ML19312D591
| ML19312D591 | |
| Person / Time | |
|---|---|
| Site: | Cherokee |
| Issue date: | 01/22/1980 |
| From: | Dail L DUKE POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML19312D585 | List: |
| References | |
| NUDOCS 8003250040 | |
| Download: ML19312D591 (1) | |
Text
.
I h
e DUIm Po VI:It C O 3tI'A N Y
$ f?..
Cisfridi, Ilox 33189. CH Ani.orrn. N. C.
1 2m242 L. C DAIL "M EE"*
?9 JM125 All : 23 Janua'y 22, 1980 Mr. J. P. O'Reilly, Director U. S. Nuclear Regulatory Commission l'J1 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Re: Cherokee Nuclear Station IE:II:JJL Inspection Reports:
50-491/79-20, 50-492/79-20, and 50-493/79-20*
Duke File CK-1412. ll-1
Dear Mr. O'Reilly:
Q In Mr. Lenahan's inspection reports referenced above, he identified a deficiency entitled " Sampling and Testing of Concrete Aggregate" and requested a report be filed within twenty (20) days of receipt of these reports.
Duke Power Company's interim response is as follows:
1)
The subject samples have been taken and a Nonconforming Item Report (NCI) written to document and resolve the problem.
2)
A formal, computerized " Tickler" system has been implemented to prevent reoccurrence.
i 3)
The sample results will be obtained and the NCI resolved by February 15, 1980 at which time Duke will file a final report.
Very truly yours, L. C. Dail JEB/fch 80032500h 2009 WW OiHAL (o7V L