Responds to NRC Re Violations Noted in IE Insp Repts 50-491/79-20,50-492/79-20 & 50-493/79-20.Corrective Actions:Concrete Aggregate Samples Taken,Nonconforming Item Rept Written & Computerized Tickler Sys Implemented
ML19305B913
Person / Time
Site: Cherokee  
Issue date: 01/15/1980
From: Dail L
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19305B912 List:
References
NUDOCS 8003200610
Download: ML19305B913 (1)


Text

,

pm

%J

.\\

DUKE POWER COMPANY Z

[ " 'sff.4$

GENEllAL OFFICES 422 SOUTH CHURCH STREET g

,;7 CII ArtLorrE. N. C. 2824" n,

1 g

February 15, 1980

.c

.c Mr. J. P. O'Reilly, Director U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Re: Cherokee Nuclear Station IE:II:JJL Inspection Reports:

50-491/79-20, 50-492/79-20, and 50-493/79-20 Duke File: CK-1412.ll-1

Dear Mr. O' Reilly:

In Mr. Lenahan's inspection reports referenced above, he identified a deficiency entitled " Sampling and Testing of Concrete Aggregate" and requested a report be filed within twenty (20) days of receipt of these reports.

Duke Power Company submitted its interim response on January 22, 1980.

Duke's final response is as follows:

1) The subject samples have been taken and a Nonconforming Item Report (NCI) written to document and resolve the problem.
2) A formal, computerized " Tickler" system has been implemented to prevent reoccurrence.
3) The sample test results were obtained and the NCI was re-solved. The test results were reviewed and approved by site QA personnel on February 5, 1980.

Very truly yours, f " "e,

ss

[4 A

L. C. Dail t

Vice President Design Engineering Anniversary JEB/jmi

/