ML19323G117

From kanterella
Revision as of 02:46, 1 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
First Interim Deficiency Rept Re Incorrect Insulation Weight Used in Piping Analysis.Drawing Data Will Be Reviewed
ML19323G117
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 05/23/1980
From:
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML19323G114 List:
References
MCR-SQN-CEB-800, NUDOCS 8005300417
Download: ML19323G117 (1)


Text

,

a

^

( )* <

ENCLOSURE SEQUOYAH I;UCLEAR PLANT UNIT 2 INCORRECT INSULATION UKIGHT USED IN PIPING ANALYSIS 10CPR50.5S(e)

NCR_SQN CEB 8008 , ,

FIRST INTERIM REPORT Description of Deficiency Insulation uaights that were originally provided ucre used in the pipin;; analysis. When the "as-constructed" insulation drawings are received, th=y are reviewed to determine if any significant changes were made that affect the scisraic analysis. Upon review of the piping analysis for unit 1, a discrepancy between actuci insulation weight and the d..ta used for the piping analysis was discovered. A similar situation may also exist for unit 2.

Corrective Action When the "cs-constructed" insulation drawings for unit 2 are received, tha infomation will be compared with the data used in the unit 2 pipin;; analysis. When this review is complete, TVA can determine if a sic.ilar concern exists for unit 2 and uhat corrective action, if any, is required. -

I l

l

  • C $'

l D

  • ~D)

W W Ju KD)M.

Udu A[lnLa

t -c i

I l

f $00530041% g L