Similar Documents at Perry |
---|
Category:INSPECTION REPORT
MONTHYEARIR 05000440/19990131999-09-13013 September 1999 Insp Rept 50-440/99-13 on 990712-30.Violations Noted. Major Areas Inspected:Effectiveness of Pnpp Program for Identification,Resolution & Prevention of Technical Issues & Problems That Could Degrade Quality of Plant Operations IR 05000440/19990091999-09-0909 September 1999 Insp Rept 50-440/99-09 on 990709-0825.One Violation Occurred & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20211M6521999-08-31031 August 1999 Revised Page Number 4, P2 Status of EP Facilities,Equipment & Resources IR 05000440/19990121999-08-12012 August 1999 Insp Rept 50-440/99-12 on 990712-16.No Violations Noted. Major Areas Inspected:Emergency Preparedness Program IR 05000440/19990081999-07-22022 July 1999 Insp Rept 50-440/99-08 on 990518-0708.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000440/19990031999-06-10010 June 1999 Insp Rept 50-440/99-03 on 990407-0517.Two Violations Noted & Being Treated as non-cited Violations.Major Areas Inspected: Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000440/19990071999-05-12012 May 1999 Insp Rept 50-440/99-07 on 990412-16.No Violations Noted. Major Areas Inspected:Rp Performance & Oversight of Refueling Outage Activities IR 05000440/19990061999-05-0606 May 1999 Insp Rept 50-440/99-06 on 990303-04 & 0412-16.No Violations Noted.Major Areas Inspected:Inservice Insp Efforts & Overlay Repairs of N4C Feedwater Nozzle IR 05000440/19990021999-05-0303 May 1999 Insp Rept 50-440/99-02 on 990225-0406.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000440/19990051999-04-0202 April 1999 Insp Rept 50-440/99-05 on 990301-05.No Violations Noted. Major Areas Inspected:Licensee Implementation of 10CFR50.65, Requirements for Monitoring Effectiveness of Maint at Npps ML20204E7901999-03-17017 March 1999 Insp Rept 50-440/99-01 on 990113-0224.Non-cited Violation Identified.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000440/19990041999-03-17017 March 1999 Insp Rept 50-440/99-04 on 990222-26.No Violations Noted. Major Areas Inspected:Radiation Protection Program & Radiological Planning for Upcoming Refueling Outage,Which Included Review of Rwps,Alara Reviews & Dose Goals IR 05000440/19980191998-12-23023 December 1998 Insp Rept 50-440/98-19 on 981021-1202.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000440/19980221998-11-25025 November 1998 Chemistry & RP Insp Rept 50-440/98-22 on 981102-06.No Violations Noted:Major Areas Inspected:Implementation of Chemistry Program,Meteorological Monitoring Program & Control & Monitoring of Personnel Radiation Dose IR 05000440/19980211998-11-18018 November 1998 Insp Rept 50-440/98-21 on 981019-22.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program ML20195C7361998-11-10010 November 1998 Insp Rept 50-440/98-18 on 980909-1020.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000440/19980171998-10-0707 October 1998 Insp Rept 50-440/98-17 on 980831-0914.Violations Noted. Major Areas Inspected:Review of Implementation of Solid Radwaste Mgt & Shipping Program.Insp Also Reviewed Conduct of Radiological Environ Monitoring Program IR 05000440/19980161998-09-25025 September 1998 Insp Rept 50-440/98-16 on 980723-0908.No Violations Noted. Major Areas Inspected:Resident Inspectors Evaluation of Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000440/19980151998-09-0808 September 1998 Insp Rept 50-440/98-15 on 980727-31.Violations Noted. Major Areas Inspected:Effectiveness of Selected Elements of Security Program IR 05000440/19980131998-08-21021 August 1998 Insp Rept 50-440/98-13 on 980605-0722.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000440/19980141998-08-19019 August 1998 Insp Rept 50-440/98-14 on 980620-24 & 0720-22.No Violations Noted.Major Areas Inspected:Licensee C/A for Issues Identified by NRC Inspections & Licensee Event Repts Submitted to NRC ML20236R8251998-07-16016 July 1998 Insp Rept 50-440/98-11 on 980518-22.Violations Noted.Major Areas Inspected:Adequacy of Licensee Programs,Procedures, Training,Equipment & Supporting Documentation for Maint of medium-voltage & low-voltage Power Circuit Breakers ML20236N0281998-07-0909 July 1998 Insp Rept 50-440/98-10 on 980421-0604.Violations Noted.Major Areas Inspected:Operations,Maint & Surveillance,Engineering & Plant Support IR 05000440/19980121998-06-25025 June 1998 Insp Rept 50-440/98-12 on 980601-05.Violations Noted.Major Areas Inspected:Plant Support ML20217M1311998-04-29029 April 1998 Insp Rept 50-440/98-07 on 980223-0305.Violations Noted. Major Areas Inspected:Operations,Engineering & Maintenance IR 05000440/19980051998-04-27027 April 1998 Insp Rept 50-440/98-05 on 980209-0408.No Violations Noted. Major Areas Inspected:Portions of Licensee Fire Protection Program IR 05000440/19980061998-04-0101 April 1998 Insp Rept 50-440/98-06 on 980128-0310.Violations Noted.Major Areas Inspected:Licensee Operations,Maint & Engineering IR 05000440/19980031998-03-26026 March 1998 Insp Rept 50-440/98-03 on 980223-27.No Violations Noted. Major Areas Inspected:Licensee Performance During Plant Biennial Exercise of Emergency Plan IR 05000440/19980021998-03-12012 March 1998 Insp Rept 50-440/98-02 on 980112-16 & 26-30.No Violations Noted.Major Areas Inspected:Operations,Engineering & Review of Effectiveness of CA Program ML20203D8241998-02-20020 February 1998 Insp Rept 50-440/97-21 on 971202-980127.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000440/19970171998-01-21021 January 1998 Insp Rept 50-440/97-17 on 971103-07 & 971215-18.No Violations Noted.Major Areas Inspected:Ep Program IR 05000440/19980041998-01-16016 January 1998 Insp Rept 50-440/98-04 on 980105-09.No Violations Noted. Major Areas Inspected:Radiolological,Environ & Chemistry Sections Programs IR 05000440/19970201998-01-12012 January 1998 Insp Rept 50-440/97-20 on 971202-05.No Violations Noted. Major Areas Inspected:Review of Physical Security Program ML20202J1301998-01-0202 January 1998 Insp Rept 50-440/97-16 on 971004-1201.Violations Noted. Major Areas Inspected:Operations,Maint & Plant Support IR 05000440/19970221997-12-31031 December 1997 Insp Rept 50-440/97-22 on 971015-1201.Violations Noted. Major Areas Inspected:Circumstances That Led to Inadvertent Loss of Reactor Pressure Vessel Water Inventory That Occured on 971011 IR 05000440/19970151997-12-21021 December 1997 Insp Rept 50-440/97-15 on 970922-1023.No Violations Noted. Major Areas Inspected:Isi Efforts & Installation Activities of Suppression Pool Suction Strainer Mod IR 05000440/19970091997-11-26026 November 1997 Insp Rept 50-440/97-09 on 970624-0808.Violations Noted. Major Areas Inspected:Operations,Maintenance & Surveillance, Engineering & Plant Support IR 05000440/19970121997-11-26026 November 1997 Insp Rept 50-440/97-12 on 970809-1004.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000440/19970191997-11-25025 November 1997 Insp Rept 50-440/97-19 on 971027-31.No Violations Noted. Major Areas Inspected:Radiological Controls,Radwaste Controls,Radiation Worker Practices & High Radiation Area Controls IR 05000440/19970071997-10-24024 October 1997 Insp Rept 50-440/97-07 on 970503-0623.Violations Noted. Major Areas Inspected:Operations,Maintenance,Surveillance, Engineering & Plant Support IR 05000440/19970141997-10-17017 October 1997 Insp Rept 50-440/97-14 on 970915-19.No Viiolations Noted. Major Areas Inspected:Review of Radiation Protection Program,Including Radiation Protection Planning & Coverage for Sixth Refueling Outage ML20212A3721997-10-16016 October 1997 Predecisional Enforcement Conference Rept on 971007.Areas Discussed:Apparent Violations Identified During Insp & CA Taken or Planned by Licensee.Apparent Violations Involved SE That Failed to Identify Unreviewed Safety Question IR 05000440/19970131997-09-29029 September 1997 Insp Rept 50-440/97-13 on 970826-28.No Violations Noted. Major Areas Inspected:Followup to Maintenance Rule Baseline Insp ML20198L5241997-09-23023 September 1997 Insp Rept 50-440/97-08 on 970721-0827.Violations Noted. Major Areas Inspected:Unresolved Items & Insp follow-up Items Identified by Design Insp Conducted from 970127-0327 IR 05000440/19970101997-08-29029 August 1997 Insp Rept 50-440/97-10 on 970728-0801.Violations Noted. Major Areas Inspected:Review of Solid Radioactive Waste Processing & Shipping Program.Additionally,Radiation Protection Planning for Upcoming Refueling Outage Reviewed IR 05000440/19970111997-08-26026 August 1997 Insp Rept 50-440/97-11 on 970728-31.No Violations Noted. Major Areas Inspected:Licensee Fire Protection Program IR 05000440/19960161997-08-0404 August 1997 Predecisional Enforcement Conference Rept on 970418.Areas Discussed:Violations Noted in Insp Repts 50-440/96-16, 50-440/96-17 & 50-440/96-18 & Corrective Actions IR 05000440/19970041997-06-16016 June 1997 Insp Rept 50-440/97-04 on 970322-0502.No Violations Noted. Major Areas Inspected:Operation,Maint & Surveillance, Engineering & Plant Support ML20140F8371997-06-10010 June 1997 Insp Rept 50-440/97-201 on 970217-0327.Issues Identified Which Challenged Capability of Sys to Perform Complete Scope DBA Mitigation Actions.Major Areas Inspected:Hpcs & Eec Sys IR 05000440/19972011997-06-10010 June 1997 Insp Rept 50-440/97-201 on 970217-0327.Issues Identified Which Challenged Capability of Sys to Perform Complete Scope DBA Mitigation Actions.Major Areas Inspected:Hpcs & Eec Sys 1999-09-09
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000440/19990131999-09-13013 September 1999 Insp Rept 50-440/99-13 on 990712-30.Violations Noted. Major Areas Inspected:Effectiveness of Pnpp Program for Identification,Resolution & Prevention of Technical Issues & Problems That Could Degrade Quality of Plant Operations IR 05000440/19990091999-09-0909 September 1999 Insp Rept 50-440/99-09 on 990709-0825.One Violation Occurred & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20211M6521999-08-31031 August 1999 Revised Page Number 4, P2 Status of EP Facilities,Equipment & Resources IR 05000440/19990121999-08-12012 August 1999 Insp Rept 50-440/99-12 on 990712-16.No Violations Noted. Major Areas Inspected:Emergency Preparedness Program IR 05000440/19990081999-07-22022 July 1999 Insp Rept 50-440/99-08 on 990518-0708.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000440/19990031999-06-10010 June 1999 Insp Rept 50-440/99-03 on 990407-0517.Two Violations Noted & Being Treated as non-cited Violations.Major Areas Inspected: Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000440/19990071999-05-12012 May 1999 Insp Rept 50-440/99-07 on 990412-16.No Violations Noted. Major Areas Inspected:Rp Performance & Oversight of Refueling Outage Activities IR 05000440/19990061999-05-0606 May 1999 Insp Rept 50-440/99-06 on 990303-04 & 0412-16.No Violations Noted.Major Areas Inspected:Inservice Insp Efforts & Overlay Repairs of N4C Feedwater Nozzle IR 05000440/19990021999-05-0303 May 1999 Insp Rept 50-440/99-02 on 990225-0406.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000440/19990051999-04-0202 April 1999 Insp Rept 50-440/99-05 on 990301-05.No Violations Noted. Major Areas Inspected:Licensee Implementation of 10CFR50.65, Requirements for Monitoring Effectiveness of Maint at Npps ML20204E7901999-03-17017 March 1999 Insp Rept 50-440/99-01 on 990113-0224.Non-cited Violation Identified.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000440/19990041999-03-17017 March 1999 Insp Rept 50-440/99-04 on 990222-26.No Violations Noted. Major Areas Inspected:Radiation Protection Program & Radiological Planning for Upcoming Refueling Outage,Which Included Review of Rwps,Alara Reviews & Dose Goals IR 05000440/19980191998-12-23023 December 1998 Insp Rept 50-440/98-19 on 981021-1202.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000440/19980221998-11-25025 November 1998 Chemistry & RP Insp Rept 50-440/98-22 on 981102-06.No Violations Noted:Major Areas Inspected:Implementation of Chemistry Program,Meteorological Monitoring Program & Control & Monitoring of Personnel Radiation Dose IR 05000440/19980211998-11-18018 November 1998 Insp Rept 50-440/98-21 on 981019-22.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program ML20195C7361998-11-10010 November 1998 Insp Rept 50-440/98-18 on 980909-1020.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000440/19980171998-10-0707 October 1998 Insp Rept 50-440/98-17 on 980831-0914.Violations Noted. Major Areas Inspected:Review of Implementation of Solid Radwaste Mgt & Shipping Program.Insp Also Reviewed Conduct of Radiological Environ Monitoring Program IR 05000440/19980161998-09-25025 September 1998 Insp Rept 50-440/98-16 on 980723-0908.No Violations Noted. Major Areas Inspected:Resident Inspectors Evaluation of Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000440/19980151998-09-0808 September 1998 Insp Rept 50-440/98-15 on 980727-31.Violations Noted. Major Areas Inspected:Effectiveness of Selected Elements of Security Program IR 05000440/19980131998-08-21021 August 1998 Insp Rept 50-440/98-13 on 980605-0722.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000440/19980141998-08-19019 August 1998 Insp Rept 50-440/98-14 on 980620-24 & 0720-22.No Violations Noted.Major Areas Inspected:Licensee C/A for Issues Identified by NRC Inspections & Licensee Event Repts Submitted to NRC ML20236R8251998-07-16016 July 1998 Insp Rept 50-440/98-11 on 980518-22.Violations Noted.Major Areas Inspected:Adequacy of Licensee Programs,Procedures, Training,Equipment & Supporting Documentation for Maint of medium-voltage & low-voltage Power Circuit Breakers ML20236N0281998-07-0909 July 1998 Insp Rept 50-440/98-10 on 980421-0604.Violations Noted.Major Areas Inspected:Operations,Maint & Surveillance,Engineering & Plant Support IR 05000440/19980121998-06-25025 June 1998 Insp Rept 50-440/98-12 on 980601-05.Violations Noted.Major Areas Inspected:Plant Support ML20217M1311998-04-29029 April 1998 Insp Rept 50-440/98-07 on 980223-0305.Violations Noted. Major Areas Inspected:Operations,Engineering & Maintenance IR 05000440/19980051998-04-27027 April 1998 Insp Rept 50-440/98-05 on 980209-0408.No Violations Noted. Major Areas Inspected:Portions of Licensee Fire Protection Program IR 05000440/19980061998-04-0101 April 1998 Insp Rept 50-440/98-06 on 980128-0310.Violations Noted.Major Areas Inspected:Licensee Operations,Maint & Engineering IR 05000440/19980031998-03-26026 March 1998 Insp Rept 50-440/98-03 on 980223-27.No Violations Noted. Major Areas Inspected:Licensee Performance During Plant Biennial Exercise of Emergency Plan IR 05000440/19980021998-03-12012 March 1998 Insp Rept 50-440/98-02 on 980112-16 & 26-30.No Violations Noted.Major Areas Inspected:Operations,Engineering & Review of Effectiveness of CA Program ML20203D8241998-02-20020 February 1998 Insp Rept 50-440/97-21 on 971202-980127.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000440/19970171998-01-21021 January 1998 Insp Rept 50-440/97-17 on 971103-07 & 971215-18.No Violations Noted.Major Areas Inspected:Ep Program IR 05000440/19980041998-01-16016 January 1998 Insp Rept 50-440/98-04 on 980105-09.No Violations Noted. Major Areas Inspected:Radiolological,Environ & Chemistry Sections Programs IR 05000440/19970201998-01-12012 January 1998 Insp Rept 50-440/97-20 on 971202-05.No Violations Noted. Major Areas Inspected:Review of Physical Security Program ML20202J1301998-01-0202 January 1998 Insp Rept 50-440/97-16 on 971004-1201.Violations Noted. Major Areas Inspected:Operations,Maint & Plant Support IR 05000440/19970221997-12-31031 December 1997 Insp Rept 50-440/97-22 on 971015-1201.Violations Noted. Major Areas Inspected:Circumstances That Led to Inadvertent Loss of Reactor Pressure Vessel Water Inventory That Occured on 971011 IR 05000440/19970151997-12-21021 December 1997 Insp Rept 50-440/97-15 on 970922-1023.No Violations Noted. Major Areas Inspected:Isi Efforts & Installation Activities of Suppression Pool Suction Strainer Mod IR 05000440/19970091997-11-26026 November 1997 Insp Rept 50-440/97-09 on 970624-0808.Violations Noted. Major Areas Inspected:Operations,Maintenance & Surveillance, Engineering & Plant Support IR 05000440/19970121997-11-26026 November 1997 Insp Rept 50-440/97-12 on 970809-1004.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000440/19970191997-11-25025 November 1997 Insp Rept 50-440/97-19 on 971027-31.No Violations Noted. Major Areas Inspected:Radiological Controls,Radwaste Controls,Radiation Worker Practices & High Radiation Area Controls IR 05000440/19970071997-10-24024 October 1997 Insp Rept 50-440/97-07 on 970503-0623.Violations Noted. Major Areas Inspected:Operations,Maintenance,Surveillance, Engineering & Plant Support IR 05000440/19970141997-10-17017 October 1997 Insp Rept 50-440/97-14 on 970915-19.No Viiolations Noted. Major Areas Inspected:Review of Radiation Protection Program,Including Radiation Protection Planning & Coverage for Sixth Refueling Outage ML20212A3721997-10-16016 October 1997 Predecisional Enforcement Conference Rept on 971007.Areas Discussed:Apparent Violations Identified During Insp & CA Taken or Planned by Licensee.Apparent Violations Involved SE That Failed to Identify Unreviewed Safety Question IR 05000440/19970131997-09-29029 September 1997 Insp Rept 50-440/97-13 on 970826-28.No Violations Noted. Major Areas Inspected:Followup to Maintenance Rule Baseline Insp ML20198L5241997-09-23023 September 1997 Insp Rept 50-440/97-08 on 970721-0827.Violations Noted. Major Areas Inspected:Unresolved Items & Insp follow-up Items Identified by Design Insp Conducted from 970127-0327 IR 05000440/19970101997-08-29029 August 1997 Insp Rept 50-440/97-10 on 970728-0801.Violations Noted. Major Areas Inspected:Review of Solid Radioactive Waste Processing & Shipping Program.Additionally,Radiation Protection Planning for Upcoming Refueling Outage Reviewed IR 05000440/19970111997-08-26026 August 1997 Insp Rept 50-440/97-11 on 970728-31.No Violations Noted. Major Areas Inspected:Licensee Fire Protection Program IR 05000440/19960161997-08-0404 August 1997 Predecisional Enforcement Conference Rept on 970418.Areas Discussed:Violations Noted in Insp Repts 50-440/96-16, 50-440/96-17 & 50-440/96-18 & Corrective Actions IR 05000440/19970041997-06-16016 June 1997 Insp Rept 50-440/97-04 on 970322-0502.No Violations Noted. Major Areas Inspected:Operation,Maint & Surveillance, Engineering & Plant Support ML20140F8371997-06-10010 June 1997 Insp Rept 50-440/97-201 on 970217-0327.Issues Identified Which Challenged Capability of Sys to Perform Complete Scope DBA Mitigation Actions.Major Areas Inspected:Hpcs & Eec Sys IR 05000440/19972011997-06-10010 June 1997 Insp Rept 50-440/97-201 on 970217-0327.Issues Identified Which Challenged Capability of Sys to Perform Complete Scope DBA Mitigation Actions.Major Areas Inspected:Hpcs & Eec Sys 1999-09-09
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000440/19990131999-09-13013 September 1999 Insp Rept 50-440/99-13 on 990712-30.Violations Noted. Major Areas Inspected:Effectiveness of Pnpp Program for Identification,Resolution & Prevention of Technical Issues & Problems That Could Degrade Quality of Plant Operations ML20212A8531999-09-13013 September 1999 Notice of Violation from Insp on 990712-30.Violation Noted: from 980324-990730,TS SR 3.5.1.4 & 3.5.2.5 Failed to Require Each ECCS Pump to Develop Pump Differential Pressure Greater than or Equal to ECCS Total Flow Resistance IR 05000440/19990091999-09-0909 September 1999 Insp Rept 50-440/99-09 on 990709-0825.One Violation Occurred & Being Treated as Ncv.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20211M6521999-08-31031 August 1999 Revised Page Number 4, P2 Status of EP Facilities,Equipment & Resources IR 05000440/19990121999-08-12012 August 1999 Insp Rept 50-440/99-12 on 990712-16.No Violations Noted. Major Areas Inspected:Emergency Preparedness Program IR 05000440/19990081999-07-22022 July 1999 Insp Rept 50-440/99-08 on 990518-0708.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support IR 05000440/19990031999-06-10010 June 1999 Insp Rept 50-440/99-03 on 990407-0517.Two Violations Noted & Being Treated as non-cited Violations.Major Areas Inspected: Aspects of Licensee Operations,Maint,Engineering & Plant Support ML20207B1291999-05-20020 May 1999 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $110,000.Violation Noted:Centerior Energy Corp Through Actions of RPM Discriminated Againt Rps,On 970716,as Result of RPS Engaging in Protected Activities ML20209B8891999-05-17017 May 1999 EN-99-019:on 990520,notice of Proposed Imposition of Civil Penalty in Amount of $110,000 Issued to Licensee.Action Based Upon Severity Level II Violation Involving Radiation Protection Manager Discrimination Against Supervisor IR 05000440/19990071999-05-12012 May 1999 Insp Rept 50-440/99-07 on 990412-16.No Violations Noted. Major Areas Inspected:Rp Performance & Oversight of Refueling Outage Activities ML20206Q2301999-05-10010 May 1999 Notice of Violation from Investigation Completed on 990129. Violation Noted:On 970114,info Required by Commission Regulations Not Maintained Complete & Accurate in All Matl Respects ML20196A3131999-05-10010 May 1999 Notice of Violation from Investigation on 990129.Violation Noted:On 970114,K Wierman Employed as Training Instructor at Plant & Deliberately Submitted Info to Util That Wierman Knew to Be Incomplete or Inaccurate IR 05000440/19990061999-05-0606 May 1999 Insp Rept 50-440/99-06 on 990303-04 & 0412-16.No Violations Noted.Major Areas Inspected:Inservice Insp Efforts & Overlay Repairs of N4C Feedwater Nozzle IR 05000440/19990021999-05-0303 May 1999 Insp Rept 50-440/99-02 on 990225-0406.Non-cited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000440/19990051999-04-0202 April 1999 Insp Rept 50-440/99-05 on 990301-05.No Violations Noted. Major Areas Inspected:Licensee Implementation of 10CFR50.65, Requirements for Monitoring Effectiveness of Maint at Npps IR 05000440/19990041999-03-17017 March 1999 Insp Rept 50-440/99-04 on 990222-26.No Violations Noted. Major Areas Inspected:Radiation Protection Program & Radiological Planning for Upcoming Refueling Outage,Which Included Review of Rwps,Alara Reviews & Dose Goals ML20204E7901999-03-17017 March 1999 Insp Rept 50-440/99-01 on 990113-0224.Non-cited Violation Identified.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000440/19980191998-12-23023 December 1998 Insp Rept 50-440/98-19 on 981021-1202.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering ML20210Q9291998-12-10010 December 1998 Investigation Rept 3-1998-007.No Noncompliance Noted.Major Areas Investigated:Alleged Discrimination Against Radiation Protection Supervisor for Testifying as Witness in Dept of Labor Proceedings IR 05000440/19980221998-11-25025 November 1998 Chemistry & RP Insp Rept 50-440/98-22 on 981102-06.No Violations Noted:Major Areas Inspected:Implementation of Chemistry Program,Meteorological Monitoring Program & Control & Monitoring of Personnel Radiation Dose IR 05000440/19980211998-11-18018 November 1998 Insp Rept 50-440/98-21 on 981019-22.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program ML20195C7231998-11-10010 November 1998 Notice of Violation from Insp on 980909-1020.Violation Noted:On 980902,inspectors Identified That Fire Watch Did Not Verify That Special Instructions of Burn Permit B98-DG-83,used for Welding Conducted on DG Were Met ML20195C7361998-11-10010 November 1998 Insp Rept 50-440/98-18 on 980909-1020.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000440/19980171998-10-0707 October 1998 Insp Rept 50-440/98-17 on 980831-0914.Violations Noted. Major Areas Inspected:Review of Implementation of Solid Radwaste Mgt & Shipping Program.Insp Also Reviewed Conduct of Radiological Environ Monitoring Program ML20154H1681998-10-0707 October 1998 Notice of Violation from Insp on 980831-0914.Violation Noted:As of 980415,licensee Had Not Made Adequate Surveys to Assure Compliance with 10CFR20.2006 IR 05000440/19980161998-09-25025 September 1998 Insp Rept 50-440/98-16 on 980723-0908.No Violations Noted. Major Areas Inspected:Resident Inspectors Evaluation of Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000440/19980151998-09-0808 September 1998 Insp Rept 50-440/98-15 on 980727-31.Violations Noted. Major Areas Inspected:Effectiveness of Selected Elements of Security Program ML20151V3521998-09-0808 September 1998 Notice of Violation from Insp on 980727-31.Violation Noted: on 971219,licensee Conducted Breath Analysis as Part of for Cause Test Based on Odor of Alcohol,However Drug Portion of for Cause Test Not Conducted in Timely Manner IR 05000440/19980131998-08-21021 August 1998 Insp Rept 50-440/98-13 on 980605-0722.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000440/19980141998-08-19019 August 1998 Insp Rept 50-440/98-14 on 980620-24 & 0720-22.No Violations Noted.Major Areas Inspected:Licensee C/A for Issues Identified by NRC Inspections & Licensee Event Repts Submitted to NRC ML20236R8251998-07-16016 July 1998 Insp Rept 50-440/98-11 on 980518-22.Violations Noted.Major Areas Inspected:Adequacy of Licensee Programs,Procedures, Training,Equipment & Supporting Documentation for Maint of medium-voltage & low-voltage Power Circuit Breakers ML20236R8111998-07-16016 July 1998 Notice of Violation from Insp on 980518-22.Violations Noted: as of 980520,as-tested Instantaneous Trip Function of Circuit Breaker EF1B04 Used for Emergency Closed Cooling Pump Motor 1P42C001A,inadequate ML20236N0281998-07-0909 July 1998 Insp Rept 50-440/98-10 on 980421-0604.Violations Noted.Major Areas Inspected:Operations,Maint & Surveillance,Engineering & Plant Support ML20236N0231998-07-0909 July 1998 Notice of Violation from Insp on 980421-0604.Violation Noted:Inspectors Identified That on 980504,operations Personnel Failed to Verify 1 Restoration Items Specified in Surveillance Instruction Sys Restoration Checklist ML20236L8941998-07-0808 July 1998 Errata to Notice of Violation from Insp Rept 50-440/97-21 on 971202-980127.Violation Noted:On 980106,combustible Matl W/No Transient Combustible Permit in Fire Area Containing Redundant Trains of safety-related Equipment,Identified ML20249C5641998-06-25025 June 1998 Notice of Violation from Insp on 980601-05.Violation Noted: on 980504-21,an Individual,Conducting Radiologically Restricted Area Entries Under Radiation Work Permits 980003, 980047 & 980051 Did Not Wear Thermoluminescent Dosimeter IR 05000440/19980121998-06-25025 June 1998 Insp Rept 50-440/98-12 on 980601-05.Violations Noted.Major Areas Inspected:Plant Support ML20217M1311998-04-29029 April 1998 Insp Rept 50-440/98-07 on 980223-0305.Violations Noted. Major Areas Inspected:Operations,Engineering & Maintenance ML20217M1141998-04-29029 April 1998 Notice of Violation from Insp on 980223-0305.Violation Noted:On 980227,licensed Operator Incorrectly Removed Red Tag & Installed Fuse for Annulus Exhaust Gas Treatment Sys Instead of Installing Fuse for ESW Ventilation Sys IR 05000440/19980051998-04-27027 April 1998 Insp Rept 50-440/98-05 on 980209-0408.No Violations Noted. Major Areas Inspected:Portions of Licensee Fire Protection Program ML20212H3331998-04-0909 April 1998 EN-97-106A:on 971218,licensee Responded to NOV & Proposed Imposition of Civil Penalty in Amount $100,000.Licensee Denied Violation Re 10CFR50.59 & Requested Remission.Request Denied & Order Imposing Civil Monetary Penalty Issued IR 05000440/19980011998-04-0707 April 1998 SALP 15 Rept 50-440/98-01 for Plant Covering Period from 960915-980228 IR 05000440/19980061998-04-0101 April 1998 Insp Rept 50-440/98-06 on 980128-0310.Violations Noted.Major Areas Inspected:Licensee Operations,Maint & Engineering IR 05000440/19980031998-03-26026 March 1998 Insp Rept 50-440/98-03 on 980223-27.No Violations Noted. Major Areas Inspected:Licensee Performance During Plant Biennial Exercise of Emergency Plan IR 05000440/19980021998-03-12012 March 1998 Insp Rept 50-440/98-02 on 980112-16 & 26-30.No Violations Noted.Major Areas Inspected:Operations,Engineering & Review of Effectiveness of CA Program ML20203D8211998-02-20020 February 1998 Notice of Violation from Insp on 971202-980127.Violation Noted:On 971208,an Inspector Observed Fire Door Between Div 2 & 3 Emergency Diesel Generator Rooms Stuck in Fully Open Position ML20203D8241998-02-20020 February 1998 Insp Rept 50-440/97-21 on 971202-980127.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support PNO-III-98-009, on 980123,licensee Declared Unusual Event Under Emergency Plan Because of Spill of Up to 275 Gallons of Refrigerant Called Trichlorethylene.No Plant Personnel Were in Bldg at Time of Spill1998-01-23023 January 1998 PNO-III-98-009:on 980123,licensee Declared Unusual Event Under Emergency Plan Because of Spill of Up to 275 Gallons of Refrigerant Called Trichlorethylene.No Plant Personnel Were in Bldg at Time of Spill IR 05000440/19970171998-01-21021 January 1998 Insp Rept 50-440/97-17 on 971103-07 & 971215-18.No Violations Noted.Major Areas Inspected:Ep Program IR 05000440/19980041998-01-16016 January 1998 Insp Rept 50-440/98-04 on 980105-09.No Violations Noted. Major Areas Inspected:Radiolological,Environ & Chemistry Sections Programs 1999-09-09
[Table view] |
Inspection Report - Perry - 1998021 |
---|
|
|
Text
. .. . . - . . . - . .~ . .. - -..-- . ~ -.- ... ..~ _ .
n l U.S. NUCLEAR REGULATORY COMMISSION REGIONlli Docket No: 50-440 License No: NPF-58 Report No: 50-440/98021(DRS)
. Licensee: Centerior Service Company Facility: Perry Nuclear Power Plant l
'
Location: P. O. Box 97, A200 Perry, OH 44081 l
Dates: October 19 - 22,1998 Inspectors: R. M. Bailey, Reactor Inspector A. M. Stone, Reactor Inspector j I
Approved by:
^
Melvyn Leach, Chief, Operator Licensing Branch Division of Reactor Safety
l
,
9811240184 981118 PDR ADOCK 05000440 0 PDR _
m* i -- -
, .
l l
l
l l EXECUTIVE SUMMARY l
!
Perry Nuclear Power Plant NRC Inspection Report 50-440/98021 This inspection report contains the findings and conclusiens from our inspection of your licensed operator requalification training program. The inspection included a review of the following: selected training manual procedures, annual written and operating examination material, licensed operator and evaluator performance during the administration of the l operating examination, program controls to assure a continued systems approach to training, l and continuing training records. In addition, the inspectors observed a period of control room i operations. The inspectors used the guidance in inspection procedures 71001 and 7170 Operations Licensed operators on shift in the control room area executed their duties in a professional manner and in accordance with station procedures and management expectation (Section 01.1)
Trainina Proaram In general, licensed operators at the plant specific simulator executed their duties in a safe manner during abnormal and emergency conditions, and in accordance with station procedures and management expectations. The licensee correctly identified minor deficiencies in individual performance which did not impact the crew's ability to implement necessarv safeguards measures. (Section 04.1)
The licensed operator continuing training program provided appropriate :mung on lessons learned from significant industry events. (Section 05.1)
The annual requalification examination for licensed operaters had been developed such that the minimum regulatory requirements were satisfied. However, specific weaknesses in the individual development of NRC-style performance evaluations (Job Performance Measures -
JPM format) and a lack of documented management validation and review demonstrated a lack of quality control. (Section 05.2)
Annual requalification examinations were administered according to program guidance and consistent with regulatory guidelines. Experienced evaluators were being used to verify operator mastery of needed skills. (Section 05.3)
Adequate evaluation means were in place to provide positive feedback into the licensed operator continuing training program. The variety of methods provided for operator feedback was a program enhancement. (Section 05.4)
l Licensed operator performance deficiencies requiring remediation training were appropriately l
identified, assigned, and completed prior to returning an operator to licensed dutie l
. . . . - . . . . -- -.-. - . . ... -. . . - - - . . . - . . - . - - . . - . . _
l
).
. 4
,
l.
l
' '
'
- Satisfactory operator performance with noted weaknesses was given an appropriate level of remediation training. (Section 05.5)
The licensee appropriat'ely maintained individual operator licenses in an active status and ensured the medical fitness of each licensed operator consistent with program guidelines and in
-
compliance with regulatory requirements.- (Section 05.6)
!
The plant specific control room simulator provided consistent, realistic plant conditions under abnormal and emergency transients.- (Section 05.7)-
i l
i
!
I I
.
!- l
-,
.
l l:
-
.,
.. - . . . . . . -- .- - __ . _ - - . . - - - .
Report Details I, Operations 01 Conduct of Operations i
01.1 Control Room Observations Insoection Scope (IP-71707 and IP-71001) !
The inspectors observed routine control room activities during full power operation, performed a control panel walk-down, reviewed operator logs, and questioned operators l about plant and equipment status. In addition, the inspectors reviewed administrative procedure PAP-0201, " Conduct of Operations," Revision 9, for guidance on licensed operator conduct in the control roo Observations and Findinas Control room operators performed periodic reviews of control panel indications in the i
horseshoe area per management expectations. Panel annunciators were acknowledged i and the supervising operator was informed of equipment status in a timely manne Operator logs were neat and generally contained sufficient detail on plant statu Operators demonstrated appropriate knowl6dge on equipment operability and plant status. Operations personnel used clear and concise conversation during routine communication Conclusions Licensed operators on shift in the control room area executed their duties in a professional manner and in accordance with station procedures and management expectations.
04 Operator Knowledge and Performance 04.1 Annual Evaluation Performance Review Inspection Scope (IP-71001)
The inspectors reviewed the performance of one operating crew during the annual licensed operator requalification operating examination. That crew consisted of a shift supervisor, a unit supervisor, and a shift technical advisor who were licensed senior reactor operators, and three control operators who were licensed reactor operators. The review included the following:
- NUREG-1021, " Operator Licensing Examination Standards for Power Reactors,"
Interim Revision 8, and
. -. . -- - .- - _ -. _-_ .- .
.
(
- TMP-2002, " Licensed Operator Requalification Program," Revision 2/PIC-2,Section I Observations and Findinas The operating crew successfully completed each crition ! <,k as identified in the dynamic ,
simulation test. In addition, all six licensed operators d cossfully completed the !
required five job performance measures (;i'M). The licensee evaluation team assigned !
a passing grade for each licensed operator's performance during the annual requalification examinatio However, the periodic crew briefings conducted by the unit supervisor did not always I include clear, consistent direction to the crew. For example, an operating band for l reactor vessel level control was not stated and a specific task assignment was not i defined, which created some confusion. These findings as ne? e , :s failure to enter an emergency procedure to start the Hydrogen ignition system ,;me also identified by the licensee evaluators. Individual operator performance weaknesses for five of the six licensed operators were icientified during the dynamic simulation evaluation and each operator was assigned additional training under the remediation program. (See Section j 05.5 for additional comments) ;
The evalw an team's findings and conclusions on the crew's performance during the dynanne ;.mulation evaluation agreed with the inspectors' overall assessment. In adoEn, no individual performance weaknesses were noted or identified by the licensee I duri:rg the in-plant JPM performance evaluatio l Conclusions In general, licensed operators at the plant specific simulator executed their duties in a safe manner during abnormal and emergency conditions, and in accordance with station procedures and management expectations. The licensee correctly identified minor deficiencies in individual performance which did not impact the crew's ability to implement necessary safeguards mear,e.e OS Operator Training and Qualification 05.1 Ooeratina History Insoection Scona (IP-71001)
The inspectors reviewed the plant's operating history from October 1996 to September L 1998 to determine if any operator errors occurred that could be attributed to ineffective or inadequate training. That review included the following:
- . ._ . -- ..
f .
p
.
e Selected routine NRC inspection reports, and !
e Selected Licensee Event Reports (LERs). ! Observations and Findinas The inspectors noted that previously identified knowledge weaknesses and performance deficiencies har' %en addressed in licensed operator continuing training. Related l
licensee event 's and industry events involving operations were also included in the -
continuing training, Conclusions
The licensN operator continuing training program provided appropriate training on lessons iearned from significant industry event .2 Reaualification Examination Material Iqspection Scope (IP-71001)
{
The inspectors reviewed the licensee's licensed operator requalification program sample plan, and compared that with the written examinations and operating tests administered i during the annual evaluations. The following documents were reviewed: !
- Inspection Plan IP-71001, " Licensed Operator Requalification Program Evaluation," Appendix A, e Two dynamic scenarios administered to one operating crew during the inspection l period, I e Ten JPMs administered to one operating crew during the inspection period, e Part A and Part B written questions administered to one operating crew during the inspection period, e One set of written questions and an operating test administered just prior to the inspection period,
'e Complete set of written questions and operating tests administered during the 1997 annual licensed operator requalification program evaluation, and
- TMP-2002, " Licensed Operator Requalification Program," Revision 2/PIC-2, Sections 3.0,6.5, and Observations and Findinas Tt e r.omprehensive written examination, which consisted of a Part A and Part 3, was ,
constructed in accordance with program guidelines and provided an effective evaluation {
tool. Part A incorporated the plant specific simulator and Part B required a broad use of plent procedures to answer the open-reference questions provided. The incpectors determined that the examinations were comprehensive and contained minimal duplicatio The dynamic simulation portion of the annual operating test incorporated diverse risk
l significant events; such as Anticipated Transient without Scram (ATWS) in both scenarios, and Reactor Pressure Vessel (RPV) and Containment control problem The scenarios contained credible events that included appropriate precursors and the i proper number of critical tasks. Major events were sequenced such that simultanecus I ma! functions did not requke outside operator assistance. However, a review of the dynamic scenario bank revealed that 75 percent of the examination bank involved an ATWS condition at the beginning of the major transient. The inspectors expressed a concem, with the high probability of having to respond to an ATWS event during an ,
examination process, that operator awareness would be heightened to prepare for such I an event. The licensee ackncwledged the inspectors' concern but stated that an ATWS condition was necessary, in most instances, to exercise the major portions of each !
emergency operating procedur l l
.
The in-plant portion of the annual operating test contained diverse safety system performance tasks. Each one of the ten JPMs contained clear reference task elements '
and critical steps. The five JPMs selected for operator performance evaluation did not
{
overlap between the reactor operator or senior reactor operator examines In general, the JPM performance checklists used during in-plant task simulation failed to provide needed evaluator cues or adequate evaluation standards. The following items are provided as examples: l
- JPM No.116," Locally Transfer Bus EH11 to the Preferred Source from the Diesel Generator," directed an operator to perform a bus transfer then leave the diesel generator running unloaded. The Performance Checklist contained sesan steps requiring operator action for w% h only one prescripted eva!aator cue was provided. The cue was an "if asked" response to inform the candidate that a rapid diesel generator load reduction was not required. The inspectors identified l that all of the performance steps required an evaluator response to acknowledge l the examinee's stated action.
l
- JPM No. 488, " Control Room isolation - Diesel Generator Room Veno lation,"
l directed an operator to perform actions necessary to isolate the Division 1 diesel l generator ventilation. The Performance Checklist contained two performance steps for which no prescripted evaluator cues were provided. The inspectors i
- identified that both performance steps required an evaluator response to l l acknowledge the examinee's stated action. In addition, the evaluation standard for both performance steps stated that an operator only had to locate the correct panel or controller, and state the required position. These performance standards failed to identify detailed control and indication criteria, such as switch position and indicator bulb illuminatio * JPM No. 95, " Alternate injection via Fuel Pool Cooling and Cleanup Header i using the Hotwell Dump Line," directed an operator to align the primary system for an attemate injection path using condensate water. The performance evaluation standard for each of the six steps was to have an operator identify the
a 1,. k m wA 4 , -,,,,-2-.--__a A>.-n n,.La-es A e---4,ma-- - ,,m a n. -- s ---.+---, -e48,,-L.,., A._- n _ , , , .- , .
.
!
correct valve (s) and state the required position. These performance standards failed to identify detailed control and indication critena, such as switch position and indicator bulb illuminatio Section 6.6 of TMP-2002 stated in part that the continuing training element lead j instructor shall develop an operating test and a comprehensive written examination to be administered to all licensed operators during the annual requalification examinatio In addition, the operator training unit supervisor shall review and approve the licensed i operator requalification prograrn's written examinations and answer keys. However, the ;
inspectors noted that no program guidance had been provided to ensure a unit
]
supervisor review and approval of the operating tes i l
In addition, training manual administration instruction TMA-4114, " Performance Evaluation Preparation, Review, Approval, and Administration," Revision 1, contained a purpose statement that the guidelines for developing and administering performance evaluations were to be used to provide consistent, up-to-date, and repeatable performance evaluations. Section 6.2, " Criterion Checklist Preparation," of this instruction contained a statement that a validation review was required for JPMs that l
would be administered during an NRC licensed operator requalification program examinatio The inspectors identified that 4 of the 10 JPM descriptive outlines contained a reference to procedures that were not current. Specifically:
JPM No. 68F referenced sol-E22A, Revision 4 versus Revision 5; JPM No. 98B referenced 101-11, Revision 4, PIC-9, versus Revision 6. PIC-8; JPM No. 61 referenced sol-B33, Revision 5 versus Revision 6; and JPM Wo 95 referenced PEl-SPI 4.3, Revision 0 versus Revision The inspectors determined that the reference to an incorrect revision had no impact on the performance task, as outline The inspectors identified that no review signatures were available to verify management !
representative validation of each JPM prior to administration. The licensee was unable to provide any documentation supporting the validation review of previously used JPMs.
,
However, the inspectors determined that such a review had been conducted prior to the l annual operating test administration.
l l Conclusions The annual requalification examination for licensed operators had been developed such that the minimum regulatory requirements were satisfied. However, specific weaknesses in the individual development of NRC-style performance evaluations (Job
!
i
!
t
-- . .. . . ._ __ . -.
.
'
. j l
l .
l Performance Measures - JPM format) and a lack of documented management validation and review demonstrated a lack of quality contro .3 Reaualifgation Examination Administration Practices
, Inspectior Scoce (IP-71001)
The inspecors interviewed operations and training staff personnel, and performed the following to assess the licensee's practices regarding requalification examination j administration, evaluation, and security; I
L e Observed the licensee's administration and evaluation of the annuallicensed
'
operator requalification operating examination for one operating crew, ;
e Reviewed TMP-2002, "l.icensed Operator Requalification Program," Revision 2/
, PIC-2, Section 6.6, and l e Reviewed NUREG-1021 " Operator Licensing Examination Standards for Power l Reactors," Interim Revision ! Observations and Findinas The annual operating test evaluations and the annual written examinations were administered to one operating crew during Cycle 11 training week. The licensee implemented appropriate security measures throughout the administration process. No l evidence of undue operator stress or examination comprornise was observed.
j Overall, the conduct of the operating test and the written examination was in accordance
'
with program guidelines and consistent with regulatory requirements with one exception.
l The emergency procedure implementation run time for one scenario was approximately l 25 percent of the total run time. The NRC guidance contained in NUREG-1021 l recommended that 40 to 70 percent of the total run time be spent evaluating the
!
implementation of emergency procedures. The inspectors determined that adequate
- emphasis had been placed on emergency procedure usage and no programmatic l deviation had occurre The licensee provided each operator with a complete copy of the plant procedures during the Section B portion of the written examination. However, the licensee provided only one complete set of procedures during the Section A portion of the written
.
examination. During the Section A administration portion, the operators consistently returned referenced books to their proper location, and did not mark or annotate in the l
'
procedures. In addition, the operators frequently skipped a question until the required reference material was made available. The inspectors determined that the licensee's evaluator had maintained adequate control during the written examination proces The licensee's evaluation team during the dynamic simulation test included an operations department supervisor and two operations training department instructors for
.
one operating crew which cnsisted of six licensed operators. The inspectors observed l that two of the evaluators provideo direct input to the crew in a support role; such as
i
-
!
l
. . . .
. .
. .
.. - _ _ _ _ _ __--___
'
.l l
.
nuclear engineers, instrumentation technicians, or security personnel. The inspectors also observed that evaluators did not always accompany the reactor operators during back panel operations performed outside of the view of the operators in the horseshoe area. The inspectors noted that the additional duties could distract the evaluators during critical operator actions resulting in a missed opportunity to identify a performance concer In general, the licensee's evaluation team members were professional and able to maintain an overall awareness of operator performance. The evaluators also provided appropriate system response cues during the JPM tasks. The inspectors agreed with the evaluation team's findings and recommendations. The operating crew's performance on the written examination was satisfactory which was consistent with past operator performance. No programmatic deviations were note Conclusions Annual requalification examinations were administered according to program guidance and consistent with regulatory guidelines. Experienced evaluators were being used to verify operator master / of needed skill .4 Recualification Trainina Procram Feedback Insoection Scoce (IP-71001)
'
The inspectors interviewed operations and training staff personnel, and reviewed tk following documents to assess the licensee's training program feedback system effectiveness:
- Quality Audit Report, PA 98-09, addressing July - September,1908, and e Quality Audit Report, PA 97-13, addressing July - August,199 Observations and Findinas The licensed operator requalification program incorporated an evaluation process that involved classroom, control room simulator, and on-the-job training activities which required management feedback on performance and a review committee's inpu Licensed operators and trainers were required to provide program evaluation feedback at the end of training sessions. Computerized feedback was encouraged to promote an exchange ofinformatio The inspectors received favorable inputs from the licensed operators and trainers interviewed on the feedback process. The most noted comment made was on the prompt response given to a concem or problem identified. The training crew mentor program was mentioned as a positive method for providing tecdhack to the training proces ,. -.- . - . . .. - . - - . _ . . . . . _ , . - - - . - - - . . . . - - . . . - . . . - . _
e
- . . Conclusions
. Adequate evaluation means were in place to provide positive feedback into the licensed operator continuing training program. The variety of methods provided for operator feedback was a program enhancemen .05.5 RemedialTrainino Proaram Inspection Scope (IP-71001)
The inspectors performed a review of the following remediation records and procedures l to assess the licensee's remediel training program effectiveness
'
I e Completed remediation package for one licensed operator that failed two
. consecutive weekly exams in 1998, )
- e Completed remediation packages for two licensed operators that failed the annual written examination in 1998, and e TMP-2002, " Licensed Operator Requalification Program," Revision 2/PIC-2,
_
l Sections 6.6 and i
,
i Observations and Findinas !
,
i'
!
Each remediation package contained a discussion of the significant weaknesses identified, assigned training to improve awareness, required evaluation action, and the i
. approval authority at completion. In addition, each opc ator was allowed to review the individual evaluation summary sheet with noted deficiencies. The remediat!an actions j were consistent with program guidanc '
Licensed operators were removed from licensed duties whenever individual performance l
was deemed to be unsatisfactory. The remediation packages were completed, as L outlined, prior to returning the operator to licensed duties, in addition, any licensed L operator's performance deemed marginally satisfactory was given a remediation training package to be completed prior to the next training cycle.
!
The licensee took prompt corrective action to provide remediation training for individual performance weakness noted on five of the six licensed operators evaluated during the current annual examination. None of the individual operators were required to be l removed from licensed duties which was consistent with program guidance and in L compliance with regulatory requirement Conclusions
'
Licensed operator performance deficiencies requiring remediation training were
. appropriately identified, assigned, and completed prior to returning an operator to
, licensed duties. Satisfactory operator performance with noted weaknesses was given an
- . appropriate level of remediation training.
11 L
- .
.
05.6 Conformance with Operator License Conditions Inspection Scope (IP-71001)
The inspectors reviewed the licensed operator medical and active license qualification programs to assess licensed operator compliance with regulatory requirements and the following licensee procedures and records:
- TMP-2002, " Licensed Operator Requalification Program," Revision 2/PIC-2, Sections 6.7 and 6.8,
- HRI-0001, " Nuclear Reactor Operator Health Assessment," Revision 0/PIC-11, e
American National Standard Institute /American National Standard (ANSI /ANS)
3.4-1983, and e Seven licensed operator medical records selected at random e Licensed dut'es tracking databas Observations and Findinas Licensed operator medical examination dates and the documentation of test results were consistent with program guidance and in compliance with regulatory requirements to examine on a biennial basi Operators assigned to perform licensed duties during routine plant operations had valid licenses based upon maintaining a satisfactory participation in the licensed operator requalification training program. One operator who failed to maintain an active status was required to complete an inactive license retraining program prior to resuming licensed duties. Ali operators assigned a valid and active license were consistent with program guidelines and in compliance with regulatory requirement Conclusions The licensee apprcpriately maintained individual operator licenses in an active status and ensured the medical fitness of each licensed operator consistent with program guidelines and in compliance with regulatory requirement .7 Simulator Fide!!!y Inspection Scoce (IP-71001)
The inspectors reviewed the effectiveness of the licensee to identify and correct simulator discrepancies, and noted any simulator fidelity issues identified during the operating examination. The inspectors performed the following:
- Observed the annual operating examination during administration on the licensee's plant referenced simulator, and e Reviewed " Simulator Deviation Problem Report," dated October 19,199 l
< .
. Observations and Findinas
,
The plant specific control room simulator performed the required component malfunctions and provided realistic plant response to changing conditions. No simulator fidelity concerns were identified. (See " Simulation Facility Report") Conclusions The plant specific control room simulator provided consistent, realistic plant conditions under abnorma! and emergency transient V. Manaaement Meetinas X1 Exit Meeting Summary
'On October 22,1998, the inspectors presented the inspection results to members of the Perry Plant management. The licensee acknowledged the findings presented. The inspectors asked the licensee whetner any materials examined during the inspection should be considered proprietary. No proprietary information was identifie . . _ _ _ _ _. ._ - . .
&
K
..
PARTIAL LIST OF PERSONS CONTACTED Cleveland Electric illuminatino Comoany R. Collings, Manager, Quality Assurance Sentice M. Haskins, Operations Training Supervisor T. Henderson, Compliance Supervisor H. Johnson, Continuing Training Lead W. Kanda, Manager, Perry Plant R. Keamey, Superintendent Plant Operations R. Luse, Manager, Training (Actio0)
L. Myers, Site Vice President, Nuclear S. Sanford, Compliance Engineer NRC C. Lipa, Senior Resident inspector J. Clark, Resident inspector INSPECTION PRGCEDURES USED IP 71001: Licensed Operator Requalification Program Evaluation
' IP 71707: Plant Operations ITEMS OPENED, CLOSED, AND DISCUSSED NONE.
l
,
i
"
l l
L
._ . . _ . _ . _ . . ._ . . _ - _ . - . .. _ . -_
.
.
l-Enclosure 2 SIMULATION FACILITY REPORT i
Facility Licensee: Perry Facility Licensee Docket Nos: 50-440 Operating Tests Administered: October 20,1998 This form is to be used only to report observations. These observations do not constitute audit or inspection findings and are not, without further verification and review, indicative of
,
noncompliance with 10 CFR 55.45(b). These observations do not c'fect NRC certification or
! approval of the simulation facility other than to provide it 'ormation'. hat may be used in future i
evaluations. No licensee action is required in response to these obso:vation While conducting the simulator portion of the operating tests, the following items were observed (if none, so state):
1 ITEM DESCRIPTION NONE i