Issue date | Title | Topic | |
---|---|---|---|
ML20195C513 | 28 May 1999 | Forwards Revs to Sections 3.9 & 5.6 of Its,Based on Resolution Telcons Held Between NRC Staff & Util on 990526 & 27 | Pressure and Temperature Limits Report |
ST-HL-AE-4678, Requests That Address for WT Cottle,Vice President Be Changed & Dp Hall,Wh Kinsey,Wj Jump & Ma Mcburnett Be Removed from Distribution List | 20 January 1994 | Requests That Address for WT Cottle,Vice President Be Changed & Dp Hall,Wh Kinsey,Wj Jump & Ma Mcburnett Be Removed from Distribution List | |
ML20128D621 | 24 May 1985 | Disputes Charges on 850424 Bill D0258,per 10CFR15 & 170. Bases for Calculation of Bill Involved Use of Inappropriate Fee Schedule.Extension of Due Date of Fee Requested to Facilitate Resolution of Disputed Amount | |
ML20098G627 | 27 September 1984 | Forwards Responses to 840617 Request for Addl Info in Order to Complete Review of Facility Site Stabilization Plan.W/Two Oversize Maps.Aperture Cards Available in PDR | |
ML20095E397 | 16 August 1984 | Forwards Duke Power Co & North Carolina Municipal Power Agency 1 1983 Annual Repts | |
LG-84-332, Forwards Most Recent Aerial Photographs of Site for Review of Stabilization Plan.W/O Encl | 24 April 1984 | Forwards Most Recent Aerial Photographs of Site for Review of Stabilization Plan.W/O Encl | |
ML20079J501 | 19 January 1984 | Informs That Firm Name of Counsel for Applicants/Licensees Charged from Debevoise & Liberman to Bishop,Liberman,Cook, Purcell & Reynolds.Svc Lists Should Be Revised Accordingly | |
ML20078C203 | 21 September 1983 | Requests Cancellation of CPPR-167,CPPR-168 & CPPR-169 Based on Current & Predicated Economic Conditions.Stabilization Plan Encl | |
LG-83-314, Responds to NRC Requiring Detailed Analysis of TMI Action Item II.K.3.5, Automatic Trip of Reactor Coolant Pumps. Analysis Will Not Be Submitted,Due to Indefinite Delay in Const of Facility | 7 April 1983 | Responds to NRC Requiring Detailed Analysis of TMI Action Item II.K.3.5, Automatic Trip of Reactor Coolant Pumps. Analysis Will Not Be Submitted,Due to Indefinite Delay in Const of Facility | |
LG-83-163, Forwards Amend 19 to Duke Power Nuclear Guides.Amend 20 Will Be Forwarded in Apr 1983 | 18 February 1983 | Forwards Amend 19 to Duke Power Nuclear Guides.Amend 20 Will Be Forwarded in Apr 1983 | |
LG-83-049, Forwards Response to 821210 Request for Addl Info on IE Bulletin 81-03, Flow Blockage of Cooling Water to Safety Sys Components by Corbicula Sp (Asiatic Clam) & Mytilus Sp (Mussel). Monitoring Program for Clams to Be Established | 17 January 1983 | Forwards Response to 821210 Request for Addl Info on IE Bulletin 81-03, Flow Blockage of Cooling Water to Safety Sys Components by Corbicula Sp (Asiatic Clam) & Mytilus Sp (Mussel). Monitoring Program for Clams to Be Established | |
ML20063E652 | 24 August 1982 | Forwards Util & Nc Municipal Power Agency Annual Financial Repts for 1981 | |
ML20062K387 | 20 May 1982 | Forwards First Quarter 1982 Yellow Book Updates Re Const Status | Hydrostatic |
ML20051H703 | 5 May 1982 | Recommends That Facility Be Deleted from Text of NUREG-0718. CP Applications Withdrawn | |
ML20052F090 | 4 May 1982 | Informs That Addl Action Will Be Required in Order to Fully Comply W/Asme Code Requirements for Radiography of safe-end Welds.Discrepancy Will Be Resolved by re-radiographing Affected Welds | |
ML20041D492 | 2 March 1982 | Withdraws CP Applications for Facilities,Per 10CFR2.107 & 820223 Vote by Util Board of Directors.Motion to Withdraw Applications W/O Prejudice & to Terminate CPs Filed W/Aslb & Aslab | |
ML20040F239 | 3 February 1982 | Advises That Util Mgt Intends to Recommend to Board of Directors That Application for Facility CPs Be Withdrawn. Util Is Considering Option of Applying for Early Site Review.Util Press Release Encl | |
ML20038D136 | 3 November 1981 | Responds to NRC 811014 Ltr Re Violations Noted in IE Insp Repts 50-491/81-03,50-492/81-03 & 50-493/81-03.Corrective Actions:Gas Cans Have Been Emptied & Placed in Motor Pool Storage Area | |
ML20080D457 | 30 October 1981 | Requests That NRC Be Prepared to Discuss QA Problems at Facilities at Subcommittee 811119 Hearing on QA | |
ML20011A633 | 22 October 1981 | Advises of Review of NRC 810710 Ltr Re Proposed Licensing Requirements & NUREG-0718.Facilities Share PSAR W/Cherokee. Applying Different Regulatory Requirements Could Jeopardize Standardization Concept | |
ML20009D900 | 8 July 1981 | Responds to IE Bulletin 81-03 Re Blockage of Cooling Water to Safety Sys Components by Clams & Mussels.Provisions Will Be Made to Minimize Introduction of Clams Into Raw Water Sys.Fifteen Manhours Expended in Preparation of Bulletin | |
ML20004C256 | 28 May 1981 | Requests Authorization to Use ASME Code Cases 1481-2,1592-14 & 1644-8 in Fabrication of Primary Sys Components for Facilities | |
ML20126L686 | 19 May 1981 | Ack Receipt of & Informs That Author Is Not Counsel for Intervenors.Nrc Should Furnish ASLB & Aslab W/ Encl Nc Atty General 770328 Memo.Certificate of Svc Encl | |
ML20126K415 | 25 April 1981 | Inquires Whether NRC May Withhold Matl Evidence from ASLB, Aslab or Commission | |
ML20003H775 | 11 April 1981 | Suggests That NRC Is Withholding Matl Info from Aslab | |
ML19347D556 | 16 March 1981 | Discusses Intervenor Position Re Util 810310 Response to ASLB 810225 Inquiry Re Indefinite Suspension of Const Plans at Site.Application Should Be Suspended or Dismissed Until Issues Re Schedule Commitments Have Been Resolved | |
ML19347D349 | 12 March 1981 | Responds to NRC 810223 Request for Addl Info Re Util Plans for Facilities.Completion of Cherokee 1 & 2 Has Been Indefinitely Delayed.Commercial Operating Dates for Cherokee 3 & Perkins 1,2 & 3 Have Not Been Determined | |
ML19350B438 | 10 March 1981 | Presents Reasons Why Aslab Should Proceed W/Oral Argument Re Alternate Site Issues as Previously Scheduled | |
ML19347D031 | 4 March 1981 | Forwards 810224 Press Release Re Delay of Facility Completion.Financial Situation Has Pushed Facility Completion Into Indefinite Future | |
ML20008E762 | 24 February 1981 | Forwards PWR Const Milestones & Activities for McGuire 1 & 2,Catawba 1 & 2 & Cherokee 1.Key Event Dates Provided | |
ML20003C289 | 11 February 1981 | Responds to IE Bulletin 80-23, Failures of Solenoid Valves Mfg by Valcor Engineering Corp. Bulletin Does Not Apply | |
ML19345F363 | 5 February 1981 | Forwards Evacuation Time Estimates & Color Overlay Site Map, Per Discussions w/P81 Project Manager.W/O Site Map | Siren |
ML19345G080 | 27 January 1981 | Forwards Revision 1 to Response Re IE Bulletin 79-14 Revision 1,Suppl 2, Seismic Analysis for As-Built Safety-Related Piping Sys. Describes Program Which Will Give Assurance That Design Documents Reflect Sys Conditions | |
ML19351F985 | 27 January 1981 | Responds to IE Bulletin 80-21, Valve Yokes Supplied by Malcolm Foundry Co,Inc. No safety-related Valves Using Specified Valve Yokes Are Used | |
ML19341A554 | 17 January 1981 | Requests to Make Limited Appearance Statement | |
ML20002B917 | 11 November 1980 | Forwards Supplemental Responses to NRC 801016 Ltr Re Violations Noted in IE Insp Repts 50-369/80-08,50-370/80-05, 50-413/80-09,50-414/80-09,50-491/80-02,50-492/80-06 & 50-493/80-06.Final Rept to Be Submitted by 810131 | |
ML19345C271 | 29 October 1980 | Requests Info Re Facilities W/Active CPs Pending,License Definitions & Requirements for Floating Nuclear Plants | |
ML19340B141 | 14 October 1980 | Requests Load Info Re Design Pressure,Loca & SSE Loads & Drawings for Five Containment Vessels Referred to in Statement of Work for FY81 | |
ML19338C797 | 2 September 1980 | Forwards Notice of Appeal & Brief.Requests Oral Argument on Issues | |
ML19344E978 | 29 August 1980 | Responds to IE Bulletin 80-19,Revision 1.No mercury-wetted Matrix Relays Are Used or Planned for Use in Reactor Protection Sys | |
ML19344F187 | 26 August 1980 | Responds to IE Bulletin 80-16.No Rosemount Models 1151 & 1152 Pressure Transmitters Are Used in safety-related Applications | |
ML19336A642 | 15 August 1980 | Responds to NRC 800718 Ltr Re Violations Noted in IE Insp Repts 50-369/80-08,50-370/80-05,50-413/80-09,50-414/80-09, 50-491/80-07,50-492/80-06 & 50-493/80-06.Corrective Actions: Records Storage Facility Constructed | |
ML19344E506 | 14 August 1980 | Responds to IE Bulletin 80-20, Failure of Westinghouse Type W-2 Spring Return to Neutral Control Switches. Review Showed No Westinghouse Type W-2 Switches Used in safety- Related Applications | |
ML19331D363 | 6 August 1980 | Submits Response to IE Bulletin 79-03A.No SA-312 or A-312, Type 300 Series Fusion Welded Pipe in Use or Planned for Use Is Subj to Design Stresses Greater than 85% of ASME Code Allowable Stresses | |
ML19338C340 | 4 August 1980 | Ack Receipt of IE Insp Repts 50-491/80-09,50-492/80-08 & 50-493/80-08 on 800611-13.No Proprietary Info | |
ML19331B611 | 4 August 1980 | Submits Const Completion & Fuel Load Target Dates,In Response to NRC 800711 Ltr.For Unit 1,const Completion & Fuel Load Target Dates Are Jul 1980 & Jul 1991 for Unit 2.OL Application to Be Submitted by Sept 1986 | |
ML19327A541 | 31 July 1980 | Responds to 800702 Request for Info Re Evacuation Times for Power Plants W/Current or Pending Cps.Cherokee & Perkins Stations Pose No Population Density Situation Which Would Cause Long Evacuation Times | |
ML19331C262 | 28 July 1980 | Ack Receipt of IE Insp Repts 50-491/80-08,50-492/80-07 & 50-493/80-07 on 800624-25.No Proprietary Info | |
ML19326E064 | 7 July 1980 | Forwards Response to IE Bulletin 80-08, Exam of Containment Liner Penetration Welds. Piping Penetrations Are Designed & Fabricated in Accordance w/1977 Edition of ASME Boiler & Pressure Vessel Code,Including Summer 1977 Addenda | Nondestructive Examination Liquid penetrant |
ML19327A008 | 25 June 1980 | Responds to NRC 790627 Ltr Re Violation Noted in IE Insp Repts 50-491/79-10,50-492/79-10 & 50-493/79-10.Corrective Actions:Corrected Procedure for Determining Bulk Density of Test Sand & Increased Testing of Filter Matl |