t U. Frith (t; gg973,,,,9 W"eceAAv Cea*GE 40flCt Page 4 sf {
6FCN GM v5C Cntr:
i 3 '*/
JUN 3 01988.14Gtt w5t TCM CA%CILS ON:
iC4 40,
!$5yAgCt a,Att:
!!:py forwarceo to tne 9wetear Safsty Grows. PtAFOR>t0 if:
0Att:
i I
itChh! CAL 17tCIFICATION VIOLAf!ON IF NOT COMP (tit 0 Wjm!N la car $
s ne cec reet so.
50123-VI-1.0.1 ne,,,,on u.
3 stacts ust rCh vts no 'x Cocuments - Temporary _ Change Notices (TCNs) - Preparation 7Revis, site :oc e nt riti, npprova i, incorpora tion ana vi strioution 1.
ntnato si:
1 Fa l f nnn
- As:
Aq447 ca;Am!zAt:cM:
,MA9/9PA
- rtgirator
- z. Oatu r ms catoisAtto: _ 10 a.m. 6/28/88 3,
!f reoutres, TCM Ceviation Accroval: APPt0Vt0 if:
n/a CFCM (or cesignee) lignatore/If of telecon print name ano so state sete m me 4 Cheet approprf ste Dos: l
~
$weerseces/!ncorporatea RN(s):l Entire Docmat Attaeneo Gl Affected Page(s) Attachef None
- w. o r none, io n u ti (Not applicaele for m cu est rCNii
- s. rnis c.ge cannot.avt onni ene et re tison of the site ooemet an.
re.oireo:
To implement facility design change (7FC. NCR. TFM, etc.)
RECEIVED CDM A.
ratuty.eiign cmge i.enone, JUN 301988 inaic a e arc. c. m e u.
4 enofter
- moie.entation of ene faint eni
(!f =0. a rCN cannot ne mem,o vetln enanIe m eeen eeter.ines. ris _
no ITE FILE C P{ew/
i sne x
seinty aesign lnon,e has seen i etImoementuseof7 Ot*er (e.g.. CAa. uC Cor ite.nts) spuific aesson:
Procedure ev Approval Waiver List (TQAM Change, Chapter IC) a se reverse s ae, ir re w re43 6.
Is the eocument being TCN'd QA Affecting? 't$( f the~ Tite D5Ement NO (This 1: Indicated on the fatie of Contents page o
(!f ft$. cosplete tne bo2es below.) (!f 40. see
- belom.)
. If not indicated. trent as QA Affecting.)
1 A.
Does this cnange arrut f 5AR sr Tecn. boec. cosumitments?
OMZ l
8.
Does this change affect tne nonractological environment of any offsite area previously un'dTsTuroes tt5 90 x i
C-I during site preparatton and plant construction?
I b
1 C.
Is the Intent of the original document alteree?
Vt3 ko X j
00 l
(
0.
Is the occument to se chaages an targency operating Instruction?
YE5 ho v i
03 O CD g i
t.
Does tris change pose an unreviewed safety question per 10 CFR 50.59.1.e., aces it tacrease the Yts no i
i v
accleents or reeuce tne Tecn. Spec. margin of safetytpree.ogif ty of occurrence or the conseaw g
I t
00 1
Yt3 no X no I,
(IF DE AM5Wtt 70 A. 8. C. D or i !$ Yts. A TCN !$ nOf Aun0e!!!D.)
i 00 i
g 7
fne enttre docueent was revle e4 f a conjun<tton with tnis TCM and found to be acceptante as written e
an aanwal/bfennial revfew disposition of Acceptable As britten.tatent (50123 V! 1,0 2).
fais constit tes 5
ttVIIb(D AND APPROVED 87:
n la OCr CD Q cr3n or cesignee
- ate 03 CL Q-8.
Sf;marvers at0VIRio I
I INITI4 ArrtJYA l itVlth AMD PROYED Y:" (AT (tA T CNE (1) 140 DM DE UN!f AFFECitD i
i 1
m A
Yk 6/2f/M te?
11 r
?
M u
TimeN ) mar Martgement starr vntyis3L M f//9 2.183 I
riant Panagement starr. Unit yr i
<cate 1
/ ;a t,d ~
T(me t Covia tats fCm affect or does it represent a c ge to a plant Covie tnts TCM affect or does it represeat a chage to.
caer ton in progress? Y t !"'
NQ a plant,operati" u r ege m ? v t 5 '"
NO T :
3) m' bM-e.15 t 642.
aDw1
$ YIb /VN 3G - snitu g
Pete Time das snits 444 sete n oe I
FINAL A7PeCyAt i
5 y ea _ oa. m v _ r.n.,e,
_7 6)
E
_ a m, ass.,as e. _ s.. m..
s.te I
- 1f a docw ent ts 90t C4 affectteg estatn inttial approval f rom the Cogntrant Sweervisor(s) on the affected unit (s) a (signs Plant m aagement Staff f f ae(s4 aae flaal approval from the CFor* petor to submittal to CCM.
a are required.
4o other sigaatures "If CA Affect 1*g. approval shall te by oat s aber of the Plant Maaageneat 5taf f tao.levgesete in the areas affected and oae 520 (fCe9 sed o9 the wait or units affecte0.
Maaageavnt 5taff are eeffaes as the supervisor in cnarge of the sntft(For TCM approval. mesters of the Plant eseretslag responstatlity in the specific area and unit (s) a33ressed Dy the enange.). or as destgaates in artting my the CFCu.
'"!f $. the $41f t $wperf ateadent shall prottet the reovired $40 approval.
PFill3) 110. ItV. I 02119 OC6?P
NUCLEAR GENERATION SITE ADMINISTRATIVE PROCEDURE S0123-VI-1.0.1 VNITS 1, 2 AND 3 REVISION 3 PAGE 15 0F 30 6.0 PROCEDURE (Continued)
TCN MY 6.4.2 1P_q
.1 Upon receipt of the original TCH from the originating organization, transmit to CDM for processing in accordance with Reference 2.2.7, OR 6.4.3
.(D2
.1 Upon receipt of the original TCH from the originating organization, process in accordance with Reference 2.2.7.
6.5 Final Acoroval. Processina and Distribution of Issued 0A Affectina TCNs and SINGLE USE TCNs 6.5.1 1P_q
.1 Upon receipt of the original TCNs from COM (per Section 6.3.2.4), perform the following:
.1.1 Enter the information into the SPG TCN Tracking System and stamp "SPG" in the right-hand corner of Form PF(123) 110.
.l.2 Prepare Form PF(123) 101 (see Attachment 2 and keypoints) and forward with the PF(123) 110 form as follows:
.l.2.1 Route to established internal discipline reviewers (identified to the SPG by the appropriate Division), if applicable.
.l.2.2 Route to CFOM for review and approval / disapproval.
.l.2.3 Route to Quality Assurance (QA) for review and approval /
disapproval unless indicated as not requiring QA/QC M
review / approval on the QA0 Procedure Review / Approval Waiver 1.ist (see Attachments 2 and 3 and Keypoints).
6.5.2 Reviewers
.1 Receive the PF(123) 101 form and the PF(123) 110 form from the SPG, approve / disapprove the TCN.
.1.1 Comments pertaining to the Site Document's content, but do not constitute disapproval of the TCN, may be returned on comment sheet (s) (i.e., CC(123) 261, Review, Comment and Resolution) to the SPG along with the TCN.
.l.1.1 Technical content comments ("B") constitute disapproval and shall be handled in accordance with Section 6.6.
NOTE:
Annual / Biennial Review credit is 0.q1 allowed against a Single Use TCN.
.2 The CFDM or designee, authorized by th( CFDM in accordance with Reference 2.2.4, may review the entire Site Document in conjunction with a TCN and receive Annual / Bier.nial Review credit.
n.
' NUCLEAR GENERATION SITE ADNINISTRATIVE PROCEDURE S0123-VI-1.0.1
=.
. UNITS 1, 2 AND 3 REVISION 3 PAGE 26 0F 30 ATTACljyENT 2 TCN YI 4 3.* +
. FINAL APPROVAL / DISAPPROVAL / CANCELLATION ROUTING FOR ISSUED TEMPORARY CHANGE NOTICE (S)
PF(123) 101
-KEYPOINTS-(Continued) 4 ff_DM/ DESIGNEE (9)- Perform evaluation indicating affect of disapproval (cancellation) on s
the acceptability of previous tests or other critical operations.
(Does evaluation support disapproval / cancellation? If No, attempt to resolve issues with individual disapproving to gain TCN approvai or return the disapproval evaluation to the SPG for rerouting to the i
disapprover for reconsideration and possible TCN approval.)
(10) Sign and date upon completion of evaluation.
(11) If previous operations have been invalidated, is'an NCR required?
If Yes, provide NCR Number. Should previously active TCNs, that were superseded / incorporated into this TCN on the corresponding PF(123) 110 form, be reinstated? Check Yes if you want to reinstate the previously active TCNs. Should the previous document revision be reinstated?
Check Yes if it is necessary to redistribute the document revision to the field, i.e., an entire document TCN is disapproved / cancelled and the line that indicates superseded / incorporated TCNs on the PF(123) 110 states None.
Return to SPG.
IPA (12A) Check the disapproved or cancelled block if TCN disaparoval/ cancellation evaluation supports disapproval / cancellation -
YES ciecked.
(Disapproval occurs during TCN processing, cancellation, if initiated, is to an issued, final approved TCN.)
(12) Obtain approval from the CFDM and QA and dates of approval.
For QA Program Affecting documents, QA/QC approval is agt required if the document is identified as not requiring QA/QC review / approval on the
- )
QA0 Procedure Review / Approval Waiver List.
Enter N/A in QA block when QA/QC review / approval is not required, t
(13) Provide signature and date.
Forward to CDM.
C&d (14) Provide signature and date.
Forward copy to NSG, Reinstate prior TCN(s) and/or document revision, if required.
l 0067f.aut ATTACHMENT 2 PAGE 3 0F 3 1
i.
3 NUCLEAR GENERATION SITE ADMINISTRATIVE PROCEDURE S0123 VI-1.0.1 UNITS 1, 2 AND 3 REVISION 3 PAGE 30 0F 30 ATTACHME,NT 3 TCN 3I g v,,#
TEMPORARY CHANGE NOTICE (Continued)
PF(123) 110 KEYPOINTS(Continued)
ORIGINATOR (Continued)'
(11) Not QA Affecting TCNs require initial approval only by the Cognizant Supervisor (s) for the affected unit (s). TheCognizantSupervisor(s) shall sign on the Plant Management Staff line(s).
Final approval is obtained from the CFDM.
Both signatures shall be obtained )rior to submitting the Not QA Affecting TCN to CDM.
Enter N/A on tie SR0 and Quality Assurance signature lines.
C&M (1) Provide the TCH or SINGLE USE TCH number.
NOTE:
No more than ten (10) outstanding TCNs shall be issued against a revision of a Site document determined to be QA Program Affecting unless granted a deviation.
Deviations shall be approved by the CFDM or designee (Project and Contractor / Subcontractor documents are exempted from this restriction).
Enter date TCH is issued.
Enter, for SINGLE US2 TCNs only, the date that it automatically cancels.
Provide signature of CDM representative and the date TCN is forwarded to the Nuclear Safety Group after final approval.
1PG (12) Obtain final approvals via PF(123) 101.
QA/QC review / approval is Dd required if the document is currently designated as Not QA Program h
Affecting, or is identified as not requiring QA/QC review / approval on 4
the QA0 Procedure Review / Approval Waiver List.
Enter N/A on the QA review / approval line when QA/QC review / approval is not required.
0067f.aut ATTACHMENT 3 PAGE 4 0F 4