ML20204J029
ML20204J029 | |
Person / Time | |
---|---|
Site: | San Onofre |
Issue date: | 02/17/1995 |
From: | SOUTHERN CALIFORNIA EDISON CO. |
To: | |
Shared Package | |
ML20204G565 | List: |
References | |
SO23-XXI-3.1.2, NUDOCS 9903290248 | |
Download: ML20204J029 (13) | |
Text
.
e NRC FORM 474 U.S. NUCLEAR REGULATORY COMMISSION APPAOVED 8Y OMB. NO.31504138 EXPIKES.08/31/2001 (8 1998) Estimated burdan per response to comply wth this mandatory mformrtson collection req 120 hour0.00139 days <br />0.0333 hours <br />1.984127e-4 weeks <br />4.566e-5 months <br /> This mformanon is used to certify a s n fac n US co,.u.es.t .s
- regarder.ss buroen eshmate io ine 'R*ords mem s T Manag.
SIMULATION FACILITY CERTIFICATION
, 2 3 an
- WG'IR"aT3" E"E*A,,M.nfo,,naim mieco does e'm'Pn not d.a"e..a. a cu,?.af e'Jd nay.ai t .er-- men 3 he NRC may not conduct or sponsor, and a person a not required to respond to, the INSTRUCTIONS: This form a to be Inled for matial certticaten, rece,bfi
,i ar, P,.de me %, .,-a~,, a- me m.m.,e be. ,cadon (it o .required), ande, h, a,e .e.wn forsu.-~
any enange to a simulabon facehty performance teshng plan made after mitial submittal of FACILITY San Onofre Nuclear Generating Station, Units 2 and 3 so-DOCKET 3UEIER/362 LICENSEE DATE Southern California Edison Company 3/12/99 Th. . cerbfy th.t t Tne am n.med tac,iny ncensee ,s us.ng a s,muiabon tac,iny cm.img so,e,y o, a ,iani.re,orenced s,muraio, inst meets ine requirements or io CFR ss os 1 2 oocurnemabon . a+.bie for NRC ,e.,ew m acco, dance w,th 10 CrR ss 4s<b). ,
3 This simulation facisny meets the guidance contamed m ANSI /ANS 3 51985 or AN$UANS 3 5-1993,as endorsed by NRC Regulatory Gusde 1149 N there are any EXCEPTIONS to the cordficabon of trus item, CHECK HERE ( ) and desenbe fully on addibonal pages as necessary NAME (rr other utenbfrcahon) AND LOCATION OF S!MULATION FACILITY.
SONGS Units 2/3 Control Room Training Simulator Training and Education Center, Building E-50 l San Onofre Nuclear Generating Station SIMULATON F ACILffY PERFORMANCE TEST ABSTRACTS ATTACHED (Forperfbrmance fests conducted m me panod endmg wrm me dele of this cettfcahon)
DESCRIPTION OF PERFORMANCE TESTING COMPLETED (Attach oddotnanelpages as necessary end odontity the stern descrrpte bonne coritmund)
See attached Procedure 5023-XXI-3.1.2 l
1 I
I l
SIMULATCN FACILITY PERFORMANCE TESTING SCHEDULE ATTACHED. (For me conduct of approximate #y 23 percent of partrmence tests peryear Ar me Axs-yeerpared commencmg wom the date of thos certifceta) ,
DESCRIPTION OF PERFORMANCE TEST lNG TO BE CONDUCTED (Attach addihonelpages es necessary and ndentory me rtem descnota boong conhnved)
See attached Procedure 5023-XXI-3.1.2 :
l PERFORMANCE TESTING PLAN CHANGE. (For any modtfcahon 80 e parkvmance teshng plan submotted on a provoous certifcata)
DESCRIVTCN OF PERFORMANCE TESTING PLAN CHANGE (A!!ach eddrhonelpages as necessary and oderstify the item descrrptm benng contunued)
N/A RECERTIFICATCN (Descnbe correctrve achans teken, ettsch results of compkrted peArmance leshng m eccordence with 10 CFR SS 4S(b)($)(v)
(Attach addthonalpeges es necessary and odenkty me item descrrokon bemg conhnved)
Any fasse statement or omessen m this document, mctudmg attachments, may be subl oct to es.tl and enmmal sancbons I certify under penalty of perjury that the mtormahon m this document and attachments a true and correct SIGNATURE - AUTHORIZE PRFc~ TATIVE TITLE DATE Manager of Nuclear Regulatory Affairs gg
=-
In accordance wth 10 CFR 55 5, CommuScabons, this form shall be submitted to the NRC as follows BY Mall ADDRESSED TO DIRECTOR, OFFICE OF NUCLEAR REACTOR REOULATION BY DELIVERY IN PERSON ONE WHITE FLINT NORTH U.S. NUCLEAR REGULATORY COMMIS$10N TO THE NRC OFFICE AT. 11555 ROCKVILLE PlKE WASHINGTON, DC 203654001 ROCKVILLE MD 9903290248 990312 PRINTED ON RECYCLED PAPER PDR ADOCK 05000361 R PM ,
-e
sub.ne No. Anoomou or a,,, case; bERENce: so123.vi1.o.i EDITORIAL CORRECTION (S) (EC) ggg3g,4 r mu um any:
iseuance osse FE8 1_71995 eC No. O-/ i PERFORMED BY: WN A/ M dam B 17.1995 l
- 1. Document No. 9- .[ \. Revleion No.
! ''I bbNM ' R I C D- b NC E CS M ' $CH 60ul/N 6.
Document Title p unsr Document Author / Originator hII N l 1 IN OROWarAnON e,uMT OR TYPE NME PAX Mooted page(s) ettached
- 2. Check appropriate box: L l Entire document attached f
Superseded / Incorporated EC(e)/TCN(e)
NINutM $F NOPE,30 grArE)
(Not applicable for single use TCNs)
TECHNICAL CHANGES ARE JggT ALLOWED (e.g., changes to numerical data. eetpointe, or acceptance criteria, implem NRC commitmente, changing levole of approvel). For technical changee (or a combinabon of technical changes and edi O corrections) use the revision (SO123-VI-1) or TCN (SO123-W1.0.1) procese.
l CAUTION To be used for EDITORIAL CORRECTIONS (ECe) oNLY; ensure document correctiorn are covered by item (s) listed in 3 below. ECs AR.D2! change the intent of a document and 13.3g1 require Selsty Evaluation consideration (i.e., use form PF(123) 1001, Unrev6ewed safety Question (10CFRio.59) Screening Criteria and/or a fur (7 question) 50.50 Safe Ev*ation woord nos be n=e-a'* RECEIVED CDM
- 3. Anowed types of Editor 6al Corresiviw are: FEB171995 e
. Updating a specified tool to an equivalent or better substitute. Correcting o procedure section was obviously written for 2TSH-8961; an approved document modifies annuncia phrasmg, etc.).
. Correcting misnumbered steps / sections (paragraph numbering) or stop references (referencing one step another step).
. Correcting spelling, punctuation, and typographical errors. ( Do not change numerical data, setpoints, o acceptance crteria, use the revision [SO123-VI-1] or TCN [SO123-VI-1.0.1) process.)
e DMdsng large rnuUple action steps into several smaller steps which accomplish the same goa!.
e Updating names, phone numbers, document format, promoure numbers, distribution lists, or references.
. Updating personnel titles (without changing the level of approval) e Clarifying wording in a step to enhance underst min.;; rig (changing the meaning / result of the step is aNowed),
e Updating obsolete material codes (verified in an approved document or SOMMS).
. Reordering steps out of sequence For example-6.1 install cover.
6.2 Use RTV to seal cover.
Obviat=8y (he RTV sp M tite applied (o the spver before instaNing the cover.
\ At - db DAM b'9
- 4. PREPARED BY:
C REVIEWED AND APPROVED BY:
/
)W .
coeswrrsur6aEn I rY e sJ DATE: 1 I 'L
~
.;"le as written. This constitutes an
- 5. (Optonal) The entire document wee reviewed in conjunction with this EC and found to b6 .
annuevbiennial review disposeon of Aeooptable As wrieermeend (so123-VM.o.2).
REVIEWED and APPROVED BY:
A/ /M oarE co ,ewrr,uNerxmeu.o,nt-sosaonos
- 5. For mu EAe Cany: Ed~W in computer 77 A.
- J $
PERFORMED BY: DATE JC2. EAR P6 WRouP &#on GCE PF(123111. Rev. o er1/se
NUCLEAR ORGANIZATION TRAINING PROCEDURE S023-XXI-3.1.2 UNITS 2 AND 3 REVISION O PAGE 1 0F I2 EFFECTIVE DATE EC D*/ PAGE 2 0F 3
. 9 i
I SIMULATOR PERFORMANCE TEST SCHEDULING i TABLE OF CONTENTS SECTION PAGE 2
1.0 OBJECTIVE 2
2.0 REFERENCE l 2
3.0 PREREQUISITE 2
4.0 PRECAUTION (S) 3 5.0 CHECKLIST (S) l 1
3 6.0 PROCEDURE 6.1 Simulator Operability Testing 3 6.2 Simulator Performance Testing 3 4
7.0 RECORDS ATTACHNENTS-Straulator Operability Testing Schedule 5 1
Simulator Performance Testing Four-Year Schedule 6 l 2
12 3 Developmental Resources ,
i l
a l XX1312.wS1 LEVEL 1 QA PROGRAM AFFECTING t,
NUCLEAR ORGANIZATION TRAINING PROCEDURE S023-XXI-3.1.2 UNITS 2 AND 3 REVISION O PAGE 2 0F 12
. . EC 04 ,
PAGE 3 0F 3 JIMULATOR PERFORMANCE TEST SCHEDULING 1.0 OBJECTIVE 1.1 To provide a four year simulator testing schedule as required by Reference 2.1.1.
2.0 BEFERENCES i 2.1 Procedures 2.1.1 S023-XXI-3.1.4, Naintenance of Simulator Certification Records 2.1.2 S023-XXI-3.3.1, Real Time Simulation Test l
2.1.3 S023-XXI-3.3.2, Simulator Steady State Performance Testing 2.1.4 S023-XXI-3.3.4, Simulator Surveillance Testing g 2.1.5 S023-XXI-3.3.5, Simulator Normal Operations Performance Testing 2.1.6 S023-XXI-3.3.6, Simulator Transient Testing and Evaluation 2.1.7 S023-XXI-3.3.7, Simulator Malfunction Testing l 3.0 PRERE0yISITE t 3.1 Prior to use of a user-controlled copy of this document, it is the user's responsibility to verify the revision and any TCNs are current by using one of the following methods:
3.1.1 Access the San Onofre Document Management System (SDMS)
[ San Onofre local area network (SLAN) or online system]
(preferred methods).
3.1.2 Check it against a Corporate Documentation Management-SONGS (CDM-SONGS) controlled copy and any TCNs.
3.1.3 Contact CDM-SONGS by telephone or through counter inquiry.
3.1.4 Obtain a user-controlled copy of this procedure from COM-SONGS or SDMS SLAN.
4.0 PRECAUTIONfS) 4.1 None
NUCLEAR ORGANIZATION TRAINING PROCEDURE S023-XXI-3.1.2 1 UNITS 2 AND 3 REVISION O PAGE 3 0F 12 5.0 CHECKLIST (S) 5.1 None ,
6.0 PROCEDURE 6.1 Simulator Operability Testinu 6.1.1 Simulator operability testing shall be conducted annually.
The intent of this testing is to:
.1 Verify overall simulator model completeness and integration.
.2 Verify simulator performance against steady state criteria.
.3 Verify simulator perfonnance against transient criteria. l 6.1.2 Operability testing shall be perfonned in accordance with References 2.1.2 through 2.1.7.
6.1.3 Attachment 1 of this procedure lists the testing required to be done annually.
6.2 Simulator Performance Testina 6.2.1 Simulator performance testing shall be performed on a four i year schedule. Testing shall be performed in the following areas:
.1 Real Time Simulation test
.2 Normal Operations testing
.3 Surveillance testing
.4 Malfunction testing 6.2.2 Simulator perfonmance testing shall be >erfonned in accordance with References 2.1.2 througi 2.1.7.
6.2.3 A> proximately 25% of all required performance testing stall be performed each year.
6.2.4 Attachment 2 of this procedure list the required testing.
NOTE: The number in the year tested colurn indicates which year in the four year cycle a specific test will be performeu.
NUCLEAR ORGANIZATION TRAINING PROCEDURE S023-XXI-3.1.2 UNITS 2 AND 3 REVISION O PAGE 4 0F 12 7.0 RECORDS' 7.1 Records shall be maintained in accordance with Reference 2.1.1.
4 1
l DRogers:XXI312.w51
NUCLEAR ORGANIZATION TRAINING PROCEDURE S023-XXI-3.1.2 UNITS 2 AND 3 REVISION O PAGE 5 0F 12 ATTACHMENT 1
$1MULATOR OPERABILITY TESTIMi SCHEDULE The following tests are performed annually.
STEADY STATE PERFORMANCE llIkf. DESCRIPTION
- 1. SS01 SIMULATOR STABILITY 60 MINUTE STEADY STATE RUN
- 2. S502 HEAT BALANCE 9 100% RECORD STEADY STATE DATA
- 3. SS03 HEAT BALANCE 9 80% RECORD STEADY STATE DATA
- 4. SSO4 HEAT BALANCE 9 50% RECORD STEADY STATE DATA TRANSIENT PERFORMANCE IJILE DESCRIPTION
- 1. TT01 REACTOR TRIP REACTOR TRIP FROM 100%.
- 3. TT03 CLOSURE MSIV's SIMULTANEOUS CLOSURE OF ALL MAIN l STEAM ISOLATION Y(LVES.
I
- 4. TT04 TRIP ALL RCP's SIMULTANEOUS TRIP OF ALL RFACTOR COOLANT PUMPS. (LO3S OF OFF-SITE POWER)
- 5. TT05 TRIP SINGLE RCP TRIP OF A SINGLE REAC13R COOLANT PUMP..
- 6. TT06 MAIN TURBINE TRIP MAIN TURBINE TRIP AT MAX POWER THAT DOES NOT CAUSE RX TRIP.
- 7. TT07 LOCA WITH LOSS OF PWR. MAX SIZE REACTOR COOLANT SYSTEN RUPTURE COMBINED WITH LOSS OF ALL OFFSITE POWER.
- 8. TT08 MAIN STM LINE BREAK MAX SIZE UNISOLABLE STEAM LINE RUPTURE IN CONTAINMENT.
- 9. TT09 STUCK OPEN' SAFETY VLV. LOW PRIMARY SYSTEM DEPRESSURI-ZAT:0N TO SATURATED CONDITIONS US1NG PRESSURIZER SAFETY VALVE STUCK OPEN, HPSI INHIBITED.
- 10. TT10 TURBINE LOAD REJECTION 30% LOAD REJECTION WITHOUT REACTOR TRIP.
XXI312.wS1 ATTACHMENT 1 PAGE 1 0F I W- - ,w -- , . - - - - - ,--a-
. ~ . - - . - -
! NUCLEAR ORGANIZATION TRAINING PROCEDURE S023-XXI-3.1c2 UNITS 2 AND 3 REVISION O PAGE 6 0F 12 l , ATTACittENT 2 SIMULATOR PERF0lH WCE TESTING f0UR-YEAR SCNEDULE .
l REAL TIME SIMULATION TEST TITLE / DESCRIPTION YEAR OF TEST l 1. RTT01 CONPUTER REAL TINE TEST 1 N068ELOPERATI0liS TITLE / DESCRIPTION YEAR OF TEST
- 1. NOP01 COLD SHUTDOWN TO HOT STANDBY 1
- 2. NOP02 HOT STANDBY TO RATED POWER 2
- 3. NOP03 RATED POWER TO HOT STAND 8Y 2
- 4. NOPO4 HOT STAND 8Y TO COLD SHUTDOWN 3
- 5. NOP05 REACTOR TRIP FOLLOWED BY RETURN TO RATED POWER 4
$URVEILLANCE TESTING l
TITLE / DESCRIPTION YEAR OF TESI
- 1. SST01 EXCORE IN CALIBRATION 3
- 2. SST02 RCS FLOWRATE DETERNINATION 3
- 3. SST03 CEA NONTHLY OPERABILITY TEST 3
- 4. SST04 COLSS OUT OF SERVICE SURVEILLANCE 3
- 5. SST05 AUXILIARY FEEDWATER FLOW TEST 2 1
- 6. SST06 4KV EMr96ENCY BUS TRANSFER TEST 1
- 7. SST07 DIESEL GENERATOR MONTHLY TEST ,
- 8. SST08 ONCE-A-SHIFT SURVEILLANCE 2 2
- 9. SST09 ONCE-A-DAY SURVEILLANCE 2
- 10. SST10 ONCE-A-WEEK SURVEILLANCE l
L ATTACHNENT 2 PAGE 1 0F 6 I
NUCLEAR ORGANIZATION TRAINING PROCEDURE 5023-XXI-3.1.2 i UNITS 2 AND 3 REVISION O PAGE 7 0F 12 1 ATTACHNENT 2 1
SIMULATOR PERFORMANCE TESTING EOUR-YEAR SCHEDULE (Continued)
SURVEILLANCE TESTING (Continued)
TITLE / DESCRIPTION YEAR OF TEST
- 11. SST11 REMOTE SHUTDOWN PANEL INSTR. CHECKS 3
- 12. SST12 DETERNINATION OF RX. SHUTDOWN HARGIN 1
- 13. SST13 INSERVICE VALVE TESTING QUARTERLY 4
- 14. SST14 CONTAINNENT PURGE ISO. SYS. TEST 1
- 15. SST15 TUR8. OVERSPEED PROTECTION VALVE OPER- 4 ABILITY TESTS
- 16. SST16 RCS WATER INVENTORY BALANCE 4
- 17. SST17 REACTOR POWER CALCULATION 4 MALFUNCTION TESTING l TITLE / DESCRIPTION YEAR OF TEST
- 2. CC03 RUPTURE OF CCW LINE 1
- 3. CC06 LOSS OF CCW PUNP 1
- 4. CV05 LEAK IN LETDOWN LINE I.C. ISOLATABLE 2
- 5. CV06 LEAK IN LETDOWN LINE OUTSIDE CONTAINNENT 3
- 6. CV09 LOSS OF REACTOR MAKEUP 3
- 7. CV10 FALSE LETDOWN LINE HIGH TENPERATURE 3
- 8. CV11 RISE IN MAKEUP BORON CONCENTRATION 3
- 9. CV12 INADVERTENT BORON DILUTION 2
- 10. CV16 VOLUNE CONTROL TANK LYL TRANS FAIL 2
- 11. CV20 VCT OUTLET ISOLATION VALVE FAILS CLOSED 2 1
- 12. EC01 SHUTDOWN C00 LING RELIEF VALVE FAIL
- 13. EC04 LOW PRESS SAFETY INJ SUCT LINE RUPT 1 ATTACHNENT 2 PAGE 2 0F 6
.. l l
NUCLEAR ORGANIZATION TRAINING PROCEDURE S023-XXI-3.1.2 i UNITS 2 AND 3 REVISION O PAGE 8 0F 12
. . ATTACHMENT 2 SIMULATOR PERFORMANCE TESTING l FOUR-YEAR SCNEDULE
. (Continued) l MALFUNCTION TESTING (Continued) l TITLE / DESCRIPTION YEAR OF TEST
- 14. EC08 LOSS OF SI PUMP 1
- 15. ED01 LOSS OF ALL OFFSITE POWER 4
- 16. ED02 LOSS OF RESERVE TRANSFORNER 2
- 17. ED03 LOSS OF 4160 EMERGENCY BUS 3
- 18. ED04 LOSS OF 4160 N0!! VITAL BUS 2
- 20. ED06 GROUND ON 480V EMERG BUS 4
- 21. ED07 LOSS OF EACH INVERT 0R 4
- 22. ED08 LOSS OF INST BUS SUPPLIES 4
- 23. EG01 MAIN GENERATOR INTERNAL FAULT 1
- 24. EG02 MAIN GENERATOR TRIP 1
- 25. EG05 DG OUTPUT BREAKER FAILURE TO CLOSE 1
- 26. EG06 LOSS OF MAIN GENERATOR EXCITER 4
- 27. EG08 FAILURE OF DIESEL GENERATOR 1
- 28. FWO2 SHAFT SEIZURE OF MOTOR-DRIVEN AUX. FEED 1
- 29. FWO3FWPIPINGBRK(INSDCONTUPSTRMOFCHKVLV) 3
- 30. FWO4FWPIPINGBRK(OTSDCONTDNSTRM0FCHKVLV) 2 4
- 31. FWOSFWPIPINGBRK(OTSDCONTBTWNMFIVANDCHKYLV) 4
- 32. FWO6FWBRK(OTSOCONTBTWNNFRVANDHFIV)
- 33. FWO8 LOSS Cr MAIN FW PHP TURB HYDRLC OIL 4 1
- 34. FWO9 HIGH VIB IN MAIN FW PUMP TURBINE 1
- 35. FW16 HOTWELL OVERBOARD VALVE LV-3211 FAILURE ATTACHMENT 2 PAGE 3 0F 6
_. ~ .. - - ._ . - - . . - - - - . . . _ ~ . -._. .._.. - - - _ . ~ - . . - - _ . -
NUCLEAR ORGANIZATION TRAINING PROCEDURE ID23-XXI-3.1.2 UNITS 2 AND 3 REVISION O PAGE 9 0F 12 ATTACHMENT 2
, SDElLATOt PERF6dNIANCE TESTING F0t R-YEAR SCHEDULE a
(Continued)
MALFUNCTION TESTING (Continued)
TITLE / DESCRIPTION YEAR OF TEST i 36. FW21 MAIN FEEDPUMP DISCHARGE VALVE CLOSES 1
- 37. FW23 CONDENSER AIR LEAKAGE 1
' 2
~
- 39. IA01 LOCALIZED IA FAILURE 3
- 40. IA02 LOSS OF INSTRUMENT AIR 3 2
l 41. MS01 MAIN STEAM SAFETY VALVE FAILURE 4
- 42. MS03MSLINEBRK(INSDCONT) 4 i
- 43. M504MSLINEBRK(OTSDCONT) 3
- 44. MS05MSLINEBRK(OTSDCONT) 3
- 45. MS06 MAIN STEAM ISOLATION VALVE FAILS 1
- 46. MS09 LEAKAGE OF ATMOS STEAM RELIEF VALVE 4 j i
- 47. NIO1 START UP RANGE MONITOR FAILURE 2 l
I 48. NIO2 SAFETY RANGE MONT POWER SPLY FAIL 2
- 49. NIO3SAFETYCHANNELFAILURE(LOG) 2 f I
1
- 50. NIO8 LINEAR AMPLIFIER FAILURE 2 (
1
- 51. RC01 RCS COLD LEG DOUBLE ENDED BREAK 1
- 52. RC02 RCS HOT LEG DOUBLE EWED BREAK 2
- 53. RCO3 RCS LEAK INTO CONTAUMENT 2 f
! 56. RC17 PRESSURIZER PRESS TRANS F/.ILURE 2 4
- 57. RC18 PZR SAFETY VALVE LEAK j
ATTACHMENT 2 PAGE 4 0F 6 a
l
=
NUCLEAR ORGANIZATION TRAINING PROCEDURE S023-XXI-3.1.2 l UNITS 2 AND 3 REVISION O PAGE 10 0F 12 l ATTACHMENT 2 SINULATOR PERFORNANCE TESTING FOUR-YEAR SCHEDULE (Continued) i i
l MALFUNCTION TESTING (Continued)
TITLE / DESCRIPTION YEAR OF TEST
- 58. RC19 FUEL LEAK 4
- 59. RC20 PRESSURIZER PRESS TRANS FAILURE 1
- 60. RC22RCSCOLDLEGTEMPTRANSFAIL(PROT) 1
- 61. RD01 EJECTED ROD 1
- 62. RD02 UNTRIPPABLE STUCK R0D 1
- 63. RD03 DROPPED CEA 1
- 64. RD04 DROPPED R00 WITH NO INDICATION 1
- 65. RDOS MISALIG MENT OF ROD TRIPPABLE 1
- 66. RD08 FAILURE OF ROD TO MOVE IN MANUAL & AUTO 1
- 67. RP03 RP SYS FAILS TO TRIP FOR ALL TRIP 2
- 68. RP15 AUTOMATIC REACTOR TRIP FAILURE 2
- 69. RXO4 PRESSURIZER PROPORTIONAL HEATERS FAIL 4
- 70. RX05 PZR LEVEL SETPOINT RRS1 FAILURE 3
- 71. RXO8 STEAM BYPASS CONTROL SYSTEM FAILURE 3
- 73. SC01 FAILURE OF SALT WATER COOLING PUMP 3
- 74. SC03 FAILURE OF SALTWATER COOLING PUMP 3
- 75. SG02 STEAM GENERATOR TUBE RUPTURE 4 3
- 76. SG03PRESSTRANSFAIL(PROT) 3
- 77. SG04SGLEVELTRANSFAIL(CONTROL) 1 3
{ 78. TUDI TURBINE BEARING OIL LOW "RESSURE 3
- 79. TUO5 THRUST BEARING WEAR ATTACHMENT 2 PAGE 5 0F 6 i
a NUCLGR ORGANIZATION' TRAINING PROCEDURE S023-XXI-3'.1.2 UNITS 2 AND 3 REVISION O PAGE 11 0F 12 4 ATTACHNENT 2 l
SIMULATOR PERFORMANCE TESTJNG f.ggg(-YEAR Continued)SCHEDULE 1
MALFUNCTION TESTING (Continued)
TITLE / DESCRIPTION YEAR OF TEST
- 80. TUO8 TUR8INE TRIP DUE TO ELECTRIC GOVERNOR 3 i
- 81. TU14 TURBINE EXTRACTION VALVES CLOSE 3
' 4
- 82. WD01 INADV RADI0 ACTIVE LIQ REL l
- 83. WD02 RUPTURE WASTE GAS DECAY TANK 4 l
i i
i f
i iI i
4 XXI312.wS1 ATTACHMENT 2 PAGE 6 0F 6
NUCLEAR ORGANIZATION TRAINING PROCEDURE S023-XXI-3.1.2 UNITS 2 f!i9 3 REVISION O PAGE 12 0F 12 ATTACHMENT 3 l QfVELOPMENT RESOURCES l
- 1. Title 10, Chapter 1, code of Federal Regulations, f art 55 -
- 2. Regulatory Guide 1.149, Nuclear Power Plant Simult >on Facilities for use in Operator License Examinations
- 3. Simulator Verification Program
- 4. NUREG-1258 Eveluation Procedure for Simulation Fecilities Certified under 1
10CFR 55 1
- 5. ANSI /ANS-3.5-1985, American National Standard, Nuclear Power Plant l Simulators for Use in Operator Training l
l l
l
, i l
I I 1
l 4
XXI312.wS1 ATTACHMENT 3 PAGE 1 0F 1