ML19263E378

From kanterella
Revision as of 19:29, 1 February 2020 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Responds to IE Bulletin 79-03.Site Has Received 200 Ft of Pipe Mfg by Youngstown Welding & Engineering Co.Youngstown Methods Meet ASME Code Stds
ML19263E378
Person / Time
Site: Perkins, Cherokee  Duke Energy icon.png
Issue date: 04/20/1979
From: Dail L
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 7906130443
Download: ML19263E378 (2)


Text

.

- ~- 4p

-mn w,h.

DUKE POWER COMPANY li.3t ,', ".

- g~v.ery

,v/U EI.ECDUC CNEH, Hox 33180, CH AHI,OTTE. N. C. 28242

('

. .h. .. ='h. .,.. 79 APR25 a a: 54 (f,

.~

April 20,1979 ,

Mr. J. P. O'Reilly, Director U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Re: Perkins Nuclear Station Docket Nos: 50-488, 50-489, 50-490 Cherokee Nuclear Station Docket Nos: 50-491, 50-492, 50-493 IE Bulletin: 79-03 Duke File: P81-1412.ll

Dear Mr. O'Reilly:

Enclosed is Duke Power's response to IE Bulletin 79-03 which was transmitted by your letter of March 12, 1979.

Very truly yours, A

I / I o

L. C. Dail JDW/sr 2357 154 Enclosure Y

fofOr/'a

[ OITil.'.L C '

7906130 W 3 @

~ - .- . . , . . . .- ,_ -

~ . . ,

DUKE POWER COMPANY CHER0KEE NUCLEAR STATION Response to IE Bulletin No. 79-03 i

Duke has determined that the Cherokee Project site has received 200 feet of ASME SA-312 welded pipe manufactured by Youngstown Welding and Engineering Company. This pipe may be used in safety-related systems. Per the ASME Code,Section III, Paragraph NC 2551, the required NDE includes either surface or volumetric examination. Liquid penetrant testing was performed, satisfying these requirements.

Duke representatives have inspected the Youngstown shops, reviewed Youngstown's method of liquid penetrant examination, and determined that their method meets the requirements of the ASME Code. The subject pipe has also passed a shop hydrostatic test and will receive a field hydrostatic test. No additional inspections are planned at this time.

When details of the imperfections already discovered, or which may be dis-covered by this program, are available, Duke Power Company would like to review that information as a possible basis for further action.

2357 155 sr/4/19/79

. . . . - - . . . . . . . . - . - .- - .. . .. _ __. .. ... . . .... .. . .-