 2015 Requests for Additional Information for the Review of the LaSalle County Station, Units 1 and 2 License Renewal Application - Set 1 (TAC Nos. MF5347 and MF5346) Project stage: RAI ML15125A1982015-05-29029 May 2015 Requests for Additional Information for the Review of the LaSalle County Station, Units 1 and 2 License Renewal Application - Set 2 (TAC Nos. MF5347 and MF5346) Project stage: RAI ML15131A4132015-06-0808 June 2015 Requests for Additional Information for the Review of the LaSalle County Station, Units 1 and 2 License Renewal Application - Set 3 (TAC Nos. MF5347 and MF5346) Project stage: RAI ML15140A1922015-06-0808 June 2015 Summary of Telephone Conference Call Held on May 13, 2015, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Co., LLC, Concerning Requests for Additional Information, Set 2 Pertaining to the Lasalle County Station License Project stage: RAI ML15146A2622015-06-19019 June 2015 Requests for Additional Information for the Review of the LaSalle County Station, Units 1 and 2 License Renewal Application-Set 4 (TAC Nos. MF5347 and MF5346) Project stage: RAI RS-15-165, Response to NRC Requests for Additional Information, Set 2, Dated May 29, 2015 Related to the License Renewal Application2015-06-25025 June 2015 Response to NRC Requests for Additional Information, Set 2, Dated May 29, 2015 Related to the License Renewal Application Project stage: Response to RAI RS-15-171, Response to NRC Requests for Additional Information, Set 3, Dated June 8, 2015, Related to the License Renewal Application2015-07-0101 July 2015 Response to NRC Requests for Additional Information, Set 3, Dated June 8, 2015, Related to the License Renewal Application Project stage: Response to RAI ML15159A9002015-07-0606 July 2015 Telephone Conference Call Held on May 20, 2015, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Co., LLC, Requests for Additional Information, Set 3 Pertaining to the LaSalle County Station License Renewal Application ( Project stage: RAI ML15163A0712015-07-0707 July 2015 Requests for Additional Information for the Review of the LaSalle County Station, Units 1 and 2 License Renewal Application - Set 6 (TAC Nos. MF5347 and MF5346) Project stage: RAI ML15159A2082015-07-0707 July 2015 Requests for Additional Information for the Review of the LaSalle County Station, Units 1 and 2 License Renewal Application - Set 5 (TAC Nos. MF5347 and MF5346) Project stage: RAI RS-15-180, Response to NRC Requests for Additional Information, Set 4, Dated June 19, 2015 Related to the License Renewal Application2015-07-15015 July 2015 Response to NRC Requests for Additional Information, Set 4, Dated June 19, 2015 Related to the License Renewal Application Project stage: Response to RAI RS-15-198, Request for Schedule Change Related to Advisory Committee on Reactor Safeguards (ACRS) Subcommittee Review of License Renewal Application (TAC Nos. MF5347 and MF5346)2015-07-16016 July 2015 Request for Schedule Change Related to Advisory Committee on Reactor Safeguards (ACRS) Subcommittee Review of License Renewal Application (TAC Nos. MF5347 and MF5346) Project stage: Request ML15196A5292015-07-27027 July 2015 Requests for Additional Information for the Review of the Lasalle County Station, Units 1 and 2 License Renewal Application - Set 7 (Tac Nos. MF5347 and MF5346) Project stage: RAI RS-15-194, Responds to NRC Requests for Additional Information, Set 6, Dated July 7, 2015 Related to the License Renewal Application2015-08-0606 August 2015 Responds to NRC Requests for Additional Information, Set 6, Dated July 7, 2015 Related to the License Renewal Application Project stage: Other RS-15-193, Responds to NRC Requests for Additional Information, Set 5, Dated July 7, 2015 Related to the License Renewal Application2015-08-0606 August 2015 Responds to NRC Requests for Additional Information, Set 5, Dated July 7, 2015 Related to the License Renewal Application Project stage: Other ML15204A6302015-08-18018 August 2015 Requests for Additional Information for the Review of the LaSalle County Station Units 1 & 2 License Renewal Application - Set 9 (TAC Nos. MF5347 and MF5346) Project stage: RAI RS-15-223, Response to NRC Requests for Additional Information, Set 7, Dated July 27, 2015; and a Correction to Information Associated with the Set 2 Response to RAI 8.2.1.20-2, Related to the Renewal Application2015-08-26026 August 2015 Response to NRC Requests for Additional Information, Set 7, Dated July 27, 2015; and a Correction to Information Associated with the Set 2 Response to RAI 8.2.1.20-2, Related to the Renewal Application Project stage: Response to RAI ML15229A0192015-08-27027 August 2015 Requests for Additional Information for the Review of the LaSalle County Station, Units 1 and 2 License Renewal Application - Set 10 (TAC Nos. MF5347 and MF5346) Project stage: RAI ML15217A5412015-08-28028 August 2015 June 9, 2015, Summary of Telecon Held Between the NRC and Exelon Generation Co., LLC, Concerning Request for Additional Information Set 5 Pertaining to the LaSalle County Station License Renewal Application (TAC Nos. MF5347 and MF5346) Project stage: RAI ML15217A5642015-08-28028 August 2015 June 3, 2015, Summary of Telecon Held Between the NRC and Exelon Generation Co., LLC, Concerning Request for Additional Information Set 4 Pertaining to the LaSalle County Station License Renewal Application (Tac Nos. MF5347 and MF5346) Project stage: RAI ML15217A5752015-08-28028 August 2015 June 10, 2015, Summary of Telecon Held Between the NRC and Exelon Generation Co., LLC, Concerning Request for Additional Information Set 4 Pertaining to the LaSalle County Station License Renewal Application (TAC Nos. MF5347 and MF5346) Project stage: RAI ML15219A2772015-08-28028 August 2015 June 23, 2015, Summary of Telecon Held Between the NRC and Exelon Generation Co., LLC, Concerning Request for Additional Information Set 6 Pertaining to the LaSalle County Station License Renewal Application (TAC Nos. MF5347 and MF5346) Project stage: RAI ML15222A0062015-08-28028 August 2015 August 5, 2015, Summary of Telecon Held Between the NRC and Exelon Generation Co., LLC, Concerning Request for Additional Information Set 9 Pertaining to the LaSalle County Station License Renewal Application (TAC Nos. MF5347 and MF5346) Project stage: RAI ML15195A3382015-08-28028 August 2015 Requests for Additional Information for the Review of the LaSalle County Station, Units 1 and 2 License Renewal Application-Set 8 (TAC Nos. MF5347 and MF5346) Project stage: RAI ML15222A0082015-08-28028 August 2015 July 22, 2015, Summary of Telecon Held Between the NRC and Exelon Generation Co., LLC, Concerning Request for Additional Information Set 8 Pertaining to the LaSalle County Station License Renewal Application (TAC Nos. MF5347 and MF5346) Project stage: RAI ML15222A0152015-08-28028 August 2015 July 8, 2015, Summary of Telecon Held Between the NRC and Exelon Generation Co., LLC, Concerning Request for Additional Information Set 7 Pertaining to the LaSalle County Station License Renewal Application (TAC Nos. MF5347 and MF5346) Project stage: RAI ML15224A9352015-08-28028 August 2015 August 11, 2015, Summary of Telecon Held Between the NRC and Exelon Generation Co., LLC, Concerning Request for Additional Information Set 9 Pertaining to the LaSalle County Station License Renewal Application (TAC Nos. MF5347 and MF5346) Project stage: RAI ML15244B3532015-09-14014 September 2015 RAI for the Review of the LaSalle County Station, Units 1 and 2 License Renewal Application - Set 11 (TAC Nos. MF5347 and MF5346) Project stage: RAI RS-15-232, Response to NRC Requests for Additional Information, Set 9, Dated August 18, 2015 Related to the License Renewal Application2015-09-15015 September 2015 Response to NRC Requests for Additional Information, Set 9, Dated August 18, 2015 Related to the License Renewal Application Project stage: Response to RAI RS-15-238, Response to NRC Requests for Additional Information, Set 10, Dated August 27, 2015 Related to License Renewal Application2015-09-17017 September 2015 Response to NRC Requests for Additional Information, Set 10, Dated August 27, 2015 Related to License Renewal Application Project stage: Response to RAI ML15196A1152015-09-22022 September 2015 Aging Management Programs Audit Report Regarding Lasalle County Station, Units 1 and 2, Project stage: Other ML15196A0452015-09-22022 September 2015 Aging Management Programs Audit Report Regarding Lasalle County Station, Units 1 and 2, (TAC Nos. MF5347 and MF5346). Cover Letter Project stage: Other RS-15-239, Response to NRC Requests for Additional Information, Set 8, Dated August 28, 2015 Related to the License Renewal Application2015-09-28028 September 2015 Response to NRC Requests for Additional Information, Set 8, Dated August 28, 2015 Related to the License Renewal Application Project stage: Response to RAI RS-15-256, Response to NRC Request for Additional Information, Set 11, Dated September 14, 2015 Related to the License Renewal Application2015-10-0808 October 2015 Response to NRC Request for Additional Information, Set 11, Dated September 14, 2015 Related to the License Renewal Application Project stage: Response to RAI ML15208A0522015-10-22022 October 2015 Schedule Revision for the Review of the Lasalle County Station License Renewal Application (TAC Nos. MF5347 & MF5346) Project stage: Approval ML15271A0212015-10-23023 October 2015 Requests for Additional Information for the Review of the Lasalle County Station, Units 1 and 2 License Renewal Application-Set 12 (TAC Nos. MF5347 and MF5346) Project stage: RAI RS-15-281, Response to NRC Requests for Additional Information, Set 12, Dated October 23, 2015 Related to the License Renewal Application2015-10-29029 October 2015 Response to NRC Requests for Additional Information, Set 12, Dated October 23, 2015 Related to the License Renewal Application Project stage: Response to RAI ML15300A3662015-11-0303 November 2015 Requests for Additional Information for the Review of the LaSalle County Station, Units 1 and 2 License Renewal Application - Set 13 (TAC Nos. MF5347 and MF5346) Project stage: RAI RS-15-305, Corrections to the License Renewal Application Dated December 9, 20142015-12-0202 December 2015 Corrections to the License Renewal Application Dated December 9, 2014 Project stage: Other RS-15-306, Submittal of 10 CFR 54.21(b) Annual Amendment to the License Renewal Application2015-12-0202 December 2015 Submittal of 10 CFR 54.21(b) Annual Amendment to the License Renewal Application Project stage: Other RS-15-292, Response to NRC Requests for Additional Information, Set 13, Dated November 3, 2015 Related to the License Renewal Application2015-12-10010 December 2015 Response to NRC Requests for Additional Information, Set 13, Dated November 3, 2015 Related to the License Renewal Application Project stage: Response to RAI ML15272A4002015-12-11011 December 2015 Summary of Teleconference Held on September 24, 2015, Between the NRC and Exelon Generation Co., LLC, Concerning RAI Set 10 Response Pertaining to the LaSalle County Station License Renewal Application (TAC Nos. MF5347 and MF5346) Project stage: RAI ML15301A1892015-12-14014 December 2015 Request for Additional Information for the Review of the LaSalle County Station, Units 1 & 2 License Renewal Application - Set 14 (TAC Nos. MF5347 and MF5346) Project stage: RAI RS-16-003, Responses to NRC Requests for Additional Information, Set 14, Dated December 14, 2015, and Two Additional Commitment Implementation Schedule Clarifications, Related to the License Renewal Application2016-01-0707 January 2016 Responses to NRC Requests for Additional Information, Set 14, Dated December 14, 2015, and Two Additional Commitment Implementation Schedule Clarifications, Related to the License Renewal Application Project stage: Response to RAI ML15357A2812016-01-0707 January 2016 Summary of Teleconference Held on December 22, 2015, Between the NRC and Exelon Generation Co., LLC, Concerning the LaSalle County Station License Renewal Application (Tac Nos. MF5347 and MF5346) Project stage: Meeting RS-16-007, Supplemental Information Associated with Implementation of BWRVIP-25, Core Plate Inspection and Flaw Evaluation Guidelines, Related to the License Renewal Application2016-01-14014 January 2016 Supplemental Information Associated with Implementation of BWRVIP-25, Core Plate Inspection and Flaw Evaluation Guidelines, Related to the License Renewal Application Project stage: Supplement ML16021A3252016-01-29029 January 2016 Summary of Teleconference Held on January 21, 2016, Between the NRC and Exelon Generation Co., LLC, Concerning RAI 4.2.10-1 Response Project stage: RAI RS-16-033, Update to Commitment 47 Related to the License Renewal Application2016-02-0101 February 2016 Update to Commitment 47 Related to the License Renewal Application Project stage: Other ML15344A3542016-02-16016 February 2016 Requests for Additional Information for the Review of the Lasalle County, Units 1 and 2 License Renewal Application Set 15 (TAC Nos. MF5347 and MF5346) Project stage: RAI 2015-07-16
[Table View] |
|
---|
Category:Letter
MONTHYEARRS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests 05000373/LER-2023-001-01, Air Circuit Breaker (Acb) Mechanically Operated Contacts (MOC) Switch Failed to Actuate2024-10-0909 October 2024 Air Circuit Breaker (Acb) Mechanically Operated Contacts (MOC) Switch Failed to Actuate ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing IR 05000373/20244012024-09-27027 September 2024 County Station – Security Baseline Inspection Report 05000373/2024401 and 05000374/2024401 ML24263A2062024-09-19019 September 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for LaSalle County Station - Holtec MPC-68MCBS ML24260A0492024-09-16016 September 2024 Operator Licensing Examination Approval - Lasalle County Station, Unit 1 and 2, September 2024 RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000373/20240052024-08-29029 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Lasalle County Station (Report 05000373/2024005; 05000374/2024005) IR 05000373/20244022024-08-28028 August 2024 County Station - Cyber Security Inspection Report 05000373/2024402 and 05000374/2024402 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 05000373/LER-2024-004-01, Emergency Diesel Generator Auto-Start and Load Due to Loss of System Auxiliary Transformer2024-08-22022 August 2024 Emergency Diesel Generator Auto-Start and Load Due to Loss of System Auxiliary Transformer IR 05000373/20240022024-08-13013 August 2024 County Station - Integrated Inspection Report 05000373/2024002 and 05000374/2024002 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000373/20244202024-08-0505 August 2024 County Station - Security Baseline Inspection Report 05000373 2024420 and 05000374 2024420 05000373/LER-2024-003, Supplement to Technical Specification (TS) Limiting Condition for Operation (LCO) 3.6.1.3 Completion Time Exceeded2024-07-31031 July 2024 Supplement to Technical Specification (TS) Limiting Condition for Operation (LCO) 3.6.1.3 Completion Time Exceeded ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification RS-24-064, Nuclear Radiological Emergency Plan Document Revisions2024-06-28028 June 2024 Nuclear Radiological Emergency Plan Document Revisions ML24178A2522024-06-27027 June 2024 County Station – Acknowledgement of Response to NRC Inspection Report 05000373/2024001 and 05000374/2024001 and Disputed Non-Cited Violation RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000373/20240102024-05-29029 May 2024 County Station - Commercial Grade Dedication Inspection Report 05000373/2024010 and 05000374/2024010 ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report ML24131A1512024-05-13013 May 2024 County Station - Integrated Report 05000373/2024001 and 05000374/2024001 IR 05000373/20240012024-05-13013 May 2024 County Station - Integrated Report 05000373/2024001 and 05000374/2024001 RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24108A1562024-04-15015 April 2024 Updated Final Safety Analysis Report (Ufsar), Revision 26 and Fire Protection Report (Fpr), Revision 11 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24071A2122024-03-12012 March 2024 County Station - Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection IR 05000373/20230062024-02-28028 February 2024 Annual Assessment Letter for Lasalle County Station, Units 1 and 2 (Report 05000373/2023006; 05000374/2023006) RS-24-014, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2024-02-22022 February 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors ML24018A0682024-02-0909 February 2024 Issuance of Amendment Nos. 262 and 247 Revised Design Bases of Lower Downcomer Braces ML24024A1332024-01-24024 January 2024 Confirmation of Initial License Examination IR 05000373/20230042024-01-24024 January 2024 County Station - Integrated Inspection Report 05000373/2023004 and 05000374/2023004 IR 05000373/20230122024-01-18018 January 2024 County Station - Biennial Problem Identification and Resolution Inspection Report 05000373/2023012 and 05000374/2023012 ML23354A2902024-01-0505 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0028 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23360A6082023-12-27027 December 2023 County Station Request for Information for NRC Commercial Grade Dedication Inspection: Inspection Report 05000373/2024010 and 05000374/2024010 ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums RS-23-120, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information IR 05000373/20230032023-11-0909 November 2023 County Station Integrated Inspection Report 05000373/2023003, 05000374/2023003, and 07200070/2023001 ML23286A2602023-11-0808 November 2023 Issuance of Amendment Nos. 260 and 245 to Renewed Facility Operating Licenses Relocation of Pressure and Temperature Limit Curves to the Pressure Temperature Report IR 05000373/20234012023-11-0707 November 2023 County Station Security Baseline Inspection Report 05000373/2023401 and 05000374/2023401 RS-23-103, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-13013 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans 2024-09-06
[Table view] |
Text
Michael P. Gallagher Exelon Generation Vice President.
License Renewal Exelon Nuclear 200 Exelon Way RS-16-033 Kennett Square. PA 19348 610 765 5958 Office 610 765 5956 Fax www.exeloncorp.com michaelp.gallagher@exeloncorp.com 10 CFR 50 10 CFR 51 10 CFR 54 February 1, 2016 U. S. Nuclear Regulatory Commission Attention
- Document Control Desk Washington, DC 20555-0001 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-37 4
Subject:
Update to Commitment 47 related to the LaSalle County Station, Units 1 and 2, License Renewal Application (TAC Nos. MF5347 AND MF5346) References
- 1. Letter from Michael P. Gallagher, Exelon Generation Company LLC (Exelon) to NRC Document Control Desk, dated December 9, 2014, "Application for Renewed Operating Licenses" 2. Letter from Michael P. Gallagher
, Exelon Generation Company LLC (Exelon) to NRC Document Control Desk, dated September 15, 2015, "Response to NRC Requests for Additional Information, Set 9, dated August 18, 2015 related to the LaSalle County Station, Units 1 and 2, License Renewal Application (TAC Nos. MF5347 and MF5346)"
- 3. Letter from Michael P. Gallagher
, Exelon Generation Company LLC (Exelon) to NRC Document Control Desk, dated January 7, 2016, "Responses to NRC Requests for Additional Information, Set 14, dated December 14, 2015, and Two Additional Commitment Implementation Schedule Clarifications, related to the LaSalle County Station, Units 1 and 2, License Renewal Application (TAC Nos. MF5347 and MF5346)"
- 4. Teleconference Summary from Jeffrey S. Mitchell, USN RC, dated January 29, 2016, "Summary of Teleconference held on January 21, 2016, between the U.S. Nuclear Regulatory Commission and Exelon Generation Co., LLC, concerning RAI 4.2.10-1 response pertaining to the LaSalle County Station, Units 1 and 2, License Renewal Application (TAC Nos. MF5347 and MF5346)"
In Reference 1, Exelon Generation Company, LLC (Exelon) submitted the License Renewal Application (LRA) for the LaSalle County Station (LSCS), Units 1 and 2, which included license February 1, 2016 U.S. Nuclear Regulatory Commission Page 2 renewal Commitment 47, pertaining to aging management of the LSCS Unit 1 jet pump slip joint clamps. In Reference 2, Exelon responded to RAI 4.2.10-1, providing information to the NRC Staff regarding how Exelon will ensure that the limiting fluence value will not be exceeded.
In that letter, Exelon noted that an action tracking assignment within the commitment management program will be established to ensure that appropriate corrective actions are taken to repair, replace, or reanalyze the clamps in advance of reaching the fluence limit. In Reference 3, as part of an overall update to license renewal commitment implementation
- schedule, Exelon revised the Commitment 47 implementation schedule information to clarify that the procedure that tracks the cumulative effective full power years (EFPY), discussed in Reference 2, will be enhanced no later than six months prior to the period of extended operation.
As documented in Reference 4, a teleconference was held on January 21, 2016 to gain resolution on remaining NRC staff questions related to the LSCS Unit 1 jet pump slip joint clamp TLAA aging management and associated Commitment
- 47. As an outcome of the telecon, this LRA supplement is being submitted to document resolution, including a clarification regarding the action tracking item discussed in Reference 2, and an update to Commitment
- 47. Enclosure A provides a description of this LRA Supplement.
Enclosure B provides an update to the License Renewal Commitment List (LRA Appendix A, Section A.5). There are no other LRA changes or new or revised regulatory commitments contained in this letter. If you have any questions, please contact Mr. John Hufnagel, Licensing Lead, LaSalle License Renewal Project, at 610-765-5829
. I declare under penalty of perjury that the foregoing is true and correct.
Executed on () -0 l -2ot,,b Respectfully, Vice President
-License Renewal Projects Exelon Generation
- Company, LLC
Enclosures:
A. Description of LSCS LRA Supplement B. LSCS License Renewal Commitment List Update February 1, 2016 U.S. Nuclear Regulatory Commission Page 3 cc: Regional Administrator
-NRC Region Ill NRC Project Manager (Safety Review),
NRR-DLR NRC Project Manager (Environmental Review),
NRR-DLR NRC Project Manager, NRR-DORL-LaSalle County Station NRC Senior Resident Inspector, LaSalle County Station Illinois Emergency Management Agency -Division of Nuclear Safety RS-16-033 Enclosure A Page 1 of 1 Enclosure A Description of LSCS LRA Supplement Related to Unit 1 Jet Pump Slip Joint Clamps This enclosure provides a description of a revision to Commitment 47 that manages the TLAA for stress relaxation for the Unit 1 jet pump slip joint clamps due to neutron fluence as described in LRA Section 4.2.10 of the License Renewal Application (LRA).
As discussed in LRA Section 4.2.10, the allowable 30 percent stress relaxation for the Unit 1 jet pump slip joint clamps is projected to occur at a neutron fluence value that corresponds to 50.7 effective full power years (EFPY). Actions that can be taken to manage this TLAA through the end of the period of extended operation include replacement of the clamps, repair of the clamps to maintain acceptable clamp preload, or revision of the analysis to establish a higher allowable neutron fluence value. Because this TLAA is dispositioned as being managed for the period of extended operation pursuant to 10 CFR 54.24 (c)(1)(iii), if a revised analysis is performed to support the TLAA, it will be submitted to NRC for review prior to exceeding the time based limit. Therefore, Commitment 47 is being revised to require that if a revised analysis is performed, the analysis must be submitted for NRC review at least 2 years prior to exceeding 50.7 EFPY.
The response to RAI 4.2.10-1, provided within the Exelon letter dated September 15, 2015, included a discussion of activities that will be used to ensure that the limiting fluence value for the Unit 1 jet pump slip joint clamps will not be exceeded. The response stated that a commitment tracking assignment for Commitment 47 will include an action tracking assignment with a due date approximately five years prior to the estimated calendar date that 50.7 EFPY
will be reached for Unit 1. As discussed by Exelon in the January 21, 2016 telecon with NRC Staff (Reference 4), the purpose of that action tracking assignment is to prompt the initiation of corrective actions to ensure adequate time to implement the appropriate corrective action so that the Unit 1 jet pump slip joint clamps will be repaired, replaced, or reanalyzed prior to exceeding the limiting neutron fluence value.
LRA Appendix A, Section A.5, Commitment 47 is revised as shown in Enclosure B.
RS-16-033 Enclosure B Page 1 of 2 Enclosure B LSCS License Renewal Commitment List Update This Enclosure provides an update to the LRA Appendix A, Section A.5, License Renewal Commitment List. Any other actions discussed in the submittal represent intended or planned actions. They are described to the NRC for the NRC's information and are not regulatory commitments.
Changes to the LRA Appendix A, Section A.5, License Renewal Commitment List are as a result of this LRA Supplement, pertaining to Commitment 47 and the Unit 1 jet pump slip joint
clamps. To facilitate understanding, relevant portions of the previously submitted License Renewal Commitment List have been repeated in this Enclosure, with revisions indicated. Previously submitted information is shown in normal font. Changes are highlighted with bolded italics for inserted text and strikethroughs for deleted text.
RS-16-033 Enclosure B Page 2 of 2 LRA Appendix A, Section A.5, License Renewal Commitment List, Commitment 47 on LRA page A-80, is revised as shown below.
NO. PROGRAM OR TOPIC COMMITMENT IMPLEMENTATION SCHEDULE*
SOURCE 47 TLAA - Slip Joint Clamp Prior to exceeding the limiting fluence value of 1.17E+20 n/cm 2 at the Unit 1 jet pump slip joint clamp location, estimated to be at 50.7 EFPY, revise the analysis for the slip joint clamps for a higher acceptable fluence value or take other corrective action such as repair or replacement of the clamps to ensure acceptable clamp preload. Procedure tracking the cumulative EFPY values to be enhanced no later than six months prior to the period of extended operation Additional schedule information identified in commitment.
For the analysis option, if selected, the revised analysis must be submitted to the NRC for review at least 2 years prior to exceeding 50.7 EFPY. For the repair or replacement options, if selected, repair or replacement must be implemented prior to exceeding 50.7 EFPY.
Section A.4.2.10 Exelon Letter RS-15-232 09/15/2015 Exelon Letter RS-16-003 01/07/2016 Exelon Letter RS-16-033 02/01/2016