 Issue dateTitleTopic
ML20195C51328 May 1999Forwards Revs to Sections 3.9 & 5.6 of Its,Based on Resolution Telcons Held Between NRC Staff & Util on 990526 & 27Pressure and Temperature Limits Report
ST-HL-AE-4678, Requests That Address for WT Cottle,Vice President Be Changed & Dp Hall,Wh Kinsey,Wj Jump & Ma Mcburnett Be Removed from Distribution List20 January 1994Requests That Address for WT Cottle,Vice President Be Changed & Dp Hall,Wh Kinsey,Wj Jump & Ma Mcburnett Be Removed from Distribution List
ML20128D62124 May 1985Disputes Charges on 850424 Bill D0258,per 10CFR15 & 170. Bases for Calculation of Bill Involved Use of Inappropriate Fee Schedule.Extension of Due Date of Fee Requested to Facilitate Resolution of Disputed Amount
ML20098G62727 September 1984Forwards Responses to 840617 Request for Addl Info in Order to Complete Review of Facility Site Stabilization Plan.W/Two Oversize Maps.Aperture Cards Available in PDR
ML20095E39716 August 1984Forwards Duke Power Co & North Carolina Municipal Power Agency 1 1983 Annual Repts
LG-84-332, Forwards Most Recent Aerial Photographs of Site for Review of Stabilization Plan.W/O Encl24 April 1984Forwards Most Recent Aerial Photographs of Site for Review of Stabilization Plan.W/O Encl
ML20079J50119 January 1984Informs That Firm Name of Counsel for Applicants/Licensees Charged from Debevoise & Liberman to Bishop,Liberman,Cook, Purcell & Reynolds.Svc Lists Should Be Revised Accordingly
ML20078C20321 September 1983Requests Cancellation of CPPR-167,CPPR-168 & CPPR-169 Based on Current & Predicated Economic Conditions.Stabilization Plan Encl
LG-83-314, Responds to NRC Requiring Detailed Analysis of TMI Action Item II.K.3.5, Automatic Trip of Reactor Coolant Pumps. Analysis Will Not Be Submitted,Due to Indefinite Delay in Const of Facility7 April 1983Responds to NRC Requiring Detailed Analysis of TMI Action Item II.K.3.5, Automatic Trip of Reactor Coolant Pumps. Analysis Will Not Be Submitted,Due to Indefinite Delay in Const of Facility
LG-83-163, Forwards Amend 19 to Duke Power Nuclear Guides.Amend 20 Will Be Forwarded in Apr 198318 February 1983Forwards Amend 19 to Duke Power Nuclear Guides.Amend 20 Will Be Forwarded in Apr 1983
LG-83-049, Forwards Response to 821210 Request for Addl Info on IE Bulletin 81-03, Flow Blockage of Cooling Water to Safety Sys Components by Corbicula Sp (Asiatic Clam) & Mytilus Sp (Mussel). Monitoring Program for Clams to Be Established17 January 1983Forwards Response to 821210 Request for Addl Info on IE Bulletin 81-03, Flow Blockage of Cooling Water to Safety Sys Components by Corbicula Sp (Asiatic Clam) & Mytilus Sp (Mussel). Monitoring Program for Clams to Be Established
ML20063E65224 August 1982Forwards Util & Nc Municipal Power Agency Annual Financial Repts for 1981
ML20062K38720 May 1982Forwards First Quarter 1982 Yellow Book Updates Re Const StatusHydrostatic
ML20051H7035 May 1982Recommends That Facility Be Deleted from Text of NUREG-0718. CP Applications Withdrawn
ML20052F0904 May 1982Informs That Addl Action Will Be Required in Order to Fully Comply W/Asme Code Requirements for Radiography of safe-end Welds.Discrepancy Will Be Resolved by re-radiographing Affected Welds
ML20041D4922 March 1982Withdraws CP Applications for Facilities,Per 10CFR2.107 & 820223 Vote by Util Board of Directors.Motion to Withdraw Applications W/O Prejudice & to Terminate CPs Filed W/Aslb & Aslab
ML20040F2393 February 1982Advises That Util Mgt Intends to Recommend to Board of Directors That Application for Facility CPs Be Withdrawn. Util Is Considering Option of Applying for Early Site Review.Util Press Release Encl
ML20038D1363 November 1981Responds to NRC 811014 Ltr Re Violations Noted in IE Insp Repts 50-491/81-03,50-492/81-03 & 50-493/81-03.Corrective Actions:Gas Cans Have Been Emptied & Placed in Motor Pool Storage Area
ML20080D45730 October 1981Requests That NRC Be Prepared to Discuss QA Problems at Facilities at Subcommittee 811119 Hearing on QA
ML20011A63322 October 1981Advises of Review of NRC 810710 Ltr Re Proposed Licensing Requirements & NUREG-0718.Facilities Share PSAR W/Cherokee. Applying Different Regulatory Requirements Could Jeopardize Standardization Concept
ML20009D9008 July 1981Responds to IE Bulletin 81-03 Re Blockage of Cooling Water to Safety Sys Components by Clams & Mussels.Provisions Will Be Made to Minimize Introduction of Clams Into Raw Water Sys.Fifteen Manhours Expended in Preparation of Bulletin
ML20004C25628 May 1981Requests Authorization to Use ASME Code Cases 1481-2,1592-14 & 1644-8 in Fabrication of Primary Sys Components for Facilities
ML20126L68619 May 1981Ack Receipt of & Informs That Author Is Not Counsel for Intervenors.Nrc Should Furnish ASLB & Aslab W/ Encl Nc Atty General 770328 Memo.Certificate of Svc Encl
ML20126K41525 April 1981Inquires Whether NRC May Withhold Matl Evidence from ASLB, Aslab or Commission
ML20003H77511 April 1981Suggests That NRC Is Withholding Matl Info from Aslab
ML19347D55616 March 1981Discusses Intervenor Position Re Util 810310 Response to ASLB 810225 Inquiry Re Indefinite Suspension of Const Plans at Site.Application Should Be Suspended or Dismissed Until Issues Re Schedule Commitments Have Been Resolved
ML19347D34912 March 1981Responds to NRC 810223 Request for Addl Info Re Util Plans for Facilities.Completion of Cherokee 1 & 2 Has Been Indefinitely Delayed.Commercial Operating Dates for Cherokee 3 & Perkins 1,2 & 3 Have Not Been Determined
ML19350B43810 March 1981Presents Reasons Why Aslab Should Proceed W/Oral Argument Re Alternate Site Issues as Previously Scheduled
ML19347D0314 March 1981Forwards 810224 Press Release Re Delay of Facility Completion.Financial Situation Has Pushed Facility Completion Into Indefinite Future
ML20008E76224 February 1981Forwards PWR Const Milestones & Activities for McGuire 1 & 2,Catawba 1 & 2 & Cherokee 1.Key Event Dates Provided
ML20003C28911 February 1981Responds to IE Bulletin 80-23, Failures of Solenoid Valves Mfg by Valcor Engineering Corp. Bulletin Does Not Apply
ML19345F3635 February 1981Forwards Evacuation Time Estimates & Color Overlay Site Map, Per Discussions w/P81 Project Manager.W/O Site MapSiren
ML19345G08027 January 1981Forwards Revision 1 to Response Re IE Bulletin 79-14 Revision 1,Suppl 2, Seismic Analysis for As-Built Safety-Related Piping Sys. Describes Program Which Will Give Assurance That Design Documents Reflect Sys Conditions
ML19351F98527 January 1981Responds to IE Bulletin 80-21, Valve Yokes Supplied by Malcolm Foundry Co,Inc. No safety-related Valves Using Specified Valve Yokes Are Used
ML19341A55417 January 1981Requests to Make Limited Appearance Statement
ML20002B91711 November 1980Forwards Supplemental Responses to NRC 801016 Ltr Re Violations Noted in IE Insp Repts 50-369/80-08,50-370/80-05, 50-413/80-09,50-414/80-09,50-491/80-02,50-492/80-06 & 50-493/80-06.Final Rept to Be Submitted by 810131
ML19345C27129 October 1980Requests Info Re Facilities W/Active CPs Pending,License Definitions & Requirements for Floating Nuclear Plants
ML19340B14114 October 1980Requests Load Info Re Design Pressure,Loca & SSE Loads & Drawings for Five Containment Vessels Referred to in Statement of Work for FY81
ML19338C7972 September 1980Forwards Notice of Appeal & Brief.Requests Oral Argument on Issues
ML19344E97829 August 1980Responds to IE Bulletin 80-19,Revision 1.No mercury-wetted Matrix Relays Are Used or Planned for Use in Reactor Protection Sys
ML19344F18726 August 1980Responds to IE Bulletin 80-16.No Rosemount Models 1151 & 1152 Pressure Transmitters Are Used in safety-related Applications
ML19336A64215 August 1980Responds to NRC 800718 Ltr Re Violations Noted in IE Insp Repts 50-369/80-08,50-370/80-05,50-413/80-09,50-414/80-09, 50-491/80-07,50-492/80-06 & 50-493/80-06.Corrective Actions: Records Storage Facility Constructed
ML19344E50614 August 1980Responds to IE Bulletin 80-20, Failure of Westinghouse Type W-2 Spring Return to Neutral Control Switches. Review Showed No Westinghouse Type W-2 Switches Used in safety- Related Applications
ML19331D3636 August 1980Submits Response to IE Bulletin 79-03A.No SA-312 or A-312, Type 300 Series Fusion Welded Pipe in Use or Planned for Use Is Subj to Design Stresses Greater than 85% of ASME Code Allowable Stresses
ML19338C3404 August 1980Ack Receipt of IE Insp Repts 50-491/80-09,50-492/80-08 & 50-493/80-08 on 800611-13.No Proprietary Info
ML19331B6114 August 1980Submits Const Completion & Fuel Load Target Dates,In Response to NRC 800711 Ltr.For Unit 1,const Completion & Fuel Load Target Dates Are Jul 1980 & Jul 1991 for Unit 2.OL Application to Be Submitted by Sept 1986
ML19327A54131 July 1980Responds to 800702 Request for Info Re Evacuation Times for Power Plants W/Current or Pending Cps.Cherokee & Perkins Stations Pose No Population Density Situation Which Would Cause Long Evacuation Times
ML19331C26228 July 1980Ack Receipt of IE Insp Repts 50-491/80-08,50-492/80-07 & 50-493/80-07 on 800624-25.No Proprietary Info
ML19326E0647 July 1980Forwards Response to IE Bulletin 80-08, Exam of Containment Liner Penetration Welds. Piping Penetrations Are Designed & Fabricated in Accordance w/1977 Edition of ASME Boiler & Pressure Vessel Code,Including Summer 1977 AddendaNondestructive Examination
Liquid penetrant
ML19327A00825 June 1980Responds to NRC 790627 Ltr Re Violation Noted in IE Insp Repts 50-491/79-10,50-492/79-10 & 50-493/79-10.Corrective Actions:Corrected Procedure for Determining Bulk Density of Test Sand & Increased Testing of Filter Matl