ML20086G774
| ML20086G774 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde, Sequoyah |
| Issue date: | 12/19/1983 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Bishop T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, ANPP-28461-BSK, DER-83-54, NUDOCS 8401120399 | |
| Download: ML20086G774 (2) | |
Text
FE,
V.,;
~
!?ECEiVE0 Imc Arizona Public Service Company CM g P.o. Box 21666 + PHOENIX, ARtZONA 85036 December 19, 1983 ANPP-28461-BSK/lGIEl0;j y n; U. S.-Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention:
Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs
Subject:
Time Extension for Report - DER 83-54 A 50.55(e) Potentially Reportable Condition Relating To Washers Found In Unit 1 Steam Generator #1 and #2.
' File: 83-019-026; D.4.33.2
Reference:
(A) Telephone Conversation between P. Narbut and R. Tucker on August 2, 1983 (B) ANPP-27603, dated August 22, 1983 (Interim Report)
(C) ANPP-28009, dated October 13, 1983 (Time Extension)
'~
Dear Sir:
The NRC was notified of a potentially reportable deficiency in Reference (A), an Interim Report was transmitted by Reference (R), and a Time Extension was requested by Reference (C). At that time, it was estimated that a Final Report would be available by December 15, 1983.
Due to the extensive investigation and evaluation required, it is now expected that. this information will be finalized by January 18, 1984, at which time a complete report will be submitted.
~
There is no new information or change to the Interim Report at this time.
Very truly yours
}
n
- L'.
O LL_
6 LLA _ l-E. E. Van Brunt, Jr.
APS Vice President t Ne:: lear Projects Management ANPP Project Directar EEVBJr/KCP:ru cc: See Page 2 8401120399 831219 9
PDR ADOCK 05000328 S
b,, =.
~
^
~
?
^_e
^
i
~Mr. T. W. Bishop
' DERF 83-54.
~Page.2
.. c c :
Richard DeYoung',- Director Office of Inspection and Enforcement U. S.. Nuclear Regulatory _ Commission Washington, D. C. 20555 T. G.-Woods, Jr.
C. C. Andognini J. A. Roedel D. B. Easnacht A._C. Rogers B. 9. Kaplan W. E. Ide
_ J. Vorees J. R. Bynum D.-D. Green /P. P. Klute A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W.-Welcher R. M. Grant D. R. Hawkinson L. E.. Vorderbrueggen G. A.'Fiorelli S. R. Frost J. Self D. Canady Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway - Suite 1500 Atlanta, Georgia 30339