Interim Deficiency Rept DER 84-67 Re Defective Target Rock Solenoid Valves.Initially Reported on 840907.Bechtel Studying Problem to Determine Reportability & Technical Justification for Corrective Action.Final Rept by 841030
ML20106D830
Person / Time
Site: Palo Verde, Sequoyah  
Issue date: 10/04/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-30744-TDS, DER-84-67, NUDOCS 8410260182
Download: ML20106D830 (3)


Text

.

.b is,

..;9 i: :

= RECEtygy Arizona Public Service Company HRC W CCT - 3 pn, 3 2 3 October 4, 1984 ANPP-30744-TDS /'IR$fQyp.

U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention: Mr. T. W. Bishop, Director Division of. Resident Reactor Projects and Engineering Programs i

Subject:

Interim Report - DER 84-67 A 50.55(e) Potentially Reportable Deficiency Relating To Target Rock Solenoid Valves.

File: 84-019-026; D.4.33.2.

Reference : Telephone Conversation between D. Hollenbach and T. Bradish on September 7, 1984 1

Dear Sir:

The NRC was notified of a potentially reportable deficiency in the referenced telephone conversation. At that time, it was estimated ~that a determination of reportability would be made within thirty (30) days.

Due to the extensive investigation and evaluation required, an. Interim -

Report is attached.

It is now expected that this information will be finalized by October 30, 1984, at which time a complete report will be submitted.

Very truly yours, ONN E. E. Van Brunt, Jr.

APS Vice President Nuclear Production ANPP Project Director EEVB/TRB/nj Attachment cc: See Page Two I

8410260182'841004

'f.d *f I I

PDR ADOCK 05000328 S

PDR

1 f

..,.o,

~

4 Mr. ~ T. W. Bis' op h

DER 84-67 Page Two ac:

Richard DeYoung, Direct'or Office :of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 T. G; Woods, Jr.

D. B. Karner.

W. E. Ide D. B. Fasnacht.

A. C. Rogers L. A. Souza D. E. Fowler T. D. Shriver C. N..Russo J. Vorees J. R. Bynum J. M. Allen A. C. Gehr W.'J.

Stubblefield W. G. Bingham R. L. Patterson

- R. W. Welcher

- H. D. Foster D. R. Hawkinson R. P. Zinnerman.

L. Clyde M. Woods T. J. Bloom Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, GA 30339 l

l L

p-

.. C og.

U INTERIM REPORT - DER 84-67

'^

POTENTIAL REPORTABLE DEFICIENCY-ARIZONA.PUBLIC SERVICE COMPANY (APS)

PVNGS' UNIT.1 o

. I.,

. Potential Problem Valves.1JSGBUV-ll35A, -1136A, 1136B, lJSCAUV-1133, and -1134

+

are Target Rock solenoid valves used in steam: drain trap

. applications. These'are fail-close valves.that did not stroke

. when. required during testing. The control room indication lights were initially reported not to' reflect the true state of the valve.- However, later investigation indicated that'the valves were mechanicallyf stuck;.

II..

Approach To and Status Of ~ Proposed Res'olution -

1 Two other DERs -(84-58 and 84-63) have been written to document

~

similar situations on Target Rock solenoid valves for other i

systems.

i-Bechtel Engineering is currently studying this problem to determine Reportability and technical ' justification for l-corrective action.

III.

Projected Completion of Corrective Action

+

and Submittal of the Final Report The complete evaluation and final report are forecast to be completed by October 30, 1984 l