Informs That NRC Has Reviewed Changes to Part II of Application for License SNM-1227.Administrative Error Re Three 500 Kw Generators Was Noted.Nrc Would Like to Be Informed as to Whether Interpretation Is Correct
ML20155A537
Person / Time
Site: Framatome ANP Richland
Issue date: 10/09/1998
From: Lain P
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Maas L
SIEMENS POWER CORP. (FORMERLY SIEMENS NUCLEAR POWER
References
TAC-L31093, NUDOCS 9810290166
Download: ML20155A537 (2)


Text

-- - -. - - - . - - - _ . - - - - - = . - . . - --

l

, , October 9, 1998 s, l 4

Mr. L. J. Maas Manager, Rebulatory Compliance Siemens Power Corporation 2101 Horn Rapids Road P.O. Box 130 Richland, Washington 99352-0130

SUBJECT:

PART 11 LICENSE CHANGES (TAC NO. L31093)

Dear Mr. Maas:

We have reviewed the changes to Part 11 of the application for Materials License SNM-1227, submitted by letter dated July 8,1998. The changes included updating the descriptions and drawings for the Operations Scrape Warehouse, Cylinder Recertification Facility, Waste Storage Facility, and Modular Extraction Recovery Facility. The package also included changes to the process exhaust system and emergency power system.

The subject letter indicates Siemens replaced two 225 KW generators with one 500 KW l generator, and now has a total of two 500 KW emergency generators onsite. However, the text l in the new revision mistakenly implies three 500 KW generators onsite. The staff views this l

error as administrative and will note it in the license application. Please inform the NRC if this interpertation is incorrect.

If you have any questions regarding this correspondence, please call me at (301) 415-6317.

Sincerely, Original signed by:

Paul W. Lain, Project Manager i Licensing Section 2 Licensing Branch Division of Fuel Cycle Safety and Safeguards, NMSS Docket 70-1257 License SNM-1227 Fb5 ' o Distribution (Control No.1HOS(FE))

Docket'-)4L&PUBLIC NRC File Center NMSS R/F FCLB R/F FCSS R/F Region Region Contact Env PM BackupPM (g:\L31093.spc] MW OFC FCLB _

[ FCLB [ FCLL g FCLB FCLB NAME PLai[{M PShea[ M" DATE 10/ 'l /98 10/[ /98 10/7 /98 C = COVER E = COVER & ENCLOSURE N = NO COPY OFFICIAL RECORD COPY 9010290166 981009 qpfw r a5 /,Jjji bdadA[]hh PDR C

ADOCK 07001257 PDR g

l

, ....,~

p  % UNITED STATES

) ,j NUCLEAR REGULATORY COMMISSION

' , # WASHINGTON, D.C. 2066tWM)01 g .

'2

%,.. October 9, 1998 l

Mr. L. J. Maas Manager, Regulatory Compliance 1 Siemens Power Corporation l 2101 Horn Rapids Road l P.O. Box 130 Richland, Washington 99352-0130 l

SUBJECT:

PART 11 LICENSE CHANGES (TAC NO. L31093)

Dear Mr. Maas:

We have reviewed the changes to Part 11 of the application for Materials License SNM-1227, submitted by letter dated July 8,1998. The changes included updating the description and drawings for the Operations Scrape Warehouse, Cylinder Recertification Facility, Waste Storage Facility, and Modular Extraction Recovery Facility. The package also included changes to the process exhaust system and emergency power system.

l The subject letter indicates Siemens replaced two 225 KW generators with one 500 KW j generator, and now has a total of two 500 KW emergency generators onsite. However, the text in the new revision mistakenly implies three 500 KW generators onsite. The staff views this error as adminictrative and will note it in the license application. Please inform the NRC if this interpertation is incorrect.

If you have any questions regarding this correspondence, please call me at (301) 415-6317.

Sincerely, g ,

Paul W. Lain, Project Manager Licensing Section 2 Licensing Branch  !

Division of Fuel Cycle Safety and Safeguards, NMSS Docket 70-1257 License SNM-1227