ML20083P975

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept DER 84-07 Re Borg Warner Valve Stem Extensions & Failure to Provide Corrective Action Stated in Deficiency Rept DER 80-21.Initially Reported on 840209. Final Rept Will Be Submitted by 840601
ML20083P975
Person / Time
Site: Palo Verde, Sequoyah  Tennessee Valley Authority icon.png
Issue date: 04/12/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-29283-BSK, DER-84-07, DER-84-7, NUDOCS 8404200285
Download: ML20083P975 (2)


Text

._

.o Arizona Public Service Company 1

April 12,1984 ANPP-29283-BSK/TRB U. S. Nuclear Regulatory Commission Region V i

Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs i

Subject:

-Time Extension For Report - DER 84-07 j

A 50.55(e) Potentially Reportable Deficiency Relating To Borg Warner Valves Stem Extensions and the Failure to Provide Corrective Acton as Stated in DER 80-21.

File: 84-019-026; D.4.33.2 i

Reference:

(A) Telephone conversation between P. Narbut and T. Bradish on 3

i February 9, 1984 j

(B) ANPP-28996, dated March 2,1984 (Interim Report)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by. Reference (B).

At that time, it was estimated that a Final Report would be available by-l April 16, 1984.

i Due to the extensive investigation and evaluation required, it is now expected that this-information will be finalized by' June 1,1984, at which time a complete report will be submitted.

There is no new information or change to the'Interia Report at this time.

.Very truly ours, CM q

E.

E.' Van Brunt, Jr.

APS Vice President, Nuclear

_g.

.ANPP Project Director EEVB/TRB:db 1

I See Page TwOI tl Ad 3l EdY I35-cc:

1

' J M..g 4

}( 2%

, e

~~~,,._

r m

s

.,3

~n 1

3 I

Mr. T. W. Bishop.

DER 84-07 Page Two cc:

Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear. Regulatory Commission Washington,-D. C. 20555 4

T. G. Woods, Jr.

i' W. E.'Ide D. B. Fasnacht

~

A.

C.- Rogers j '

B. S. Kaplan L. A. Souza t

J. Vorees J. R. Bynum i

P. P. Klute A. C. ~ Cehr,

l l.

W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher l

H. D. Foster' i

D. R. Hawkinson l

L. E. Vorderbrueggen j

G. A. Fiorelli l

S. R. Frost i

J. Self

}

]~'

D..Canady I

Records Center Institute of Nuclear Power Operations j'

1100 Circle-75 Parkway, Suite 1500 Atlanta, GA 30339 s

i if -

a i

, s.

I

+

I c.

,.* =

.'I l

t h '-

. [ ;,

4

.i i

.(

y s -

,}

Q $7, '

),;.'^i

~

7(j s

,l 4

3

- i y

e

-. _ _..... - _. __ -_ : l _ -_ _ _ l _.7=_

_ _ A 1 :. :

E

'