Proposed Tech Specs Adding SR to TS 3.3.9, CR Isolation Signal
ML20155B874
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 10/20/1998
From:
SOUTHERN CALIFORNIA EDISON CO.
To:
Shared Package
ML20155B858 List:
References
NUDOCS 9810300320
Download: ML20155B874 (15)


Text

__ . _ _ _ _ - _ . _ _ _ - _ _ _ . _ _ _ _ _ _ . _ _ . - . . _ _ . _ _ _ _ . _ . _ . _ _ _ _ _ . _ _

CRIS 3.3.9 SURVCILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY l

SR 3.3.9.2 Perform a CHANNEL FUNCTIONAL TEST on 92 days I required CRIS airborne radiation monitor cha.anel .

Verify CRIS high radiation setpoint is s 4E2 cpm above normal background.

SR 3.3.9.3 -----------------NOTE-------------------

Surveillance of Actuation Logic'~shall include the verification of the proper I operation of each initiation relay.

Perform a CHANNEL FUNCTIONAL TEST on 18 months required CRIS Actuation Logic channel.

SR 3.3.9.4 Perform a CHANNEL CALIBRATION on 18 months required CRIS airborne radiation monitor channel.

SR 3.3.9.5 Perform a CHANNEL FUNCTIONAL TEST on 18 months required CRIS Manual Trip channel.

SAN ON0FRE--UNIT 2 3.3-41 Amendment No. 4 W , 132 9810300320 981020' PDR ADOCK 05000361 p PDR j

4 PCN-485 l

l l

l l

l l

ATTACHMENT "B" '

EXISTING SPECIFICATIONS UNIT 3 l

l I

t i

l

CRIS 3.3.9 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.3.9.2 Perform a CHANNEL FUNCTIONAL TEST on 92 days required CRIS airborne radiation monitor channel.

Verify CRIS high radiation setpoint is s 4E2 cpm above normal background.

SR 3.3.9.3 -----------------NOTE-------------------

Surveillance of Actuation Logic shall include the verification of the ' proper operation of each initiation relay.

Perform a CHANNEL FUNCTIONAL TEST on 18 months regtired CRIS Actuation Logic channel.

SR 3.3.9.4 Perform a CHANNEL CALIBRATION on 18 months required CRIS airborne radiation monitor channel.

SR 3.3.9.5 Perform a CHANNEL FUNCTIONAL TEST on 18 months required CRIS Manual Trip channel.

SAN ON0FRE--UNIT 3 3.3-41 Amendment No. +46, 121

PCN-485 l

ATTACHMENT "C" PROPOSED SPECIFICATIONS (RED LINE & STRIKEOUT)

UNIT 2

l CRIS 3.3.9 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY

'~ SR 3.3.9.2 Perform a CHANNEL FUNCTIONAL TEST on 92 days j required CRIS airborne radiation monitor i channel. l i

Verify CRIS high radiation setpoint is l s 4E2 cpm above normal background. j l

SR 3.3.9.3 -----------------NOTE------------------- i Surveillance of Actuation Logic shall  !

include the verification of the' proper operation of each initiation relay.

Perform a CHANNEL FUNCTIONAL TEST on 18 months  ;

required CRIS Actuation Logic channel. l SR 3.3.9.4 Perform a CHANNEL CALIBRATION on 18 months i required CRIS airborne radiation monitor channel.

SR 3.3.9.5 Perform a CHANNEL FUNCTIONAL TEST on 18 months required CRIS Manual Trip channel.

SR!3.3.9.6 Verifvithat responsettime.of required 18~ months CRIS channel is within' limits.

1 SAN ON0FRE--UNIT 2 3.3-41 Amendment No.

y -%'-+

~ _ _

1 PCN-485

\

i l l l l l

l l

l l

l l l l 1 l ATTACHMENT "D" l l

PROPOSED SPECIFICATIONS I (RED LINE & STRIKE 0UT)

! UNIT 3 i

i l

l l

r 1

1

CRIS 3.3.9 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.3.9.2 Perform a CHANNEL FUNCTIONAL TEST on 92 days required CRIS airborne radiation monitor channel.

Verify CRIS high radiation setpoint is s 4E2 cpm above normal background.

SR 3.3.9.3 -----------------NOTE-------------------

Surveillance of Actuation Logic shall include the verification of the proper operation of each initiation relay.

Perform a CHANNEL FUNCTIONAL TEST on 18 months required CRIS Actuation Logic channel.

SR 3.3.9.4 Perform a CHANNEL CALIBRATION on 18 months required CRIS airborne radiation monitor channel.

SR 3.3.9.5 Perform a CHANNEL FUNCTIONAL TEST on 18 months required CRIS Manual Trip channel.

SR-3.3.9,6 Verify that response time of required 18 months CRIS channel is within limits.

SAN ON0FRE--UNIT 3 3.3-41 Amendment No.

l l

O.

PCN-485 l

l l

l ATTACHMENT "E" l

PROPOSED SPECIFICATIONS l UNIT 2 l l

i l

1 1

a

l l

CRIS 3.3.9 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.3.9.2 Perform a CHANNEL FUNCTIONAL TEST on 92 days required CRIS airborne radiation monitor channel.

Verify CRIS high radiation setpoint is s 4E2 cpm above normal background.

SR 3.3.9.3 -----------------NOTE-------------------

Surveillance of Actuation Logic shall include the verification of the proper operation of each initiation relay.

Perform a CHANNEL FUNCTIONAL TEST on 18 months required CRIS Actuation Logic channel. 4 SR 3.3.9.4 Perform a CHANNEL CALIBRATION on 18 months required CRIS airborne radiation menitor channel.

SR 3.3.9.5 Perform a CHANNEL FUNCTIONAL TEST on 18 months required CRIS Manual Trip channel.

SR 3.3.9.6 Verify that response time of required 18 months CRIS channel is within limits.

SAN ON0FRE--UNIT 2 3.3-41 Amendment No.

v l

1 ..

PCN-485 1

1 l

l l

1 I

ATTACHMENT "F" PROPOSED SPECIFICATIONS UNIT 3 l

l l

l l

L

CRIS 3.3.9 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.3.9.2 Perform a CHANNEL FUNCTIONAL TEST on 92 days required CRIS airborne radiation monitor channel.

L Verify CRIS high radiation setpoint is s 4E2 cpm above normal background.

l l l l l SR 3.3.9.3 -----------------NOTE-------------------

l Surveillance of Actuation Logic shall j include the verification of the proper i l operation of each initiation relay.

)

l ........................................ l Perform a CHANNEL FUNCTIONAL TEST on 18 months required CRIS Actuation Logic channel. j i

! i i SR 3.3.9.4 Perform a CHANNEL CALIBRATION on 18 months required CRIS airborne radiation monitor channel.

l SR 3.3.9.5 Perform a CHANNEL FUNCTIONAL TEST on 18 months

, required CRIS Manual Trip channel.

l I- SR 3.3.9.6 Verify that response-time of required 18 months L CRIS' channel is within limits.

t

SAN ON0FRE--UNIT 3 3.3-41 Amendment No.

f l

~

(

l-

PCN-485 ATTACflMENT "G" PROPOSED BASES UNIT 2 l

1 1

CRIS B 3.3.9 BASES SURVEILLANCE SR 3.3.9.5 REQUIREMENTS (continued) Every 18 months, a CHANNEL FUNCTIONAL TEST is performed on the manual CRIS actuation circuitry.

l This test verifies that the trip push buttons are capable of  ;

opening contacts in the Actuation Logic as designed, '

de-energizing the initiation relays and providing Manual Trip of the function. The 18 month Frequency is based on the need to perform this Surveillance under the conditions that apply l during a plant outage and the potential for an unplanned l transient if the Surveillance were performed with the reactor I at power. Operating experience has shown these components usually pass the Surveillance when performed at a Frequency of once every 18 months. l

~ ~

SR 3.3.'9'.6 l l

This Surveillance ensures that the train actuation response I times.are less than or eaual to the maximum times assumed in  !

I the analyses. A time limit to isolate the control room is needed to ensure compliance with 10 CFR 50 Appendix A General Desian Criterion 19. The 18 month freauency is based upon plant operatina experience, which shows that random failures of instrumentation components causina serious response time dearadation, but not channel failure, are infreauent occurrences. The response time is tested from the module input: i.e., the radiation detector response is not measured.

Testina of the final actuatina devices is included in the Surveillance. Response time testing accepthnce criteria are included in Reference 4.

REFERENCES 1. SONGS Units 2 and 3 UFSAR, Chapter 15.

2. PPS Selection of Trip Values Document.
3. 10 CFR 50, Appendix A, GDC 19.
4. Licensee Controlled Specification 3.3.100, "RPS/ESFAS Response Times."

SAN ON0FRE--UNIT 2 B 3.3-151

44 1

PCN-485 ATTACHMENT "H" PROPOSED BASES UNIT 3

CRIS BASES' O

SURVEILLANCE SR 3.3.9.5 REQUIREMENTS ,

(continued) Every 18 months, a CHANNEL FUNCTIONAL TEST is performed on (

the manual CRIS actuation circuitry. 1 This test verifies that the trip push buttons are capable of opening contacts in the Actuation Logic as designed, de-energizing the initiation relays and providing Manual Trip of the function. The 18 month Frequency is based on the need to perform this Surveillance under the conditions that apply during a plant outage and the potential for an unplanned transient if the Surveillance were performed with the reactor  !

at power. Operating experience has shown these components l usually pass the Surveillance when performed at a Frequency of once every 18 months.

i SR-3.3.9.6 i

This Surveillance ensures that the train actuation response I times are less.than or eaual to the maximum times: assumed in j the analyses. A time limit to isolate the control room is  ;

needed to ensure compliance with 10.CFR 50 Accendix A General l Desian Criterion 19. The 18 month.freauency is based uoon '

plant operatina experience, which shows that random failures {

of instrumentation components causina serious response' time l dearadation, but not channel failure.-are'infreauent i occurrences. The response time is' tested from the module 1 input:-.i.e.. the radiation detector response.is not measured. l Testino of the final actuatina devices is -included in the {

! Surveillance. . Response time testing acceptance criteria are included.in Reference 4.

REFERENCES 1. SONGS Units 2 and 3 UFSAR, Chapter 15.

2. PPS Selection of Trip Values Document.
3. 10 CFR 50,-Appendix A, GDC 19.
4. .

Licensee Controlled Specification 3.3.100, "RPS/ESFAS Response Times."

l l

SAN ONOFRE--UNIT 3 B 3.3-151  !