NUREG-1258, Extends Invitation to TE James to Participate as Independent Peer Advisor to NRC in Certification Audit.Nrc Insp of Util Simulation Facility Certification Will Consists of Three Phases

From kanterella
(Redirected from NUREG-1258)
Jump to navigation Jump to search
Extends Invitation to TE James to Participate as Independent Peer Advisor to NRC in Certification Audit.Nrc Insp of Util Simulation Facility Certification Will Consists of Three Phases
ML20151L499
Person / Time
Site: Maine Yankee
Issue date: 07/28/1988
From: Hannon J
Office of Nuclear Reactor Regulation
To: Short M
Maine Yankee
References
RTR-NUREG-1258 NUDOCS 8808040057
Download: ML20151L499 (4)


Text

,

  • /

o UNITED STATES

~g NUCLEAR REGULATORY COMMISSION n

A

-E WASHINGTON, D. C. 20555

%'*****[

JUL 2 81988 Mr. Michael P. Short Training Manager San Onofre Nuclear Generating Station P. O. Box 128 San Clemente, California 92672

Dear Mr. Short:

This letter is to invite Mr. Thomas E. James, Simulator Administrator, to participate as an_ independent peer advisor to the NRC in its certification audit of the' Maine. Yankee Lsimulation facility.

As you may kr.aw, each facility licensee is required to have a certified or approved simulation facility in place for use in the conduct of operating tests by May 26, 1991. When required, the NRC will convene a team to inspect those simulation facilities that have been certified in compliance with 10CFR55.

Provided that the facility licensee whose simulation facility is being inspected does not object, the NRC will utilize the services of independent, industry-based peer advisors in support of the work of its staff audit teams.

Maine Yankee is the first facility licensee to have submitted a certification for its simulation fecility, and it has consented to the participation of a peer advisor.

In accordance with the guidance provided in NUREG-1258, "Evaluation Procedure for Simulation Facilities Certified Under 10CFR55," the peer advisor will:

"work with the staff, under the direction of the lead staff member, in the collection and analysis of simulation facility data, but will not perform evaluations or participate in staff decision-making regarding the findings of inspections."

We believe that Mr. James, because of his demonstrated experience and expertise in the field, would serve as an excellent peer advisor. This role is especially important at this time, since the Maine Yankee inspection is the first to be conducted under the recently issued regulations.

The NRC inspection of the Maine Yankee simulation facility certification will consist of three phases. The first phase includes a review of the certification materials submitted by the facility licensee, and a request for additional information, if needed.

This phase has been completed. The second phase will consist of a desk-top review of materials submitted in response to questions raised by the NRC, and the preparation for the on-site testing to be conducted in phase three. This desk-top review will take place at the NRC headquarters in Rockville, Maryland, on August 17-19, 1988. The third phase will be the actual site-visit, which will take place at Maine Yankee from August 29 - September 2, 1988. We request the support of Mr. James for both phases two and three of this inspection,

  • p l 8808040057 880728 PDR ADOCK 05000309 I M PDC U

~

-4 Michael P. Short 2_

JUL 2 g 1988 If you have questions, please do not hesitate to call me at (301) 492-1031.

We look forward to Mr. James' participation in this important project.

Sincerely, e

/ John N. Hannon, Chief Operator Licensing Branch Division of Licensee Perfomance and Quality Evaluation, NRR

Distribution and Concurrence for Letter to Michael Short dated DISTRIBUTION:

OLB RF Q"TCeritFallE11A T

~"

NRC'PDR"'"

JNHannon TLSzymanski LAWiens JAWachtel JAZwolinski JWRoe MICHAEL P. SHORT t

OFC LB:DLPQ

_ _ _ _ :... p),.y.).............Y,,... :. _ _ _..... _ _ _. :. _ _ _......

.B :

LP0

OLB:DlIP NAME
JA achtel:tc
L siens
JNHannon

....__:.... __.......:......__.....:... d....______..__....____................. ________

l DATE : 7/T/88

7/#/88
7/ /88 0FFICIAL FILE COPY

l i

JUL 2 81988 Distribution and Concurrence for Letter to Michael Short dated DISTRIBUTION:

OLB RF Central Files i

NRC PDR JNHannon TLSzymanski i

LAWiens JAWachtel JAZwolinski JWRoc 1

MICHAEL P. SHORT i

0FC LB:DLPQ O L.

JLP0

.w,2..... :..OL B : DMW......Y./..__:...._________:..........____.:...........

NAME

JA achtel:tc
L iens
JNHannon

......:................:...........__.....d......................................................

DATE : 7/%/88

7f#/88
7/ /88 0FFICIAL FILE COPY

..