Letter Sequence Response to RAI |
---|
TAC:MF5346, Control Room Habitability (Approved, Closed) TAC:MF5347, Control Room Habitability (Approved, Closed) |
Results
Other: ML15104A782, ML15196A045, ML15196A115, ML16202A033, RS-15-193, Responds to NRC Requests for Additional Information, Set 5, Dated July 7, 2015 Related to the License Renewal Application, RS-15-194, Responds to NRC Requests for Additional Information, Set 6, Dated July 7, 2015 Related to the License Renewal Application, RS-15-305, Corrections to the License Renewal Application Dated December 9, 2014, RS-15-306, Submittal of 10 CFR 54.21(b) Annual Amendment to the License Renewal Application, RS-16-033, Update to Commitment 47 Related to the License Renewal Application, RS-16-068, Comments on the Safety Evaluation Report with Open Items, Related to the License Renewal Application, RS-16-128, Second 10 CFR 54.21(b) Annual Amendment to the License Renewal Application
|
MONTHYEARML15104A7822015-05-0808 May 2015 Scoping and Screening Methodology Audit Report Regarding LaSalle County Station, Units 1 and 2 Project stage: Other ML15111A1372015-05-14014 May 2015 Requests for Additional Information for the Review of the LaSalle County Station, Units 1 and 2 License Renewal Application - Set 1 (TAC Nos. MF5347 and MF5346) Project stage: RAI ML15125A1982015-05-29029 May 2015 Requests for Additional Information for the Review of the LaSalle County Station, Units 1 and 2 License Renewal Application - Set 2 (TAC Nos. MF5347 and MF5346) Project stage: RAI ML15131A4132015-06-0808 June 2015 Requests for Additional Information for the Review of the LaSalle County Station, Units 1 and 2 License Renewal Application - Set 3 (TAC Nos. MF5347 and MF5346) Project stage: RAI ML15140A1922015-06-0808 June 2015 Summary of Telephone Conference Call Held on May 13, 2015, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Co., LLC, Concerning Requests for Additional Information, Set 2 Pertaining to the Lasalle County Station License Project stage: RAI ML15146A2622015-06-19019 June 2015 Requests for Additional Information for the Review of the LaSalle County Station, Units 1 and 2 License Renewal Application-Set 4 (TAC Nos. MF5347 and MF5346) Project stage: RAI RS-15-165, Response to NRC Requests for Additional Information, Set 2, Dated May 29, 2015 Related to the License Renewal Application2015-06-25025 June 2015 Response to NRC Requests for Additional Information, Set 2, Dated May 29, 2015 Related to the License Renewal Application Project stage: Response to RAI RS-15-171, Response to NRC Requests for Additional Information, Set 3, Dated June 8, 2015, Related to the License Renewal Application2015-07-0101 July 2015 Response to NRC Requests for Additional Information, Set 3, Dated June 8, 2015, Related to the License Renewal Application Project stage: Response to RAI ML15159A9002015-07-0606 July 2015 Telephone Conference Call Held on May 20, 2015, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Co., LLC, Requests for Additional Information, Set 3 Pertaining to the LaSalle County Station License Renewal Application ( Project stage: RAI ML15163A0712015-07-0707 July 2015 Requests for Additional Information for the Review of the LaSalle County Station, Units 1 and 2 License Renewal Application - Set 6 (TAC Nos. MF5347 and MF5346) Project stage: RAI ML15159A2082015-07-0707 July 2015 Requests for Additional Information for the Review of the LaSalle County Station, Units 1 and 2 License Renewal Application - Set 5 (TAC Nos. MF5347 and MF5346) Project stage: RAI RS-15-180, Response to NRC Requests for Additional Information, Set 4, Dated June 19, 2015 Related to the License Renewal Application2015-07-15015 July 2015 Response to NRC Requests for Additional Information, Set 4, Dated June 19, 2015 Related to the License Renewal Application Project stage: Response to RAI RS-15-198, Request for Schedule Change Related to Advisory Committee on Reactor Safeguards (ACRS) Subcommittee Review of License Renewal Application (TAC Nos. MF5347 and MF5346)2015-07-16016 July 2015 Request for Schedule Change Related to Advisory Committee on Reactor Safeguards (ACRS) Subcommittee Review of License Renewal Application (TAC Nos. MF5347 and MF5346) Project stage: Request ML15196A5292015-07-27027 July 2015 Requests for Additional Information for the Review of the Lasalle County Station, Units 1 and 2 License Renewal Application - Set 7 (Tac Nos. MF5347 and MF5346) Project stage: RAI RS-15-194, Responds to NRC Requests for Additional Information, Set 6, Dated July 7, 2015 Related to the License Renewal Application2015-08-0606 August 2015 Responds to NRC Requests for Additional Information, Set 6, Dated July 7, 2015 Related to the License Renewal Application Project stage: Other RS-15-193, Responds to NRC Requests for Additional Information, Set 5, Dated July 7, 2015 Related to the License Renewal Application2015-08-0606 August 2015 Responds to NRC Requests for Additional Information, Set 5, Dated July 7, 2015 Related to the License Renewal Application Project stage: Other ML15204A6302015-08-18018 August 2015 Requests for Additional Information for the Review of the LaSalle County Station Units 1 & 2 License Renewal Application - Set 9 (TAC Nos. MF5347 and MF5346) Project stage: RAI RS-15-223, Response to NRC Requests for Additional Information, Set 7, Dated July 27, 2015; and a Correction to Information Associated with the Set 2 Response to RAI 8.2.1.20-2, Related to the Renewal Application2015-08-26026 August 2015 Response to NRC Requests for Additional Information, Set 7, Dated July 27, 2015; and a Correction to Information Associated with the Set 2 Response to RAI 8.2.1.20-2, Related to the Renewal Application Project stage: Response to RAI ML15229A0192015-08-27027 August 2015 Requests for Additional Information for the Review of the LaSalle County Station, Units 1 and 2 License Renewal Application - Set 10 (TAC Nos. MF5347 and MF5346) Project stage: RAI ML15217A5412015-08-28028 August 2015 June 9, 2015, Summary of Telecon Held Between the NRC and Exelon Generation Co., LLC, Concerning Request for Additional Information Set 5 Pertaining to the LaSalle County Station License Renewal Application (TAC Nos. MF5347 and MF5346) Project stage: RAI ML15217A5642015-08-28028 August 2015 June 3, 2015, Summary of Telecon Held Between the NRC and Exelon Generation Co., LLC, Concerning Request for Additional Information Set 4 Pertaining to the LaSalle County Station License Renewal Application (Tac Nos. MF5347 and MF5346) Project stage: RAI ML15217A5752015-08-28028 August 2015 June 10, 2015, Summary of Telecon Held Between the NRC and Exelon Generation Co., LLC, Concerning Request for Additional Information Set 4 Pertaining to the LaSalle County Station License Renewal Application (TAC Nos. MF5347 and MF5346) Project stage: RAI ML15219A2772015-08-28028 August 2015 June 23, 2015, Summary of Telecon Held Between the NRC and Exelon Generation Co., LLC, Concerning Request for Additional Information Set 6 Pertaining to the LaSalle County Station License Renewal Application (TAC Nos. MF5347 and MF5346) Project stage: RAI ML15222A0062015-08-28028 August 2015 August 5, 2015, Summary of Telecon Held Between the NRC and Exelon Generation Co., LLC, Concerning Request for Additional Information Set 9 Pertaining to the LaSalle County Station License Renewal Application (TAC Nos. MF5347 and MF5346) Project stage: RAI ML15195A3382015-08-28028 August 2015 Requests for Additional Information for the Review of the LaSalle County Station, Units 1 and 2 License Renewal Application-Set 8 (TAC Nos. MF5347 and MF5346) Project stage: RAI ML15222A0082015-08-28028 August 2015 July 22, 2015, Summary of Telecon Held Between the NRC and Exelon Generation Co., LLC, Concerning Request for Additional Information Set 8 Pertaining to the LaSalle County Station License Renewal Application (TAC Nos. MF5347 and MF5346) Project stage: RAI ML15222A0152015-08-28028 August 2015 July 8, 2015, Summary of Telecon Held Between the NRC and Exelon Generation Co., LLC, Concerning Request for Additional Information Set 7 Pertaining to the LaSalle County Station License Renewal Application (TAC Nos. MF5347 and MF5346) Project stage: RAI ML15224A9352015-08-28028 August 2015 August 11, 2015, Summary of Telecon Held Between the NRC and Exelon Generation Co., LLC, Concerning Request for Additional Information Set 9 Pertaining to the LaSalle County Station License Renewal Application (TAC Nos. MF5347 and MF5346) Project stage: RAI ML15244B3532015-09-14014 September 2015 RAI for the Review of the LaSalle County Station, Units 1 and 2 License Renewal Application - Set 11 (TAC Nos. MF5347 and MF5346) Project stage: RAI RS-15-232, Response to NRC Requests for Additional Information, Set 9, Dated August 18, 2015 Related to the License Renewal Application2015-09-15015 September 2015 Response to NRC Requests for Additional Information, Set 9, Dated August 18, 2015 Related to the License Renewal Application Project stage: Response to RAI RS-15-238, Response to NRC Requests for Additional Information, Set 10, Dated August 27, 2015 Related to License Renewal Application2015-09-17017 September 2015 Response to NRC Requests for Additional Information, Set 10, Dated August 27, 2015 Related to License Renewal Application Project stage: Response to RAI ML15196A1152015-09-22022 September 2015 Aging Management Programs Audit Report Regarding Lasalle County Station, Units 1 and 2, Project stage: Other ML15196A0452015-09-22022 September 2015 Aging Management Programs Audit Report Regarding Lasalle County Station, Units 1 and 2, (TAC Nos. MF5347 and MF5346). Cover Letter Project stage: Other RS-15-239, Response to NRC Requests for Additional Information, Set 8, Dated August 28, 2015 Related to the License Renewal Application2015-09-28028 September 2015 Response to NRC Requests for Additional Information, Set 8, Dated August 28, 2015 Related to the License Renewal Application Project stage: Response to RAI RS-15-256, Response to NRC Request for Additional Information, Set 11, Dated September 14, 2015 Related to the License Renewal Application2015-10-0808 October 2015 Response to NRC Request for Additional Information, Set 11, Dated September 14, 2015 Related to the License Renewal Application Project stage: Response to RAI ML15208A0522015-10-22022 October 2015 Schedule Revision for the Review of the Lasalle County Station License Renewal Application (TAC Nos. MF5347 & MF5346) Project stage: Approval ML15271A0212015-10-23023 October 2015 Requests for Additional Information for the Review of the Lasalle County Station, Units 1 and 2 License Renewal Application-Set 12 (TAC Nos. MF5347 and MF5346) Project stage: RAI RS-15-281, Response to NRC Requests for Additional Information, Set 12, Dated October 23, 2015 Related to the License Renewal Application2015-10-29029 October 2015 Response to NRC Requests for Additional Information, Set 12, Dated October 23, 2015 Related to the License Renewal Application Project stage: Response to RAI ML15300A3662015-11-0303 November 2015 Requests for Additional Information for the Review of the LaSalle County Station, Units 1 and 2 License Renewal Application - Set 13 (TAC Nos. MF5347 and MF5346) Project stage: RAI RS-15-305, Corrections to the License Renewal Application Dated December 9, 20142015-12-0202 December 2015 Corrections to the License Renewal Application Dated December 9, 2014 Project stage: Other RS-15-306, Submittal of 10 CFR 54.21(b) Annual Amendment to the License Renewal Application2015-12-0202 December 2015 Submittal of 10 CFR 54.21(b) Annual Amendment to the License Renewal Application Project stage: Other RS-15-292, Response to NRC Requests for Additional Information, Set 13, Dated November 3, 2015 Related to the License Renewal Application2015-12-10010 December 2015 Response to NRC Requests for Additional Information, Set 13, Dated November 3, 2015 Related to the License Renewal Application Project stage: Response to RAI ML15272A4002015-12-11011 December 2015 Summary of Teleconference Held on September 24, 2015, Between the NRC and Exelon Generation Co., LLC, Concerning RAI Set 10 Response Pertaining to the LaSalle County Station License Renewal Application (TAC Nos. MF5347 and MF5346) Project stage: RAI ML15301A1892015-12-14014 December 2015 Request for Additional Information for the Review of the LaSalle County Station, Units 1 & 2 License Renewal Application - Set 14 (TAC Nos. MF5347 and MF5346) Project stage: RAI RS-16-003, Responses to NRC Requests for Additional Information, Set 14, Dated December 14, 2015, and Two Additional Commitment Implementation Schedule Clarifications, Related to the License Renewal Application2016-01-0707 January 2016 Responses to NRC Requests for Additional Information, Set 14, Dated December 14, 2015, and Two Additional Commitment Implementation Schedule Clarifications, Related to the License Renewal Application Project stage: Response to RAI ML15357A2812016-01-0707 January 2016 Summary of Teleconference Held on December 22, 2015, Between the NRC and Exelon Generation Co., LLC, Concerning the LaSalle County Station License Renewal Application (Tac Nos. MF5347 and MF5346) Project stage: Meeting RS-16-007, Supplemental Information Associated with Implementation of BWRVIP-25, Core Plate Inspection and Flaw Evaluation Guidelines, Related to the License Renewal Application2016-01-14014 January 2016 Supplemental Information Associated with Implementation of BWRVIP-25, Core Plate Inspection and Flaw Evaluation Guidelines, Related to the License Renewal Application Project stage: Supplement ML16021A3252016-01-29029 January 2016 Summary of Teleconference Held on January 21, 2016, Between the NRC and Exelon Generation Co., LLC, Concerning RAI 4.2.10-1 Response Project stage: RAI RS-16-033, Update to Commitment 47 Related to the License Renewal Application2016-02-0101 February 2016 Update to Commitment 47 Related to the License Renewal Application Project stage: Other ML15344A3542016-02-16016 February 2016 Requests for Additional Information for the Review of the Lasalle County, Units 1 and 2 License Renewal Application Set 15 (TAC Nos. MF5347 and MF5346) Project stage: RAI 2015-07-16
[Table View] |
|
---|
Category:Letter type:RS
MONTHYEARRS-23-120, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information RS-23-103, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-13013 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor RS-23-084, Response to Request for Additional Information Regarding the Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis2023-07-24024 July 2023 Response to Request for Additional Information Regarding the Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations RS-23-048, Exigent Amendment Request to Revise Design Basis Related to Seismic Requirements2023-03-0707 March 2023 Exigent Amendment Request to Revise Design Basis Related to Seismic Requirements RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 RS-23-037, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station2023-02-22022 February 2023 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 RS-22-085, Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis2023-01-12012 January 2023 Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis RS-23-006, Supplemental Information Regarding License Amendment Request Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report2023-01-10010 January 2023 Supplemental Information Regarding License Amendment Request Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report RS-22-126, Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2022-11-30030 November 2022 Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI RS-22-109, Response to Request for Additional Information License Amendments Related to Fuel Storage2022-10-12012 October 2022 Response to Request for Additional Information License Amendments Related to Fuel Storage RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration RS-22-093, Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans2022-08-18018 August 2022 Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans RS-22-083, Response to Request for Additional Information Related to the License Amendment Request to Change New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical2022-06-17017 June 2022 Response to Request for Additional Information Related to the License Amendment Request to Change New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical RS-22-051, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-04-12012 April 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-049, Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for2022-04-0404 April 2022 Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for V RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations RS-22-035, Supplemental Information Regarding Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs2022-03-0404 March 2022 Supplemental Information Regarding Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs RS-22-033, Response to Request for Additional Information Regarding Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs2022-03-0303 March 2022 Response to Request for Additional Information Regarding Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs RS-22-032, Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs2022-03-0202 March 2022 Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs RS-22-023, Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement2022-02-23023 February 2022 Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement RS-22-027, Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated2022-02-23023 February 2022 Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated P RS-22-018, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station2022-02-22022 February 2022 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station RS-22-019, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-02-16016 February 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-015, Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC2022-02-0101 February 2022 Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC RS-22-004, Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-01-0404 January 2022 Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RS-21-121, Proposed Changes to Decommissioning Trust Agreements and Master Terms2021-12-15015 December 2021 Proposed Changes to Decommissioning Trust Agreements and Master Terms RS-21-115, Supplemental Information for License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical Specifications 4.3.1 and 5.6.52021-11-0404 November 2021 Supplemental Information for License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical Specifications 4.3.1 and 5.6.5 RS-21-109, Request to Withhold Meeting Materials for the Non-Public Meeting Held on September 2, 20212021-10-14014 October 2021 Request to Withhold Meeting Materials for the Non-Public Meeting Held on September 2, 2021 RS-21-091, Implementation of Insider Threat Program Requirements Associated with the Voluntary Security Clearance Program and Advisement of Leadership Changes2021-09-13013 September 2021 Implementation of Insider Threat Program Requirements Associated with the Voluntary Security Clearance Program and Advisement of Leadership Changes RS-21-078, Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel2021-08-19019 August 2021 Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel RS-21-085, Response to Request for Additional Information Regarding License Amendment Request to Incorporate Licensing Topical Report NEDE-33885PA, Revision 1, GNF CRDA Application Methodology (EPID-L-2021-LLA-0016)2021-08-17017 August 2021 Response to Request for Additional Information Regarding License Amendment Request to Incorporate Licensing Topical Report NEDE-33885PA, Revision 1, GNF CRDA Application Methodology (EPID-L-2021-LLA-0016) RS-21-063, Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2021-06-30030 June 2021 Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RS-21-064, License Amendment Request Re New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies - Cover Letter2021-06-30030 June 2021 License Amendment Request Re New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies - Cover Letter RS-21-070, Proposed Alternative to Utilize Code Case N-8932021-06-30030 June 2021 Proposed Alternative to Utilize Code Case N-893 RS-21-055, Response to Third Round Request for Additional Information (Rals) for LaSalle License Amendment Request to Adopt Risk Informed Completion Times TSTF- 505, Revision 2, Provide Risk-Informed Extended.2021-05-10010 May 2021 Response to Third Round Request for Additional Information (Rals) for LaSalle License Amendment Request to Adopt Risk Informed Completion Times TSTF- 505, Revision 2, Provide Risk-Informed Extended. RS-21-054, Response to NRC Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations2021-04-29029 April 2021 Response to NRC Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations RS-21-050, Response to Request for Additional Information (RAI) Regarding Request for License Amendment Regarding Ultimate Heat Sink (EPID-L-2020-LLA-0165)2021-04-16016 April 2021 Response to Request for Additional Information (RAI) Regarding Request for License Amendment Regarding Ultimate Heat Sink (EPID-L-2020-LLA-0165) RS-21-045, Response to Request for Additional Information (RAI) Regarding Request for License Amendment Regarding Ultimate Heat Sink (EPID-L-2020-LLA-0165)2021-04-0707 April 2021 Response to Request for Additional Information (RAI) Regarding Request for License Amendment Regarding Ultimate Heat Sink (EPID-L-2020-LLA-0165) RS-21-040, Response to Second Round Request for Additional Information (Rais) for License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2021-03-31031 March 2021 Response to Second Round Request for Additional Information (Rais) for License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RS-21-043, Supplemental Information Regarding Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs, Revision 22021-03-26026 March 2021 Supplemental Information Regarding Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs, Revision 2 RS-21-042, Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs, Revision 22021-03-26026 March 2021 Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs, Revision 2 RS-21-039, Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments2021-03-25025 March 2021 Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments RS-21-035, Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs2021-03-0909 March 2021 Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs 2023-08-04
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARRS-23-120, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information RS-23-084, Response to Request for Additional Information Regarding the Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis2023-07-24024 July 2023 Response to Request for Additional Information Regarding the Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis RS-22-109, Response to Request for Additional Information License Amendments Related to Fuel Storage2022-10-12012 October 2022 Response to Request for Additional Information License Amendments Related to Fuel Storage RS-22-083, Response to Request for Additional Information Related to the License Amendment Request to Change New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical2022-06-17017 June 2022 Response to Request for Additional Information Related to the License Amendment Request to Change New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical RS-22-033, Response to Request for Additional Information Regarding Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs2022-03-0303 March 2022 Response to Request for Additional Information Regarding Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs RS-22-027, Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated2022-02-23023 February 2022 Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated P NMP1L3447, Constellation Energy Generation, LLC - Response to Request for Additional Information - Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs2022-02-0202 February 2022 Constellation Energy Generation, LLC - Response to Request for Additional Information - Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs JAFP-21-0087, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments2021-09-16016 September 2021 Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments RS-21-078, Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel2021-08-19019 August 2021 Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel RS-21-085, Response to Request for Additional Information Regarding License Amendment Request to Incorporate Licensing Topical Report NEDE-33885PA, Revision 1, GNF CRDA Application Methodology (EPID-L-2021-LLA-0016)2021-08-17017 August 2021 Response to Request for Additional Information Regarding License Amendment Request to Incorporate Licensing Topical Report NEDE-33885PA, Revision 1, GNF CRDA Application Methodology (EPID-L-2021-LLA-0016) NMP2L2773, Company - Response to Request for Additional Information2021-06-30030 June 2021 Company - Response to Request for Additional Information JAFP-21-0044, Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments2021-06-11011 June 2021 Response to Request for Additional Information Regarding Request for Approval of Transfer of Licenses and Conforming Amendments RS-21-055, Response to Third Round Request for Additional Information (Rals) for LaSalle License Amendment Request to Adopt Risk Informed Completion Times TSTF- 505, Revision 2, Provide Risk-Informed Extended.2021-05-10010 May 2021 Response to Third Round Request for Additional Information (Rals) for LaSalle License Amendment Request to Adopt Risk Informed Completion Times TSTF- 505, Revision 2, Provide Risk-Informed Extended. JAFP-21-0032, Response to Request for Additional Information - Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting2021-04-20020 April 2021 Response to Request for Additional Information - Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting RS-21-050, Response to Request for Additional Information (RAI) Regarding Request for License Amendment Regarding Ultimate Heat Sink (EPID-L-2020-LLA-0165)2021-04-16016 April 2021 Response to Request for Additional Information (RAI) Regarding Request for License Amendment Regarding Ultimate Heat Sink (EPID-L-2020-LLA-0165) RS-21-045, Response to Request for Additional Information (RAI) Regarding Request for License Amendment Regarding Ultimate Heat Sink (EPID-L-2020-LLA-0165)2021-04-0707 April 2021 Response to Request for Additional Information (RAI) Regarding Request for License Amendment Regarding Ultimate Heat Sink (EPID-L-2020-LLA-0165) RS-21-040, Response to Second Round Request for Additional Information (Rais) for License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2021-03-31031 March 2021 Response to Second Round Request for Additional Information (Rais) for License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RS-21-027, Response to Request for Additional Information Regarding Request for Exemption from Pre-Access Drug and Alcohol Testing Requirements in 10 CFR 26.652021-02-21021 February 2021 Response to Request for Additional Information Regarding Request for Exemption from Pre-Access Drug and Alcohol Testing Requirements in 10 CFR 26.65 ML21022A1302021-01-22022 January 2021 Response to Request for Additional Information Regarding the License Amendment Request to Adopt 10 CFR 50.69 RS-20-136, Response to Request for Additional Information Re License Amendment Requests for Amendments to Renewed Facility OL to Adopt 10CFR50.69 & to Adopt TSTF-505, Rev. 2 (EPID L-2020-LLA-0017 and EPID-L-2020-LLA-0018)2020-10-29029 October 2020 Response to Request for Additional Information Re License Amendment Requests for Amendments to Renewed Facility OL to Adopt 10CFR50.69 & to Adopt TSTF-505, Rev. 2 (EPID L-2020-LLA-0017 and EPID-L-2020-LLA-0018) RS-20-133, Response to Request for Additional Information Re License Amendment Request to Renewed Facility Operating Licenses to Adopt 10 CFR 50.692020-10-16016 October 2020 Response to Request for Additional Information Re License Amendment Request to Renewed Facility Operating Licenses to Adopt 10 CFR 50.69 RS-20-104, Supplement to the Request for a License Amendment Technical Specification 3.7.3, Ultimate Heat Sink2020-09-11011 September 2020 Supplement to the Request for a License Amendment Technical Specification 3.7.3, Ultimate Heat Sink RS-20-112, Response to Request for Additional Information Related to License Amendment Request to Adopt TSTF-5682020-09-0303 September 2020 Response to Request for Additional Information Related to License Amendment Request to Adopt TSTF-568 NMP2L2711, Byron Station; Calvert Cliffs; Clinton Power Station; LaSalle County Station; Limerick Generating Station; and Nine Mile Point Nuclear Station - Proposed Alternative to Utilize Code Case N-8792019-10-16016 October 2019 Byron Station; Calvert Cliffs; Clinton Power Station; LaSalle County Station; Limerick Generating Station; and Nine Mile Point Nuclear Station - Proposed Alternative to Utilize Code Case N-879 JAFP-19-0057, Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-8802019-06-0404 June 2019 Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-880 NMP1L3279, Response to Request for Additional Information - Proposed Alternatives to Utilize Code Cases N-878 and N-880 for Plants2019-05-0101 May 2019 Response to Request for Additional Information - Proposed Alternatives to Utilize Code Cases N-878 and N-880 for Plants RS-19-052, Supplement to the Response to Request for Additional Information Regarding License Amendment Request to Remove Operating Mode Restrictions for Performing Surveillance Testing of the Division 3 Battery and High ..2019-04-24024 April 2019 Supplement to the Response to Request for Additional Information Regarding License Amendment Request to Remove Operating Mode Restrictions for Performing Surveillance Testing of the Division 3 Battery and High .. RS-19-019, Response to Request for Additional Information Regarding Relief Request 13R-152019-04-0202 April 2019 Response to Request for Additional Information Regarding Relief Request 13R-15 JAFP-19-0006, Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-8802019-01-0808 January 2019 Response to Request for Additional Information - Proposed Alternative to Utilize Code Cases N-878 and N-880 RS-18-143, Supplemental Information Supporting License Amendment Requests for Approval of Changes to Emergency Plan Staffing Requirements2018-11-29029 November 2018 Supplemental Information Supporting License Amendment Requests for Approval of Changes to Emergency Plan Staffing Requirements RS-18-097, Response to Request for Additional Information and Supplemental Information-License Amendment.2018-07-27027 July 2018 Response to Request for Additional Information and Supplemental Information-License Amendment. RS-18-086, Response to Request for Additional Information Regarding License Amendment Request for Temporary Extensions to Technical Specifications Supporting Maintenance on Portions of the Core Standby Cooling System2018-07-16016 July 2018 Response to Request for Additional Information Regarding License Amendment Request for Temporary Extensions to Technical Specifications Supporting Maintenance on Portions of the Core Standby Cooling System RS-18-078, Supplemental Information Related to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2018-06-18018 June 2018 Supplemental Information Related to Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control RS-18-061, Response to Request for Additional Information Regarding Decommissioning Funding Plans for Independent Spent Fuel Storage Installations (Isfsis)2018-05-0202 May 2018 Response to Request for Additional Information Regarding Decommissioning Funding Plans for Independent Spent Fuel Storage Installations (Isfsis) RS-18-014, Supplement to Request to Revise Technical Specifications 2.1.1 for Minimum Critical Power Ratio Safety Limits2018-01-25025 January 2018 Supplement to Request to Revise Technical Specifications 2.1.1 for Minimum Critical Power Ratio Safety Limits RS-17-147, Response to Request for Additional Information Regarding LaSalle County Station Fourth Inservice Inspection Interval Relief Request 14R-012017-11-10010 November 2017 Response to Request for Additional Information Regarding LaSalle County Station Fourth Inservice Inspection Interval Relief Request 14R-01 RS-17-146, Additional Information Regarding License Amendment Request to Revise Suppression Pool Swell Design Analysis2017-10-19019 October 2017 Additional Information Regarding License Amendment Request to Revise Suppression Pool Swell Design Analysis RS-17-099, Response to Request for Additional Information Regarding LaSalle County Station License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals (PRA Branch)2017-08-0808 August 2017 Response to Request for Additional Information Regarding LaSalle County Station License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals (PRA Branch) RS-17-101, Response to Request for Additional Information Regarding License Amendment Request to Revise Suppression Pool Swell Design Analysis2017-07-28028 July 2017 Response to Request for Additional Information Regarding License Amendment Request to Revise Suppression Pool Swell Design Analysis RS-17-102, Response to Request for Supplemental Information Regarding Fourth Inservice Inspection Interval Relief Request 14R-012017-07-20020 July 2017 Response to Request for Supplemental Information Regarding Fourth Inservice Inspection Interval Relief Request 14R-01 RS-17-098, Response to Request for Additional Information Regarding License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals (Sbpb Branch)2017-07-17017 July 2017 Response to Request for Additional Information Regarding License Amendment Request for Extension of Type a and Type C Containment Leak Rate Test Intervals (Sbpb Branch) RS-17-044, Response to Request for Additional Information Regarding Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography2017-03-13013 March 2017 Response to Request for Additional Information Regarding Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography RS-17-010, Response to Request for Additional Information Regarding LaSalle County Station Alternative Request RV-01 for the Lnservice Testing Program Fourth 10-Year Interval2017-02-0909 February 2017 Response to Request for Additional Information Regarding LaSalle County Station Alternative Request RV-01 for the Lnservice Testing Program Fourth 10-Year Interval RS-16-244, Additional Information Regarding Request for License Amendment to Address Secondary Containment Access Openings2016-12-12012 December 2016 Additional Information Regarding Request for License Amendment to Address Secondary Containment Access Openings RS-16-176, County, High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ic2016-12-0101 December 2016 County, High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ich RS-16-125, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident2016-08-31031 August 2016 Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident RS-16-159, County, and Quad Cities - Response to Request for Additional Information Regarding License Amendment to Address Secondary Containment Access Openings2016-07-28028 July 2016 County, and Quad Cities - Response to Request for Additional Information Regarding License Amendment to Address Secondary Containment Access Openings RS-16-144, Response to Request for Additional Information on Severe Accident Mitigation Alternatives for License Renewal Environmental Review Dated July 6, 20162016-07-11011 July 2016 Response to Request for Additional Information on Severe Accident Mitigation Alternatives for License Renewal Environmental Review Dated July 6, 2016 RA-16-049, Response to Request for Additional Information Regarding Requests to Withhold Emergency Preparedness Documents from Public Disclosure2016-05-26026 May 2016 Response to Request for Additional Information Regarding Requests to Withhold Emergency Preparedness Documents from Public Disclosure RS-16-076, Response to Request for Additional Information Regarding License Amendment Request to Reduce the Reactor Steam Dome Pressure Specified in the Technical Specification 2.1.1, Reactor Core Sls.2016-04-11011 April 2016 Response to Request for Additional Information Regarding License Amendment Request to Reduce the Reactor Steam Dome Pressure Specified in the Technical Specification 2.1.1, Reactor Core Sls. 2023-07-24
[Table view] |
Text
Michael P. Gallagher Vice President. License Renewal Exelon Generation Exelon Nuclear 200 Exelon Way Kennett Square, PA 19348 610 765 5958 Office 610 765 5956 Fax www.exeloncorp.com michaelp.gallagher@exeloncorp.com 10 CFR 50 10 CFR 51 10 CFR 54 RS-15-238 September 17, 2015 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374
Subject:
Response to NRC Requests for Additional Information, Set 10, dated August 27, 2015 related to the LaSalle County Station, Units 1 and 2, License Renewal Application (TAC Nos. MF5347 and MF5346)
References:
- 1. Letter from Michael P. Gallagher, Exelon Generation Company LLC (Exelon),
to NRC Document Control Desk, dated December 9, 2014, "Application for Renewed Operating Licenses"
- 2. Letter from Jeffrey S. Mitchell, US NRC to Michael P. Gallagher, Exelon, dated August 27, 2015, "Requests for Additional Information for the Review of the LaSalle County Station, Units 1 and 2 License Renewal Application - Set 10 (TAC Nos. MF5347 and MF5346)"
In Reference 1, Exelon Generation Company, LLC (Exelon) submitted the License Renewal Application (LRA) for the LaSalle County Station (LSCS), Units 1 and 2. In Reference 2, the NRC requested additional information to support staff review of the LRA.
Enclosure A contains the response to this request for additional information.
Enclosure B contains updates to sections of the LRA (except for the License Renewal Commitment List) affected by the response.
Enclosure C provides an update to the License Renewal Commitment List (LRA Appendix A, Section A.5). There are no other new or revised regulatory commitments contained in this letter.
September 17, 2015 U.S. Nuclear Regulatory Commission Page 2 If you have any questions, please contact Mr. John Hufnagel, Licensing Lead, LaSalle License Renewal Project, at 610-765-5829.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on P9 .,,..17.,,.. 2.<J /J-Respectfully, Vice President - License Renewal Projects Exelon Generation Company, LLC
Enclosures:
A: Responses to Set 10 Requests for Additional Information B: LSCS License Renewal Application Updates C: LSCS License Renewal Commitment List Updates cc: Regional Administrator- NRC Region Ill NRC Project Manager (Safety Review), NRR-DLR NRC Project Manager (Environmental Review), NRR-DLR NRC Project Manager, NRR-DORL- LaSalle County Station NRC Senior Resident Inspector, LaSalle County Station Illinois Emergency Management Agency - Division of Nuclear Safety
RS-15-238 Enclosure A Page 1 of 4 Enclosure A Response to Set 10 Request for Additional Information Related to various sections of the LaSalle County Station (LSCS)
License Renewal Application (LRA)
Follow-up RAI 2.3.3.12-2a
RS-15-238 Enclosure A Page 2 of 4 Follow-up RAI 2.3.3.12-2a
Background:
In its response to RAI 2.3.3.12-2, dated July 1, 2015, regarding scoping and screening related to the smoke and heat vent housings, the applicant stated the following:
Smoke and heat vent housings are located in the LSCS Turbine Building roof.
These smoke and heat vent housings are not relied upon in safety analyses or plant evaluations to perform a function that demonstrates compliance with the Commissions regulations for Fire Protection, specifically considering the regulations applicable to LSCSs current licensing basis: 10 CFR 50.48, Branch Technical Position (BTP) ASB 9.5-1, Appendix R to Part 50 - Fire Protection Program for Nuclear Power Facilities, and the associated Safety Evaluation Report for LSCS Fire Protection. The BTP discusses smoke and heat vents in support of manual fire fighting for some areas, such as cable spreading rooms, diesel fuel oil storage areas, and switchgear rooms. It does not discuss the Turbine Building smoke and heat vents in this regard. The Turbine Building roof smoke and heat vent housings are discussed in the UFSAR and Fire Protection Report. There is no connection between the BTP manual fire fighting support statement and the Turbine Building roof vent housing discussions. The UFSAR and Fire Protection report information is provided for completeness of the area description and does not imply that the vent housings are required or credited for implementation of regulatory requirements. The smoke and heat vent housings are not safety-related nor relied upon to remain functional during design basis events, and the failure of these nonsafety-related components would not prevent the accomplishment of safety-related functions. The smoke and heat vent housings are not relied upon to demonstrate compliance with the Commissions regulations for Environmental Qualification, Anticipated Transient Without Scram, or Station Blackout. Therefore, the smoke and heat vent housings do not perform a license renewal intended function. They are not in scope for license renewal and therefore are not subject to AMR.
Issue:
The applicant stated that the turbine building smoke and heat vents do not have fire protection intended functions required for compliance with Title 10 of the Code of Federal Regulations (10 CFR), Part 50.48, Fire Protection. Additionally, the applicant stated that the turbine building smoke and heat vents are not relied upon in safety analyses or plant evaluations to perform a function that demonstrates compliance with the Commissions regulations for Fire Protection, specifically considering the regulations applicable to LaSalle County Stations (LSCSs) current licensing basis (CLB). The licensee concluded that the smoke and heat vent housings are not within the scope of license renewal and not subject to an aging management review (AMR).
The staff finds the applicants response contrary to the Updated Final Safety Analysis Report (UFSAR) and Fire Protection Report (FPR), Rev. 6, which include the original LSCS Fire Protection program as the CLB. FPR Section H.3.5.3, Turbine Operating Floor and Heater Bay
- Fire Zone 5A3, subsection Description, states, in part:
RS-15-238 Enclosure A Page 3 of 4 Fusible link type heat and smoke vents are provided on the turbine building roof.
The criteria for sizing these vents is a vent ratio of one to one hundred for the combined floor area of the main turbine floor and the heater bay. Motorized outside doors are provided for intake air for heat and smoke venting.
FPR Section H.3.5.3, subsection Safety-Related Equipment, states that [t]his zone contains safety related HVAC monitoring instrumentation.
Additionally, FPR Section H.3.5.3, subsection Design-Basis Fire states:
The design-basis fire would be contained within the turbine building. It is possible for oil, in the unlikely event of a line rupture, to leak down to the zone below; however, that zone is completely protected by automatic sprinklers. The automatic sprinklers are designed to extinguish an oil fire and the automatic smoke and heat vents would prevent heat from building up and causing any flashover.
Fire Zone 5A3 contains safety related HVAC monitoring instrumentation and equipment, and the fire protection system consists of the automatic sprinkler system and automatic smoke and heat vents noted above. According to LSCSs FPR, following an oil fire in Fire Zone 5A3, automatic smoke and heat vents would prevent heat from building up and causing any flashover. Based on the LSCS CLB, turbine building smoke and heat vents were credited to meet the guidance of BTP ASB 9.5-1. The turbine building automatic smoke and heat vent housings should not be excluded from the scope of license renewal on the basis that they are not required to function during a fire, or on not being required for compliance to 10 CFR 50.48, without factoring in the CLB.
For the above reasons, the staff determined that the turbine building smoke and heat vent housings in question must be managed during the period of extended operation to-comply with 10 CFR 50.48 (in accordance with the current licensing basis) as stated in 10 CFR 54.4(a)(3).
Request:
Provide information to demonstrate that the effects of aging will be adequately managed so that the intended function(s) will be maintained consistent with the CLB for the period of extended operation as required by 10 CFR 54.21(a)(3).
RS-15-238 Enclosure A Page 4 of 4 Exelon Response:
The Turbine Building smoke and heat vents are added to the scope of license renewal. They are active components, and are not subject to aging management review. The Turbine Building smoke and heat vent housings are passive components, and are added to the scope of the Structures Monitoring (B.2.1.34) aging management program to specifically identify these components. The program is enhanced to include the smoke and vent housings in the program scope. These components will be inspected for loss of material.
LRA Sections 2.3.3.12 and 2.4.13, LRA Table 2.4-13, LRA Table 3.5.2-13, LRA Appendix A, Section A.2.1.34, and LRA Appendix B, Section B.2.1.34 are revised as shown in Enclosure B to include aging management of these components. LRA Table A.5, Commitment 34 is revised as shown in Enclosure C to reflect this change.
RS-15-238 Enclosure B Page 1 of 7 Enclosure B LSCS License Renewal Application Updates Resulting from the Response to the following RAI:
Follow-up RAI 2.3.3.12-2a Note: To facilitate understanding, portions of the LRA have been repeated in this Enclosure, with revisions indicated. Previously submitted information is shown in normal font.
Changes are highlighted with bolded italics for inserted text and strikethroughs for deleted text.
RS-15-238 Enclosure B Page 2 of 7 As a result of the response to Follow-up RAI 2.3.3.12-2a provided in Enclosure A of this letter, the third paragraph of the Boundary subsection of LRA Section 2.3.3.12, beginning on the bottom of page 2.3-82 of the LRA, is revised as follows:
2.3.3.12 Fire Protection System Also included in the system evaluation boundary are the physical plant design features that consist of fire barrier walls and slabs, fire barrier penetration seals, fire doors and dampers, Turbine Building smoke and heat vents, fire wraps, and flammable fluid retention curbs and walls. This includes fire dampers in the Reactor Buildings, Turbine Buildings, Auxiliary Building, Lake Screen House, Radwaste Building, and Diesel Generator Buildings. The fire damper housings are subject to aging management review. The fire barrier function of all fire damper housings is evaluated with the Fire Protection System for license renewal aging management review. The pressure boundary function of the fire damper housings, if applicable, is evaluated with the appropriate ventilation system. However, the dampers are active components and are not subject to aging management review. Similarly, the Turbine Building smoke and heat vents are active components and are not subject to aging management review. The Turbine Building smoke and heat vent housings are evaluated with the Turbine Building structure. The Fire Protection System includes fire rated doors in the Reactor Buildings, Turbine Buildings, Auxiliary Building, and Diesel Generator Buildings. Air supervised preaction sprinkler systems are provided with individual air compressors to maintain air pressure. These compressors are active components and are not subject to aging management review.
As a result of the response to Follow-up RAI 2.3.3.12-2a provided in Enclosure A of this letter, the first sentence of the sixth paragraph of LRA Section 2.4.13, on page 2.4-59 of the LRA, is revised as follows:
2.4.13 Turbine Building Included in the boundary of the Turbine Building and determined to be within the scope of license renewal are the blowout panels, concrete anchors, concrete embedments, curbs, equipment supports and foundations, hatches, plugs, masonry walls, metal decking, metal siding, pipe whip restraints, reinforced concrete elements of the building, smoke and heat vent housings, steel components, steel elements, and structural bolting.
RS-15-238 Enclosure B Page 3 of 7 As a result of the response to Follow-up RAI 2.3.3.12-2a provided in Enclosure A of this letter, a new component type is added to LRA Table 2.4-13, which begins on page 2.4-61 of the LRA, as shown below:
Table 2.4-13 Turbine Building Components Subject to Aging Management Review Component Type Intended Function Blowout Panels Pressure Relief Bolting (Structural) Structural Support Concrete Anchors Structural Support Concrete Curbs Flood Barrier Concrete Embedments Structural Support Concrete: Above-grade Exterior Flood Barrier (accessible areas) Shelter, Protection Structural Support Concrete: Above-grade Exterior Flood Barrier (inaccessible areas) Shelter, Protection Structural Support Concrete: Below-grade Exterior Flood Barrier (inaccessible areas) Shelter, Protection Structural Support Concrete: Foundation, Subfoundation Flood Barrier (inaccessible areas) Shelter, Protection Structural Support Concrete: Interior Flood Barrier Shelter, Protection Shielding Structural Support Equipment Supports and Foundations Structural Support Hatches/Plugs Shelter, Protection Shielding Structural Support Masonry Walls: Above-grade Exterior Shelter, Protection Shielding Structural Support Masonry Walls: Interior Shelter, Protection Shielding Structural Support Metal Decking Shelter, Protection Structural Support Metal Siding Pressure Relief Shelter, Protection Pipe Whip Restraints Pipe Whip Restraint Smoke and Heat Vent Housings Direct Flow Shelter, Protection
RS-15-238 Enclosure B Page 4 of 7 As a result of the response to Follow-up RAI 2.3.3.12-2a provided in Enclosure A of this letter, a new component type is added to the affected portion of LRA Table 3.5.2-13, which was contained on LRA page 3.5-234, as shown below:
Table 3.5.2-13 Turbine Building (Continued)
Component Intended Material Environment Aging Effect Aging Management NUREG-1801 Table 1 Item Notes Type Function Requiring Programs Item Management Pipe Whip Pipe Whip Restraint Carbon Steel Air - Indoor Loss of Material Structures Monitoring III.A3.TP-302 3.5.1-77 C Restraints Uncontrolled (B.2.1.34)
Stainless Steel Air - Indoor None None III.B5.TP-8 3.5.1-95 A Uncontrolled Smoke and Heat Direct Flow Galvanized Steel Air - Indoor None None III.B5.TP-8 3.5.1-95 C Vent Housings Uncontrolled Air - Outdoor Loss of Material Structures Monitoring III.B2.TP-6 3.5.1-93 C (B.2.1.34)
Shelter, Protection Galvanized Steel Air - Indoor None None III.B5.TP-8 3.5.1-95 C Uncontrolled Air - Outdoor Loss of Material Structures Monitoring III.B2.TP-6 3.5.1-93 C (B.2.1.34)
Steel Components: Structural Support Carbon Steel Air - Indoor Loss of Material Structures Monitoring III.A3.TP-302 3.5.1-77 A Structural Steel Uncontrolled (B.2.1.34)
RS-15-238 Enclosure B Page 5 of 7 As a result of the response to Follow-up RAI 2.3.3.12-2a provided in Enclosure A of this letter, LRA Appendix A, Section A.2.1.34, beginning on page A-34 of the LRA is revised to add an item to Enhancement 1 as shown below:
A.2.1.34 Structures Monitoring The Structures Monitoring aging management program is an existing condition monitoring program that was developed to implement the requirements of 10 CFR 50.65 and is based on NUMARC 93-01, Revision 2 Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants, and Regulatory Guide 1.160, Revision 2 Monitoring the Effectiveness of Maintenance at Nuclear Power Plants. The program includes elements of the Masonry Walls (A.2.1.33) program and the RG 1.127, Inspection of Water-Control Structures Associated with Nuclear Power Plants (A.2.1.35) program. The program consists of periodic inspection and monitoring the condition of structures and structural component supports, to ensure that aging degradation leading to loss of intended functions will be detected and the extent of degradation can be determined. The inspections are conducted on a frequency not to exceed five years. Groundwater will be periodically sampled on a five-year frequency, and tested to ensure the groundwater remains non-aggressive.
The Structures Monitoring aging management program will be enhanced to:
- 1. Add the following components and commodities:
- a. Pipe, electrical, and equipment component support members
- b. Pipe whip restraints and jet impingement shields
- c. Panels, racks, cabinets, and other enclosures
- d. Sliding surfaces
- e. Sumps
- f. Electrical cable trays and conduits
- g. Electrical duct banks
- h. Tube tracks
- i. Transmission tower (including takeoff towers) and foundation (including cycled condensate storage tank foundations)
- j. Penetration seals and sleeves
- k. Blowout panels
- l. Permanent drywell shielding
- m. Transformer foundation
- n. Bearing pads
RS-15-238 Enclosure B Page 6 of 7
- o. Compressible joints
- p. Hatches, plugs, handholes, and manholes
- q. Metal components (decking, vent stack, and miscellaneous steel)
- r. Building features - doors and seals, bird screens, louvers, windows, and siding
- s. Concrete curbs and anchors
- t. Turbine Building smoke and heat vent housings
RS-15-238 Enclosure B Page 7 of 7 As a result of the response to Follow-up RAI 2.3.3.12-2a provided in Enclosure A of this letter, the Enhancements subsection of LRA Appendix B, Section B.2.1.34, beginning on page B-146 of the LRA is revised to add an item to Enhancement 1 as shown below:
B.2.1.34 Structures Monitoring Enhancements Prior to the period of extended operation, the following enhancements will be implemented in the following program elements:
- 1. Add the following components and commodities:
- a. Pipe, electrical, and equipment component support members
- b. Pipe whip restraints and jet impingement shields
- c. Panels, racks, cabinets, and other enclosures
- d. Sliding surfaces
- e. Sumps
- f. Electrical cable trays and conduits
- g. Electrical duct banks
- h. Tube tracks
- i. Transmission tower (including takeoff towers) and foundation (including cycled condensate storage tank foundations)
- j. Penetration seals and sleeves
- k. Blowout panels
- l. Permanent drywell shielding
- m. Transformer foundation
- n. Bearing pads
- o. Compressible joints
- p. Hatches, plugs, handholes, and manholes
- q. Metal components (decking, vent stack, and miscellaneous steel)
- r. Building features - doors and seals, bird screens, louvers, windows, and siding
- s. Concrete curbs and anchors
- t. Turbine Building smoke and heat vent housings
RS-15-238 Enclosure C Page 1 of 2 Enclosure C LSCS License Renewal Commitment List Updates This Enclosure identifies commitments made in this document and is an update to the LSCS LRA Appendix A, Table A.5 License Renewal Commitment List. Any other actions discussed in the submittal represent intended or planned actions. They are described to the NRC for the NRCs information and are not regulatory commitments.
Changes to the LSCS LRA Appendix A, Table A.5 License Renewal Commitment List are as a result of the Exelon response to the following RAI:
Follow-up RAI 2.3.3.12-2a Note: To facilitate understanding, relevant portions of the previously submitted License Renewal Commitment List have been repeated in this Enclosure, with revisions indicated.
Previously submitted information is shown in normal font. Changes due to this submittal are highlighted with bolded italics for inserted text and strikethroughs for deleted text.
RS-15-238 Enclosure C Page 2 of 2 As a result of the response to Follow-up RAI 2.3.3.12-2a provided in Enclosure A of this letter, LRA Appendix A, Section A.5, Commitment 34, beginning on page A-74 of the LRA is revised to add an item to Enhancement 1 as shown below:
A.5 License Renewal Commitment List NO. PROGRAM OR IMPLEMENTATION COMMITMENT SOURCE TOPIC SCHEDULE 34 Structures Structures Monitoring is an existing program that will be enhanced to: Program to be enhanced Section A.2.1.34 Monitoring prior to the period of
- 1. Add the following components and commodities: extended operation. Exelon Letter RS-15-180
- a. Pipe, electrical, and equipment component support members 7/15/2015
- b. Pipe whip restraints and jet impingement shields
- c. Panels, racks, cabinets, and other enclosures Exelon Letter
- d. Sliding surfaces RS-15-238
- e. Sumps 09/17/2015
- f. Electrical cable trays and conduits
- g. Electrical duct banks
- h. Tube tracks
- i. Transmission tower (including takeoff towers) and foundation (including cycled condensate storage tank foundations)
- j. Penetration seals and sleeves
- k. Blowout panels
- l. Permanent drywell shielding
- m. Transformer foundation
- n. Bearing pads
- o. Compressible joints
- p. Hatches, plugs, handholes, and manholes
- q. Metal components (decking, vent stack, and miscellaneous steel)
- r. Building features - doors and seals, bird screens, louvers, windows, and siding
- s. Concrete curbs, and anchors
- t. Turbine Building smoke and heat vent housings