ML19331B611
ML19331B611 | |
Person / Time | |
---|---|
Site: | Cherokee |
Issue date: | 08/04/1980 |
From: | Dail L DUKE POWER CO. |
To: | Eisenhut D Office of Nuclear Reactor Regulation |
References | |
NUDOCS 8008120496 | |
Download: ML19331B611 (1) | |
Similar Documents at Cherokee | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20195C5131999-05-28028 May 1999
[Table view]Forwards Revs to Sections 3.9 & 5.6 of Its,Based on Resolution Telcons Held Between NRC Staff & Util on 990526 & 27 ML20138Q8301985-12-0303 December 1985 Further Response to FOIA Request for Records Re Voluntary or Required Redress of Sites Where Const Was Terminated, Including Crbr & Legal Analysis.Forwards App E Documents.App D & E Documents Available in Pdr.Photographs Also Available ML20132A8831985-09-12012 September 1985 Responds to 830921 Request That CPPR-167,CPPR-168 & CPPR-169 Be Deleted.Stabilization Plan Has No Significant Environ Impact.Dockets Changed to Canceled Status ML20098G6271984-09-27027 September 1984 Forwards Responses to 840617 Request for Addl Info in Order to Complete Review of Facility Site Stabilization Plan.W/Two Oversize Maps.Aperture Cards Available in PDR ML20095E3971984-08-16016 August 1984 Forwards Duke Power Co & North Carolina Municipal Power Agency 1 1983 Annual Repts LG-84-332, Forwards Most Recent Aerial Photographs of Site for Review of Stabilization Plan.W/O Encl1984-04-24024 April 1984 Forwards Most Recent Aerial Photographs of Site for Review of Stabilization Plan.W/O Encl ML20078C2031983-09-21021 September 1983 Requests Cancellation of CPPR-167,CPPR-168 & CPPR-169 Based on Current & Predicated Economic Conditions.Stabilization Plan Encl ML20115A6411983-05-12012 May 1983 Forwards Updated Const Status Repts for McGuire Unit 2, Catawba Units 1 & 2 & Cherokee Unit 1 as of 830331,per NUREG-0030.Rept Last Update for McGuire Unit 2 Due to Receipt of OL on 830303.Cherokee Unit 1 Canceled on 830429 LG-83-314, Responds to NRC Requiring Detailed Analysis of TMI Action Item II.K.3.5, Automatic Trip of Reactor Coolant Pumps. Analysis Will Not Be Submitted,Due to Indefinite Delay in Const of Facility1983-04-0707 April 1983 Responds to NRC Requiring Detailed Analysis of TMI Action Item II.K.3.5, Automatic Trip of Reactor Coolant Pumps. Analysis Will Not Be Submitted,Due to Indefinite Delay in Const of Facility LG-83-163, Forwards Amend 19 to Duke Power Nuclear Guides.Amend 20 Will Be Forwarded in Apr 19831983-02-18018 February 1983 Forwards Amend 19 to Duke Power Nuclear Guides.Amend 20 Will Be Forwarded in Apr 1983 ML20127D4351983-02-0303 February 1983 Forwards Updated Const Status Repts as of 821231.Info for Inclusion in NUREG-0030.Fuel Load Target Date for Catawba Unit 1 May 1984 LG-83-049, Forwards Response to 821210 Request for Addl Info on IE Bulletin 81-03, Flow Blockage of Cooling Water to Safety Sys Components by Corbicula Sp (Asiatic Clam) & Mytilus Sp (Mussel). Monitoring Program for Clams to Be Established1983-01-17017 January 1983 Forwards Response to 821210 Request for Addl Info on IE Bulletin 81-03, Flow Blockage of Cooling Water to Safety Sys Components by Corbicula Sp (Asiatic Clam) & Mytilus Sp (Mussel). Monitoring Program for Clams to Be Established ML20063E6521982-08-24024 August 1982 Forwards Util & Nc Municipal Power Agency Annual Financial Repts for 1981 ML20062K3871982-05-20020 May 1982 Forwards First Quarter 1982 Yellow Book Updates Re Const Status LD-82-052, Informs That Addl Action Will Be Required in Order to Fully Comply W/Asme Code Requirements for Radiography of safe-end Welds.Discrepancy Will Be Resolved by re-radiographing Affected Welds1982-05-0404 May 1982 Informs That Addl Action Will Be Required in Order to Fully Comply W/Asme Code Requirements for Radiography of safe-end Welds.Discrepancy Will Be Resolved by re-radiographing Affected Welds ML20040H0391982-01-27027 January 1982 Forwards Request for Addl Info Through C-E Owners Group on C-E Heated Junction Thermocouple Reactor Vessel Level Measurement Sys.Response Requested within 30 Days to Complete Generic Review of CEN-181-P ML20038D1311981-12-0808 December 1981 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-491/81-03, 50-492/81-03 & 50-493/81-03 ML20038D1361981-11-0303 November 1981 Responds to NRC 811014 Ltr Re Violations Noted in IE Insp Repts 50-491/81-03,50-492/81-03 & 50-493/81-03.Corrective Actions:Gas Cans Have Been Emptied & Placed in Motor Pool Storage Area ML20038D1391981-10-14014 October 1981 Forwards IE Insp Repts 50-491/81-03,50-492/81-03 & 50-493/81-03 on 810908-11 & Notice of Violation ML20032D5211981-09-18018 September 1981 Informs That No Westinghouse Electro-Mechanical Div motor- Operated Gate Valves Have Been Installed in Response to IE Bulletin 81-02,Suppl 1.Approx 2 Manhours Expended in Review ML20010A8751981-08-0404 August 1981 Informs That Class 9 Accident Analyses Should Be Presented in Environ Rept.W/O Encl ML20010B8881981-07-27027 July 1981 Forwards IE Insp Repts 50-491/81-02,50-492/81-02 & 50-493/81-02 on 810707-10.No Noncompliance Noted ML20009B3301981-07-10010 July 1981 Requests That NRC Notify N Reynolds That 810622 Petition for Extension of Deadline for Compliance w/CLI-80-21 Has Been Retitled.Svc Should Be Made of All Subsequent Papers on Parties to Proceeding,Including Ucs ML20009D9001981-07-0808 July 1981 Responds to IE Bulletin 81-03 Re Blockage of Cooling Water to Safety Sys Components by Clams & Mussels.Provisions Will Be Made to Minimize Introduction of Clams Into Raw Water Sys.Fifteen Manhours Expended in Preparation of Bulletin ML20009A7271981-07-0707 July 1981 Authorizes Use of ASME Code Cases 1481-2,1592-14 & 1644-8 in Const of Containment Hydrogen Recombiners,In Response to Util .Conditions for Use Discussed.Use of Code Cases Should Be Documented in FSAR ML20030D6581981-06-29029 June 1981 Advises That Toledo Edison Co & IA Electric Light & Power Co Should Be Included as Petitioners in Licensee 810622 Petition Requesting Commission Extension of Deadline Imposed by CLI-80-21 ML20004C2561981-05-28028 May 1981 Requests Authorization to Use ASME Code Cases 1481-2,1592-14 & 1644-8 in Fabrication of Primary Sys Components for Facilities ML20008G0131981-04-0707 April 1981 Forwards IE Insp Repts 50-491/81-01,50-492/81-01 & 50-493/81-01 on 810310-12.No Noncompliance Noted ML19347D3491981-03-12012 March 1981 Responds to NRC 810223 Request for Addl Info Re Util Plans for Facilities.Completion of Cherokee 1 & 2 Has Been Indefinitely Delayed.Commercial Operating Dates for Cherokee 3 & Perkins 1,2 & 3 Have Not Been Determined ML19350B3351981-03-11011 March 1981 Forwards IE Info Notice 81-06, Failure of Ite Model K-600 Circuit Breaker. No Response Required ML19347D0311981-03-0404 March 1981 Forwards 810224 Press Release Re Delay of Facility Completion.Financial Situation Has Pushed Facility Completion Into Indefinite Future ML19350A6991981-03-0202 March 1981 Forwards IE Circular 81-03, Inoperable Seismic Monitoring Instrumentation. No Response Required ML20008E7621981-02-24024 February 1981 Forwards PWR Const Milestones & Activities for McGuire 1 & 2,Catawba 1 & 2 & Cherokee 1.Key Event Dates Provided ML20008E4531981-02-23023 February 1981 Requests Info Re Schedule for Licensing Activities for Facilities ML20003C2891981-02-11011 February 1981 Responds to IE Bulletin 80-23, Failures of Solenoid Valves Mfg by Valcor Engineering Corp. Bulletin Does Not Apply ML19341C1811981-02-0909 February 1981 Forwards IE Circular 81-02, Performance of NRC-Licensed Individuals While on Duty. No Written Response Required ML19345F3631981-02-0505 February 1981 Forwards Evacuation Time Estimates & Color Overlay Site Map, Per Discussions w/P81 Project Manager.W/O Site Map ML19339D0971981-02-0404 February 1981 Forwards IE Mgt Meeting Repts 50-269/80-34,50-270/80-30, 50-287/80-27,50-369/80-30,50-370/80-16,50-413/80-30, 50-414/80-30,50-491/80-06,50-492/80-09 & 50-493/80-09 on 801024.No Noncompliance Noted ML19345G0801981-01-27027 January 1981 Forwards Revision 1 to Response Re IE Bulletin 79-14 Revision 1,Suppl 2, Seismic Analysis for As-Built Safety-Related Piping Sys. Describes Program Which Will Give Assurance That Design Documents Reflect Sys Conditions ML19351F9851981-01-27027 January 1981 Responds to IE Bulletin 80-21, Valve Yokes Supplied by Malcolm Foundry Co,Inc. No safety-related Valves Using Specified Valve Yokes Are Used ML19345F9201981-01-23023 January 1981 Forwards IE Circular 81-01, Design Problems Involving Indicating Pushbutton Switches Mfg by Honeywell,Inc. No Response Required ML19341D2821981-01-20020 January 1981 Forwards IE Insp Repts 50-491/80-10,50-492/80-10 & 50-493/80-10 on 801202-05.No Noncompliance Noted ML19341B8371981-01-16016 January 1981 Forwards IE Info Notice 81-01, Possible Failures of GE Type Hfa Relays. No Response Required ML19340E0271980-12-16016 December 1980 Forwards IE Info Notice 80-44, Actuation of ECCS in Recirculation Mode While in Hot Shutdown. No Written Response Required ML19340C8091980-11-26026 November 1980 Forwards IE Info Notice 80-29,Suppl 1, Broken Studs on Terry Turbine Steam Inlet Flange. No Written Response Required ML19345C4561980-11-21021 November 1980 Forwards IE Bulletin 80-24, Prevention of Damage Due to Water Leakage Inside Containment. No Written Response Required ML19345C2211980-11-14014 November 1980 Forwards IE Bulletin 80-23, Failures of Solenoid Valves Mfg by Valcor Engineering Corp. Requires Estimate of Manpower Associated W/Corrective Actions ML20002B9171980-11-11011 November 1980 Forwards Supplemental Responses to NRC Re Violations Noted in IE Insp Repts 50-369/80-08,50-370/80-05, 50-413/80-09,50-414/80-09,50-491/80-02,50-492/80-06 & 50-493/80-06.Final Rept to Be Submitted by 810131 ML19345C7171980-11-10010 November 1980 Forwards IE Info Notice 80-41, Failure of Swing Check Valve in Decay Heat Removal Sys at Davis Besse Unit 1. No Response Required ML20002B5171980-11-0606 November 1980 Forwards IE Bulletin 80-21, Valve Yokes Supplied by Malcolm Foundry Co,Inc. Written Response Required 1999-05-28 Category:INCOMING CORRESPONDENCE MONTHYEARML20195C5131999-05-28028 May 1999
[Table view]Forwards Revs to Sections 3.9 & 5.6 of Its,Based on Resolution Telcons Held Between NRC Staff & Util on 990526 & 27 ML20098G6271984-09-27027 September 1984 Forwards Responses to 840617 Request for Addl Info in Order to Complete Review of Facility Site Stabilization Plan.W/Two Oversize Maps.Aperture Cards Available in PDR ML20095E3971984-08-16016 August 1984 Forwards Duke Power Co & North Carolina Municipal Power Agency 1 1983 Annual Repts LG-84-332, Forwards Most Recent Aerial Photographs of Site for Review of Stabilization Plan.W/O Encl1984-04-24024 April 1984 Forwards Most Recent Aerial Photographs of Site for Review of Stabilization Plan.W/O Encl ML20078C2031983-09-21021 September 1983 Requests Cancellation of CPPR-167,CPPR-168 & CPPR-169 Based on Current & Predicated Economic Conditions.Stabilization Plan Encl ML20115A6411983-05-12012 May 1983 Forwards Updated Const Status Repts for McGuire Unit 2, Catawba Units 1 & 2 & Cherokee Unit 1 as of 830331,per NUREG-0030.Rept Last Update for McGuire Unit 2 Due to Receipt of OL on 830303.Cherokee Unit 1 Canceled on 830429 LG-83-314, Responds to NRC Requiring Detailed Analysis of TMI Action Item II.K.3.5, Automatic Trip of Reactor Coolant Pumps. Analysis Will Not Be Submitted,Due to Indefinite Delay in Const of Facility1983-04-0707 April 1983 Responds to NRC Requiring Detailed Analysis of TMI Action Item II.K.3.5, Automatic Trip of Reactor Coolant Pumps. Analysis Will Not Be Submitted,Due to Indefinite Delay in Const of Facility LG-83-163, Forwards Amend 19 to Duke Power Nuclear Guides.Amend 20 Will Be Forwarded in Apr 19831983-02-18018 February 1983 Forwards Amend 19 to Duke Power Nuclear Guides.Amend 20 Will Be Forwarded in Apr 1983 ML20127D4351983-02-0303 February 1983 Forwards Updated Const Status Repts as of 821231.Info for Inclusion in NUREG-0030.Fuel Load Target Date for Catawba Unit 1 May 1984 LG-83-049, Forwards Response to 821210 Request for Addl Info on IE Bulletin 81-03, Flow Blockage of Cooling Water to Safety Sys Components by Corbicula Sp (Asiatic Clam) & Mytilus Sp (Mussel). Monitoring Program for Clams to Be Established1983-01-17017 January 1983 Forwards Response to 821210 Request for Addl Info on IE Bulletin 81-03, Flow Blockage of Cooling Water to Safety Sys Components by Corbicula Sp (Asiatic Clam) & Mytilus Sp (Mussel). Monitoring Program for Clams to Be Established ML20063E6521982-08-24024 August 1982 Forwards Util & Nc Municipal Power Agency Annual Financial Repts for 1981 ML20062K3871982-05-20020 May 1982 Forwards First Quarter 1982 Yellow Book Updates Re Const Status LD-82-052, Informs That Addl Action Will Be Required in Order to Fully Comply W/Asme Code Requirements for Radiography of safe-end Welds.Discrepancy Will Be Resolved by re-radiographing Affected Welds1982-05-0404 May 1982 Informs That Addl Action Will Be Required in Order to Fully Comply W/Asme Code Requirements for Radiography of safe-end Welds.Discrepancy Will Be Resolved by re-radiographing Affected Welds ML20038D1361981-11-0303 November 1981 Responds to NRC 811014 Ltr Re Violations Noted in IE Insp Repts 50-491/81-03,50-492/81-03 & 50-493/81-03.Corrective Actions:Gas Cans Have Been Emptied & Placed in Motor Pool Storage Area ML20032D5211981-09-18018 September 1981 Informs That No Westinghouse Electro-Mechanical Div motor- Operated Gate Valves Have Been Installed in Response to IE Bulletin 81-02,Suppl 1.Approx 2 Manhours Expended in Review ML20009B3301981-07-10010 July 1981 Requests That NRC Notify N Reynolds That 810622 Petition for Extension of Deadline for Compliance w/CLI-80-21 Has Been Retitled.Svc Should Be Made of All Subsequent Papers on Parties to Proceeding,Including Ucs ML20009D9001981-07-0808 July 1981 Responds to IE Bulletin 81-03 Re Blockage of Cooling Water to Safety Sys Components by Clams & Mussels.Provisions Will Be Made to Minimize Introduction of Clams Into Raw Water Sys.Fifteen Manhours Expended in Preparation of Bulletin ML20030D6581981-06-29029 June 1981 Advises That Toledo Edison Co & IA Electric Light & Power Co Should Be Included as Petitioners in Licensee 810622 Petition Requesting Commission Extension of Deadline Imposed by CLI-80-21 ML20004C2561981-05-28028 May 1981 Requests Authorization to Use ASME Code Cases 1481-2,1592-14 & 1644-8 in Fabrication of Primary Sys Components for Facilities ML19347D3491981-03-12012 March 1981 Responds to NRC 810223 Request for Addl Info Re Util Plans for Facilities.Completion of Cherokee 1 & 2 Has Been Indefinitely Delayed.Commercial Operating Dates for Cherokee 3 & Perkins 1,2 & 3 Have Not Been Determined ML19347D0311981-03-0404 March 1981 Forwards 810224 Press Release Re Delay of Facility Completion.Financial Situation Has Pushed Facility Completion Into Indefinite Future ML20008E7621981-02-24024 February 1981 Forwards PWR Const Milestones & Activities for McGuire 1 & 2,Catawba 1 & 2 & Cherokee 1.Key Event Dates Provided ML20003C2891981-02-11011 February 1981 Responds to IE Bulletin 80-23, Failures of Solenoid Valves Mfg by Valcor Engineering Corp. Bulletin Does Not Apply ML19345F3631981-02-0505 February 1981 Forwards Evacuation Time Estimates & Color Overlay Site Map, Per Discussions w/P81 Project Manager.W/O Site Map ML19351F9851981-01-27027 January 1981 Responds to IE Bulletin 80-21, Valve Yokes Supplied by Malcolm Foundry Co,Inc. No safety-related Valves Using Specified Valve Yokes Are Used ML19345G0801981-01-27027 January 1981 Forwards Revision 1 to Response Re IE Bulletin 79-14 Revision 1,Suppl 2, Seismic Analysis for As-Built Safety-Related Piping Sys. Describes Program Which Will Give Assurance That Design Documents Reflect Sys Conditions ML20002B9171980-11-11011 November 1980 Forwards Supplemental Responses to NRC Re Violations Noted in IE Insp Repts 50-369/80-08,50-370/80-05, 50-413/80-09,50-414/80-09,50-491/80-02,50-492/80-06 & 50-493/80-06.Final Rept to Be Submitted by 810131 ML19340B1411980-10-14014 October 1980 Requests Load Info Re Design Pressure,Loca & SSE Loads & Drawings for Five Containment Vessels Referred to in Statement of Work for FY81 ML19344E9781980-08-29029 August 1980 Responds to IE Bulletin 80-19,Revision 1.No mercury-wetted Matrix Relays Are Used or Planned for Use in Reactor Protection Sys ML19344F1871980-08-26026 August 1980 Responds to IE Bulletin 80-16.No Rosemount Models 1151 & 1152 Pressure Transmitters Are Used in safety-related Applications ML19336A6421980-08-15015 August 1980 Responds to NRC Re Violations Noted in IE Insp Repts 50-369/80-08,50-370/80-05,50-413/80-09,50-414/80-09, 50-491/80-07,50-492/80-06 & 50-493/80-06.Corrective Actions: Records Storage Facility Constructed ML19344E5061980-08-14014 August 1980 Responds to IE Bulletin 80-20, Failure of Westinghouse Type W-2 Spring Return to Neutral Control Switches. Review Showed No Westinghouse Type W-2 Switches Used in safety- Related Applications ML19331D3631980-08-0606 August 1980 Submits Response to IE Bulletin 79-03A.No SA-312 or A-312, Type 300 Series Fusion Welded Pipe in Use or Planned for Use Is Subj to Design Stresses Greater than 85% of ASME Code Allowable Stresses ML19331B6111980-08-0404 August 1980 Submits Const Completion & Fuel Load Target Dates,In Response to NRC .For Unit 1,const Completion & Fuel Load Target Dates Are Jul 1980 & Jul 1991 for Unit 2.OL Application to Be Submitted by Sept 1986 ML19338C3401980-08-0404 August 1980 Ack Receipt of IE Insp Repts 50-491/80-09,50-492/80-08 & 50-493/80-08 on 800611-13.No Proprietary Info ML19327A5411980-07-31031 July 1980 Responds to 800702 Request for Info Re Evacuation Times for Power Plants W/Current or Pending Cps.Cherokee & Perkins Stations Pose No Population Density Situation Which Would Cause Long Evacuation Times ML19331C2621980-07-28028 July 1980 Ack Receipt of IE Insp Repts 50-491/80-08,50-492/80-07 & 50-493/80-07 on 800624-25.No Proprietary Info ML19326E0641980-07-0707 July 1980 Forwards Response to IE Bulletin 80-08, Exam of Containment Liner Penetration Welds. Piping Penetrations Are Designed & Fabricated in Accordance w/1977 Edition of ASME Boiler & Pressure Vessel Code,Including Summer 1977 Addenda ML19327A0081980-06-25025 June 1980 Responds to NRC Re Violation Noted in IE Insp Repts 50-491/79-10,50-492/79-10 & 50-493/79-10.Corrective Actions:Corrected Procedure for Determining Bulk Density of Test Sand & Increased Testing of Filter Matl ML19318A8361980-06-0909 June 1980 Forwards Response to IE Bulletin 80-05 Re Vacuum Conditions Resulting in Damage to Holdup Tanks.Lists Vacuum Conditions in Low Pressure & Holdup Tanks by Tank Name,Sys,Quantity/ Unit,Design Pressure & Protective Measures ML19323G8791980-05-0808 May 1980 Ack Receipt of IE Insp Repts 50-491/80-05,50-492/80-05 & 50-493/80-05.No Proprietary Info ML19309G2151980-04-0303 April 1980 Ack Receipt of IE Insp Repts 50-491/80-04,50-492/80-04 & 50-493/80-04 on 800304-07.No Proprietary Info ML19305D9951980-03-28028 March 1980 Ack Receipt of IE Insp Repts 50-491/80-02,50-492/80-02 & 50-493/80-02 on 800226-29. No Proprietary Info ML19309E8061980-03-28028 March 1980 Ack Receipt of IE Insp Repts 50-491/80-03,50-492/80-03 & 50-493/80-03 on 800303-05.No Proprietary Info ML19305E1751980-03-19019 March 1980 Submits Response to IE Bulletin 80-03.Review Revealed That No Charcoal Adsorber Cells Have Been Received from Manufacturers ML19294B8521980-02-11011 February 1980 Ack Receipt of IE Insp Repts 50-491/80-01,50-492/80-01 & 50-493/80-01.No Proprietary Info ML19312D1301980-02-0505 February 1980 Responds to IE Bulletin 79-28.No Namco EA180 Limit Switches from Affected Production Period Are Used or Planned for Use ML19262C2231980-02-0404 February 1980 Informs of Change in Projected Commercial Operation Dates for Facilities.Units 1 & 2 Will Be Placed in Commercial Operation in Jan 1990 & Jan 1992,respectively.FSAR Will Be Filed in Jan 1987.Schedules Are Periodically Reviewed ML19312D5911980-01-22022 January 1980 Responds to NRC Re Violations Noted in IE Insp Repts 50-491/79-20,50-492/79-20,& 50-493/79-20.Corrective Actions:Samples Taken,Nonconforming Item Report Written & Computer Tickler Sys Implemented ML19257C5371980-01-15015 January 1980 Updates 790412 & 0510 Ltrs Re Recall of 4-inch Elbows & 2-inch Tees from Lot W6719.Lists Nuclear Power Plants at Which Fittings Have Been Located.Lists Facilities from Which Fittings Have Been Removed 1999-05-28 Category:UTILITY TO NRC MONTHYEARML20098G6271984-09-27027 September 1984
[Table view]Forwards Responses to 840617 Request for Addl Info in Order to Complete Review of Facility Site Stabilization Plan.W/Two Oversize Maps.Aperture Cards Available in PDR ML20095E3971984-08-16016 August 1984 Forwards Duke Power Co & North Carolina Municipal Power Agency 1 1983 Annual Repts LG-84-332, Forwards Most Recent Aerial Photographs of Site for Review of Stabilization Plan.W/O Encl1984-04-24024 April 1984 Forwards Most Recent Aerial Photographs of Site for Review of Stabilization Plan.W/O Encl ML20078C2031983-09-21021 September 1983 Requests Cancellation of CPPR-167,CPPR-168 & CPPR-169 Based on Current & Predicated Economic Conditions.Stabilization Plan Encl ML20115A6411983-05-12012 May 1983 Forwards Updated Const Status Repts for McGuire Unit 2, Catawba Units 1 & 2 & Cherokee Unit 1 as of 830331,per NUREG-0030.Rept Last Update for McGuire Unit 2 Due to Receipt of OL on 830303.Cherokee Unit 1 Canceled on 830429 LG-83-314, Responds to NRC Requiring Detailed Analysis of TMI Action Item II.K.3.5, Automatic Trip of Reactor Coolant Pumps. Analysis Will Not Be Submitted,Due to Indefinite Delay in Const of Facility1983-04-0707 April 1983 Responds to NRC Requiring Detailed Analysis of TMI Action Item II.K.3.5, Automatic Trip of Reactor Coolant Pumps. Analysis Will Not Be Submitted,Due to Indefinite Delay in Const of Facility LG-83-163, Forwards Amend 19 to Duke Power Nuclear Guides.Amend 20 Will Be Forwarded in Apr 19831983-02-18018 February 1983 Forwards Amend 19 to Duke Power Nuclear Guides.Amend 20 Will Be Forwarded in Apr 1983 ML20127D4351983-02-0303 February 1983 Forwards Updated Const Status Repts as of 821231.Info for Inclusion in NUREG-0030.Fuel Load Target Date for Catawba Unit 1 May 1984 LG-83-049, Forwards Response to 821210 Request for Addl Info on IE Bulletin 81-03, Flow Blockage of Cooling Water to Safety Sys Components by Corbicula Sp (Asiatic Clam) & Mytilus Sp (Mussel). Monitoring Program for Clams to Be Established1983-01-17017 January 1983 Forwards Response to 821210 Request for Addl Info on IE Bulletin 81-03, Flow Blockage of Cooling Water to Safety Sys Components by Corbicula Sp (Asiatic Clam) & Mytilus Sp (Mussel). Monitoring Program for Clams to Be Established ML20063E6521982-08-24024 August 1982 Forwards Util & Nc Municipal Power Agency Annual Financial Repts for 1981 ML20062K3871982-05-20020 May 1982 Forwards First Quarter 1982 Yellow Book Updates Re Const Status ML20038D1361981-11-0303 November 1981 Responds to NRC 811014 Ltr Re Violations Noted in IE Insp Repts 50-491/81-03,50-492/81-03 & 50-493/81-03.Corrective Actions:Gas Cans Have Been Emptied & Placed in Motor Pool Storage Area ML20032D5211981-09-18018 September 1981 Informs That No Westinghouse Electro-Mechanical Div motor- Operated Gate Valves Have Been Installed in Response to IE Bulletin 81-02,Suppl 1.Approx 2 Manhours Expended in Review ML20009D9001981-07-0808 July 1981 Responds to IE Bulletin 81-03 Re Blockage of Cooling Water to Safety Sys Components by Clams & Mussels.Provisions Will Be Made to Minimize Introduction of Clams Into Raw Water Sys.Fifteen Manhours Expended in Preparation of Bulletin ML20004C2561981-05-28028 May 1981 Requests Authorization to Use ASME Code Cases 1481-2,1592-14 & 1644-8 in Fabrication of Primary Sys Components for Facilities ML19347D3491981-03-12012 March 1981 Responds to NRC 810223 Request for Addl Info Re Util Plans for Facilities.Completion of Cherokee 1 & 2 Has Been Indefinitely Delayed.Commercial Operating Dates for Cherokee 3 & Perkins 1,2 & 3 Have Not Been Determined ML19347D0311981-03-0404 March 1981 Forwards 810224 Press Release Re Delay of Facility Completion.Financial Situation Has Pushed Facility Completion Into Indefinite Future ML20008E7621981-02-24024 February 1981 Forwards PWR Const Milestones & Activities for McGuire 1 & 2,Catawba 1 & 2 & Cherokee 1.Key Event Dates Provided ML20003C2891981-02-11011 February 1981 Responds to IE Bulletin 80-23, Failures of Solenoid Valves Mfg by Valcor Engineering Corp. Bulletin Does Not Apply ML19345F3631981-02-0505 February 1981 Forwards Evacuation Time Estimates & Color Overlay Site Map, Per Discussions w/P81 Project Manager.W/O Site Map ML19345G0801981-01-27027 January 1981 Forwards Revision 1 to Response Re IE Bulletin 79-14 Revision 1,Suppl 2, Seismic Analysis for As-Built Safety-Related Piping Sys. Describes Program Which Will Give Assurance That Design Documents Reflect Sys Conditions ML19351F9851981-01-27027 January 1981 Responds to IE Bulletin 80-21, Valve Yokes Supplied by Malcolm Foundry Co,Inc. No safety-related Valves Using Specified Valve Yokes Are Used ML20002B9171980-11-11011 November 1980 Forwards Supplemental Responses to NRC Re Violations Noted in IE Insp Repts 50-369/80-08,50-370/80-05, 50-413/80-09,50-414/80-09,50-491/80-02,50-492/80-06 & 50-493/80-06.Final Rept to Be Submitted by 810131 ML19344E9781980-08-29029 August 1980 Responds to IE Bulletin 80-19,Revision 1.No mercury-wetted Matrix Relays Are Used or Planned for Use in Reactor Protection Sys ML19344F1871980-08-26026 August 1980 Responds to IE Bulletin 80-16.No Rosemount Models 1151 & 1152 Pressure Transmitters Are Used in safety-related Applications ML19336A6421980-08-15015 August 1980 Responds to NRC Re Violations Noted in IE Insp Repts 50-369/80-08,50-370/80-05,50-413/80-09,50-414/80-09, 50-491/80-07,50-492/80-06 & 50-493/80-06.Corrective Actions: Records Storage Facility Constructed ML19344E5061980-08-14014 August 1980 Responds to IE Bulletin 80-20, Failure of Westinghouse Type W-2 Spring Return to Neutral Control Switches. Review Showed No Westinghouse Type W-2 Switches Used in safety- Related Applications ML19331D3631980-08-0606 August 1980 Submits Response to IE Bulletin 79-03A.No SA-312 or A-312, Type 300 Series Fusion Welded Pipe in Use or Planned for Use Is Subj to Design Stresses Greater than 85% of ASME Code Allowable Stresses ML19338C3401980-08-0404 August 1980 Ack Receipt of IE Insp Repts 50-491/80-09,50-492/80-08 & 50-493/80-08 on 800611-13.No Proprietary Info ML19331B6111980-08-0404 August 1980 Submits Const Completion & Fuel Load Target Dates,In Response to NRC .For Unit 1,const Completion & Fuel Load Target Dates Are Jul 1980 & Jul 1991 for Unit 2.OL Application to Be Submitted by Sept 1986 ML19327A5411980-07-31031 July 1980 Responds to 800702 Request for Info Re Evacuation Times for Power Plants W/Current or Pending Cps.Cherokee & Perkins Stations Pose No Population Density Situation Which Would Cause Long Evacuation Times ML19331C2621980-07-28028 July 1980 Ack Receipt of IE Insp Repts 50-491/80-08,50-492/80-07 & 50-493/80-07 on 800624-25.No Proprietary Info ML19326E0641980-07-0707 July 1980 Forwards Response to IE Bulletin 80-08, Exam of Containment Liner Penetration Welds. Piping Penetrations Are Designed & Fabricated in Accordance w/1977 Edition of ASME Boiler & Pressure Vessel Code,Including Summer 1977 Addenda ML19327A0081980-06-25025 June 1980 Responds to NRC Re Violation Noted in IE Insp Repts 50-491/79-10,50-492/79-10 & 50-493/79-10.Corrective Actions:Corrected Procedure for Determining Bulk Density of Test Sand & Increased Testing of Filter Matl ML19323G8791980-05-0808 May 1980 Ack Receipt of IE Insp Repts 50-491/80-05,50-492/80-05 & 50-493/80-05.No Proprietary Info ML19309G2151980-04-0303 April 1980 Ack Receipt of IE Insp Repts 50-491/80-04,50-492/80-04 & 50-493/80-04 on 800304-07.No Proprietary Info ML19305D9951980-03-28028 March 1980 Ack Receipt of IE Insp Repts 50-491/80-02,50-492/80-02 & 50-493/80-02 on 800226-29. No Proprietary Info ML19309E8061980-03-28028 March 1980 Ack Receipt of IE Insp Repts 50-491/80-03,50-492/80-03 & 50-493/80-03 on 800303-05.No Proprietary Info ML19305E1751980-03-19019 March 1980 Submits Response to IE Bulletin 80-03.Review Revealed That No Charcoal Adsorber Cells Have Been Received from Manufacturers ML19294B8521980-02-11011 February 1980 Ack Receipt of IE Insp Repts 50-491/80-01,50-492/80-01 & 50-493/80-01.No Proprietary Info ML19312D1301980-02-0505 February 1980 Responds to IE Bulletin 79-28.No Namco EA180 Limit Switches from Affected Production Period Are Used or Planned for Use ML19262C2231980-02-0404 February 1980 Informs of Change in Projected Commercial Operation Dates for Facilities.Units 1 & 2 Will Be Placed in Commercial Operation in Jan 1990 & Jan 1992,respectively.FSAR Will Be Filed in Jan 1987.Schedules Are Periodically Reviewed ML19312D5911980-01-22022 January 1980 Responds to NRC Re Violations Noted in IE Insp Repts 50-491/79-20,50-492/79-20,& 50-493/79-20.Corrective Actions:Samples Taken,Nonconforming Item Report Written & Computer Tickler Sys Implemented ML19305B9131980-01-15015 January 1980 Responds to NRC Re Violations Noted in IE Insp Repts 50-491/79-20,50-492/79-20 & 50-493/79-20.Corrective Actions:Concrete Aggregate Samples Taken,Nonconforming Item Rept Written & Computerized Tickler Sys Implemented ML19257D5661980-01-0707 January 1980 Forwards Revision to Response to IE Bulletin 79-02,Revision 2,re Pipe Support Base Plate Designs.Will Account for Base Plate Flexibility in Calculations of Bolt Loads by Using Conservative Hand Calculation Method ML19257D3801980-01-0404 January 1980 Responds to IE Bulletin 79-25, Failures of Westinghouse Bfd Relays in Safety-Related Sys. No Westinghouse Bfd/Nbfd Relays Are Used in safety-related Sys ML19256G1341979-12-20020 December 1979 Estimates Submittal Date for FSAR for Cherokee 1 as Jan 1984 ML19210E8511979-11-29029 November 1979 Ack Receipt of IE Insp Repts 50-491/79-19,50-492/79-19 & 50-493/79-19 on 791023-26.No Proprietary Info ML19269F4841979-11-16016 November 1979 Responds to NRC Re Violations Noted in IE Insp Repts 50-491/79-18,50-492/79-18 & 50-493/79-18.Corrective Actions:Const Procedure CKP-8 Revised Re Electrode Stubs. Personnel Involved Have Been Instructed ML19210D7721979-11-0202 November 1979 Responds to IE Bulletin 79-23 Re Failure of Emergency Transformers.No Connections Made Between Low Kva Rated Transformers & High Kva Emergency Diesel Generators W/O Limitations on Flow of Circulatory Currents 1984-09-27 |
Text
-
DUKE POWER COMPANY ELECTRIC CENTER Box 33189. CHARLOTTE. N. C. 28242 oeE'm "'s "nIma
=
August 4,1980 Mr. Darrell G. Eisenhut, Director Division of Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555 Re: Cherokee Nuclear Station Docket Nos: 50-491, 492, & 493 Construction Completion Schedules Duke Files: CK-1412.05, CK-1412.06
Dear Mr. Eisenhut:
In your letter of July 11, 1980, you requested that "all applicants for operating licenses and construction permit holders" provide construction completion and fuel load target dates. These dates are as follows for Cherokee Nuclear Station:
Construction' Completion Date Fuel Load Target Date Unit 1 July, 1989 July, 1989 Unit 2 July, 1991 July, 1991 Based on the safety review period of 33 months listed in your letter, we plant to submit the Cherokee Operating License Application by September,1986.
Ve truly yours, L. C. Dail, Vice-Pre nt Design Engineering EKM/pam bb!