ML20011A633
| ML20011A633 | |
| Person / Time | |
|---|---|
| Site: | Perkins |
| Issue date: | 10/22/1981 |
| From: | Dail L DUKE POWER CO. |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| RTR-NUREG-0718, RTR-NUREG-718 NUDOCS 8110290206 | |
| Download: ML20011A633 (1) | |
Text
DUKE POWER COMPANY ELECTHIC CENTER, 150% 33189 CH A H MYrrE. N. C.
28242 L. C. D AIL
(
DE N ENGl EER NG October 22, 1981
- f. 7 i~p f
f.
@. J b 4 L
1 00T2 81981* f
- 5,, p**" mon 7 Mr. Darrell G. Eisenhut, Director Division of Licensing U
4 Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, DC 20555 m
W Re: Perkins Nuclear Station Docket Nos. 50-488, 50-489, 50-490 Proposed Licensing Requirements for Pending Construction Pennit and Manufacturing License Applications Duke File:
P81-1412.09
Dear Mr. Eisenhut:
We are presently reviewing your letter of' July 10, 1981 and its enclosures, NUREG 0718 and the Proposed Licensi_ng ' Requirements for Pendi.ng Construction Permit and Manufacturing License Applications.
It has been our objective to make our Cherokee Nuclear Station units and Perkins Nuclear Station units identical. Because of their standardized design, construction permit applications.for all six units were file simultaneously in March of 1974. All six units share one coninon PSAR.
Applying different regulatory requirements to the Perkins units could jeopardize the standardization concept. Therefore, a careful review of the proposed requirements is warranted. We will inform you of our position when we conclude the review.
Very truly yours,
/q
,Q. '
J
/
b.C.Dail,VicePresideat
/
L L
Design Engineering Department JRD/pam I
b 0 8110290206 811022' i
PDR ADOCK 05000488 A