ML20195J031
| ML20195J031 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 11/18/1998 |
| From: | Leach M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Myers L CENTERIOR ENERGY |
| Shared Package | |
| ML20195J037 | List: |
| References | |
| 50-440-98-21, NUDOCS 9811240179 | |
| Download: ML20195J031 (3) | |
See also: IR 05000440/1998021
Text
. . .
.
- _
_.
_ ._
_.
_ -.
.
.
November 18, 1998
.
Mr. Lew W. Myers
Vice President - Nuclear
Centerior Service Company
P.O. Box 97, A200
Perry, OH 44081
SUBJECT:
NRC INSPECTION REPORT 50-440/98021(DRS)
.
Dear Mr. Myers:
1
On October 22,1998, the NRC completed an inspection at your Perry Nuclear Power Plant.
The enclosed report presents the results of that inspection.
]
During the 1-week period covered by this inspection period, your conduct of activities
surrounding the implementation of the licensed operator requalification program was generally
characterized by safety conscious operations and sound evaluation of licensed operator
performance. The inspectors determined that your licensed operator requalification program
was being implemented in accordance with 10 CFR Part 55 requirements.
However, the inspectors identified a lack of quality control measures in regard to management's
review and approval of the examination material used for NRC-style performance evaluations.
These re!!ews were not documented for the operating test portion of the examination. In
support of this concern, the inspectors identified a lack of appropriate evaluator cues and valid
performance standards for a number of the job performance measure checklists used to
administer the in-plant performance evaluations. The circumstances surrounding this issue are
described in detailin the enclosed report. Please note that you are not required to respond to
this letter,
i
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
,
enclosures will be placed in the NRC Public Document Room (PDR).
Sincerely,
~
nr.1 Signed bv Melvyn Leach
/
9811240179 981118
ADOCK 05000440
Melvyn Leach, Chief
[
Q
Operator Licensing Branch
Docket No.:
50-440
License No.: NPF-58
Enclosures:
1. Inspection Report 50-440/98021(DRS)
2. Simulation Facility Report
See Attached Distribution
DOCUMENT NAME: G:DRS\\PER98021.wpd
- See Previous Concurrence
To recehre a copy of this document, Indicate in the t>on: *C* a Copy without attachmenvenclosure T = Copy with attachmenUenclosure *N= a No copy
i
OFFICE
Rill
Rlli
l
Rill
l
Rlll
k
NAME
Bailey:Jp/sd
Stone *
Kozak *
Leach /Wv6
DATE
11/ /98
11/ /98
11/ /98
11/4/98
OFFICIAL RECORD COPY
-
r
.
Mr. Lew W. Myers
Vice President - Nuclear
Cleveland Electric Illuminating Company
P.O. Box 97, A200
Perry, OH 44081
SUBJECT:
NRC INSPECTION REPORT 50-440/98021(DRS)
Dear Mr. Myers:
On October 22,1998, the NRC completed an inspection at your Perry Nuclear Power Plant.
The enclosed report presents the results of that inspection.
During the 1-week period covered by this inspection period, your conduct of activities
surrounding the implementation of the licensed operator requalification program was gennrally
characterized by safety conscious operations and sound evaluation of licensed operator
performance. We are concerned, however, about the lack of quality control measures in regard
to management's review and approval of the examination material used for NRC-style
performance evaluations. These reviews were not documented for the operating test portion of
'
the examination. In support of this concern, the inspectors identified a lack of appropriate
evaluator cues and valid performance standards for a number of the job performance measure
checklists used to administer the in-plant performance evaluations.
The circumstances surrounding our concern are described in detail in the enclosed report.
'
Please note that you are not required to respond to this letter. The inspectors determined that
your licensed operator requalification program was generally being implemented in accordance
with 10 CFR Part 55 requirements.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
enclosures will be placed in the NRC Public Document Room (PDR).
Sincerely,
Melvyn Leach, Chief
Operator Licensing Branch
Docket No.:
50-440
License No.: NPF-58
Enclosures:
1. Inspection Report 50-440/98021(DRS)
2. Simulation Facility Report
See Attached Distribution
DOCUMENT NAME: G:DRS\\PER98021.wpd
To receive a copy of this document, Indicate in the box: *C's Copy ethout attachmenvenclosure "E* = Copy wth attachmenvenclosure *N" s No copy
OFFICE
Rlli
C- Rlli
N Rill MAK b
J
Rlll
YV
,
NAME
Bailey:Jp/sdA/
Stone b$y
Durgcd fouk
Leach
W
DATE
11//3/98
11/ly98
11//;Y98
11/ry/98
OFFICIAL RECORD COPY
l
_ .. . _ .
-
- _ _
_ - . -
_.
.
__ .
.
_
._.
(
,
i
5
L. Myers
-2-
cc w/encis:
H. Hegrat, Manager, Regulatory Affairs
j
T. Rausch, Director, Quality and
Personnel Development
R. Schrauder, Director, Nuclear
Engineering Departmerit
W. Kanda, General Manager
Nuclear Power Plant Department
N. Bonner, Director, Nuclear
i
Maintenece Department
H. Bergendahl, Director
Nuclear Services Department
!
Ohio State Liaison Officer
R. Owen, Ohio Department of Healtti
C. Glazer, State of Ohio Public
Utilities Commission
Distribution:
RPC (E-Mail)
Project Mgr., NRR w/encls
J. Caldwell, Rlll w/encls
C. Pederson, Rlli w/encls
' B.'Clayton, Rlli w/encls
j
SRI Perry w/encls
DRP w/encls
'
TSS w/encls
DRS (2) w/encls
Rlli PRR w/encls
PUBLIC lE-42 w/encis?
Docket File w/encls
GREENS
LEO (E-Mail)
DOCDESK (E-Mail)
.
,
l
n e o r r: 0
5, u
L v **
,
<<r
v
+
c
w