Other: ML15104A782, ML15196A045, ML15196A115, ML16202A033, RS-15-193, Responds to NRC Requests for Additional Information, Set 5, Dated July 7, 2015 Related to the License Renewal Application, RS-15-194, Responds to NRC Requests for Additional Information, Set 6, Dated July 7, 2015 Related to the License Renewal Application, RS-15-305, Corrections to the License Renewal Application Dated December 9, 2014, RS-15-306, Submittal of 10 CFR 54.21(b) Annual Amendment to the License Renewal Application, RS-16-033, Update to Commitment 47 Related to the License Renewal Application, RS-16-068, Comments on the Safety Evaluation Report with Open Items, Related to the License Renewal Application, RS-16-128, Second 10 CFR 54.21(b) Annual Amendment to the License Renewal Application
|
MONTHYEARML15104A7822015-05-0808 May 2015 Scoping and Screening Methodology Audit Report Regarding LaSalle County Station, Units 1 and 2 Project stage: Other ML15111A1372015-05-14014 May 2015 Requests for Additional Information for the Review of the LaSalle County Station, Units 1 and 2 License Renewal Application - Set 1 (TAC Nos. MF5347 and MF5346) Project stage: RAI ML15125A1982015-05-29029 May 2015 Requests for Additional Information for the Review of the LaSalle County Station, Units 1 and 2 License Renewal Application - Set 2 (TAC Nos. MF5347 and MF5346) Project stage: RAI ML15131A4132015-06-0808 June 2015 Requests for Additional Information for the Review of the LaSalle County Station, Units 1 and 2 License Renewal Application - Set 3 (TAC Nos. MF5347 and MF5346) Project stage: RAI ML15140A1922015-06-0808 June 2015 Summary of Telephone Conference Call Held on May 13, 2015, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Co., LLC, Concerning Requests for Additional Information, Set 2 Pertaining to the Lasalle County Station License Project stage: RAI ML15146A2622015-06-19019 June 2015 Requests for Additional Information for the Review of the LaSalle County Station, Units 1 and 2 License Renewal Application-Set 4 (TAC Nos. MF5347 and MF5346) Project stage: RAI RS-15-165, Response to NRC Requests for Additional Information, Set 2, Dated May 29, 2015 Related to the License Renewal Application2015-06-25025 June 2015 Response to NRC Requests for Additional Information, Set 2, Dated May 29, 2015 Related to the License Renewal Application Project stage: Response to RAI RS-15-171, Response to NRC Requests for Additional Information, Set 3, Dated June 8, 2015, Related to the License Renewal Application2015-07-0101 July 2015 Response to NRC Requests for Additional Information, Set 3, Dated June 8, 2015, Related to the License Renewal Application Project stage: Response to RAI ML15159A9002015-07-0606 July 2015 Telephone Conference Call Held on May 20, 2015, Between the U.S. Nuclear Regulatory Commission and Exelon Generation Co., LLC, Requests for Additional Information, Set 3 Pertaining to the LaSalle County Station License Renewal Application ( Project stage: RAI ML15163A0712015-07-0707 July 2015 Requests for Additional Information for the Review of the LaSalle County Station, Units 1 and 2 License Renewal Application - Set 6 (TAC Nos. MF5347 and MF5346) Project stage: RAI ML15159A2082015-07-0707 July 2015 Requests for Additional Information for the Review of the LaSalle County Station, Units 1 and 2 License Renewal Application - Set 5 (TAC Nos. MF5347 and MF5346) Project stage: RAI RS-15-180, Response to NRC Requests for Additional Information, Set 4, Dated June 19, 2015 Related to the License Renewal Application2015-07-15015 July 2015 Response to NRC Requests for Additional Information, Set 4, Dated June 19, 2015 Related to the License Renewal Application Project stage: Response to RAI RS-15-198, Request for Schedule Change Related to Advisory Committee on Reactor Safeguards (ACRS) Subcommittee Review of License Renewal Application (TAC Nos. MF5347 and MF5346)2015-07-16016 July 2015 Request for Schedule Change Related to Advisory Committee on Reactor Safeguards (ACRS) Subcommittee Review of License Renewal Application (TAC Nos. MF5347 and MF5346) Project stage: Request ML15196A5292015-07-27027 July 2015 Requests for Additional Information for the Review of the Lasalle County Station, Units 1 and 2 License Renewal Application - Set 7 (Tac Nos. MF5347 and MF5346) Project stage: RAI RS-15-194, Responds to NRC Requests for Additional Information, Set 6, Dated July 7, 2015 Related to the License Renewal Application2015-08-0606 August 2015 Responds to NRC Requests for Additional Information, Set 6, Dated July 7, 2015 Related to the License Renewal Application Project stage: Other RS-15-193, Responds to NRC Requests for Additional Information, Set 5, Dated July 7, 2015 Related to the License Renewal Application2015-08-0606 August 2015 Responds to NRC Requests for Additional Information, Set 5, Dated July 7, 2015 Related to the License Renewal Application Project stage: Other ML15204A6302015-08-18018 August 2015 Requests for Additional Information for the Review of the LaSalle County Station Units 1 & 2 License Renewal Application - Set 9 (TAC Nos. MF5347 and MF5346) Project stage: RAI RS-15-223, Response to NRC Requests for Additional Information, Set 7, Dated July 27, 2015; and a Correction to Information Associated with the Set 2 Response to RAI 8.2.1.20-2, Related to the Renewal Application2015-08-26026 August 2015 Response to NRC Requests for Additional Information, Set 7, Dated July 27, 2015; and a Correction to Information Associated with the Set 2 Response to RAI 8.2.1.20-2, Related to the Renewal Application Project stage: Response to RAI ML15229A0192015-08-27027 August 2015 Requests for Additional Information for the Review of the LaSalle County Station, Units 1 and 2 License Renewal Application - Set 10 (TAC Nos. MF5347 and MF5346) Project stage: RAI ML15217A5412015-08-28028 August 2015 June 9, 2015, Summary of Telecon Held Between the NRC and Exelon Generation Co., LLC, Concerning Request for Additional Information Set 5 Pertaining to the LaSalle County Station License Renewal Application (TAC Nos. MF5347 and MF5346) Project stage: RAI ML15217A5642015-08-28028 August 2015 June 3, 2015, Summary of Telecon Held Between the NRC and Exelon Generation Co., LLC, Concerning Request for Additional Information Set 4 Pertaining to the LaSalle County Station License Renewal Application (Tac Nos. MF5347 and MF5346) Project stage: RAI ML15217A5752015-08-28028 August 2015 June 10, 2015, Summary of Telecon Held Between the NRC and Exelon Generation Co., LLC, Concerning Request for Additional Information Set 4 Pertaining to the LaSalle County Station License Renewal Application (TAC Nos. MF5347 and MF5346) Project stage: RAI ML15219A2772015-08-28028 August 2015 June 23, 2015, Summary of Telecon Held Between the NRC and Exelon Generation Co., LLC, Concerning Request for Additional Information Set 6 Pertaining to the LaSalle County Station License Renewal Application (TAC Nos. MF5347 and MF5346) Project stage: RAI ML15222A0062015-08-28028 August 2015 August 5, 2015, Summary of Telecon Held Between the NRC and Exelon Generation Co., LLC, Concerning Request for Additional Information Set 9 Pertaining to the LaSalle County Station License Renewal Application (TAC Nos. MF5347 and MF5346) Project stage: RAI ML15195A3382015-08-28028 August 2015 Requests for Additional Information for the Review of the LaSalle County Station, Units 1 and 2 License Renewal Application-Set 8 (TAC Nos. MF5347 and MF5346) Project stage: RAI ML15222A0082015-08-28028 August 2015 July 22, 2015, Summary of Telecon Held Between the NRC and Exelon Generation Co., LLC, Concerning Request for Additional Information Set 8 Pertaining to the LaSalle County Station License Renewal Application (TAC Nos. MF5347 and MF5346) Project stage: RAI ML15222A0152015-08-28028 August 2015 July 8, 2015, Summary of Telecon Held Between the NRC and Exelon Generation Co., LLC, Concerning Request for Additional Information Set 7 Pertaining to the LaSalle County Station License Renewal Application (TAC Nos. MF5347 and MF5346) Project stage: RAI ML15224A9352015-08-28028 August 2015 August 11, 2015, Summary of Telecon Held Between the NRC and Exelon Generation Co., LLC, Concerning Request for Additional Information Set 9 Pertaining to the LaSalle County Station License Renewal Application (TAC Nos. MF5347 and MF5346) Project stage: RAI ML15244B3532015-09-14014 September 2015 RAI for the Review of the LaSalle County Station, Units 1 and 2 License Renewal Application - Set 11 (TAC Nos. MF5347 and MF5346) Project stage: RAI RS-15-232, Response to NRC Requests for Additional Information, Set 9, Dated August 18, 2015 Related to the License Renewal Application2015-09-15015 September 2015 Response to NRC Requests for Additional Information, Set 9, Dated August 18, 2015 Related to the License Renewal Application Project stage: Response to RAI RS-15-238, Response to NRC Requests for Additional Information, Set 10, Dated August 27, 2015 Related to License Renewal Application2015-09-17017 September 2015 Response to NRC Requests for Additional Information, Set 10, Dated August 27, 2015 Related to License Renewal Application Project stage: Response to RAI ML15196A1152015-09-22022 September 2015 Aging Management Programs Audit Report Regarding Lasalle County Station, Units 1 and 2, Project stage: Other ML15196A0452015-09-22022 September 2015 Aging Management Programs Audit Report Regarding Lasalle County Station, Units 1 and 2, (TAC Nos. MF5347 and MF5346). Cover Letter Project stage: Other RS-15-239, Response to NRC Requests for Additional Information, Set 8, Dated August 28, 2015 Related to the License Renewal Application2015-09-28028 September 2015 Response to NRC Requests for Additional Information, Set 8, Dated August 28, 2015 Related to the License Renewal Application Project stage: Response to RAI RS-15-256, Response to NRC Request for Additional Information, Set 11, Dated September 14, 2015 Related to the License Renewal Application2015-10-0808 October 2015 Response to NRC Request for Additional Information, Set 11, Dated September 14, 2015 Related to the License Renewal Application Project stage: Response to RAI ML15208A0522015-10-22022 October 2015 Schedule Revision for the Review of the Lasalle County Station License Renewal Application (TAC Nos. MF5347 & MF5346) Project stage: Approval ML15271A0212015-10-23023 October 2015 Requests for Additional Information for the Review of the Lasalle County Station, Units 1 and 2 License Renewal Application-Set 12 (TAC Nos. MF5347 and MF5346) Project stage: RAI RS-15-281, Response to NRC Requests for Additional Information, Set 12, Dated October 23, 2015 Related to the License Renewal Application2015-10-29029 October 2015 Response to NRC Requests for Additional Information, Set 12, Dated October 23, 2015 Related to the License Renewal Application Project stage: Response to RAI ML15300A3662015-11-0303 November 2015 Requests for Additional Information for the Review of the LaSalle County Station, Units 1 and 2 License Renewal Application - Set 13 (TAC Nos. MF5347 and MF5346) Project stage: RAI RS-15-305, Corrections to the License Renewal Application Dated December 9, 20142015-12-0202 December 2015 Corrections to the License Renewal Application Dated December 9, 2014 Project stage: Other RS-15-306, Submittal of 10 CFR 54.21(b) Annual Amendment to the License Renewal Application2015-12-0202 December 2015 Submittal of 10 CFR 54.21(b) Annual Amendment to the License Renewal Application Project stage: Other RS-15-292, Response to NRC Requests for Additional Information, Set 13, Dated November 3, 2015 Related to the License Renewal Application2015-12-10010 December 2015 Response to NRC Requests for Additional Information, Set 13, Dated November 3, 2015 Related to the License Renewal Application Project stage: Response to RAI ML15272A4002015-12-11011 December 2015 Summary of Teleconference Held on September 24, 2015, Between the NRC and Exelon Generation Co., LLC, Concerning RAI Set 10 Response Pertaining to the LaSalle County Station License Renewal Application (TAC Nos. MF5347 and MF5346) Project stage: RAI ML15301A1892015-12-14014 December 2015 Request for Additional Information for the Review of the LaSalle County Station, Units 1 & 2 License Renewal Application - Set 14 (TAC Nos. MF5347 and MF5346) Project stage: RAI RS-16-003, Responses to NRC Requests for Additional Information, Set 14, Dated December 14, 2015, and Two Additional Commitment Implementation Schedule Clarifications, Related to the License Renewal Application2016-01-0707 January 2016 Responses to NRC Requests for Additional Information, Set 14, Dated December 14, 2015, and Two Additional Commitment Implementation Schedule Clarifications, Related to the License Renewal Application Project stage: Response to RAI ML15357A2812016-01-0707 January 2016 Summary of Teleconference Held on December 22, 2015, Between the NRC and Exelon Generation Co., LLC, Concerning the LaSalle County Station License Renewal Application (Tac Nos. MF5347 and MF5346) Project stage: Meeting RS-16-007, Supplemental Information Associated with Implementation of BWRVIP-25, Core Plate Inspection and Flaw Evaluation Guidelines, Related to the License Renewal Application2016-01-14014 January 2016 Supplemental Information Associated with Implementation of BWRVIP-25, Core Plate Inspection and Flaw Evaluation Guidelines, Related to the License Renewal Application Project stage: Supplement ML16021A3252016-01-29029 January 2016 Summary of Teleconference Held on January 21, 2016, Between the NRC and Exelon Generation Co., LLC, Concerning RAI 4.2.10-1 Response Project stage: RAI RS-16-033, Update to Commitment 47 Related to the License Renewal Application2016-02-0101 February 2016 Update to Commitment 47 Related to the License Renewal Application Project stage: Other ML15344A3542016-02-16016 February 2016 Requests for Additional Information for the Review of the Lasalle County, Units 1 and 2 License Renewal Application Set 15 (TAC Nos. MF5347 and MF5346) Project stage: RAI 2015-07-16
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000373/20230042024-01-24024 January 2024 County Station - Integrated Inspection Report 05000373/2023004 and 05000374/2023004 ML24024A1332024-01-24024 January 2024 Confirmation of Initial License Examination IR 05000373/20230122024-01-18018 January 2024 County Station - Biennial Problem Identification and Resolution Inspection Report 05000373/2023012 and 05000374/2023012 ML23354A2902024-01-0505 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0028 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23360A6082023-12-27027 December 2023 County Station Request for Information for NRC Commercial Grade Dedication Inspection: Inspection Report 05000373/2024010 and 05000374/2024010 ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums RS-23-120, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information IR 05000373/20230032023-11-0909 November 2023 County Station Integrated Inspection Report 05000373/2023003, 05000374/2023003, and 07200070/2023001 ML23286A2602023-11-0808 November 2023 Issuance of Amendment Nos. 260 and 245 to Renewed Facility Operating Licenses Relocation of Pressure and Temperature Limit Curves to the Pressure Temperature Report IR 05000373/20234012023-11-0707 November 2023 County Station Security Baseline Inspection Report 05000373/2023401 and 05000374/2023401 RS-23-103, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-13013 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans IR 05000374/20230102023-10-11011 October 2023 NRC Inspection Report 05000374/2023010 IR 05000373/20233012023-09-15015 September 2023 Errata to NRC Initial License Examination Report 05000373/2023301; 05000374/2023301 RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor ML23212A9012023-08-0303 August 2023 Regulatory Audit Report to Support the Review of the Amendments to Relocation of the Pressure Temperature Limit Curves to the Pressure and Temperature Limits Report IR 05000373/20230022023-08-0101 August 2023 County Station - Integrated Inspection Report 05000373/2023002 and 05000374/2023002 ML23208A3182023-07-27027 July 2023 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and RFI RS-23-084, Response to Request for Additional Information Regarding the Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis2023-07-24024 July 2023 Response to Request for Additional Information Regarding the Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis ML23192A5272023-07-12012 July 2023 NRC Initial License Examination Report 05000373/2023301; 05000374/2023301 ML23186A2062023-07-0606 July 2023 Information Request for a NRC Post-Approval Site Inspection for License Renewal 05000374/2023010 ML23181A1502023-06-30030 June 2023 Combined Response to Request for Additional Information and Supplemental Information in Support of LAR to Relocate Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III IR 05000373/20230112023-06-26026 June 2023 County Station - Quadrennial Fire Protection Team Inspection Report 05000373/2023011 and 05000374/2023011 RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23167A0352023-06-16016 June 2023 Registration of Use of Cask to Store Spent Fuel ML23171A9562023-06-12012 June 2023 Post Exam Ltr RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling IR 05000373/20230012023-05-10010 May 2023 County Station - Integrated Inspection Report 05000373/2023001 and 05000374/2023001 ML23123A2202023-05-0303 May 2023 Relief Request I4R-14 for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection ML23118A3472023-05-0101 May 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Correction of Amendment No. 193 Adoption of TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration EPID L-2022-LLA-0143 ML23121A1612023-05-0101 May 2023 Information Meeting (Open House) with a Question-and-Answer Session to Discuss NRC 2022 End-of-Cycle Plant Performance Assessment of LaSalle County Station, Units 1 and 2 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI ML23081A0382023-04-25025 April 2023 County, 1 & 2; Nine Mile Point, 2; and Quad Cities, 1 & 2 - Issuance of Amendments to Adopt TSTF-306, Rev. 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration ML23110A3202023-04-21021 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML23107A1822023-04-18018 April 2023 Operator Licensing Examination Approval Lasalle County Station, May 2023 RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23073A2182023-03-22022 March 2023 Issuance of Amendment No. 258 to Renewed Facility Operating Licenses Exigent Amendment to Revise Design Basis Related to Seismic Requirements RS-23-048, Exigent Amendment Request to Revise Design Basis Related to Seismic Requirements2023-03-0707 March 2023 Exigent Amendment Request to Revise Design Basis Related to Seismic Requirements ML23061A1632023-03-0303 March 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch 3 IR 05000373/20220062023-03-0101 March 2023 Annual Assessment Letter for LaSalle County Station, Units 1 and 2 (Report 05000373/2022006 and 05000374/2022006) RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 RS-23-037, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station2023-02-22022 February 2023 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station ML23024A1372023-02-0303 February 2023 Request for Withholding Information from Public Disclosure for LaSalle County Station, Unit Nos. 1 and 2 ML23031A1972023-01-31031 January 2023 Notification of NRC Fire Protection Team Inspection Request for Information, Inspection Report Nos. 05000373/2023011 and 05000374/2023011 IR 05000373/20220042023-01-31031 January 2023 County Station - Integrated Inspection Report 05000373/2022004 and 05000374/2022004 RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 2024-01-05
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML23360A6082023-12-27027 December 2023 County Station Request for Information for NRC Commercial Grade Dedication Inspection: Inspection Report 05000373/2024010 and 05000374/2024010 ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC Fleet Request License Amendment Request to Adopt TSTF-580, Revision 1 ML23208A3182023-07-27027 July 2023 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and RFI ML23153A1562023-06-0202 June 2023 NRR E-mail Capture - RAI LaSalle pressure-temperature Limits Report (PTLR) Amendment Request ML23150A2482023-05-25025 May 2023 NRR E-mail Capture - RAI Re LaSalle Downcomer Analysis Amendment Request ML23110A3202023-04-21021 April 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML22361A0792022-12-27027 December 2022 Notification of NRC Baseline Inspection and Request for Information (05000374/2023001) ML22256A0112022-09-12012 September 2022 NRR E-mail Capture - Request for Additional Information LaSalle County Station, Units 1 and 2 and Quad Cities Nuclear Power Station, Units 1 and 2 License Amendments Related to Fuel Storage ML22138A4112022-05-18018 May 2022 NRR E-mail Capture - Lasalle 1 and 2 - (RAI) License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Changes to TS Sections 4.3.1 and 5.6.5 (EPID-L-2021-LLA-0124) ML22126A0392022-05-0606 May 2022 NRR E-mail Capture - Lasalle 1 and 2 Draft (RAI) License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to TS Sections 4.3.1 and 5.6.5 ML22097A0832022-04-0707 April 2022 County Station Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000373/2022403 and 05000374/2022403 ML22062B0232022-03-0303 March 2022 NRR E-mail Capture - EPID-L-2022-LLR-0028, LaSalle Unit 1, Request for Additional Information (Rai), LaSalle Unit 1, Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21292A1782021-10-19019 October 2021 Information Request for a NRC Post-Approval Site Inspection for License Renewal 05000373/2022010 ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21207A0072021-07-26026 July 2021 NRR E-mail Capture - La Salle Units 1 and 2 - Request for Additional Information (RAI) License Amendment Request to Incorporate Licensing Topical Report NEDE-33885P-A, Revision 1, GNF CRDA Application Methodology(EPID-L-2021-LLA-0016) ML21190A0192021-07-0808 July 2021 NRR E-mail Capture - Exelon Fleet - Request for Additional Information Regarding Adoption of TSTF-582 and TSTF-583-T ML21187A2972021-07-0707 July 2021 Information Request for an NRC Triennial 10 CFR 50.59 (Evaluation of Changes, Tests, and Experiments) Baseline Inspection ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21117A0342021-05-0505 May 2021 Request for Additional Information Regarding Proposed Alternative to Use ASME Code Case N-893 ML21119A2282021-04-29029 April 2021 NRR E-mail Capture - Request for Additional Information (RAI) - LaSalle, EPID-L-2020-LLA-0018, License Amendment Request (LAR) TSTF-505 ML21077A1902021-03-18018 March 2021 NRR E-mail Capture - Lasalle Units 1 and 2 - Request for Additional Information (RAI) Request for License Amendment Regarding Ultimate Heat Sink, (EPID-L-2020-LLA-0165) ML21068A2762021-03-0909 March 2021 NRR E-mail Capture - La Salle Units 1 and 2 - Request for Additional Information (RAI) Relief Request I4R-12 Relief from Code Surface Examinations for 2B33-F060B Valve Repair (EPID-L-2020-LLA-0016) ML21067A6752021-03-0808 March 2021 NRR E-mail Capture - La Salle Units 1 and 2 - Request for Additional Information (RAI) UHS Amendment Request (EPID-L-2020-LLA-0165) ML21060B4352021-03-0101 March 2021 NRR E-mail Capture - Second Round - Request for Additional Information (Rais) EPID-L-2020-LLA-0018, LaSalle License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2 ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21053A0252021-02-20020 February 2021 NRR E-mail Capture - Request for Additional Information (Rais) - LaSalle Request for Exemption from Pre-Access Drug and Alcohol Testing ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21048A0432021-02-16016 February 2021 County Station - Notification of NRC Design Bases Assurance Inspection (Programs) and Initial Request for Information - Inspection Report 05000373/2021011 and 05000374/2021011 ML20364A2452020-12-29029 December 2020 Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information; Inspection Report 05000373/2021002; 05000374/2021002 ML20346A1042020-12-11011 December 2020 NRR E-mail Capture - LaSalle County Station, Units 1 and 2 - Request for Additional Information Regarding the License Amendment Request to Adopt 10 CFR 50.69 ML20330A1892020-11-25025 November 2020 Request for Information for an NRC Post-Approval Site Inspection for License Renewal; Inspection Report 05000374/2021010 ML20321A0852020-11-16016 November 2020 Notification of NRC Baseline Inspection and Request for Information (05000374/2021001) ML20247J4082020-09-29029 September 2020 Apla Request for Additional Information LAR 50.69 and TSTF-505 (Epids L-2020-LLA-0017) and ML20253A3422020-09-17017 September 2020 Correction to Request for Additional Information Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors (EPID-2020-LLA-0017) ML20253A2272020-09-16016 September 2020 Correction to Request for Additional Information Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML20240A2182020-09-0303 September 2020 Request for Additional Information Regarding Amendment Request for Amendments to Renewed Facility Operating Licenses to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Co ML20239A7262020-08-27027 August 2020 Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Request for a License Amendment to Technical Specification 3.7.3, Ultimate Heat Sink ML20239A7982020-08-25025 August 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet License Amendment Request to Adopt TSTF-568, Revision 2 ML19275H1362019-10-0202 October 2019 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Request to Use ASME Code Case N-879 ML19179A0612019-07-19019 July 2019 Three Mile Point 1 - Supplemental Information Needed to Proposed Alternative to Use ASME Code Case N-879 ML19120A2302019-04-29029 April 2019 Ltr. 04/29/19 LaSalle County Station, Units 1 and 2 - Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team); Inspection Report 05000373/2019012; 05000374/2019012 (DRS-M.Jones) ML19087A2682019-03-28028 March 2019 NRR E-mail Capture - Request for Additional Information (RAI) - LaSalle 1 and 2, EPID-L-2018-LLA-0162, LAR Removal of Operating Mode Restrictions for Performing Surveillance Testing of the Div 3 Battery and HPCS DG ML19065A0902019-03-0505 March 2019 NRR E-mail Capture - LaSalle 1 and 2, EPID-L-2018-LLR-0162, LAR Removal of Operating Mode Restrictions for Performing Surveillance Testing of the Div 3 Battery and HPCS DG, Additional Draft Request for Additional Information (RAI) ML19058A2392019-02-27027 February 2019 Information Request to Support Upcoming Problem Identification and Resolution Inspection at LaSalle County Station, Units 1 and 2 ML19036A6562019-02-0505 February 2019 NRR E-mail Capture - LaSalle 1 and 2, EPID-L-2018-LLR-0123, Relief Request I3R-15, Third Inservice Inspection Interval, Request for Additional Information (RAI) ML19022A2552019-01-22022 January 2019 NRR E-mail Capture - LaSalle Units 1 and 2, EPID-L-2018-LLA-0035, Amendment Request to Adopt TSTF-334-A, Status of Revised Draft RAIs Sent to You on December 13, 2018 ML19050A0042019-01-22022 January 2019 NRR E-mail Capture - LaSalle 1 and 2, EPID-L-2018-LLR-0162, LAR Removal of Operating Mode Restrictions for Performing Surveillance Testing of the Div 3 Battery and HPCS DG, Draft Request for Additional Information (RAI) ML19022A0292018-12-13013 December 2018 NRR E-mail Capture - Draft Request for Additional Information for LaSalle License Amendment Request to Adopt TSTF-334-A, Revision 2 2023-09-21
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 27, 2015 Mr. Michael P. Gallagher Vice President, License Renewal Projects Exelon Generation Company, LLC 200 Exelon Way Kennett Square, PA 19348
SUBJECT:
REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE LASALLE COUNTY STATION, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION - SET 7 (TAC NOS. MF5347 AND MF5346)
Dear Mr. Gallagher:
By letter dated December 9, 2014, Exelon Generation Company, LLC (Exelon) submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54, to renew the operating licenses NPF-11 and NPF-18 for LaSalle County Station (LSCS), Units 1 and 2, respectively. The staff of the U.S. Nuclear Regulatory Commission (NRC or the staff) is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review.
These requests for additional information were discussed with Mr. John Hufnagel, and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-3019 or by e-mail at Jeffrey.Mitchell2@nrc.gov.
Sincerely,
/RA/
Jeffrey S. Mitchell, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-373 and 50-374
Enclosure:
As stated cc: Listserv
July 27, 2015 Mr. Michael P. Gallagher Vice President, License Renewal Projects Exelon Generation Company, LLC 200 Exelon Way Kennett Square, PA 19348
SUBJECT:
REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE LASALLE COUNTY STATION, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION - SET 7 (TAC NOS. MF5347 AND MF5346)
Dear Mr. Gallagher:
By letter dated December 9, 2014, Exelon Generation Company, LLC (Exelon) submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54, to renew the operating licenses NPF-11 and NPF-18 for LaSalle County Station (LSCS), Units 1 and 2, respectively. The staff of the U.S. Nuclear Regulatory Commission (NRC or the staff) is reviewing the information contained in the license renewal application and has identified, in the enclosure, areas where additional information is needed to complete the review.
These requests for additional information were discussed with Mr. John Hufnagel, and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me at 301-415-3019 or by e-mail at Jeffrey.Mitchell2@nrc.gov.
Sincerely,
/RA/
Jeffrey S. Mitchell, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-373 and 50-374
Enclosure:
As stated cc: Listserv DISTRIBUTION:
See next page ADAMS Accession Number: ML15196A529 *Concurred via e-mail OFFICE LA:DLR* PM:RPB1:DLR PM:RPB1:DLR* BC:RPB1:DLR PM:RPB1:DLR NAME YEdmonds JMitchell RPlasse YDiaz-Sanabria JMitchell DATE 7/ 21 /15 7/ 23 /15 7/ 23 /15 7/ 23 /15 7/ 27 /15 OFFICIAL RECORD COPY
Letter to M. Gallagher from J. Mitchell dated July 27, 2015
SUBJECT:
REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE LASALLE COUNTY STATION, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION - SET 7 (TAC NOS. MF5347 AND MF5346)
DISTRIBUTION:
E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRerb Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDlrRsrg Resource RidsNrrPMLaSalle Resource
J. Mitchell R. Plasse D. Drucker J. Danna J. Wachutka, OGC D. McIntyre, OPA M. Kunowski, RIII V. Mitlyng, RIII P. Chandrathil, RIII H. Logaras, RIII C. Lipa, RIII S. Sheldon, RIII R. Ruiz, RIII J. Robbins, RIII
LASALLE COUNTY STATION, UNITS 1 AND 2 LICENSE RENEWAL APPLICATION REQUESTS FOR ADDITIONAL INFORMATION - SET 7 (TAC NOS. MF5347 AND MF5346)
RAI 2.3.3.2-1
Background:
License Renewal Application (LRA) Section 2.1 describes the applicants scoping methodology, which specifies how systems or components were determined to be included within the scope of license renewal, in accordance with Title 10 of the Code of Federal Regulations (10 CFR)
Paragraph 54.4(a). The staff reviewed Section 2.3.3.2, Combustible Gas Control System, and the associated License Renewal Boundary Drawings, and determined that additional information is needed to confirm that all components within the scope of license renewal were properly identified.
Issue:
One review method used by the staff is to confirm the inclusion of all components subject to aging management review (AMR) by reviewing the results of the screening of components within the license renewal boundary. The staff noted during its review of the drawings and locations indicated in the table below that continuations of piping within the scope of license renewal could not be located; therefore, acceptable scoping of systems, structures and components (SSCs) could not be verified.
License Renewal Boundary Drawing Number Continuation Issue and Location LR-LAS-M-130 Sheet 1, location A/B-8 212° and 30° continuations at the containment side of penetrations M-102 and M-95, respectively, were not provided.
LR-LAS-M-130 Sheet 2, location A/B-8 212° and 30° continuations at the containment side of penetrations M-102 and M-95, respectively, were not provided.
Request:
The staff requests that the applicant provide sufficient information to locate the license renewal boundary. If the continuation cannot be shown on license renewal boundary drawings, then provide additional information describing the extent of the scoping boundary and verify whether there are additional component types subject to an AMR between the continuation and the termination of the scoping boundary. If the scoping classification of a section of the piping changes over the continuation, provide additional information to clarify the change in scoping classification.
ENCLOSURE
RAI 2.3.3.4-1
Background:
In LRA Section 2.1.5.2, subsection Connected to and Provide Structural Support for Safety-Related SSCs, the applicant states in part [f]or nonsafety-related SSCs directly connected to safety-related SSCs the nonsafety-related piping and supports, up to and including the first seismic or equivalent anchorbeyond the safety/nonsafety interface, are within the scope of license renewal per 10 CFR 54.4(a)(2). The staff reviewed Section 2.3.3.4, Control Rod Drive System, and the associated License Renewal Boundary Drawings, and determined that additional information is needed to confirm that all components within the scope of license renewal were properly identified.
Issue:
The staff could not locate seismic or equivalent anchors between the safety/nonsafety interface and the end of the 10 CFR 54.4(a)(2) scoping boundary on the following drawings:
- LR-LAS-M-100-4 (B-2) downstream of safety-related valve 1C11-F381
- LR-LAS-M-146-4 (B-1) downstream of safety-related valve 2C11-F381
- LR-LAS-M-93-1 (B-8) upstream of safety-related valve 1B33-F017A
- LR-LAS-M-139-1 (B-8) upstream of safety-related valve 2B33-F017A
- LR-LAS-M-100-3 and LR-LAS-M-146-3 (C-4, 5, 6 and 7) upstream of safety-related valves 5, 3, 4 and 9
- LR-LAS-M-100-5 and LR-LAS-M-146-6 (E-1, B-4, C-4, E-4, F-4 and E-8)
Request:
The staff requests that the applicant provide additional information to locate the seismic or equivalent anchors between the safety/nonsafety interface and the end(s) of the 10 CFR 54.4(a)(2) scoping boundary.
RAI 2.3.3.11-1
Background:
LRA Section 2.1 describes the applicants scoping methodology, which specifies how systems or components were determined to be included within the scope of license renewal, in accordance with 10 CFR 54.4(a). The staff confirms the inclusion of all components subject to AMR by reviewing the results of the screening of components within the license renewal boundary. The staff reviewed Section 2.3.3.11, Essential Cooling Water System and the associated License Renewal Boundary Drawings, and determined that additional information is needed to confirm that all components within the scope of license renewal were properly identified.
Issue:
Drawings LR-LAS-M-87-3 (E-6) and LR-LAS-M-134-3 (D-6) show 10 CFR 54.4(a)(1) piping whose scope changes to 10 CFR 54.4(a)(2) without a change in piping classification.
Request:
The staff requests that the applicant provide sufficient information to clarify the change in scoping classification.
RAI 2.3.3.13-1
Background:
LRA Section 2.1 describes the applicants scoping methodology, which specifies how systems or components were determined to be included within the scope of license renewal, in accordance with 10 CFR 54.4(a). The staff confirms the inclusion of all components subject to AMR by reviewing the results of the screening of components within the license renewal boundary. The staff reviewed Section 2.3.3.13, Fuel Pool Cooling and Storage System and the associated License Renewal Boundary Drawings, and determined that additional information is needed to confirm that all components within the scope of license renewal were properly identified.
Issue:
Unit 1 drawing LR-LAS-M-98-1 shows 10 CFR 54.4(a)(1) piping whose scope changed to 10 CFR 54.4(a)(2) without a change in piping classification at the following locations:
LR-LAS-M-98, Sheet-1, Location Piping ID Location C-2 1FC87A upstream of valve 1FC130 Location C-5 1FC19AA downstream of valve 1FC118 Location C-8 1FC110A upstream of valve 1FC141 Location B-8 1FC01DA downstream of valve 1FC139A Location A-8 1FC01DB downstream of valve 1FC139B Similarly for Unit 2, drawing LR-LAS-M-144, Sheet-1, shows 10 CFR 54.4(a)(1) piping whose scope changed to 10 CFR 54.4(a)(2) without any change in system scope or piping classification at the following locations:
LR-LAS-M-144, Sheet-1, Location Piping ID Location C-1 2FC11DA upstream of valve 2FC141 Location B-1 2FC01DA downstream of valve 2FC139A Location B-1 2FC01DB downstream of valve 2FC139B Location C-4 2FC19AA downstream of valve 2FC118 Location C-7 2FC87A upstream of valve 2FC130
Request:
The staff requests that the applicant provide sufficient information to clarify the change in scoping classification.
RAI 2.3.3.13-2
Background:
LRA Section 2.1 describes the applicants scoping methodology, which specifies how systems or components were determined to be included within the scope of license renewal, in accordance with 10 CFR 54.4(a). The staff confirms the inclusion of all components subject to AMR by reviewing the results of the screening of components within the license renewal boundary. The staff reviewed Section 2.3.3.13, Fuel Pool Cooling and Storage System and the associated License Renewal Boundary Drawings, and determined that additional information is needed to confirm that all components within the scope of license renewal were properly identified.
Issue:
Unit 1 drawing LR-LAS-M-98-1 (C-7) shows a 10 CFR 54.4(a)(2) line 1FC11DC 10 downstream of a 10 CFR 54.4(a)(1) valve 1FC086 whose scope changed to 10 CFR 54.4(a)(2) while the piping classification changed to Class C indicating ASME Section III-Class 3 piping.
Unit 2 drawing LR-LAS-M-144-1 (C-2) shows a 10 CFR 54.4(a)(2) line 2FC11DC 10 downstream of a 10 CFR 54.4(a)(1) valve 2FC086 whose scope changed to 10 CFR 54.4(a)(2) while the piping classification changed to Class C indicating ASME Section III-Class 3 piping.
Request:
The staff requests that the applicant provide sufficient information to clarify the change in scoping classification.
RAI 2.3.3.16-1
Background:
In LRA Section 2.1.5.2, subsection Connected to and Provide Structural Support for Safety-Related SSCs, the applicant states in part [f]or nonsafety-related SSCs directly connected to safety-related SSCs the nonsafety-related piping and supports, up to and including the first seismic or equivalent anchorbeyond the safety/nonsafety interface are within the scope of license renewal per 10 CFR 54.4(a)(2). The staff reviewed Section 2.3.3.16, Plant Drainage System, and the associated License Renewal Boundary Drawings, and determined that additional information is needed to confirm that all components within the scope of license renewal were properly identified.
Issue:
On drawing LR-LAS-M-142-1 (A-4), the staff could not locate seismic or equivalent anchors between the safety/nonsafety interface at the F.4.c termination symbol (valve 2E12-F070) and the end of the 10 CFR 54.4(a)(2) scoping boundary.
Request:
The staff requests that the applicant provide additional information to locate the seismic or equivalent anchors between the safety/nonsafety interface and the end(s) of the 10 CFR 54.4(a)(2) scoping boundary.
RAI 2.3.3.21-1
Background:
LRA Section 2.1 describes the applicants scoping methodology, which specifies how systems or components were determined to be included within the scope of license renewal, in accordance with 10 CFR 54.4(a). The staff confirms the inclusion of all components subject to AMR by reviewing the results of the screening of components within the license renewal boundary. The staff reviewed Section 2.3.3.21, Reactor Water Cleanup System and the associated License Renewal Boundary Drawings, and determined that additional information is needed to confirm that all components within the scope of license renewal were properly identified.
Issue:
Unit 1 drawing LR-LAS-M-97-1 shows 10 CFR 54.4(a)(1) piping whose scope changes to 10 CFR 54.4(a)(2) while the piping classification changes to Class C indicating ASME Section III-Class 3 piping at the following locations:
LR-LAS-M-97, Sheet-1, Location Piping ID Location E-7 Line 1RT01C 4 downstream of valve 1G33-F004 Location F-4 Line 1RT06B 4 downstream of valve 1G33-F040 Similarly for Unit 2, drawing LR-LAS-M-143, Sheet-1, shows 10 CFR 54.4(a)(1) piping whose scope changed to 10 CFR 54.4(a)(2) while the piping classification changes to Class C indicating ASME Section III-Class 3 piping at the following locations:
LR-LAS-M-143, Sheet-1, Location Piping ID Location E-7 2RT01C 4 downstream of valve 2G33-F004 Location F-4 2RT06B 4 downstream of valve 2G33-F040 Request:
The staff requests that the applicant provide sufficient information to clarify the change in scoping classification.
RAI 3.2.2.2.5-1
Background:
Standard Review Plan for License Renewal (SPR-LR) Section 3.2.2.2.5 addresses loss of material due to general corrosion and fouling that leads to corrosion for steel drywell and suppression pool spray system nozzles exposed to uncontrolled indoor air. The further evaluation discussed in the section states [t]his aging mechanism and effect [plugging of the spray nozzles and flow orifices] will apply since the spray nozzles and flow orifices are occasionally wetted, even though the majority of the time the system is on standby. The wetting and drying of these components can accelerate corrosion and fouling. The associated Table 1 item (3.2.1-6) states that a plant-specific aging management program is to be evaluated. LRA Section 3.2.2.2.5 states that this further evaluation item is not applicable because the spray system nozzles are stainless steel, not steel. The discussion for this item in the LRA does not mention that the system is occasionally wetted; however, the staff notes that technical specification surveillance requirement 3.6.2.4.2 for the residual heat removals suppression pool spray subsystem requires periodic verification of a flow rate greater than 450 gallons per minute through the associated spray sparger (identified as spray header on drawing LR-LAS-M-96).
The spray nozzles in LRA Table 3.2.2-4, Residual Heat Removal System, show the internal environment as condensation that will be managed for loss of material by the Inspection of Internal Surfaces in Miscellaneous Piping and Ducting Components program. The same table shows carbon steel piping and piping components with internal environments of both condensation and treated water that will be managed for loss of material by either the Inspection of Internal Surfaces in Miscellaneous Piping and Ducting Components program or the Water Chemistry with One-Time Inspection program, respectively.
Issue:
- 1. Plugging of the spray nozzles is not precluded simply because they are constructed of a material that is not susceptible to general corrosion in an uncontrolled indoor air environment. The wetting and drying that can accelerate corrosion and fouling also applies to steel piping and components upstream of the spray nozzles. It is unclear to the staff how the difference in material for the spray nozzles provides sufficient justification for non-applicability of the further evaluation item, if the steel piping and components upstream of the nozzles are occasionally wetted.
- 2. The internal environment for the spray header (i.e., piping upstream of the spray nozzles) is either condensation or treated water, and the associated components will be considered as part of a population for either periodic inspections or one-time inspections, depending on the program. It is not clear to the staff which components are considered to have a condensation environment, and whether it is applicable to the spray header piping. In addition, the staff notes that a total flow of 450 gallons per minute with 18 spray nozzles on a 4-inch spray header results in flow velocities between 0.6 and 5.7 feet per second, depending on the spray header segment relative to the supply point. It is not clear whether the internal environment of the spray header will be considered unique due to the flow variations throughout the line or whether the internal environment will be grouped with other system components from a sampling perspective.
Request:
- 1. For the drywell and suppression pool spray system nozzles, provide the bases for not needing a plant-specific aging management program to manage plugging of spray nozzles caused by accelerated corrosion of steel components upstream of the nozzles due to occasional wetting and drying.
- 2. For the piping upstream of the suppression pool spray nozzles, clarify which environment (condensation or treated water) is being considered and discuss whether the suppression pool spray header will be considered as a unique environment due to the variations in flow, or provide the bases for considering it as part of a larger population from a sampling perspective.
RAI 3.5.1.78-1
Background:
LRA Table 3.5.1, item 3.5.1-78 addresses the spent fuel pool (SFP) liner exposed to treated water, which will be managed for loss of material and cracking due to stress corrosion cracking (SCC). LRA Table 3.5.2-9, associated with item 3.5.1-78, cites generic note B, indicating that the items are consistent with the GALL Report item; however, these items also include components such as stainless steel gates, liner anchors, and integral attachments, in addition to the SFP liner. Based on the discussion in LRA Table 3.5.1, item 3.5.1-78, these additional items will only be managed for loss of material through the Water Chemistry program and by monitoring the SFP water level and leakage from the leak chase channels. LRA Table 3.5.2-9 does not address cracking for stainless steel components exposed to treated water that are associated with item 3.5.1-78.
The staff recognizes that treated water less than 140 °F is not an environment that is conducive to SCC. However, although the Updated Final Safety Analysis Report (UFSAR) Section 9.1.3.2.1.1 states that normal operating and refueling temperatures in the SFP are at or below 140 °F, during an emergency full core offload, the UFSAR states that the SFP water temperature remains below boiling (212 °F). In addition, SFP temperature limits maintain bulk water temperature less than 140 °F, but there may be local temperatures that exceed the limitation for susceptibility to cracking.
Issue:
It is unclear to the staff if appropriate activities to verify the effectiveness of the Water Chemistry program are being performed for the components in LRA Table 3.5.2-9 that reference item 3.5.1-78. It is also unclear to the staff why the aging effect of cracking is not being managed for stainless steel components that reference item 3.5.1-78, since temperatures in the SFP can exceed 140 °F.
Request:
- 1. State the basis for why the aging effect of cracking is not being managed for items that reference 3.5.1-78. Include information regarding past SFP temperatures and discuss whether local temperatures need to be considered.
- 2. If it is determined that cracking needs to be managed, provide clarification on how the effectiveness of the Water Chemistry program is being verified for items that reference item 3.5.1-78 in LRA Table 3.5.2-9 since some of the components cannot be monitored via leakage through the leak chase channels.
RAI 3.5.2.2.1.5-1
Background:
Section 54.21(a)(3) of 10 CFR requires applicants to demonstrate that the effects of aging will be adequately managed so that intended functions will be maintained consistent with the current licensing basis for each structure and component subject to aging management review.
Section 54.2(c)(1) of 10 CFR requires the evaluation of time-limited aging analyses (TLAA) to demonstrate that: (i) the analyses remain valid for the period of extended operation, (ii) the analyses have been projected to the end of the period of extended operation; or (iii) the effects of aging on the intended function will be adequately managed for the period of extended operation.
LRA Section 3.5.2.2.1.5 Cumulative Fatigue Damage, corresponding to LRA Table 3.5.1, item 3.5.1-9, states in part that the evaluation of fatigue as a TLAA for the LaSalle County Station, Units 1 and 2, primary containment liner is addressed in LRA Section 4.6. In LRA Section 4.6.1, the applicant provides the TLAA evaluation of the primary containment liner plate and penetrations. The applicant dispositioned this TLAA in accordance with 10 CFR 54.21(c)(1)(iii), and stated that the effects of aging on the intended functions of components analyzed in accordance with ASME Section III, Class 1 requirements will be managed by the Fatigue Monitoring program through the period of extended operation.
LRA Table 3.5.2-7 AMR results line items corresponding to LRA Table 3.5.1, item 3.5.1-9, address electrical penetration assemblies, mechanical penetration assemblies, penetration sleeves, refueling bellows assembly, and downcomers components which will be managed for the cumulative fatigue damage aging effect by the TLAA program. However, LRA Table 3.5.2-7 does not identify any AMR results line items corresponding to Table 3.5.1, item 3.5.1-9, for the primary containment liner.
Issue:
The staff is not clear why the LRA Table 3.5.2-7 AMR results line items corresponding to Table 1, item 3.5.1-9, do not address the containment liner component(s), and how this component is being adequately managed for the cumulative fatigue damage aging effect for the period of extended operation.
Request:
Describe how the primary containment liner is adequately managed for the cumulative fatigue damage aging effect through the period of extended operation, and provide the technical basis for not addressing the containment liner component(s) in LRA Table 3.5.2-7 AMR results line items corresponding to Table 1, item 3.5.1-9.
RAI 4.2.5-1
Background:
LRA Section 4.2.5 addresses a TLAA on reactor vessel axial weld failure probability assessment. Specifically, LRA Tables 4.2.5-1 and 4.2.5-2 provide comparison of axial weld failure probability parameters between the applicants assessment and the staffs safety assessment in the safety evaluation (July 28, 1998) of the BWRVIP-05 report. The comparison of parameters includes initial RTNDT (nil-ductility transition reference temperature) and mean RTNDT. The LRA indicates that Unit 1 has a Combustion Engineering (CE) reactor vessel and Unit 2 has a Chicago Bridge and Iron (CB&I) reactor vessel. The applicant dispositioned this TLAA in accordance with 10 CFR 54.21(c)(1)(ii) by projecting the axial weld failure probability assessments through the period of extended operation.
The NRC staffs safety evaluation for the methodology in BWRVIP-05 was supplemented in a safety evaluation to the BWRVIP dated March 7, 2000. In the supplemental evaluation, the staff updated the reactor vessel failure probability and mean RTNDT analyses for axial welds in reactor vessels designed by CE and by CB&I.
Issue:
The staff noted that LRA Section 4.2.5 does not provide a comparison of axial weld failure probability parameters between the applicants assessment and the staffs March 7, 2000, supplemental safety evaluation regarding the BWRVIP-05 Report. Specifically, Table 3 of the supplemental safety evaluation addresses the axial weld failure frequencies determined in the staffs assessment. The LRA does not discuss these failure frequencies in comparison with the applicants assessment results.
In addition, the applicant did not provide a probabilistic analysis establishing that the reactor vessel failure frequency for axial welds is less than 5 x 10-6 per reactor year in accordance with the staffs March 7, 2000, supplemental safety evaluation.
Request:
- 1. Justify why LRA Section 4.2.5 does not need to be revised to provide comparison of axial weld failure probability parameters between the applicants assessment and the staffs supplemental safety evaluation dated March 7, 2000.
- 2. If the applicants failure probability comparison does not indicate that the reactor vessel failure frequency for axial welds is less than 5 x 10-6 per reactor year, provide the following information:
- a. a plant-specific probabilistic analysis for axial weld failure, consistent with SRP-LR Section 4.2.3.1.5, or
- b. information demonstrating that loss of fracture toughness due to neutron irradiation embrittlement of axial welds does not affect the structural integrity of the reactor vessel for the period of extended operation.