ML16273A361

From kanterella
Revision as of 00:29, 27 April 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Emergency Plan Implementing Procedure Revision
ML16273A361
Person / Time
Site: Watts Bar  Tennessee Valley Authority icon.png
Issue date: 09/30/2016
From: Simmons P
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML16273A361 (120)


Text

Watts Bar Nuclear Plant, Post Office Box 2000 Spring City, Tennessee 37381 September 30, 2016 10 cFR 50.4 10 CFR 50, Appendix E, Section V 10 CFR 50.54(qX5) 10 cFR 72.4 10 cFR 72.44(f)ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001

Subject:

Watts Bar Nuclear Plant, Unit 1 & Unit 2 Facility Operating License No. NPF-90 NRC Docket No. 50-390, 50-391 Emergency PIan lmplementing Procedure Revision ln accordance with the requirements of 10 CFR Part 50, Appendix E, Section V, 10 CFR 50.54(qX5), and 10 CFR72.44(f), the enclosures provide the Emergency Plan lmplementing Procedures (EPIP) and associated Screening Evaluation Forms for the following procedures:

EPIP Revision 5 0046 6 0049 Title General Emergency Activation and Operation of the Technical Support Center (TSC)Effective Date 9t08t2016 9t02t2016 There are no regulatory commitments in this letter. Please direct allquestions concerning this matter to Thomas Detchemendy, Emergency Preparedness Manager, at (423) 365-3232.Respectfully, Paul Simmons Site Vice President Watts Bar Nuclear Plant U.S. Nuclear Regulatory Commission September 30, 2016 Page 2

Enclosures:

1. Emergency Plan lmplementing Procedure Revision - Screening Evaluation Form and EPIP-S, Revision 0046 2. Emergency Plan lmplementing Procedure Revision - Screening Evaluation Form and EPIP-6, Revision 0049 cc: NRC Regiona! Administrator - Region ll NRC Senior Resident Inspector - Watts Bar Nuclear Plant NRC Project Manager - Watts Bar Nuclear Plant EDMS ENCLOSURE 1 WATTS BAR NUCLEAR PLANT, UNIT O EPIP Screening Evaluation Form EPIP-5, General Emergency, Revision 0046 EPDP-17 , Attachment 2 Screening Evaluation Form Evaluation No.: Change Type: E The change is editorial or typographical.

/i-1*'r lu tri/, r,:/'; "i'J n The change is not editorial or typographical.

Ii:ln Iu Fil. r,,:/i 4J Conformance:

n The change conforms to an activity that has prior approval.Record the prior approved activity: '-,], r lrr [],lt',t:l:

7i tr The change does not conform to an activity that has prior approval.

[Qe lr t,]!,:cl.

jt j Activity Description and

References:

I BLOCK I Activity is Revision 46 to EPIP-5;Removed "lnitial" from the title of Appendix H (CR 1 190953)Added Appendix D to the list of QA records (cR 1168376)Corrected title of Appendix D in Section 5.0 These changes are all considered to be eitorial in nature. They do not change the intent or the requirements of this procedure.

They do not require any additional work for any of the positions in the Technical Support Center.X The activity is a change to the radiological emergency plan (includes EPIPs or any other document describing the programmatic methods for maintaining preparedness or responding to an emergency).

[Gct to B/crr,;( 3/tr The activity is not a change to the radiological emergency plan. 1r-io trt Bli':cli 5l Page 1 of 3 EPDP-I 7, Attachment 2 Screening Evaluation Form Evaluation No..Comm itment Im pact Determination

tr The activity involves a site specific EP commitment.

Record the Commitment or Commitment reference:

i,31lO gl1'tr-.l, /j n The activity does not involve a site specific EP commitmenl.

[{-;o tl $1111'1' 71 Planning Standard lmpact Determination (Check All Applicable):

I BLOCK 5 tl 50.47(bX1) - Assignment of Responsibility (Organization Control)tr 50.47(bX2) - Onsite Emergency Organization tr 50.47(bX3) - Emergency Response Support and Resources n 50.47(b)(4) - Emergency Classification System .tr 50.47(bX5) - Notification Methods and Procedures

  • tr 50.47(bX6)-EmergencyCommunications tr 50.47(bX7) - Public Education and lnformation tr 50.47(bX8) - Emergency Facility and Equipment tl 50.47(bxg) - Accident Assessment
  • tr 50.47(bX10) - Protective Response *tr 50.47(bX11) - Radiological Exposure Control tr 50.47(b)(12) - Medical and Public Health Support tr 50.47(bX13) - Recovery and Reentry Planning and Post-Accident Operations tr 50.47(bX14)-

Drills and Exercises tr 50.47(bX15) - Emergency Responder Training tr 50.47(bX16)-

Emergency Plan Maintenance tr 72.44(fl - lndependent Spent Fuel Storage lnstallation (lSFSl)ii: ,,i;rt !-'l;tntittt:j.il.rnrl,-tlrl.s rtnlt,tt.let'l 91rt to Blctcl.,7 l{ rr,tnt:,,:)tc nn!)aclc(1. (io to Blctch 6l' Denofes Risk Significant Planning Standard Page 2 of 3 EPDP-1 7, Attachment 2 Screening Evaluation Form Evaluation No.' i "ii,,, i' i , t,, : i, ;, Screening Evaluation Results: A The activity can be implemented without performing a 50.54(q) reduction in effectiveness evaluation.

tr The activity cannot be implemented without performing a 50.54(q) reduction in effectiveness evaluation.

BLOCK 7 Approvals:

Preparer Name: Michael R. White Preparer Signature:

<-^--,!t'-4 Date: Reviewer Name: Thomas F. Detchemendy Date: . t Z/r/za/a Page 3 of 3 Watts Bar Nuclear Plant Unit 0 Emergency PIan lmplementing Procedure EPIP.5 General Emergency Revision 0046 Quality Related Level of Use: Reference Use Effective Date: 09-08-201 6 Responsible Organization:

REP, Radiological Emer. Prep.Prepared By: Michael R. White Approved By: Tom Detchemendy WBN Unit 0 General Emergency EP!P.5 Rev.0046 Paqe 2 of 36 Revision Log Revision or Change Number Effective Date Affected Page Numbers Description of Revision/Change Rev 41 06121113 10,20,24 Removed reference to EPIP-8 Appendices.

The procedure now references EPIP-8 in its entirety to prevent errors in procedure usage within EPIP-8 Rev 42 11t26t13 13 15 22 Section 4.1 , added applicable appendices to QA records section. PER724038 Revised Appendix A, removed line 4 brief description section; revised line 2 removing the SED name section; replaced completed by with peer checked by. PER 712039 Revised Appendix F line 2 removing the SED name section. PER 712039 Rev 43 03119t14 16,19 Added Faxing instructions to Appendix B and Appendix C.

WBN Unit 0 Genera! Emergency EPIP.5 Rev. 0046 Paqe 3 of 36 Revision Log Revision or Ghange Number Effective Date Affected Page Numbers Description of Revision/Ghange Rev 44 12t18114 7,14,22 I 11 1 5,1 6,35,36, 37 17 19 24,25 29 31 ,32 10 Updated title of Appendix H (PER 914554)Revised step 3.2[1] added steps to allow SM to transfer responsibility for State notification and PAR development to the CECC Director if the TSC is not activated but the CECC is activated Added additional TEENS notification options Revised wording of Step 3.5 Evacuation of Non-Emergency Responders to clarify events that preclude performing the action.Updated Appendix A and J based on new PAR scheme(PER 914554)Added Emergency Communication Notification System (ECNS) phone instructions to Appendix B (PER 87e182)Corrected typographical error in step 1.0[2]A and 1.0l2lC by changing referenced procedure step from 4.0[5] to 1.0[6]Updated Appendix F based on new PAR scheme (PER 914554)Added direction to record time evacuation of 2 mile radius commenced (PER 914554)Updated Appendix H based on new PAR scheme (PER 914554)

General Emergency EP!P.5 Rev.0046 Paqe 4 of 36 Revision Log Revision or Change Number Effective Date Affected Page Numbers Descri ption of Revision/Change 45 10t14t15 I 10, 11 ,12,17 18,19,20,21 23,26,27,34 38 11 11 ,19 14 18,19 32,33 Revised step 1.1 to remove wording "or upgraded to a higher emergency classification" since no higher classification exists. (CR e855 14)Updated all telephone numbers and extensions to remove the requirement to dial "9" to access off site phone numbers and to add three digit prefix to phone numbers due to new AVAYA telephone system upgrade.(CR 983963)Removed human error trap by changing spacing and pagination so the announcement performed in step 3.3[2J is on a single page (CR 1010168) ]Aligned TEENS activation options in a two I column format to more easily distinguish I between an actual event and a drill. Changed I"Staging Area" references to read "Alternate I Facility" which is the new designation. (CR I:nl..HNon eA records section 4.212!to I reflect requirements for eight year planning I cycle by removing the qualifying statement I"starting the year after the next HAB drilt". I Added step 1.0[4] to Appendix B, to direct the I ODS to activate TEENS if appropriate. (CR I 1066247) I lncorporated a legible copy of Appendix H into I BSL copy of procedure (CR 101 3411) l46 09/08 t16 11,29 12 13 Removed "lnitial" from the title of Appendix H (cR 11e0e53)Added Appendix D to the list of QA records (cR 1168376)corrected title of Appendix D in Section s.0 WBN Unit 0 General Emergency EPIP.5 Rev. 0046 Paoe 5 of 36 Table of Contents TNTRODUCTTON

.........7 Purpose ..................7 REFERENCES

........ ...................7 lndustry Documents

.................7 Plant lnstructions..............

.......7 EMERGENCY ACT!ONS...........

.................8 Site Emergency Director (SED) Location...

................8 WBN Risk County and State of Tennessee Notification and Confirmation

............

................8 Activation of the Emergency Response Organization (ERO). ......................

9 Dose Assessment Evaluation...........

...... 10 Evacuation of Non-Emergency Responders.............

................

10 Notification of Site Personnel

..................

10 Notification of the Nuclear Regulatory Commission (NRC)... ....11 Monitor / Re-evaluate the Event .............

11 Review of Procedure

............

..................12 DOCUMENTATION

...................

12 QA Records..............

.............12 Non-QA Records ...................12 ILLUSTRATIONS

/APPENDICES

.............12 Appendix A: General Emergency lnitial Notification Form ........14 1.0 1.1 2.0 2.1 2.2 3.0 3.1 3.2 3.3 3,4 3.5 3.6 3.7 3.8 3.9 4.0 4.1 4.2 5.0 Appendix Appendix Appendix Appendix Appendix B: State of Tennessee Notification

.............

16 C: Notification of Site Personnel.....................Error!

Bookmark not defined.18 D: Notification of the Nuclear Regulatory Commission (NRC) (NRC Event Notification Worksheet)..........

..................19 E: Monitor / Re-Evaluate the Event......

......21 F: General Emergency Follow-Up lnformation Form .................23 Appendix G: Technical Support Center General Emergency Classification lnstruction

......25 WBN Unit 0 General Emergency EPIP.5 Rev.0046 Paqe 6 of 36 Table of Contents (continued)

Appendix H: Protective Action Recommendation FIow chart.......

.............30 Appendix l: Activation of the Emergency paging system Alternate ERO Activation........

................32 Appendix J: Upgrade - Protective Action Recommendation...

...................34 WBN Unit 0 General Emergency EPIP.5 Rev.0046 Paqe 7 of 36 1.1 1.0 2.0 2.1

2.2 INTRODUCTION

Purpose The purpose of this procedure is to provide for the timely notification of appropriate individuals or organizations when the Shift Manager or the Site Emergency Director (SED) has determined through the use of EPIP-1 that an event has occurred which is classified as a General Emergency.

Additionally, this procedure provides for periodic evaluation of the current situation by the Shift Manager/SED to determine whether the General Emergency should be continued or terminated.

REFERENCES lndustry Documents NUREG-0654, "Criteria for Preparation and Evaluation of Radiologica!

Emergency Response Plans and Preparedness in Support of Nuclear Power Plants" 10 CFR 50.47, Code of Federal Regulations 10 CFR 72.75, Code of Federal Regulations PIant lnstructions TVA Radiological Emergency PIan EPIP - l, "Emergency Plan Classification Logic" EPIP - 2, "Notification of Unusual Event" EPIP - 3, "Alert" EPIP - 4, "Site Area Emergency" EPIP -16, "Termination and Recovery Procedure" A.B.C.D.E.F.

WBN Unit 0 General Emergency EPIP-5 Rev. 0046 Paqe 8 of 36 3.0 EMERGENCY ACTIONS NOTES 1) Procedure steps can be performed concurrenfly.

2) All procedure steps can be delegated except as noted.3) A STA or SRO should peer check Appendix A completion.

3.1 Site Emergency Director (SED) Location t1] lF the TSC SED has assumed the responsibilities from the SM SED THEN CONTINUE in this procedure at Aooendix G.Otherwise continue in this procedure.

3.2 wBN Risk county and state of rennessee Notification and Confirmation CAUTION Notification of the Risk Counties / State of Tennessee is required to be compteted within 15 minutes from the time of emergency classification declaration NOTE Completion of the General Emergency Apoendix A includes protective action recommendation development, therefore it must be performed by the Site Emergency Director or delegated only to the CECC Director.t1] lF the CECC is activated, THEN contact the CECC Director at extension 7 51 -161 4 and COMMUNICATE:

TIME of the General Emergency classification General Emergency Classification EAL Designator:

t1.11 lF the cEcc Directorwas contacted, the state of rennessee notification action is complete, THEN Go ro step 3.3. orHERWlsE go to step [2].I2l COMPLETE Aooendix A "lnitial Notification Form" t3] COMPLETE Apoendix B "State of Tennessee Notification" utilizing a completed Aooendix A WBN Unit 0 General Emergency EPIP.5 Rev. 0046 Paqe 9 of 36 3.3 Activation of the Emergency Response Organization (ERO)11] TVA Enterprise Emergency Notification System (TEENS)A. CALL the ODS at751-1700 or 751-2495 to ACTIVATE TEENS utilizing one of the following notifications as appropriate:

B. IF unable to contact the ODS after 5 minutes, Then IMPLEMENT Aooendix l, "Activation of the Emergency Paging System" CAUTION Ongoing or anticipated security events may present a danger to site personnel.

Do not conduct the notification of site personnel PA message during an ongoing anticipated security event. All pertinent site personnel PA messages will be conducted per 1-AOl-,42.01 "Securityl Events" for securityr events.l2l Plant PA Announcement CONDUCT a Plant PA announcement similar to the following: (Dial487 to obtain the Plant PA)"Attention AII Personnel.

Attention AII Personnel.

A GENERAL Emergency Classification has been declared.The Watts Bar Emergency Plan is being implemented at this time.Activate the Emergency Response Facilities Further updates will follow." (Repeat the message once)tr tr tr tr EMERGENCY EMERGENCY ALTERNATE FACILITY (lf events are on-going or anticipated that may present a danger to normal emergency center staffi ng . )IMMINENT SECURITY EVENT (Events at the site may present a situation where personnel in the Protected Area will shelter or remain sheltered.)

DRILL DRILL ALTERNATE FAGILITY (If events are on-going or anticipated that may present a danger to normal emergency center staffing AND a drill is in progress.)

DRILL IMMINENT SECURITY EVENT (Events at the site may present a situation where personnel in the Protected Area will shelter or remain sheltered AND a drill is in progress.)

tr tr WBN Unit 0 General Emergency EPIP.5 Rev.0046 Paqe 10 of 36 3.4 Dose Assessment Evaluation 11] DETERMINE if a Dose Assessment Evaluation is warranted.

lF emergency conditions warrant dose assessment THEN CONTACT Radiation Protection at 365-7865 and request the implementation of EPIP-13 for dose assessment.

3.5 Evacuation

of Non-Emergency Responders 11] lF any of the following conditions exists: o A severe weather condition is currently in progress or is projected on-site, such as a tornado.OR. An on-site security risk condition exists that may present a danger to site personnel during the Assembly / Accountability process as determined by SED/Nuclear Security.OR. Rapid Evacuation of the Protected Area (REPA) has been conducted.

THEN DO NOT initiate the Evacuation Process AND CONTINUE in this procedure at Section 3.6.OTHERWISE continue to step [2]121 INITIATE Assembly and Accountability and evacuation of Non-Emergency Responders by IMPLEMENTING EPIP-8 WHILE continuing with this procedure.

3.6 Notification

of Site Personnel t1l IMPLEMENT Aooendix C, "Notification of Site Personne!".

WBN Unit 0 General Emergency EPIP.5 Rev.0046 Pase 11 of 36 3.7 Notification of the Nuclear Regulatory Commission (NRC)CAUTION Notification of the NRC shall be completed immediately after notification of the appropriate State or Iocal agencies and not later than one hour after the time of Emergency Classification.

t1] COMPLETE Appendix D, "Notification of the NRC".NOTE When the TSC is staffed, the open and continuous line of communications with the NRC may be transferred to the NRC Coordinator position.l2l lF REQUESTED by the NRC, DIRECT a member of the Operations staff (SRO if Available) to maintain an open and continuous line of communications as directed by NRC.3.8 Monitor / Re-evaluate the Event t1] Monitoring and reevaluation of plant events along with communicating significant changes should be performed continuously as a function of the emergency response.

Methods used to communicate significant changes are not formalized and may vary depending upon staffing levels as wel! as availability of personnel or equipment.

Aooendix E provides a systematic approach to monitoring/re-evaluation and the communication of significant changes in plant conditions.

CONTINUE to conduct State follow-ups untilthe CECC has assumed State communications responsibilities using Aooendix F'Genera!

Emergency Follow-up lnformation Form" to communicate follow-up information.

121 Reevaluation of significant changes must additionally include a determination of whether Protective Action Recommendations (PARs) should be upgraded.The need to upgrade PARs is determined through the continuous assessment of Aooendix H "Protective Action Recommendations".

lF it has been determined that a PAR Upgrade is appropriate, THEN COMMUNICATE the Upgrade to the State using Appendix J "Upgrade-Protective Action Recommendation".

13] CONTINUE to assess PARs until the CECC has assumed PAR responsibilities.

WBN Unit 0 Genera! Emergency EP!P.5 Rev.0046 Paqe 12 of 36 3.9 Review of Procedure 11l DIRECT a member of the staff to review this procedure ensuring that all steps have been completed as applicable.

4.0 DOCUMENTATION

4.1 CIA Records The following records are QA records when completed during actual radiological emergencies.

Appendix A - General Emergency lnitial Notification Form Appendix B - State of Tennessee Notification Appendix D - Notification of the Nuclear Regulatory Commission (NRC) (NRC Event Notifi cation Worksheet)

Appendix F - General Emergency Follow-up lnformation Form Appendix G - Technical Support Center General Emergency Classification Instruction Appendix J - Upgrade-Protective Action Recommendation.

4.2 Non.QA Records t1] Emergency Records The records generated due to declaration of an emergency classification are considered Lifetime Retention records. These records shall be fonrarded to the WBN EP Manager. The records necessary to demonstrate performance are then submitted to the Corporate EP Manager for storage.l2l Drill and Exercise Records The records deemed necessary to demonstrate performance of key actions during drills are considered Non-QA records. These records shall be forwarded to the WBN EP Manager. The WBN EP Manager shall retain records necessary to demonstrate eight-year plan requirements for eight years. The WBN EP Manager shall retain other records in this category for three years.5.0 ILLUSTRATIONS

/APPENDICES Appendix A - Genera! Emergency lnitial Notification Form WBN I General Emergency IEPIP-S UnitO I lRev.0046 Paqe 13 of 36 5.0 ILLUSTRATIONS

/APPENDICES (continued)

Appendix B - State of Tennessee Notification Appendix C - Notification of Site Personnel Appendix D - Notification of the Nuclear Regulatory Commission (NRC) (NRC Event Notifi cation Worksheet)

Appendix E - Monitor / Re-evaluate the Event Appendix F - General Emergency Follow-up lnformation Form Appendix G -Technical Support Center General Emergency Classification lnstruction Appendix H - Protective Action Recommendation Flowchart Appendix I - Activation of the Emergency Paging System (EPS)Appendix J - Upgrade - Protective Action Recommendation WBN Unit 0 General Emergency EPIP.5 Rev.0046 Paqe 14 of 36 Appendix A (Page 1 ot 2l General Emergency Initial Notification Form Protective Action Recommendation Worksheet 1. Determine the correct PAR using the PAR diagram (Appendix H)E Recommendation 1 o Shelter 2 mile radius o Shelter 5 miles downwind tr Recommendation

3. Evacuate 2 mile radius o Shelter 5 miles downwind El Recommendation
2. Shelter 5 mile radius O tr Recommendation 5 tr o Evacuate 2 mile radius and all sectors greater than o Protective Action Guidelines (PAG)a 2. ldentify the affected sectors using the table below Wind direction From (46 meters): Recommendation 4 Evacuate 2 mile radius Evacuate 5 miles downwind Shelter 10 miles downwind Recommendation 6 Evacuate 2 mile radius Evacuate 5 miles downwind 5 Mile Radius Sectors 10 Mile Downwind Sectors A1, Bl, C1, Dl A1,81, C1, D1, M, 82, C2, D2, A3, 84, c4, c5, c7, cg, D4, D5 c7, D2, D4, D5 C9, D6, D7, D8, D9 A2, A3, D2, D5 1 1 1'- 170" A4, A5, A6, A7, D3, D6 82,B.4, C2 231"- 270" 326.- 25 c6, cg, c10, c11, Dg 3. Use the above information to complete page 2 of this appendix.

WBN Unit 0 General Emergency EPIP.5 Rev. 0046 Paqe 15 of 36 Appendix A (Page 2 ot 2l General Emergency Initial Notification Form 1 2 3 tr This is a Drill tr This is an Actual Event - Repeat - This is an Actual Event The SED at Watts Bar has declared a GENERAL EMERGENCY EAL Desisnator: (Use only one EAL)4. Radiological Gonditions: (Check one under both Airborne and Liquid column.)Airborne Releases Offsite tr Minor releases within federally approved limitsl tr Releases above federally approved limits'tr Release information not known (1Tech Specs/ODCM)

Liquid Releases Offsite El Minor releases within federally approved timitsl tr Releases above federatly approved limitsl tr Release information not known (1Tech Specs/ODCM)

5. Event Declared:

Time: Date: 6. The Meteorological Conditions are: (Use 46 meter data from the Met Tower. lF data is NOT available from the MET tower, contact the National Weather Service by dialing 1423-586-8400.

The National Weather Service will provide wind direction and wind speed.)Wind Direction is FROM degrees Wind Speed mph 7.(15 minute average)Provide Protective Action Recommendation utilizinq Appendix H: (15 minute average)Check al! Sectors as appropriate)

A) AFFECTED SECTORS Evacuate 2Mile trA1 ElBl trC1 trD1 5Mile EM trA3 trB2 trB4 ElC2 trC4 UCs trC7 trC8 E]D2 trD4 trDs trA4 trA5 trA6 trA7 tr83 tr85 trC3 trC6 trC9 trC10 trC11 trD3 10 Mile trD6 trD7 trD8 trD9 Shelter (do not check sectors evacuated above)2 Mile tr A1 tr81 trC1 trD1 SMile EJA2. trA3 ElB2 trB4 ElCz trC4 trCs ElC7 trCB ElD2 trD4 trDs trA4 trA5 trA6 trA7 tr83 tr85 trC3 trC6 trC9 trC10 trC11 trD3 10 Mile trD6 trD7 trD8 trD9 B) ALL OTHER SEGTORS MONITOR AND PREPARE.c) coNStDER tssuANcE oF Kt tN AccoRDANCE WITH THE STATE PLAN.Completed by (SED)Peer Checked by General Emergency EPIP.5 Rev.0046 Paqe 16 of 36 Appendix B (Page 1 of 2l State of Tennessee Notification

1.0 State

Notification CAUTION Notification of the Risk Counties / State of Tennessee is required to be completed within 15 minutes from the time of emergency dectaration.

FAX copy of completed Aooendix A (page 2 onry) to state of rennessee by pressing the REP 2 preprogrammed number. This will send a fax to TEMA, the ODS, the TSC, the CECC, Rhea County EMA, Meigs County EMA, and McMinn County EMA 121 REPORT the information recorded on completed Appendix A to the WBN Risk Counties and the State by pressing REP 2 preprogrammed number on the Emergency Communication Notification System (eeruS) phone at the SM desk (coMLAB phone). This wiil auto diar and connect the oDS, TEMA lvarning point, Rhea county EMA, Meigs county EMA, and McMinn county EMA to a conference call.PERFORM a roll call of all required stations and deliver information.

t1I A.B.C.D.Rhea County (Alternate number)Meigs County (Alternate number)McMinn County (Alternate number)TEMA State Warning Point 1-423-775-2505 1-423-775-7929 1-423-334-3211 1-423-334-5269 1-423-744-5256 1-423-745-3222 1-900 -262-3300 1-6 15-741 -0001 Person Contacted Person Contacted Person Contacted Person Contacted t3I REcoRD information from the notification Time and Date of Notification I t4l IF not yet completed:

DIRECT the ODS to ACTTVATE TEENS utitizing one of the notifications (in Step 3.3 or below) as appropriate.

NOTE The Time of the notification is when the State Representative answers the phone. lf any county fails to respond, continue with State notification and report the missed county.

WBN Unit 0 General Emergency EPIP.5 Rev. 0046 Paoe 17 of 36 Appendix B (Page 2 ot 2l State of Tennessee Notification

1.0 State

Notification (continued) tr tr tr tr EMERGENCY EMERGENCY ALTERNATE FACILITY (lf events are on-going or anticipated that may present a danger to normal emergency center staffi ng . )IMMINENT SECURITY EVENT (Events at the site may present a situation where personnel in the Protected Area will shelter or remain sheltered.)

DRILL DRILL ALTERNATE FACILITY (If events are on-going or anticipated that may present a danger to normal emergency center staffing AND a drill is in progress.)

DRILL IMMINENT SECURITY EVENT (Events at the site may present a situation where personnel in the Protected Area will shelter or remain sheltered AND a drill is in progress.)

tr tr t5] lF REP 2 voice connection fails, THEN CONTACT the State of Tennessee by pressing the TEMA preprogrammed number.t6] lF both preprogrammed voice connection buttons failto work, THEN REPORT to the State of Tennessee the information on Appendix A utilizing:

Primary: 1-800-262-3300 Backup: 1-615-741-0001 l7l lF fax REP 2 preprogrammed number(s) does not work A. Rhea County 1423-775-6816 (Rhea EMA)(Alternate fax numbers) 1 423_TTS_5042 (Rhea 91i)B. Meigs County 1423-3344316 (Meigs EMA)(Alternate fax number) 1423-334-3165 (Meigs 911)C. McMinn County 1423-744-5271 (McMinn EMA)(Altemate fax number) 1423-744-8043 (McMinn 911)D. TEMA State Warning Point 1-615-242-9635 (Alternate fax number)E. ODS fax '1423-751-8620 t8] RETURN the completed Aooendix B and Aooendix A to the SED.

WBN Unit 0 General Emergency EPIP.5 Rev. 0046 Pase 18 of 36 Appendix C (Page 1 of 1)Notification of Site Personnel 1.0 Conduct Notification of Site Personnel t1] ENSURE a copy of EPIP-S. Aooendix A used for the State Notification has been faxed to TSC at 365-83GS and CECC attil-1682.

l2l lF the emergency has been declared based upon a security related event THEN A. DELAY making notification steps 1.0[3] through 1.0t61 B. NOTIFY the Shift Manager of the delay C. Periodically MONITOR the event until such time that the Shift Manager determines the present danger has subsided OR The Shift Manager suspends notification steps 1.0[3] through 1.016I Otherwise continue in this procedure t3l NOTIFY Nuclear Security (NS) Shift Supervisor at Plant Extension 365-8464 or 8495. INFORM NS that a "GENERAL EMERGENCY HAS BEEN DECLARED" AND DIRECT NS to activate EPIP-11, "security and Access Control".141 NOTIFY the Chemistry Lab at Plant Extension 365-8330 or 8339. INFORM Chemistry Lab personnelthat a "GENERAL EMERGENCY HAS BEEN DECLARED" tsl NOTIFY the RP Lab at Plant Extension 365-8300 or 7865. TNFORM RP Lab PETSONNEIthAt A "GENERAL EMERGENCY HAS BEEN DECLARED" AND DIRECT RP Lab personnelto implement as applicable EPIP-14, "Radiotogical Control Procedure".

t6] NOTIFY the "On-Call" NRC Resident at Plant Extension 365-1776 (Secretary) or from Weekly Duty List. INFORM NRC Resident that a "GENERAL EMERGENCY HAS BEEN DECLARED" 2.0 Return completed Apoendix c to the site Emergency Director.

WBN Unit 0 General Emergency EPIP.5 Rev.0046 Paoe 19 of 36 Appendix D (Page 1 ot 2l Notification of the Nuclear Regulatory Gommission (NRC)(NRC Event Notification Worksheet)

NOTES 1) Utilize the NRC Emergency Notification System (ENS) when available or if the NRC ENS is inoperable or unavailable utilize any plant telephone.

2) Ensure prior to making this notification that all previously made emergency classifications have been communicated.

Fast breaking plant conditions may have resulted in classifications that have not been officially communicated.

3) Utilize completed Aooendix A for determining information below.1.0 Complete the NRC Event Notification Worksheet below (after Step 3.0)2.0 Utilize the following telephone numbers when making this notification. (Dialing 1 may be required)Main 800-532-3469 OR 301-816-5100 o Backup 1 800-449-3694 OR 301-951-0550 Backup 2 301-415-0550 Backup 3 301415-0553 Fax 301-816-5151. Region lV (alternate site) 817-860-8100 General Emergency EPIP.5 Rev.0046 Paqe 20 of 36 3.0 Appendix D (Page 2 ot 2l Notification of the Nuclear Regulatory Gommission (NRC)(NRC Event Notification Worksheet)

Provide the following information to NRC. Be prepared to answer other questions directed from the NRC based upon the event.Time NRC Notified Facility WBN Affected Unit TVA Contact NRC Contact Time of Glassification

/Eastern Glassification Date Power/Mode Before Power/Mode After Call Back Number ENS Telephone 423-365-1422 TVA Gontact 423-365 Emergency Classification GENERAL EMERGENCY Emergency Action Level Designator Brief Description of Emergency Action Level Protective Action Recommendations (GE ONLY)lf known when staffed PAR developed by cEcc Comments 4.0 RECORD the NRC Event Notification Number (will be provided by the NRC)5.0 RETURN the completed Appendix D to the Site Emergency Director.

WBN Unit 0 General Emergency EPIP-5 Rev.0046 Paqe 21 of 36 Appendix E (Page 1 ot 2l Monitor / Re-Evaluate the Event 1.0 Monitor / Re-Evaluate t1] Re-evaluation of significant changes must additionally include a determination of whether Protective Action Recommendations (PARs) should be upgraded.The need to upgrade PARs is determined through the continuous assessment of Appendix H "Protective Action Recommendation Flowchart".

lF it is determined that a PAR upgrade is appropriate THEN COMMUNICATE the Upgrade to the State using Apoendix J "Upgrade-Protective Action Recommendation" l2l lF significant changes in plant conditions occur, DIRECT a SRO to COMPLETE Aooendix F "General Emergency Follow-Up lnformation Form".l3l COMMUNICATE the Aopendix F information to:. On-Site Emergency Centers o Plant personnel through PA announcements (if applicable) o CECC (751-1614) o ODS (751-1700 or 751-2495), when the CECC is not activated. State of Tennessee when the CECC is not activated 24 Hours Primary: 1-800-262-3300 Backup: 1-6 15-741 -0001 o Nuclear Regulatory Commission (refer to Appendix D)Otherwise Continue in this Appendix.

WBN Unit 0 Genera! Emergency EPIP-5 Rev.0046 Paqe 22 of 36 2.4 3.0 Appendix E (Page 2 ot 2l Monitor / Re-Evaluate the Event Evacuation of Non-Emergency Responders l1l lF Evacuation of Non-Emergency Responders has not been performed THEN RE-EVALUATE the following conditions to determine the ability to perform an evacuation A. A severe weather condition is currently in progress or is projected on-site, such as a tornado.OR B. An on-site security risk condition exists that may present a danger to site personnel during the Assembly / Accountability process as determined by SED/Nuclear Security.OR C. Rapid Evacuation of the Protected Area (REPA) has been conducted.

lF conditions permit evacuation of Non-Emergency Responders.

A. THEN INITIATE evacuation of Non-Emergency Responders in accordance with EPIP-8, "Personnel Accountability and Evacuation" WHILE continuing with this procedure.

Termination

/ Recovery t1l lF conditions warrant termination of the emergency classification, THEN ENTER EP!E!*, "Termination and Recovery Procedure" and exit this procedure l2l WBN Unit 0 Genera! Emergency EPIP.5 Rev.0046 Paqe 23 of 36 Appendix F (Page 1 ot 2l General Emergency Follow-Up Information Form 1. tr This is a Drill tr This is an Actual Event 2. The SED at Watts Bar has declared a GENERAL EMERGENCY 3. Reactor Status: Unit 1: tr SHUT DOWN E At Power tr Refueling tr N/A Unit 2: tr SHUT DOWN E At Power tr Refueling tr N/A 4. Additional EAL Designators:

5. Significant Changes in Plant Conditions:
6. Significant Ghanges in Radiological Conditions:
7. Onsite Protective Actions: Assembly and Accountability Site Evacuation trNo trNo tr lnitiated tr lnitiated tr Completed E Completed 8. The Meteorological Gonditions are: I Wind Speed: mph (Use 46 meter data on the Met Tower)(15 minute Average)Wind Direction is from:_ degrees WBN Unit 0 General Emergency EPIP.5 Rev. 0046 Paqe 24 of 36 Appendix F (Page 2 ot 2l General Emergency Follow-Up Information Form 9. Offsite Protective Actions A) AFFECTED SECTORS Evacuate 2Mile trA1 trBl trcl trD1 EM trA3 EJB,2 trB4 EC2 trC4 trCs trC7 trC8 rlD2 trD4 5 Mile trD5 trA4 trAs trA6 trA7 trB3 tr85 trC3 trC6 trCg trC1o trC11 10 Mile trD3 trD6 ElD7 trD8 trD9 Shelter (do not check sectors evacuated above)2Mile trA1 tr81 trC1 trD1 EM trA3 rlB2 tr84 ElC2 trC4 trCs EC7 trC8 rlD2 trD4 5 Mile trD5 10 trA4 trAs trA6 trA7 trB3 trBs trC3 trC6 trCg trC1O trC11 Mile trD3 trD6 trD7 trD8 trD9 B) ALL OTHER SECTORS MONTTOR AND PREPARE.C) CONSIDER ISSUANGE OF KI IN ACCORDANCE WITH THE STATE PLAN.10. Please repeat the information you have received to ensure accuracy.11. Fff to applicable contact after reporting follow-up information:

CEGC Director at(151-1682) or ODS at (751-8620) or TEMA at(1-615-242-9635).

Completed by: Date/Time:

Eastern Time WBN Unit 0 General Emergency EPIP.5 Rev.0046 Paqe 25 of 36 Appendix G (Page 1 of 5)Technical Support Genter General Emergency Glassification Instruction NOTES 1) Procedure steps can be performed concurrently.

2) Procedure steps 1.0[1] and 1.0[3] CANNOT be delegated, except as prescribed.

All other procedure steps can be delegated.

1.0 NOTIFICATION

OF STATE OF TENNESSEE t1l CECC Notification A. RECORD the following information:

GE Classification EAL Designator:

GE Classification declared at time: Site Emergency Director: (Name)B. Contact the CECC Director utilizing the CECC direct ring down telephone or at extension 751-1614, C. COMMUNICATE the information recorded in step 1.0 [1] A.l2l lF the CECC Director was contacted, THEN the state of Tennessee notification action is complete.

RE-ENTER this appendix at Section 2.0 13] !F the CECC Director was NOT contacted, THEN COMPLETE the State of Tennessee notification A. COMPLETE Aopendix A and B. COMPLETE Aooendix B, "State of Tennessee Notification" (This may be delegated to the Ops Communicator, Ops Manager or the EP Manager)

WBN Unit 0 General Emergency EPIP.5 Rev. 0046 Paqe 26 of 36 Appendix G (Page 2 ot 5l Technical Support Center General Emergency Glassification lnstruction

2.0 Notification

of Site Personnel CAUTION Ongoing or anticipated security events may present danger to site personnel.

Do not conduct the notification of site personnel PA message during an ongoing or anticipated security event. All pertinent site personnel PA messageJwill be conducted per 1-Aol-,42.01 "security Events" for securityr events.11] DIRECT a member of the TSC to CONDUCT a Plant PA announcement similar to the following: (Dial487 to obtain the plant pA)"Attention All Personnel.

Attention All personnet.', A General Emergency Glassification has been declared.The Watts Bar Emergency Plan is being implemented at this time.Further updates will follow.,'(Repeat Message)3.0 Dose Assessment Evaluation t1l lF emergency circumstances warrant dose assessment, THEN DIRECT Radiation Protection to implement EPIP-I3 lnitial Dose Assessment For Radiolooical Emeroencies.

WBN Unit 0 General Emergency EPIP.5 Rev. 0046 Paoe 27 of 36 Appendix G (Page 3 of 5)Technical Support Center General Emergency Classification I nstruction

4.0 Evacuation

of Non-Emergency Responders t1l INITIATE Assembly and Accountability A. lF any of the following conditions exists o A severe weather condition is currently in progress or is projected on-site, such as a Tornado.OR o An on-site security risk condition exists that may present a danger to site personnel during the Assembly / Accountability process as determined by SED/Nuclear Security.OR. Rapid Evacuation of the Protected Area (REPA) has been conducted.

THEN DO NOT initiate the Evacuation Process AND CONTINUE in this procedure at Section 5.0 I21 INITIATE Evacuation of Non-Emergency Responders A. INITIATE EP!89, WHILE continuing with this appendix WBN Unit 0 General Emergency EPIP.5 Rev.0046 Paqe 28 of 36 5.0 Appendix G (Page 4 of 5)Technical Support Center General Emergency Classification Instruction Notification of the Nuclear Regulatory Gommission (NRC)CAUTION Notification of the NRC shall be completed immediately after notification of the appropriate State or local agencies and not later than one hour after the time of Emergency Classification.

DIRECT the TSC NRC Coordinator to implement Aooendix D, "Notification of the NRC".lF REQUESTED by the NRC to maintain an open and continuous tine of communications, DIRECT TSC NRc Coordinator to maintain and or manage an open and continuous line of communications as directed by NRC.6.0 Monitor / Re-evaluate the event Record when the state commenced evacuation of the 2 mire radius.Time evacuation commenced:

l2l Monitoring and re-evaluation of plant events along with communicating significant changes should be performed continuously as a function of the emergency response.

Methods used to communicate significant changes are not formalized and may vary depending upon staffing levers as well as availability of personnel or equipment.

Aooendix E provides a systematic approach to monitoring/re-evaluation and the communication of significant changes in plant conditions.

GONTINUE to conduct State follow-ups until the cEcc has assumed State communications responsibilities using Aooendix F "Generar Emergency Follow-up lnformation Form" to communicate follow-up information.

Re-evaluation of significant changes must additionally include a determination of whether Protective Action Recommendations (PARs) should be upgraded.The need to upgrade PARs is determined through the continuous assessment of Aooendix H "Protective Action Recommendations".

lF it has been determined that a PAR Upgrade is appropriate, THEN GOMMUNICATE the Upgrade to the state using Aooendix J "upgrade-Protective Action Recommendation" t1I l2l t1I t3I WBN Unit 0 General Emergency EPIP.5 Rev.0046 Paoe 29 of 36 Appendix G (Page 5 of 5)Technical Support Genter General Emergency Classification Instruction

6.0 Monitor

/ Re-evaluate the event (continued) 141 Gontinue to assess PARs untilthe CECC has assumed PAR responsibilities.

7.0 Procedure

Review t1l DIRECT a member of the staff to review this procedure ensuring that all steps have been completed as applicable.

WBN Unit 0 General Emergency EPIP.5 Rev.0046 Pase 30 of 36 Appendix H (Page 1 ot 2l Protective Action Recommendation Flow Chart INITIAL PROTECTIVE ACTION RECOMMENDATTON FLOWCHART Note l: lF flflchart declslon block condlfiona arc unknown THEN ansr NO.Noto 2: state agencl*s hav* Prcvldad prlor knotivledge of offstte Impeatmeniiio sEcuaflon Note 3: Note 4: Note 5: (such a3 floodlng' brldg.rmd cb3ur6, ctc.j ana rq@mnrGnd that any needea ini snoura bG sh*tter.A ahort te]m ElGs* 18 daflnad a8 "a rolaasothat does not axc*ed a l-5 mlnut* duraton,'.

RPSA ftr BFN EAL 2.342OR EAL 4.t*.RPSA for soN,wBN 18 d.finad a8 a lo8s of cortalnmont bamer (EAL i.3) AND ElTHER z2o,a chd damag! (EAL 1.3.5) oR a rcleaae ln progEss that exccd8 pAG Etu6 (EAL Z.f (GED.'r Rec 2 :,1i r SheJter 5 ml Radtue,,!there a shott-term controlled release whercai ncar plart areas cannot be evacuated bcfore plume al? (See Note 3 therc a knowri offslte lmpedlment to evtcurtlon?

ls this a Rapldly Progresslng Severe Accident (RPSA)See Note 4 or 5l Euacude 2 mi Radlus Euacuate 5 mi DW EYacuate 2 mi Radlus Sheltter 5 rml [lllll 7 Recl. \Sheltgr 2 nrl Radlus Evacuate 2 rrri Radius She]ter 5 rni tttllf WBN Unit 0 General Emergency EPIP.5 Rev.0046 Paqe 31 of 36 Appendix H (Page 2 ot 2l Protective Action Recommendation FIow Chart r Shift in 15 rnin aur{. wand dr.ctaon rc..dtang an additaorlal 3.ctor3 bdng .tf.ci.d.o State provide- anformaaaon tha otfJaaa arr?.dam.rt3 no lonCcr.xara INC) rcl...c an progt -).o Ho:tilc Actaon Evura h.r b.an t.rmant.d.

o E2(}lt clad dam.g. (Ac. ilot. t!.. sat. .p.aafe tam. h!. .hp..d .aric. 2 mt r.dh.r..v.cualion cofirn.nc.d (lfil l:4O. tclil l:55, U\rEL {:4O1.r- R.cZ , l. sh.lt.r 3 rnl Redlur ,l Note 1: NoG 2: Noil.3: NoG4: Not.6: PROTECTIVE ACTTON RECOMMENDATIONS(PAR)

UPGRADE lFflowahart dccblon block condltlons arc unknown THEN angwer NO.6tatc agcnclc. h.v. prEvld.d prlor knowlcdge of offolte lmpcdlments to evacuatlon (3uoh ar rloodlng, brldg.rtod cloeur!3, rtc.) and rccommcnd that any needed PAR *hotlld bc 3hcltcr.R.fGr to.ltc EALr (BFN 2.3{it, SOil 1.3.6. WBN 1.8.6}, Chemlstry sample, or Corc Damagc A33e33mcnt.

RPaA tor BFN EAL 2.9*2 OR EAL4.i*.RPEA fo, SCINTWBN 13 dcflncd a3 a lo(ra of contalnment barrlcr (EAL f .S) ANO EITHER =29,6 clad damagp (EAL f .t.6) OR. rrlc... ln progrt.3 ihlt .xcc.ds PAG valu.e (EAL 7.'l (GE))-Plant eondltlon.

..c undcr3tood (Eource tcrml Relea3e pethuray undcr3tood (flltcrcdrunflltcrcd, alcvat.d, monltor.d),.nd mctcorologleal lnformstlon lB avallabla.

Conlkl.r gh.!t.r for 3hort tcrm lrlca3c lf accurat.h/

proJeqted to be =1 5 mlnutc3 ln duratlon and coniroll.d (c.gt , controllGd vcrtilng of cont.lnmcnt).

Not S: Xot T:

WBN Unit 0 General Emergency EPIP.5 Rev. 0046 Pase 32 of 36 1.0 Appendix I (Page 1 ot 2)Activation of the Emergency Paging system Alternate ERO Activation Activate the Emergency Paging System (EpS)11] PREss the EPS cRT screen once to activate the paging options 121 PRESS the appropriate option as instructed by the SED o DRILL. EMERGENCY o STAGING AREA I3l PRESS the SIARf button to initiate the option OR PRESS the ABORf button to deny the option request l4l lF the EPS fails to operate tocaily, coNTAcr the oDS at751-1700 or 751-2495 and DIREGT the ODS to activate the notification system (TEENS is preferred; EPS is Alternate) for WBN.15] lF the EPS FAILS to operate either locally or by the ODS exit this step and re-enter this Appendix at Section 2.0 Otherwise continue in this procedure.

1)NOTES The Emergency Paging System (EPS) consists of a dedicated touch screen CRT.Activation of any screen feature requires the user ptace their fingertip within the boundary of the select button and leave it there for at least 1 second. The CRT Screen will normally display a large rectangle that indicates that the paging system is available but currently inactive.lf the EPS fails to operate, contact the SM/SED immediately.

Request that the ODS be contacted to initiate the notification system (TEENS is preferred EPS is Alternate) from their location.2)

WBN Unit 0 General Emergency EPIP.5 Rev. 0046 Paoe 33 of 36 Appendix I (Page 2 ot 2l Activation of the Emergency Paging System Alternate ERO Activation

1.0 Activate

the Emergency Paging System (EPS) (continued) 16l MONITOR the Paging System Terminal Display NOTE Monitor ERO positions through OSC Document Control. Positions below OSC Document Control are courtesy pages and are not subject to call-out requirements.

A. lF A'NO" response is observed, OR The position being paged has not responded promptly or within approximately 20 minutes, THEN UTILIZE the Weekly Duty List and aftempt to contact the position representative with available information. (No Fitness for Duty question is required.)

B. IF The individual cannot be reached utilizing the Weekly Duty List, THEN UTILIZE the Call-Out List and attempt to contact an alternate position representative. (Fitness for Duty question is required when utilizing the Call-Out List.)2.0 ALTERNATE BACKUP ERO ACTIVATION - Manual Gall'Out t1] UTILIZE the current Weekly Duty List and contact positions as listed. (No Fitness for Duty question is required.)

l2l lf a position cannot be reached from the current Weekly Duty list, then refer to the Call-out List as applicable to fill all vacant positions. (Fitness for Duty question is required when utilizing the Call-Out List.)t3] CONTINUE until all positions have been filled.

WBN Unit 0 General Emergency EPIP.5 Rev. 0046 Paqe 34 of 36 Appendix J (Page 1 of 3)Upgrade - Protective Action Recommendation Protective Action Recommendation Worksheet 1. Determine the correct PAR using the PAR diagram-tr Recommendation 1 Shelter 2 mile radius Shelter 5 miles downwind o o tr Recommendation 2 Shelter 5 mile radius a tr Recommendation 3 Evacuate 2 mile radius Shelter 5 miles downwind o o tr Recommendation 4 Evacuate 2 mile radius Evacuate 5 miles downwind Shelter 10 miles downwind a a O tr Recommendation 5 o Evacuate 2 mile radius and all sectors greater than Protective Action Guidelines (PAG)u Recommendation 6 Evacuate 2 mile radius Evacuate 5 miles downwind o O 2. ldentify the affected sectors using the table betow Wind direction From: degrees 2 Mile Radius Sectors 5 Mile Radius Sectors 5 Mile Downwind Sectors Wind Direction From 10 Mile Downwind Sectors A1, Bl, C1, Dl A1, 81,C1, D1, M 82, C2, D2, A3, 84 c4, c5, c7, cg, D4 D5 c7, D2, D4, D5 260- 680 C9, D6, D7, D8, D9 A3, D2, D4, D5 69"- 1 10" 42, A3, D2, D5 111"- 170" A4, A5, A6, A7, D3, D6 M,A3,B,2,B.4,C2 171"- 230.A5, A6, A7,83, 85 82,B.4, C2 23',a"- 270" 85, C3 B,2, C2, C4, C5 2710- 3250 B3,C3, C6, C11 c2, c4, c5, c7, cg, D4 326"- 25 c6, cg, c10, c11, Dg WBN General Emergency IEPIP-S UnitO I lRev.0046 Paqe 35 of 36 Appendix J (Page 2 of 3)Upgrade - Protective Action Recommendation

3. ldentify any affected Sectors from previous PARs.Evacuate 2 Mile tr A1 tr81 trC1 trD1 SMile EM trA3 ElB2 tr84 ElCz trC4 trCs ElC7 trC8 EJD2 trD4 trDs trA4 trA5 trA6 trA7 tr83 tr85 trC3 trC6 trC9 trC10 trC1l trD3 10 Mile trD6 trD7 trD8 trD9 Shelter (do not check sectors evacuated above)2 Mile trA1 tr81 trC1 trD1 5Mile EM trA3 ElB2 tr84 ElCz trC4 trC5 ElC7 trC8 ElD2 trD4 trD5 trA4 trA5 trA6 trA7 tr83 tr85 trC3 trC6 trC9 trC10 trC11 trD3 l0 Mile trD6 trD7 trD8 trD9 o lf a sector was previously sheltered and now is to be evacuated it should only be listed as evacuate.o Once a Sector has been recommended to be evacuated it cannot be recommended for sheltering
4. Use the above information to complete page 3 of this appendix WBN Unit 0 General Emergency EPIP.5 Rev. 0046 Paqe 36 of 36 Appendix J (Page 3 of 3)Upgrade - Protective Action Recommendation
t. I u rnis is a oritt g tnis is an Actual Event - EeEc! - This is;; AcGt Eve;2. watts Bar has declared a GENERAL EMERGENCY 3. Watts Bar is making a PAR UPGRADE.4. The Meteorological Conditions are: (Use 46 meter data from the Met Tower. lf data is not available from the MET tower, contact the National Weather Service by dialing 142&58&8400.

The National Weather Service will provide wind direction and wind speed.)Wind Direction is FROM: degrees Wind Speed: mph (15 min average)(15 min average)5. Provide Protective Action Recommendation utilizing Appendix H: (Check all sectors 9s appropriate)

A) AFFECTED SECTORS-I Evacuate 2Mile trA1 tr81 trCl trD1 5Mile EM trA3 ElB2 trB4 rlc2 trc4 trcs Elct trc8 t]D2 trD4 trDs trA4 trA5 trA6 ElA7 tr83 tr85 trC3 trC6 trC9 trClO trC11 trD3 10 Mile trD6 trD7 trD8 trD9 shelter (do not check sectors evacuated above)2Mile trA1 tr81 trCl trD1 SMile EM trA3 ElB2 trB4 Ec2 trc4 trcs trcr trcB rlD2 trD4 trDs trA4 trA5 trA6 trA7 tr83 tr85 trC3 trC6 trC9 trClO trC11 trD3 10 Mile trD6 trD7 trD8 trD9 B) ALL OTHER SECTORS MONITOR AND PREPARE.C} CONSIDER ISSUANCE OF KI IN ACCORDANGE WITH THE STATE PLAN.6. Please repeat the information you have received to ensure accuracy.State of rennessee FAx number 1-61 s-242-963s Completed by Approved by (SED)

ENCLOSURE 2 WATTS BAR NUCLEAR PLANT, UNIT O EPIP Screening Evaluation Form EPIP-6, Activation and Operation of the TechnicalSupport Center (TSC), Revision 0049 EPDP-17 , Attachrnent 2 Screening Evaluation Form Evaluation No.: WBN-2016-014 Activity Scope: I BLOCK 2 X The activity is a change to the radiological emergency plan (includes EPIPs or any other document describing the programmatic methods for maintaining preparedness or responding to an emergency).

[Go to Blocli 3]tr The activity is not a change to the radiological emergency plan. lGo tct Blor:t< 5l ChangeType:

I BLOGK3 X The change is editorial or typographical.

iGri ln 91,,,,trt 7 j I The change is not editorial or typographical . [(;r-) h) 8/lr;L -tl Conformance:

I BLOCK 4 n The change conforms to an activity that has prior approval.Record the prior approved activity: lGtt lo tslttt:li 7j tr The change does not conform to an activity that has prior approval.

[$p tct Elot:h 5]Activity Description and

References:

I BLOCK {Activity is Revision 49 to EPIP-6: Corrected procedure titles for NPG-SPP-14.1 and NPG-SPP-O3.21 and procedure number for o-Tt-12.19 Deleted lnterface documents that are no longer applicable to EPIP-6 and added RCI-104. A review of the deleted documents showed that their inclusion on this list was no longer needed.Deleted reference Materials and Equipment List (Appendix V) (CR 1190970).

This list is redundant to information found in EPIP-12. Updated Appendix references throughout document Appendix C - Added space to reference SED priority related to action request (CR 1202372).This additional space on the form does not change the intent or use of this form, only allows an additional piece of information to be included.Appendix P - Reformatted first bulleted item to conform with procedure template format.Appendix S - Changed reference to condenser vacuum exhaust mid and high range monitors from 1-RE-90-404A and 4048 to 1-RE-90-255 and 256 (CR 1190962).

1-RE-404A and 4048 are no longer used at WBN. These numbers have been changed in the plant to 1-RE-90-255 and 256. They perform the same function.These changes are all considered to be editorial in nature. They do not change the intent or the requirements of this procedure.

They do not require any additional work for any of the positions in the Technical Support Center.Page 1 of 3 EPDP-I 7, Attachment 2 Screening Evaluation Form Evaluation No.: WBN-2016-014 Planning Standard lmpact Determination (Check All Applicable):

n 50.47(bX1) - Assignment of Responsibility (Organization Control)tr 50.47(bX2) - Onsite Emergency Organization n 50.47(bX3) - Emergency Response Support and Resources tr 50.47(bX4) - Emergency Classification System .n 50.47(bX5)-

Notification Methods and procedures

" tr 50.47(bXO)-EmergencyCommunications tr 50.47(bX7) - Public Education and tnformation n 50.47(bXB)-

Emergency Facility and Equipment tr 50.47(bxg) - Accident Assessment

  • tr 50.47(b)(10) - Protective Response *! 50.47(bX11) - Radiological Exposure Controt n 50.47(b)(12) - Medical and Pubtic Heatth Support tr 50.47(bX13) - Recovery and Reentry Planning and Post-Accident Operations tr 50.47(bX14) - Drilts and Exercises tr 50.47(bX15) - Emergency Responder Training tr 50.47(bX16) - Emergency Plan Maintenance n 72.44(f)-

lndependent Spent Fuel Storage lnstailation (tSFSl)If ;'trt1' Plttrrrttn;l Slartt/arrls rntstar;le<l gts to Block 7 lf rtrsne are tntpaclecl.

c1o to Btocti 6l BLOCK 5* Denofes Risk Significant Planning Standard Gommitment lmpact Determination:

LtB-t-ggt<e tr The activity involves a site specific EP commitment.

Record the Commitment or Commitment reference:

lGo lo Bktr:h 7l tr The activity does not involve a site specific EP commitment.

[Go to Btock 7]Page 2 of 3 EPDP-17, Attachmentz Screening Evaluation Form Evaluation No. : WBN-2016-01 4 scruentng Evaluaton Regults: -I E The activity can be implemented without performing a 50.54(q) reduction in effectiveness evaluation.

tr The activity cannot be implemented without performing a 50.5a(q) reduction in effec'tiveness evaluation.

Approvals:

Preparer Name: Michael R. White Preparer Signature:

  • 44%Date: fi/r*/ te Reviewer Name: Thomas F. Detchemendy Date: 8l st lzow Page 3 of 3 Watts Bar Nuclear Plant Unit 0 Emergency Plan lmplementing Procedure EPIP.6 Activation and Operation of the Technical Support Genter (TSC)Revision 0049 Quality Related Level of Use: Reference Use Effective Date: 09-02-201 6 Responsible Organization:

REP, Radiological Emer. Prep.Prepared By: Michael R. White Approved By: Thomas F. Detchemendy WBN Unit 0 Activation and Operation of the Technical Support Center (TSG)EPIP.6 Rev. 0049 Paqe 2 of 74 Revision Log Revision or Ghange Number Effective Date Affected Page Numbers Description of Revision/Change Rev 44 09127 113 22-23 16 7B Section 4.1 , added applicable appendices to QA records section. PER 724038 Section 3.3.E.3, Added instruction for turnover of ERO positions in the TSC if relieving a previous shift. PER7670B0 Added a signature line to attachment Y.sR 7851 99 Rev 45 05/06 114 62 69-72 Removed reference to the facility classification/clock marquee which is no longer installed in the TSC Revised Appendix S to align with the fleet Rev 46 12t08t14 22 31 44 46 49, 53 60 15 18 50, 61, 62, 63 51 Added note that Ops Manager m ay anitiate TSC briefing if SED is unavailable.

Added Normal Work Process Deviation information. (PER 925653)Added additional guidance for the Maintenance Manager regarding the establishment of OSC teams and maintenance of the teams status board.Updated the names of status boards and "REP" vehicle and corrected spelling and grammatical errors.Removed reference to the CECC computer.Removed reference to smoking in the facilities Added note to TSC Logkeeper responsibilities stating that Web EOC is the preferred method of maintaining facility logs.Revised step 3.3.B to allow the SED to activate the TSC once responders for the required minimum staffing positions are identified as present in the TSC. (PER 933425)

WBN Unit 0 Activation and Operation of the Technical Support Center (TSC)EPIP.6 Rev. 0049 Paqe 3 of 74 Revision Log Revision or Change Number Effective Date Affected Page Numbers Description of Revision/Ghange Rev 47 10-30-15 14-21 22 23 25 28,29,32, 36, 37 and 3B 36, 37 and 38 31, 39, 41, 43, 45, 47, 49,51, 54, 56, 60, 62, 63, 65 30 31 33 37 13 Added NPG-SPP-18.3 and EPIP- 14 to list of interfacing documents.

Added unit designators to appropriate procedures Changed OSC to TSC Rearranged steps for filling out and routing Appendix C in order to better clarify instructions.

Added Appendix R Fire to examples Added "radiological" to step 3 .4.F.1 in order to specify which type of habitability survey should be performed Changed records retention to eight years Rearranged and added blocks to Appendix B and Appendix D, in order to make the status of Un,t 2 more clear (CR 101 8225)Added space to record EAL, release point and release type in SED Turnover Datasheet.

Also added clarifying words to SED Turnover Datasheet in several places.Added bullet "Sign in on TSC Sign ln Roster" and instruction to notify SED of arrival to Appendices that did not have those instructions Made format changes to Appendix C to increase usability Added instructions to SED to Declare the TSC activated and added notation clarifying that checklist completion is not required for facility activation.

Deleted requirement to collect checklist from TAT Leader and TAT Tearn Removed reference to ODS in third bullet Added protective action recommendations 4, 5 and 6 to SED Turnover Datasheet (CR 979327)

WBN Unit 0 Activation and Operation of the Technical Support Genter (TSG)EPIP.6 Rev. 0049 Paqe 4 of 74 Revision Log Revision or Ghange Number Effective Date Affected Page Numbers Description of Revision/Change Rev 47(cont)38 42 45 51 52 61 62 64 66 74 76 78 Added place for SED to record time for assuming SED responsibilities Changed Station Technical Advisor to Shift Technical Advisor. Added MCR staffing numbers for two unit operation and added notation that the AUOs may be assigned to the OSC Added comment stating th e 4104 telephone bridge is available to appendix H.Reworded statement regarding habitability to clarify responsi b i I ity Added "if necessary" to second bullet Added bullet directing the EP Manager to change the classification sign Added bullet directing the Log Keeper to establish video link with the OSC Added bullet directing the clerk to fax/scan appendix C to the OSC reworded first bullet to clarify intent changed instructions to send Appendix T from the CECC RAC to the Plant Assessment Team.Added Unit 2 Technical Specifications Removed columns for "replacement within 12 hou rs" Rev 48 04101 116 65 Revised bullet to add the reference to procedure RCI-104 for determining RCS activity. (CR 1 10BO 14)

WBN Unit 0 Activation and Operation of the Technical Support Center (TSC)EPIP.6 Rev. 0049 Paqe 5 of 74 Revision Log Revision or Ghange Number Effective Date Affected Page Numbers Description of Revision/Change Rev 49 09102116 8,72 9 12,13,1 5, 21 ,38,60, 72 26 58 6B Corrected procedure titles for NPG-SPP-1 4.1 and NPG-SPP-O3.21 and procedure number for 0-Tl-12. 19 Deleted Interface documents that are no longer applicable to EPIP-6 and added RCI-104 Deleted reference Materials and Equipment List (Appendix V) (CR 1 190970), Updated Appendix references th roughout docu ment.Added space to reference SED priority related to action request (CR 1202372)Reformatted first bulleted item to conform with procedure template format.Changed reference to condenser vacuum exhaust mid and high range monitors from 1-RE-90-4044 and 4048 to 1-RE-90-255 and 256(CR 1 1e0e62)

WBN Unit 0 Activation and Operation of the Technical Support Center (TSC)EPIP.6 Rev. 0049 Paqe 6 of 74 Table of Contents 1.0 PURPOSE ..............8

2.0 REFERENCES

........

................

8 3.0 INSTRUCTTONS

.... 10 4.0 RECORDS ............21 Appendix A: TSG Facility Layout Diagram ................22 Appendix B: Facility Briefing Guide......

....24 Appendix C: Action Request Form ...........26 Appendix D: SITE EMERGENCY D1RECTOR.............

.................27 Appendix E: SITE VICE PRES1DENT..............

............35 Appendix F: OPERATIONS MANAGER.........

.............37 Appendix G: TECHNICAL ASSESSMENT MANAGER ................

39 Appendix H: MAINTENANCE MANAGER ...................41 Appendix l: OPERATIONS COMMUN!CATOR..............

.............43 Appendix J: NUCLEAR SECURITY MANAGER ......,..45 Appendix K: RP MANAGER ........ ...............47 Appendix L: CHEMISTRY MANAGER........

................

50 Appendix M: NRC COORD!NATOR..............

...............52 Appendix N: CONTROL ROOM COMMUNICATOR...

..................54 Appendix O: EP MANAGER........

...............

56 Appendix P: TSC LOGKEEPER

..................58 Appendix Q: TSC CLERICAL STAFF .........59 Appendix R: TECHNICAL ASSESSMENT TEAM ....... 61 Appendix S: Plant Parameter Data Sheets ................64 Appendix T: Predictive Release Data Sheet...............

................70 Appendix U: TSC Accident Assessment Summary Sheet ........71 WBN Unit 0 Activation and Operation of the Technical Support Genter (TSG)EPIP.6 Rev. 0049 Paqe 7 of 74 Appendix V: Appendix W: Appendix X: Table of Contents (continued)

EMERGENCY RESPONDER NOTIFICATION FORM ..............72 WBN TSC Sign ln Roster. ......73 TSC LOG .................74 WBN Unit 0 Activation and Operation of the Technical Support Center (TSG)EPIP.6 Rev. 0049 Paqe 8 of 74 1.0 2.0 2.1 2.2 PURPOSE The purpose of this Procedure is to describe activation of Technical Support Center (TSC), describe the TSC organization, and provide for TSC operation once it has been staffed.REFERENCES Source Documents:

A. Tennessee Valley Authority Nuclear Power Radiological Emergency Plan (REP)B. NPG-SPP-14.1, Fitness-For-Duty and Fatigue Management C. NPG-SPP-03.21, Fatigue Rule and Work Hour Limits D. Memo from J. B. Hosmer to R. J. Johnson dated '1115188, RIMS No. B25 88011 5028 E. NUREG 0654, FEMA-REP-1, Rev. 1, Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in support of Nuclear Power Plants NUREG 0696, Functional Criteria for Emergency Response Facilities, Final Report ANSI Standard N 18.7-1976 CFR 20, Standards for Protection From Radiation EPA 400-R-92-001, Manual of Protective Action Guides and Protective Actions for Nuclear lncidents NRC Generic Letter 96-06, Assurance of Equipment Operability and Containment Integrity During Design Basis Accident Condition Response Technical Manual (RTM) 96 Vol. 1 Rev. 4 0-Tl-12.19, Control of Time Critical OperatorActions lnterface Documents A. EPIP-1 Emergency Plan Classification Logic B. EPIP-Z Notification of Unusual Event C. EPIP-3 Alert F.G H l.J.K.L.

WBN Unit 0 Activation and Operation of the Technical Support Center (TSC)EPIP.6 Rev. 0049 Paqe 9 of 74 2.2 Interface Documents (continued)

D. EPIP-4 Site Area Emergency E. EPIP-5 General Emergency F. EPIP-7 Activation and Operation of the Operations Support Center G. EPIP-8 Personnel Accountability and Evacuation H. EPIP-11 Security and Access Control l. EPIP-13 lnitial Dose Assessment for Radiological Emergencies J. EPIP-14 Radiological Control Response K. EPIP-15 Emergency Exposure Guidelines L. EPIP-16 Termination of the Emergency and Recovery M. NPG-SPP-18.3 Emergency Preparedness N. RCI-104 Radiological Response To Abnormal Plant Conditions O. Tl-128 Post Accident Technical Considerations (TSC)P. CECC-EPIP-9 Emergency Environmental Radiological Monitoring Procedure O. WBN FSAR R. Chemistry Manual, Chapter 13 (PASS)S. ICS Use/s Manual WBN I Activation and Operation of the I EPIP-6 Unit 0 l Technical Support Center (TSC) lRev. 0049 Paqe 10 of 74 3.0 INSTRUCTIONS General 3.1 A. Concept of Operations

1. The TSC is an area within the plant near the control room dedicated for use during an emergency.

The TSC will be the focal point of onsite activity during the event. The TSC will have sufficient staff to provide management control of the site response to the event. Equipment will be available to enable the TSC staff to communicate with onsite and offsite TVA emergency personnel.

2. An area within the TSC will be dedicated for NRC use and will include five telephone sets and the NRC FTS 2000 System telephones.
3. The TSC will have the same habitability as the control room.4. Sufficient plant parameter information will be available to the TSC to enable the TSC staff to assess the consequences of an event and assist the control room personne!

in mitigating the accident.5. Sufficient information will be transmitted to the CECC to enable the CECC Director to make protective action recommendations to State authorities.

6. Activation time for the TSC is approximately 90 minutes following declaration of an Alert or higher emergency classification, depending upon the time of day, weather conditions or immediate availability of personnel.
7. The Site Emergency Director (SED) shall assume responsibility for implementing this procedure and directing TSC personnel and activities.
8. The SED is responsible for the timely activation of the TSC.NOTE ln the event of plant inaccessibility, all references to the TSC (or OSC) are intended to refer to the alternate location selected for staffing, such as the Alternate Facility in the PSO Building.The TSC will provide the following functions:
1. Provide plant management and technical support to plant Operations personnel during emergency conditions.
2. Perform CECC functions for the Alert Emergency class, the Site Area Emergency class, and General Emergency class untilthe CECC is functional.

B.

WBN I Activation and Operation of the IEPIP-6 Unit 0 l Technical Support Center (TSC) lRev. 0049 Activation and Operation of the I EPIP-G Paqe 11 of 74 3.1 General (continued)

3. Help the reactor operators determine the plant safety status.4. Relieve the reactor operators of peripheral duties and communications not directly related to reactor system manipulations.
5. Prevent congestion in the control room.6. Provide assistance to the operators by technical personnelwho have comprehensive plant data at their disposal.7. Provide a coordinated emergency response by both technical and management personnel.
8. Provide reliable communications between onsite and offsite emergency response personnel.
9. Provide a focal point for development of recommendations for offsite actions.10. Provide relevant plant data to the NRC for its analysis of abnormal plant operating conditions.

C. lf the TSC becomes uninhabitable, the SED will relocate the TSC to an alternate location based on RP/OPERATIONS advice.D. Log Keeping 1. lndividual logs and facility logs are legal records of activities that occurred during an emergency.

lt is vital that they are as complete as possible.

Web EOC electronic logs can be accessed on the EP web site and should be used when applicable.

2. Logs should include such information as: a. Times of major events and subsequent actions taken (such as, change in emergency classifications, fission product barrier status, discovery of an unplanned radiological release).b. Times and content of important communications with other members of the ERO that are related to major events (such as, decisions made during turnover or routine briefings and subsequent actions taken).c. Specific actions taken to mitigate equipment failures, contain chemical or radiological spills or fires, and so forth.

WBN I Activation and Operation of the I EPIP-6 Unit 0 l Technical Support Center (TSC) lRev. 0049 Paqe 12 of 74 3.1 General (continued)

d. Specific references to Emergency Radiation Work Permits, clearances, procedure deviations authorized emergency radiation exposures authorized, and so forth.3. Corrections to paper logs shal! be made by drawing a single line through and initialing and dating the incorrect entry.4. Preparation of paper Logs (Appendix X)a. lnitiate the last sheet of the applicable checklists as follows: (1) DArE (2) PAGE OF: Enter "1" on the first page and sequential numbers on the following pages as they are used.b. Enter chronologically those events that are pertinent to the particular individual or organizations:

(1) TIME: Record the time (using the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> clock) that a message or information was received or action was taken.(2) COMMENTS:

Briefly record the incident, message, or order received or transmitted.

lndicate the time of the incident and actions taken.c. Upon relief from the position or termination of the emergency, complete the log as follows: (1) PAGE OF: Enter the total number of pages used at the top of each page (that is, Page I of 12, Page 2 of 12, and so forth).(2) NAME AND SIGNATURE:

Check the log for completeness, then in the Comments Section of the last page used in the log, print and sign your name.d. The person relieving the position will initiate and maintain a new log and review any previously prepared logs to allow for continuity of the position.e. Upon termination of the emergency or exercise/drill, provide all completed logs to the EP Manager.

WBN I Activation and Operation of the IEPIP-6 Unit 0 l Technical Support Center (TSC) lRev. 0049 Paqe 13 of 74 3.2 Initiating Conditions A. The TSC will be activated and Operated during the following conditions

1. Upon declaration of an Alert, Site Area Emergency or General Emergency classification.
2. At the discretion of the Shift Manager (SM)/Site Emergency Director (SED).B. The Shift Manager will initiate activation of the TSC by announcing the emergency condition using one or more of the following methods.1. Plant Public Address (PA) announcement.
2. TEENS or Emergency Paging System (EPS) activation.

NOTE The Radiological Emergency Response Organization Call List is managed in accordance with the TVA Fitness For Duty Program.3. Utilizing the Radiological Emergency Response Organization Call List and Appendix V of this procedure.

3.3 Activation

of the TSG A. Target activation time for the TSC is approximately 90 minutes. Once notified, Emergency Responders are expected to report to the TSC without delay.B. The SED will declare the TSC activated once responders for the required minimum staffing positions are identified as present in the TSC and shall inform the Shift Manager of the final transfer of responsibilities.

C. Once the TSC is activated a plant-wide brief will be given announcing the facility activation, transfer of SED responsibilities from the SM to the TSC and updating personnel on the status of the emergency.

D. Positions that are in communication with the CECC will contact their CECC counterparts as soon as practical.

TSC personnel should not let contacting the CECC delay activation of the TSC.E. Upon arrival in the TSC, personnel will perform the following 1. Sign in on the roster and the TSC Staffing chart.

WBN I Activation and Operation of the I EPIP-6 Unit 0 I Technical Support Center (TSC) lRev. 0049 Paqe 14 of 74 3.3 Activation of the TSC (continued)

2. Refer to their appropriate position notebook and appendix to this procedure and perform the activities listed in the appropriate lnitial TSC Activation Checklist (appendices D-R). lf relieving a position in the TSC that is previously activated and staffed, completion of the activation checklist is not required.

Receive turnover and log turnover in accordance with this procedure.

3. Turn on and perform function checks of equipment they will be using.4. Report readiness status to the EP Manager when activation checklist is complete.NOTE All TSC responders shall have unescorted protected area access and shall comply with fitness-for-duty policies while on-call.TSC Staffing Requirements (See Appendix A pag e 2 af 2)1. Required minimum staffing positions:
a. Site Emergency Director b. Operations Manager c. Technical Assessment Manager (TAM)d. RP Manager e. Maintenance Manager f. Chemistry Manager F.

WBN I Activation and Operation of the IEPIP-6 Unit 0 l Technical Support Center (TSC) lRev. 0049 Paqe 15 of 74 3.3 Activation of the TSG (continued)

2. Additional positions for FULL STAFFING: a. Ops Communicator
b. CR Communicator
c. Board writer (status)d. Board writer (teams)e. Asst. Chem Mgr.f. Asst. RP Mgr.g. TAT Leader h. TAT Team (ElecUl & C, Mech/Civil, Thermal Hydraulics)
i. Security Mgr.j. NRC Coordinator
k. Log keeper l. EP Mgr.3. Other plant staff the SED determines to be necessary to support TSC functions will be called: a. Site Vice President b. Media Relations Specialist
c. Westinghouse Representative
d. Clerical Staff e. Others, as needed 4. The SED or Operations Manager may designate individuals to fill a position based on capabilities, training or team needs.5. Appendix W wil! be used to document who fills which position.

WBN I Activation and Operation of the IEPIP-6 Unit 0 l Technical Support Center (TSC) lRev. 0049 Paqe 16 of 74 3.4 Operation SED Priorities and Assignments

1. The SED will periodically review the plant conditions and update the priorities for mitigating the plant emergency.
2. These priorities will be communicated to the ERO during periodic briefings and on the SED Priorities Status Board.3. The SED may assign tasks to functional areas in the TSC. These tasks will be tracked by the TSC Logkeeper and the TSC organization the task is assigned to using logs and status boards as appropriate.

Briefings 1. lnitial Facility Briefing An initial briefing should be provided to the facility staff as soon as possible.2. Periodic Facility Briefings a. lntra-facility briefings should be held at least once per hour using the Plant PA or the TSC/OSC PA system.b. The SED, if available, will initiate the briefings.

c. lf the SED is not available, then the EP manager or the Operations Manager will initiate the briefings.
d. Briefings will use Appendix B, Facility Briefing Guide, as a guide.3. lmpromptu Facility Update Anyone in the TSC that comes into possession of important information should conduct a facility update by first gaining everyone's attention and then making an announcement.

C. Requesting Tasks/Actions from other Facilities (OSC, Control Room or CECC)1. Appendix C, Action Request Form, will be used to request tasks be performed by another facility.A.B.

WBN I Activation and Operation of the I EPIP-6 Unit 0 I Technical Support Center (TSC) lRev. 0049 Paqe 17 of 74 3.4 Operation (continued)

2. The person initiating the request will check, as appropriate, this is a driil or this is an actual emergency.

lf the request is from the Main Control Room, then the Operations Communicator will initiate the request.3. The initiator will fill out their name, the date and time, and the nature of the request.4. The initiator will give the form to the TAM or Operations Manager for review.5. The TAM or Ops Manager will decide if the request is for a Rapid Response Team.6. The form will be approved or rejected by the SED or designee, who will record this in the disposition section.7. The form will be provided to the TSC Logkeeper, who will review the form for completeness and assign a tracking number to the request (Request Number).8. The Logkeeper will give the form to the appropriate team member for disposition.

9. lf the request is an OSC task, the Maintenance Manager will call the OSC Board Writer to discuss.10. The form will be faxed to the appropriate facility.11. The completed forms will be collected by the Maintenance Manager.D. Types of teams dispatched from the OSC 1. TeamA a. Team A will consist of an electrician and an Assistant Unit Operator (AUO) that will be dispatched to the Main Control Room to assist with plant shutdown issues. They will be tracked on the teams status board and operate under the control of the Main Control Room. Team A should be considered a Rapid Response Team.

WBN I Activation and Operation of the I EPIP-6 Unit 0 l Technical Support Center (TSC) lRev. 0049 Paqe 18 of 74 3.4 Operation (continued)

b. The primary responsibilities of Team A are to respond to instructions that require operations within the shutdown board rooms, (those electrical board rooms located on Auxiliary Building, elevations 757'and772');

and any tasks that would be in the Control Building proper.This allows the MCR to perform necessary actions in a timely manner that is required for unit shutdown.

Team "A" should not be sent anywhere else for additional tasks, i.e., Reactor Building, Turbine Building, etc. The Shift Manager or his designee would have responsibility for these individuals accountability and would notify the TSC/OSC of their locations and all actions taken by this team, as required.2. Rapid Response Team A Rapid Response Team may be assembled and dispatched with a minimal briefing in order to perform time critical operator actions, evolutions or assessments of plant conditions.

A Rapid Response Team may include an RP Technician to provide job coverage in lieu of a detailed RP brief.Examples of rapid response actions may include the following:

a. opening reactor trip breakers following an Anticipated Transient Without Scram (ATWS)b. medical emergency c. fire/appendix R fire d. providing system alignments for core cooling e. establishing water inventory for core cooling f. mitigating LOCAs g. mitigatingradiological releases h. restoring vital/shutdown power supplies i. performing radiological surveillances for dose assessment
j. determining radiological release pathways k. realigning steam supply to TDAFW pump L closing MSIVs or PORVs to prevent release from tube rupture m. SED/TSC discretion to restore control of the plant WBN Activation and Operation of the I EPIP-6 Unit 0 l Technical Support Center (TSC) lRev. 0049 Paqe 19 of 74 3.4 Operation (continued)

The Designation of an OSC team as a "Rapid Response Team" will be recommended by the TSC staff and authorized by the SED or designee.Refer to Appendix C.3. Radiological Survey Team 4. Maintenance Team 5. Search and Rescue Team 6. Operations Team 7. Other types of teams may be dispatched at the request of the TSC.E. Communications

1. The following dedicated NRC Telephone lines are located in the TSC a. Emergency Notification System (ENS)b. Health Physics Network (HPN)c. Reactor Safety Counterpart Link (RSCL)d. Protective Measures Counterpart Link (PMCL)2.3.e. Management Counterpart Link (MCL)A fixed satellite telephone is located in the telephone operation is lost.Portable satellite telephones are located in normal telephone operation is lost.Several telephone conference bridges are communications with the control room and TSC in the event that normal the TSC in the event that available to provide for other facilities.

4.F.Facility Habitability

1. Radiation Protection will conduct periodic radiologica!

habitability surveys to ensure the continued safety of TSC occupants.

2. Unsatisfactory habitability surveys may indicate a need to suspend eating, drinking and smoking in affected plant areas or move the TSC to an alternate location based on RP/Operations advice.Severe Accident Management G.

WBN Activation and Operation of the I EPIP-6 Unit 0 l Technical Support Center (TSC) lRev. 0049 Paqe 20 of 74 3.4 Operation (continued) ln order to assume Severe Accident Management responsibilities, the TSC must have: One SAMG Decision Maker Three SAh/G Evaluators 3.5 Long-Term Operation A. Long-term operation will be put into effect during emergencies which are projected to exist for more than 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.B. The SED will notify the Central Emergency Control Center (CECC) of the decision to begin long{erm operation.

C. Meals and arrangements for sleeping facilities will be made at the request of the SED. These arrangements may be made by the CECC.D. Additional personnel will be called in at the request of the SED to provide coverage or to ensure 12-hour or shorter shifts in the TSC. The SED will coordinate these call-ins with Nuclear Security to facilitate site access.E. The SED, through the OSC Manager, will establish 12-hour (or shorter) shifts for craft personnel onsite and call in additional personnel as necessary.

Normal Work Process Deviation When a Site Area Emergency or General Emergency has been declared, deviations from normal processes may be authorized by the Site Emergency Director, or designee, in order to take action to restore core cooling, mitigate an off-site release in progress, or maintain spent fuel pool cooling. Evaluation of deviations from the normal established processes should be considered prior to dispatch of work.Attachment 5 of NPG-SPP-18.3, SED Procedure Deviation Checklist, provides a mechanism to evaluate and document such deviations.

3.7 Termination

and Deactivation REFER TO EPIP-16, "Termination of the Emergency and Recovery," for activities associated with terminating emergencies, TSC deactivation, and post-accident recovery.All equipment, supplies, and procedures will be replenished in the TSC following a drill, exercise or emergency by applicable groups as assigned in EPIP-12, 1.2.3.6 A.B.A.B.

WBN Activation and Operation of the I EPIP-6 Unit 0 l Technical Support Genter (TSC) lRev. 0049 Paqe 21 of 74 4.0 4.1 4.2 RECORDS Cl,A Records The following records are QA records when completed during actual radiological emergencies.

Appendix D: Site Emergency Director Appendix W: WBN TSC Sign in Roster Non-QA Records t1l l2l Emergency Records The records generated due to declaration of an emergency classification are considered Lifetime Retention records. These records shall be forwarded to the WBN EP Manager. The records necessary to demonstrate performance are then submitted to the Corporate EP Manager for storage.Drill and Exercise Records The records deemed necessary to demonstrate performance of key actions during drills are considered Non-QA records. These records shall be forwarded to the WBN EP Manager. The WBN EP Manager shall retain records necessary to demonstrate eight-year plan requirements for eight years. The WBN EP Manager shall retain other records in this category for three years.

WBN I Activation and Operation of the IEPIP-G Unit 0 l Technical Support Genter (TSC) lRev. 0049 Paqe 22 of 74 (t:!:Tll, TSC Facility Layout Diagram 755.0 - CI6 CHEM.MGR ASST.CHEM.MGR i***-**': I I *_..-;ll ELEPI"{ONE 755.0 - C17 TECHNIC UPPORT CE 755.0 - C1 TI n ffi ffi WBN I Activation and Operation of the IEPIP-6 Unit 0 I Technical Support Center (TSC) lRev. 0049 Paqe 23 of 74 Appendix A (Page 2 of 2l Technical Support Center (TSC)WBN EMERGENCY RESPONSE ORGANIZATION Westinghouse Representative o$c Contacts: Htrain Control Room Contaets:$ite VP Site Emergency Director (#)Emergency P reparedness Manager TSC Clerks TSC Logkeeper fechnical Assessment Manager (#)Operations Manager {#}Nucfear Security Manager Maintenance Manager (#)Chernistry Manager (#)Operatlons Cornrnunicator Technical Assessment Team fr$c Chemistry Briefer O$C RP Supervisor osc Operations Briefer osc Nuclear Security Advisor O$C h4anager Shift Manager and Control Room Skff Control Room Communicator

(#) denotes 90 minute minimum staffing position(s)

WBN I Activation and Operation of the IEPIP-6 Unit 0 l Technical Support Center (TSC) lRev. 0049 Paqe 24 of 74 Appendix B (Page 1 ot 2l Facility Briefing Guide OSC, (if applicable, say "This is a drill, this is a drill") -, Site Emergency Director The current emergency classification is: Attention in the TSC and This is tr EI tr E]Levels (EALs) in effect are: Notification of Unusual Event (NOUE)Alert Site Area Emergency (SAE)General Emergency (GE)The Emergency Action Brief Event

Description:

The upgrade criteria is: The affected unit(s): tr Unit 1 tr Unit2 tr Units 1 and 2 The status of the Fission Product Barriers: SED Priorities:

1.Unit I Unit 2 Bairier ,lntact, i Potential Lost lntaet Potential Lost Fuel Clad RCS Containment 2.3.4.

WBN Activation and Operation of the I EPIP-6 Unit 0 l Technical Support Center (TSC) lRev. 0049 Paqe 25 of 74 Appendix B (Page 2 ot 2)Unit Status (if delegated to the Ops Manager, announce the statement below)"The Ops Manager will now provide plant status" - (plant parameters and unit status, emergency procedures in effect, key equipment out of service, etc.): Unit 1 Unat 2 Radiological Status (if delegated to the RP Manager, announce the statement below)"The RP Manager will now provide radiological status" - (airborne areas, onsite and offsite dose rates, wind direction, ongoing releases, etc.): Onsite and Offsite Protective Actions (assembly and accountability status, personnel early releases or evacuations, PARs, etc.): Security Issues: Major activities ongoing in the field: End of Brief (This is a drill - if applicable)

WBN I Activation and Operation of the IEPIP-6 Unit 0 l Technical Support Center (TSC) lRev. 0049 Paqe 26 of 74 Appendix C (Page 1 of 1)Action Request Form tr This is a Drill tr This is an Actual Emergency Requested by: Request No.(Name/Title)(Date/Time)

Request: Which SED Priority does this task support?Rapid Response Team: tr Yes trNo Reviewed By TAM/Ops Mgr: (lnit)(Date/Time)

Disposition:

tr Acceptance of Request: El Assigned to OSC as task E Assigned to Main Control Room tr Assigned to CECC PAT tr Other: u Rejection of RequesUReason:

Approved By SED (or designee): (ln it)(Date/Time)

WBN I Activation and Operation of the I EPIP-6 Unit 0 l Technical Support Center (TSG) lRev. 0049 Paqe 27 of 74 Appendix D (Page 1 of 8)SITE EMERGENCY DIRECTOR Lnitial Activation of the Technical Support Center Checklist Date: lnits/Time l_ OBTAIN turnover briefing from SM/SED. Pages 6, 7 and 8 of Appendix D, SED Turnover Data Sheet may be used as a guide.I REPORT to the TSC l_ SIGN lN on the staffing chart and PUT ON position badge.l_ ESTABLISH log of communications/events.

l_ SIGN lN on the TSC Sign ln Roster.l_ CHECK the status of emergency actions already in effect such as emergency notifications (NRC, State, etc.) and accountability or site evacuation.

l_ REQUEST checklist completion status for required positions: (Check list completion is not required for facility activation) tr Site Emergency Director tr Operations Manager tr TAM tr RP Manager tr Chemistry Manager tr Maintenance Manager l_ CONFIRM TSC staffed and Operational.

I Declare the TSC activated at (time)l_ ASSUME role of SED from SM (confirmatory phone call to the SM).INFORM the CECC Director (if the CECC is activated) and OSC Manager that the TSC is operational and that you have assumed responsibilities of the SED and provide initial briefi ng.

WBN Activation and Operation of the I EPIP-6 Unit 0 l Technical Support Center (TSC) lRev. 0049 Paqe 28 of 74 Appendix D (Page 2 ot 8l SITE EMERGENCY DIRECTOR MAKE a general plant-wide announcement regarding plant condition similar to the following:

ACCESS the Public Address System by dialing 487.COVER the following points as a minimum: a. .ATTENTION ALL SITE PERSONNEL.

ATTENTION ALL SITE PERSONNEL.'

tr "This is a drill, this is a drill." OR EI "This is a real emergency.

This is a real emergency." This is (name)Site Emergency Director.

The TSC was activated at hours. Due to in unit(s)We have declared (NOUE, Alert, Site Area Emerqencv, General Emerqencv).

We are implementing plant protective actions including: (Evacuations, assembly and accountability, etc.)e.Unit 1 Status is Unit 2 Status is Radiological release points: Our plan of action at this time is to The OSC (is, is not) activated.

Allemergency response teams will be dispatched from the OSC.Any emergency response personnel, who are fatigued or feel they cannot perform their assigned duties, should notify the EP Manager in the TSC or the OSC Manager in the OSC.tr "This is a drill, this is a drill." OR tr "This is a real emergency.

This is a real emergency." 1.2.b.c.d.g.h.

WBN I Activation and Operation of the IEPIP-6 Unit 0 l Technical Support Genter (TSC) lRev. 0049 Paqe 29 of 74 Appendix D (Page 3 of 8)SITE EMERGENCY DIRECTOR Ooerational Resoonsi bilities o Determines the emergency classification and periodically reevaluates the classification.

Changes to the classification will be reported to the CECC Director and the NRC. THE CLASSIFICATION OF THE EVENT CANNOT BE DELEGATED. (See EPIP-I). Approves or authorizes emergency doses that may exceed applicable NRC dose limits. THIS RESPONSIBILITY CANNOT BE DELEGATED. (See EPtP-15)o Prior to the CECC being staffed makes recommendations for protective actions to State and Local agencies.

THIS RESPONSIBILITY CANNOT BE DELEGATED EXCEPT TO THE CECC DIRECTOR.

Refers to EPIP-S, Protective Action Recommendation Guidance Flowchart, as a guide.o Directs onsite emergency accident mitigation activities and briefs the TSC/OSC staff on the current plant situation.. Approves Action Requests and authorizes the designation of OSC teams as"Rapid Response Teams".o Ensures that general plant population is periodically briefed on the emergency conditions.

o Periodically reviews priority of field teams with the OSC Manager. (See EPIP-7)o Directs activities of onsite emergency organizations.. Consults with the CECC Director and Site VP on important decisions.

Use the CECC Ring-down Line to the CECC Director.. Approves normalwork process deviations in accordance with NPG-SPP-18.3, attachment

5.

WBN I Activation and Operation of the IEPIP-6 Unit 0 I Technical Support Center (TSC) lRev. 0049 Paqe 30 of 74 Appendix D (Page 4 of 8)SITE EMERGENCY DIRECTOR Ooerational Resoonsibilities (continued)

Coordinates emergency actions with onsite NRC.lnitiates onsite protective actions. (See EPIP-8)Verifies the administration of Potassium lodine (Kl)to TVA personnel based on RP Manage/s advice/direction. (See EPIP-14)Establishes a RP checkpoint for site evacuation if conditions warrant. (See EPIP-8 and EPIP-14)lnitiates long-term 24 Hourlday operation.

When Severe Accident Management Guidelines are entered, assumes Decision Maker responsibility (lf qualified).

This responsibility can be delegated to another qualified Decision Maker.Coordinates with lncident Commander (lf assigned) and/or any offsite emergency responders that have responded to the site.

WBN I Activation and Operation of the I EPIP6 Unit 0 l Technical Support Center (TSG) lRev. 0049 Paqe 31 of 74 Appendix D (Page 5 of 8)SITE EMERGENCY DIRECTOR Ooerational Resoonsibilities (continued) o Evaluates conditions and determines if emergency procedures should be implemented.

a. Emergency Environmental CECC-EPIP-9 Radiological Monitoring Procedures
b. Medical Emergency Response EPIP-10 c. Security Threat Physical Security Plan d. PersonnelAccountability and EPIP-8 Evacuation
e. lnitial Dose Assessment for EPIP-13 Radiological Emergencies DEACTIVATION RESPONSI BI LITI ES Reference EPIP-1 6.

WBN I Activation and Operation of the I EPIP-6 Unit 0 l Technical Support Center (TSC) lRev. 0049 Paqe 32 of 74 Appendix D (Page 6 of 8)SITE EMERGENCY DIRECTOR SED Turnovel, Q3tashee!The affected unit: El Units 1 and 2 UE tr ALERT tr SAE tr Time/Date Declared I GEN Event

Description:

1.tr Unit 1 tr Unit2 Cu rrent Emergency Classification

EAL: 2.3.4.Equipment Problems: 5.Status of the unaffected unit: 6.Site Radiological Problems: 7.Radiological Release: Yes tr Release Point: Release Type: Filtered Monitored Controlled GAP tr Fuel Damage tr Unfiltered tr Unmonitored tr Uncontrolled tr Notr RCS tr tr tr tr Fue! Melt tr Projected Duration (hrs.lmin.)

WBN I Activation and Operation of the I EPIP6 Unit 0 l Technical Support Center (TSC) lRev. 0049 Paqe 33 of 74 Appendix D (Page 7 of 8)SITE EMERGENCY DIRECTOR SED Turnover Datasheej Jgontinued)

Wind Speed mph Wind Direction FROM Projected Whole Body Dose Projected Thyroid Dose mrem = miles mrem = miles 8. Protective Action Recommendations to Offsite Officials (use PAR Flowchart in EPIP-5): Nonetr 1tr 2i 3tr 4E str 6tr 9. Onsite Protective Actions Taken: tr SITE EVACUATION tr ACCOUNTABILITY tr SPECIF]C AREA EVACUATIONS

10. Field Monitoring Vans Activated:

Yes tr No El 11. SM/SED Notifications Made: Time State notified: Time NRC Notified: 12. lnjured or contaminated persons status: Transported to: tr Rhea County Medical Center tl Athens Regional Medical Center tr Other WBN I Activation and Operation of the I EPIP-6 Unit 0 l Technical Support Genter (TSC) lRev. 0049 Paqe 34 of 74 Appendix D (Page 8 of 8)SITE EMERGENCY DIRECTOR S ED Tu rnover Datasheet, (,cgn,tinued

)13.Status of personnel in the field: NAME SED Responsibility Transferred

tr Physically in the TSC tr TSC has minimum staffing tr Call SM to see if conditions have changed.tr Declares over the telephone, "The TSC is staffed and activated.

This is and I am now assuming the role of Site Emergency Director at (time)." From: to SM TSC/SED Date: Time: LOCATIOI.\.

14.

WBN I Activation and Operation of the IEPIP-6 Unit 0 l Technical Support Center (TSC) lRev. 0049 Paqe 35 of 74 Appendix E (Page 1 ot 2l SITE VICE PRESIDENT lnitial Activation of the Technical Support Qgntg.,l,,9Lecklist Date: lnits/Time l_ SIGN lN on the Organizational/Staffing Chart and PUT ON position badge.l_ SIGN lN on the TSC Sign in Roster.I NOTIFY SED of arrival.l_ ESTABLISH a log of communications/events.

I ESTABLISH contact with the CECC Director.l_ CHECK the status of emergency actions already in progress. (Such as accountability, site evacuation or press inquiries.)

l_ PROVIDE this completed checklist to the SED or EP Manager.

WBN Activation and Operation of the I EPIP-6 Unit 0 I Technical Support Center (TSC) lRev. 0049 Paqe 36 of 74 Appendix E (Page 2 ot 2l SITE VICE PRESIDENT Operational Resoonsibilities List o Provides TVA policy direction to the Site Emergency director (SED).o Provides support to other emergency centers as necessary.. Serves as the primary site representative to function as a TVA Spokesperson in the Local News Center (LNC) at the WBN Training Center (if activated).

o Directs the site resources to support the SED in the accident mitigation activities.

o Provides direct interface on overall site response activities with NRC, FEMA, other Federal organizations, the CECC Director, and onsite media.o Provides interfaces/briefings (as needed) at offsite locations on the overall site response activities with Federal, State and Local agencies.. Update Fission Product Barrier Matrix status in WebEOC as conditions change.

WBN Activation and Operation of the I EPIP-6 Unit 0 l Technical Support Center (TSC) lRev. 0049 Paqe 37 of 74 Appendix F (Page 1 of 2)OPERATIONS MANAGER lnitial Activation of The Technical Support Center Checklist Date: Inits/Tirne l_ SIGN lN on the Organizational/Staffing Chart and PUT ON position badge.l- SIGN IN on the TSC Sign in Roster.l- NOTIFY SED of arrival.l_ ESTABLISH log of communications/events.

l_ ESTABLISH contact with the OSC Operations Briefer and the CR Communicator in the MCR. MCR bridge line is 41 01 .l_ CHECK the status of onsite emergency actions already in effect such as Accountability or Evacuations.

l_ REPORT the status of in plant field activities (operations, repair, radiological, etc.) received from the OSC Operations Briefer, Maintenance Manager or SM.l_ VERIFY that notification of the NRC has been accomplished and inform SED and NRC Coordinator.

l_ DESIGNATES a person knowledgeable of the event to establish and maintain communications with the NRC via the phone as needed. This will be the NRC Coordinator when present. NOTIFY the SM that responsibility for NRC contact has been transferred to the TSC.l_ PROVIDE this completed checklist to the SED or EP Manager.

WBN I Activation and Operation of the IEPIP-6 Unit 0 l Technical Support Center (TSC) lRev. 0049 Paqe 38 of 74 Appendix F (Page 2 ot 2l OPERATIONS MANAGER Ooerational Responsibilities o Directs operational activities.

o lnforms the SED of plant status and operational problems.o Recommends solutions and mitigating action for operational problems.. Designates a SRO for the Technical Assessment Team, as needed.o Provides advice regarding Technical Specifications, system response, safety limits, etc.o Periodically reviews the emergency status with the control room. Reviews trended parameters, time history information, and status boards with the Control Room staff.o Ensures that the Control Room is aware of TSC accident assessments and OSC repair and response activities and priorities.

o Reviews Action Requests (Appendix C) and recommends if an OSC team should be designated as a "Rapid Response Team" o Ensures that adequate Operations staffing is currently in the Main Control Room and that oncoming control room staffing requirements are being met for the following positions (Appendix V, Emergency Responder Notification Form, may be used to document):

tr Shift Manager tr 2 Unit Supervisors tr Shift TechnicalAdvisor tr 4 Reactor Operators tr 8 AUOs (minimum tech specs/Appendix R staffing.

May be assigned to the OSC)

WBN I Activation and Operation of the IEPIP-6 Unit 0 l Technical Support Center (TSC) lRev. 0049 Paqe 39 of 74 Appendix G (Page 1 of 2l TEGHNICAL ASSESSMENT MANAGER lnitial Activation of The fechni.qa,LQ.ttpport Center Checklist Date: lnits/Time l_ SIGN lN on the Organizational/Staffing Chart and PUT ON position badge.l_ SIGN IN on the TSC Sign in Roster.I NOTIFY SED of arrival.l_ ESTABLISH log of communications/events.

l_ CHECK the status of emergency actions already in effect such as Accountability or Site Evacuation or Response Teams in the Plant.l_ PROVIDE this completed checklist to the SED or EP Manager.

WBN I Activation and Operation of the I EPIP-6 Unit 0 I Technical Support Center (TSC) lRev. 0049 Paqe 40 of 74 Appendix G (Page 2 ot 2l TECHNICAL ASSESSMENT MANAGER Ooerational Resoonsibil ities. Designates Technical Assessment Team Leader (if necessary).

o Directs activities of the Technical Assessment Team.o Reviews Action Requests (Appendix C) and recommends if an OSC team should be designated as a "Rapid Response Team" o Directs onsite effluent assessment.. Projects future plant status based on present plant conditions.

o Keeps assessment team informed of plant status.o Provides information, evaluations, and projections to the SED.o Coordinates assessment activities with the CECC Plant Assessment team.o Establishes and maintains a status of significant plant problems.. lf ICS is not operable, ensures information on Appendices S and T are sent to the CECC to be used in the predictive release rate model.o Coordinate with the Chemistry Manager to initiate a Post-Accident Sample (PASS) as needed for assessment of the containment atmosphere and/or fuel damage.o Provides for trending of significant parameters.. Coordinate support activities performed by the TAT Team in association with WOG-99-064 Emergency Response Guidelines (ERGs) Background lnformation.. Assumes SAMG responsibilities when directed by the SED. The TSC must be functional and 3 SAMG Evaluators must be monitoring the "TSC Diagnostic Flow Chart' (DFC) to assume SAMG responsibilities.

WBN I Activation and Operation of the I EPIP-6 Unit 0 l Technical Support Center (TSC) lRev. 0049 Paqe 41 of 74 Appendix H (Page 1 ot 2l MAINTENANCE MANAGER lnitial Activation,gf.."The fqchnic,al Support Center Checklist Date: Inits/Time t_ SIGN lN on the Organizational/Staffing Chart and PUT ON position badge.l_ SIGN IN on the TSC Sign in Roster.I NOTIFY SED of arrival.l_ ESTABLISH log of communications/events.

l_ ESTABLISH contact with the OSC Manager or Asst. OSC Manager.The 4104 telephone bridge is available for coordinating communications between the TSC Maintenance Manager, OSC Assistant Manager, OSC Board Writer and the OSC Teams Coordinator.

l_ CHECK the status of emergency actions already in effect such as Accountability, Site Evacuation and Team A status.t_ CHECK status of deployed emergency response teams (Operations, Maintenance, Medical Emergency Response Teams, etc.)l_ PROVIDE this completed checklist to the SED or EP Manager.

WBN I Activation and Operation of the IEPIP-6 Unit 0 l Technical Support Center (TSC) lRev. 0049 Paqe 42 of 74 Appendix H (Page 2 ot 2l MAINTENANCE MANAGER Ooerational Resoonsibilities o Coordinates emergency response team assignment activities with the SED and the OSC.o Maintains an understanding of deployed OSC teams' purpose and status.o Collects completed Action Requests (Appendix C)o Assists the SED and the OSC Manager in determining the relative priorities of maintenance/repair activities.. Communicates the need to establish new OSC teams with the OSC.o Ensures that damage assessment and repair priorities are coordinated with the osc.o Maintains the Emergency Response Teams tracking board in the TSC.A. The preferred method for tracking the status of OSC teams is using the Teams Status Board in Web EOC.

WBN Activation and Operation of the I EPIP-G Unit 0 l Technical Support Genter (TSC) lRev. 0049 Paqe 43 of 74 Appendix I (Page 1 ot 2l OPERATIONS GOM MU N ICATOR lniti,A,l.Ac:[vation of The Technical Support Cenler Checklist Date:!nits/Time l_ SIGN lN on the Organizational/Staffing Chart and PUT ON position badge.l_ SIGN lN on the TSC Sign in Roster.l_ ESTABLISH communication via telephone with the Control Room Communicator by dialing 4101 .l_ RECEM update on plant status from Control Room Communicator.

l_ CHECK operability of the lntegrated Computer System (lCS) system.l_ PROVIDE this completed checklist to the SED or EP Manager.

WBN I Activation and Operation of the I EPIP-6 Unit 0 l Technical Support Genter (TSC) lRev. 0049 Paqe 44 of 74 Appendix I (Page 2 of 2l OPERATIONS COMMUNICATOR Ooerational Resoonsibilities o Provides operationa!

knowledge as needed to status evaluations of plant systems.. Provides advice to the Operations Manager regarding Technical Specifications, Systems Response, and safety limits.o Assist Operations Manager in development of operations recommendations to problems.o Monitors the Control Room Communicator Party line.o Operates TSC ICS to obtain plant status and parameters.

o Provides information from the Control Room to the Technical Support Center personnel.

o lnitiates Action Requests (Appendix C) for the Control Room. Completes portions of plant parameter data sheets (Appendices S and T) as needed.o Monitors plant status boards.. Obtains supplemental data as needed by the TSC, OSC, or CECC.o Makes inquiries to the Control Room Communicator to obtain specific information as necessary.

o Update Fission Product Barrier Matrix status in WebEOC WBN I Activation and Operation of the IEPIP-6 Unit 0 l Technical Support Center (TSC) lRev. 0049 Paqe 45 of 74 Appendix J (Page 1 ot 2l NUGLEAR SEGURITY MANAGER lnitial Activation of The Technical Support Cg.nter QhecKlist Date: lnits/Time l_ SIGN lN on the Organizational/Staffing Chart and PUT ON position badge.l_ SIGN IN on the TSC Sign in Roster.I NOTIFY SED of arrival.l_ ESTABLISH log of communications/events.

l_ ESTABLISH contact with the Central Alarm Station (CAS) and the Secondary Alarm Station (SAS).l_ CHECK the status of emergency actions already in effect such as Accountability, Site Evacuation or site being closed to visitors.t_ PROVIDE this completed checklist to the SED or EP Manager.

WBN I Activation and Operation of the I EPIP-6 Unit 0 l Technical Support Center (TSC) lRev. 0049 Paqe 46 of 74 Appendix J (Page 2 ot 2l NUCLEAR SECURITY MANAGER Ooerational Resoonsibilities o Directs activities of Nuclear Security personnel and mobilizes additional personnel as needed.. Reports on site accountability/evacuation as defined in EPIP-8.o Assists in establishing search teams, as required. (EPIP-8)o Provides status updates to Nuclear Security personnel.

o Reports status of Security related events to the SED.o Remain cognizant of Plant Radiological Conditions and report location(s)of Security Personnel/Patrols (as needed) to the RP Manager and the SED.o Controls access to the site and the Main Control Room.. Advises incoming emergency response personnel at the gate house of any radiological, security, or environmental hazards in route to the TSC/OSC.

WBN I Activation and Operation of the I EPIP-6 Unit 0 l Technical Support Center (TSC) lRev. 0049 Paqe 47 of 74 Appendix K (Page 1 of 3)RP MANAGER lnitial Activation of The Technical Support 9gntgr,Qhqg,Klist Date: lnits/Time l_ SIGN IN on the Organizational/Staffing Chart and PUT ON position badge.l_ SIGN IN on the TSC Sign in Roster.I NOTIFY SED of arrival.l_ ESTABLISH log of communications/events.

l_ ESTABLISH contact with the OSC RP Superuisor and the radiological monitoring vans (if dispatched).

l_ EVALUATE radiological habitability in the TSC and suspend eating and drinking if necessary.

l_ CHECK the status of offsite/onsite radiological conditions and emergency actions already in effect such as Accountability or Site Evacuation.

l_ VERIFY that Security has distributed emergency dosimetry packages to all offsite responders (i.e., EMS, Fire, or LLEA) and to any TVA Security personnel in the OCA and Protected Area whose duties do not allow dosimetry issue at the RCA.l_ PROVIDE this completed checklist to the SED or EP Manager, WBN I Activation and Operation of the IEPIP-6 Unit 0 l Technical Support Genter (TSC) lRev. 0049 Paqe 48 of 74 Appendix K (Page 2 ot 3l RP MANAGER Ooerational Resoonsibilities Directs onsite RP activities.

IF necessary AND the CECC is not staffed, utilize EPIP-13 to perform dose assessment.

REPORT results to the SED.Makes recommendations for protective actions for onsite personnel to the SED and for personnel entry into radiological hazardous environments.

Consults with the CECC Radiological Assessment Team to determine potential plume path and location prior to evacuating personnel from the site.Obtains MET data as needed by using lCS, PEDS or the Environmental Display System (through Web EOC).Directs the issuance of Kl by following EPIP-14 guidelines to onsite personnel after notifying the SED.Remains cognizant of assessments of in-plant and onsite radiological conditions from the OSC RP Supervisor.

Directs the radiologica!

monitoring vans until the CECC assumes control (CECC EPrP-9).Provides periodic status reports to the SED on radiological conditions.

lnitiates Action Requests (Appendix C) when requesting RP teams be dispatched from the OSC Keeps the CECC-Radiological Assessment Coordinator (RAC) informed of on-site radiological conditions and coordinates supplemental RP support.Coordinates assessment of radiological conditions offsite with CECC Radiological Assessment Manager (RAM).Maintains status maps of offsite radiological conditions and in-plant Radiological Conditions status board (ensuring times are posted next to radiological data).Provide RP surveillance through the OSC to MET station personnel, if required by environmental releases.

WBN I Activation and Operation of the IEPIP-6 Unit 0 l Technical Support Genter (TSC) lRev. 0049 Paqe 49 of 74 Appendix K (Page 3 of 3)RP MANAGER Ooerational Resoonsibilities (continued). Designates a qualified/knowledgeable person to provide in-plant radiological data to the NRC via the Health Physics Network (HPN) upon request.o Ensures outlying emergency responders (i.e. line crews, warehouse) have dosimetry and are being protected during the emergency.

o Provide radiological data to the OSC that must be obtained from the Main Control Room.o Maintain control of personnel sent out of the TSC that are not part of a team sent out by the OSC, when radiological conditions are a concern.. Evaluate the need for suspending eating and drinking in potential radiological affected areas of the site OR site wide until radiological conditions can be assessed.. lf eating and drinking needs to be suspended in any areas, initiate a public announcement to communicate areas where eating and drinking are suspended.

o A similar announcement to the following should be utilized once the assessment is completed: "Attention, due to abnormal radiological conditions eating and drinking have been suspended (SITE WIDE or lN THE FOLLOWTNG AREAS)List Areas: No eating or drinking (SITE WIDE or THESE AREAS)until Radiation Protection removes this suspension".

WBN I Activation and Operation of the IEPIP-6 Unit 0 l Technical Support Center (TSC) lRev. 0049 Paqe 50 of 74 Appendix L (Page 1 ot 2l CHEMISTRY MANAGER Initlal Activation of The Technical Support Center Checklist Date: lnits/Time SIGN lN on the Organizational/Staffing Chart and PUT ON position badge.SIGN !N on the TSC sign in roster.NOTIFY SED of anival.ESTABLISH log of communications/events.

ESTABLISH contact with the OSC Chemistry Briefer.CHECK the status of emergency actions already in effect such as chemistry sampling.PROVIDE this completed checklist to the SED or EP Manager.

WBN I Activation and Operation of the I EPIP-6 Unit 0 l Technical Support Center (TSC) lRev. 0049 Paqe 51 of 74 Appendix L (Page 2 ot 2l CHEMISTRY MANAGER Ooerational Resoonsibilities. Coordinates information and the assessment of radioactive effluents with the CECC.. Directs and remains cognizant of OSC Chemistry Briefer's Post-Accident Sampling Activities.

NOTE From the time a decision is made to take a PASS sample, the results must be obtained in three (3) hours. A PASS should not (normally) be requested until post-accident conditions are stable enough to provide for useful evaluation results.o Determines the impact of the incident on radwaste and various effluent treatment systems.o Assist the RP Manager in Dose Assessment Calculations using EPIP-13, lnitial Dose Assessment for Radiological Emergencies.

o Maintains the release rate portion on the Chemistry Status Board.o lnitiates an Action Request (Appendix C) when requesting Chemistry teams to be dispatched from the OSC.. Completes portions of plant parameter data sheets (Appendices S and T) as needed.o Provides assistance to the SED and Technical Assessment Manager as needed.

WBN I Activation and Operation of the IEPIP-6 Unit 0 l Technical Support Genter (TSC) lRev. 0049 Paqe 52 of 74 Appendix M (Page 1 ot 2l NRC COORDINATOR lnitial Activation of Ihe Technical Support Center Checklist Date: lnits/Time SIGN IN on the Organizational/Staffing Chart and PUT ON position badge.SIGN lN on the TSC sign in roster.NOTIFY SED and OPS Manager of arrival.RELIEVE the Control Room of responsibility for maintaining contact with the NRC, (ENS).ESTABLISH log of communications/events.

CHECK the status of plant conditions and emergency actions already in effect such as Accountability or Site Evacuation.

CALL NRC to inform them that you have assumed responsibility for contact from the Control Room.PROVIDE this completed checklist to the SED or EP Manager.

WBN Activation and Operation of the I EPIP-6 Unit 0 l Technical Support Center (TSC) JRev. 0049 Paqe 53 of 74 Appendix M (Page 2 ot 2l NRC COORDINATOR Operational Resoonsibilities o Acts as primary liaison with onsite NRC personnel.

o Remains fully cognizant of emergency and plant conditions.. Updates NRC personnel on plant status (use Appendices S and T as a guide when ICS is unavailable).

o Provides information requests from NRC to TSC personnel.

WBN I Activation and Operation of the I EPIP-6 Unit 0 I Technical Support Center (TSG) lRev. 0049 Paqe 54 of 74 Appendix N (Page 1 ot 2l CONTROL ROOM COMMUNICATOR lnitial Activation of.fhe Technical Support Center Checklist Date: lnits/Time OBTAIN the control room communicator portable phone headset at the SM desk.RECEIVE turnover from Control Room staff on plant conditions and relevant actions in progress.ESTABLISH the Main Control Room bridge line by dialing 4101.ESTABLISH contact with the TSC OPS Communicator and other party line receivers (OSC-OPS Briefer, CECC).INFORM TSC this form is complete and PROVIDE this completed checklist to the SED or EP Manager when conditions permit WBN I Activation and Operation of the I EPIP-6 Unit 0 I Technical Support Center (TSC) lRev. 0049 Paqe 55 of 74 Appendix N (Page 2 ot 2l CONTROL ROOM COMMUNICATOR Ooerational Resoonsibilities o Serves as the control room - operations communications interface.

o Provides key plant parameters and critical safety function conditions and other information as requested over the operations "pafty line" to various positions in the TSC, OSC, and CECC.o Provides operational knowledge for status evaluation of plant systems.

WBN I Activation and Operation of the I EPIP-6 Unit 0 l Technical Support Center (TSC) lRev. 0049 Paqe 56 of 74 Appendix O (Page 1 ot 2)EP MANAGER lnitial Activation of The Technical Suoport Center Checklist Date: Inits/Time l_ SIGN lN on the Organizational/Staffing Chart and PUT ON position badge.l_ SIGN lN on the TSC sign in roster.I NOTIFY SED of arrival.l_ ESTABLISH log of communications/events.

l_ CHECK the status of emergency actions already in effect such as Accountability, Site Evacuation and MERT actions.l_ ENSURE checklists are being completed.

l_ INFORM SED when key staff members are present.l_ ENSURE all essential positions are filled by qualified responders who are fit for duty and checklists are returned.l_ CALL TSC Clerks to come to the TSC as necessary.

l_ ENSURE all activation activities are preceding normally.l-ENSUREoperabiIityofbackupcommunicationS.

l_ ANNOUNCE activation of the TSC and provide SED (name) on the Plant PA and instruct AUOs in the plant to report to the OSC staging area once they have completed previous missions assigned by the Main Control Room.

WBN I Activation and Operation of the I EPIP-6 Unit 0 l Technical Support Center (TSC) lRev. 0049 Paqe 57 of 74 Appendix O (Page 2 of 2l EP MANAGER Ooerational Resoonsibil ities o As soon as possible after the CECC is activated, ensure initial conditions are transmitted to the CECC. This may include equipment status, core status and a copy of the latest RCS chemical analysis.. Advises the SED regarding the REP, use of EPlPs, emergency equipment use and availability, and coordination with the CECC.. Confirm completion of action steps in EPIPS 2 - 5.. Confirms TSC and OSC are operating properly.o Monitor fitness for duty (i.e. fatigue) for the response team and make recommendations to the SED as needed.. Provides assistance to the SED as requested.

o Ensures relief staff are identified for TSC shift turnover. Coordinates food and lodging requirements for the ERO with the CECC.o Assist the SED by making PA announcements to update plant personnel of emergency status.. Update Fission Product Barrier Matrix status in WebEOC o Changes emergency classification signs as conditions change.Deactiyation Responsibilities Reference EPIP-16.

WBN I Activation and Operation of the I EPIP-6 Unit 0 l Technical Support Genter (TSC) lRev. 0049 Paqe 58 of 74 Appendix P (Page 1 of 1)TSC LOGKEEPER lnitial A"qlivation of The Technical Suppgrt Center Checklist Date: lnits/Time l- SIGN IN on the Organizational/Staffing Chart and PUT ON position badge.l_ SIGN lN on the TSC sign in roster.l_ REPORT to the SED and begin a log of his/her activities.

l- RECORD significant information in Web EOC boards such as significant events, priorities, etc.t_ PROVIDE this completed checklist to the SED or EP Manager.Operational Responsibilities o Maintains official logs of the events and SED activities (Web EOC is the preferred method for maintaining the facility log).o Records assignments made by the SED to functional areas in the TSC. Assigns tracking numbers to allAction Requests (Appendix C)o lnitiates the shift turnover list as directed by the SED.o Establishes video link with the OSC Team Status Board Writer during facility briefings.

WBN I Activation and Operation of the I EPIP-6 Unit 0 l Technical Support Center (TSC) lRev. 0049 Paqe 59 of 74 Appendix Q (Page 1 ot 2l TSC CLERICAL STAFF lnitial Activation,of The Technical Support Center Chegklis.,l Date: lnits/Time l_ SIGN IN on the Organizational/Staffing Chart and PUT ON position badge.I_ SIGN lN on the TSC sign in roster.l_ DISTRIBUTE manuals and TSC supplies and operate equipment as req uested.l_ ENSURE that EPIPs are at the appropriate revision level.t_ ASSIST RP Manager in distributing TLDs to TSC personnel if applicable.

t_ DISTRIBUTE Emergency Notification forms and news releases to appropriate personnel within the facility, including the NRC.l_ DISTRIBUTE copies of the Radiological Emergency Notification Directory to appropriate personnel within the facility, including the NRC.Deactivation of the TSC l_ COLLECT all logs, notes, and other materials from each TSC position and PROVIDE them to the EP Manager for documentation and storage.l_ ASSIST in the deactivation of the TSC by returning all equipment, supplies and manuals to the proper storage cabinets.l_ PROVIDE this completed checklist to the SED or EP Manager.

WBN I Activation and Operation of the IEPIP-6 Unit 0 l Technical Support Center (TSC) lRev. 0049 Paqe 60 of 74 Appendix Q (Page 2 ot 2l TSC CLERICAL STAFF Ooerational Resoonsibilities Assist in the set up of the TSC.Maintains accountability of TSC personnel and staff organization board.ln the event of a Site Wide Evacuation, inform the TSC RP Manager that the clerk position is a non-radiation worker position.Answers telephones.

Distributes plant parameter data sheets (Appendices S and T), if ICS is unavailable.

Operates facsimile machines.Faxes andior scans Appendix C forms to the OSC.Uses Emergency Response Call List to obtain staff for unfilled positions or replacement staff for shift turnover using Appendix V, "Emergency Responder Notification Form". Ensure that the following directions relative to call-in for unscheduled work per the "Fitness For Duty" (NPG-SPP-14.1) are followed: ASK responder the following questions:

1. "Have you consumed alcohol in the past five hours?" 2. "Are you fit for duty?" lf the first question is answered in the affirmative, call the next person on the call list unless the individual indicates that he/she is fit for duty in which case you should refer the determination to a supervisor.

WBN I Activation and Operation of the IEPIP-G Unit 0 l Technical Support Center (TSC) lRev. 0049 Paqe 61 of 74 Appendix R (Page 1 of 3)TECHNICAL ASSESSMENT TEAM lnitiql Activation of The Technical Support Center Ch,e.qKlist Date: Inits/Time l_ SIGN lN on the Organizational/Staffing Chart and PUT ON position badge.l_ SIGN lN on the TSC sign in roster.l_ ESTABLISH log of communications/events.

l_ ESTABLISH contact with the Technical Assessment Manager.t_ CHECK the status of emergency actions already in effect such as Accountability or Site Evacuation.

l_ PROVIDE this completed checklist to the SED or EP Manager.

WBN I Activation and Operation of the I EPIP-G Unit 0 l Technical Support Center (TSC) lRev. 0049 Paqe 62 of 74 Appendix R (Page 2 of 3)TECHNICAL ASSESSMENT TEAM Ooerational Responsibilities o The TAT Leader may designate a TAT member to be the TAT Board Writer.o Prepares and provides current assessment on plant conditions and provides this information to the CECC Plant Assessment Team.o Reviews Tl-128, "Post Accident Technical Considerations (TSC)," for additional information which may be applicable to the ongoing events.o Reviews MA-1 , 1- AOI-42.01 and EDMG-2 for additional information which may be applicable to the ongoing events.. Project future status based on present plant conditions.

o Provide technical support and recommendations to plant operations on mitigating the accident.o lnitiates Action Requests (Appendix C) to request actions by other facilities o Determines the condition of the reactor and nuclear fuel. (Evaluate use of RCI-104 for determining RCS activity). lf ICS is unavailable, prepares accident assessment form (Appendix U) for the TAM and NRC Communicator as needed.o Provides Predictive Release Data Sheet (Appendix T)to the CECC as requested.

o Performs trending of key plant parameters using lCS.o Assumes SAMG responsibilities, when directed by the TAM. The TSC must be functional and 3 SAMG Evaluators must be monitoring the "TSC Diagnostic Flow Chart'(DFC) to assume SAMG responsibilities.. If applicable, verifies that all Aux. Bldg. Secondary Containment Enclosures (ABSCE)doors are closed. (50l-30.06, Auxiliary Building Gas Treatment System, Checklist 3 or Fire Protection)

WBN I Activation and Operation of the IEPIP-6 Unit 0 l Technical Support Center (TSC) lRev. 0049 Paqe 63 of 74 Appendix R (Page 3 of 3)TECHNICAL ASSESSMENT TEAM Ooerational Responsibilities (continued) o ldentifies and tracks the status of current ABSCE breaches. (Contact HVAC System Engineer for Breaching Log status)o Verifies that all Main Control Room Habitability Zone (MCRHZ) doors are closed.o ldentifies and tracks the status of current MCRHZ breaches.

WBN Unit 0 Activation and Operation of the Technical Support Genter (TSC)EPIP.6 Rev. 0049 Paqe 64 of 74 Appendix S (Page 1 of 6)Plant Parameter Data Sheets DATE: TIME: UNIT: NOTE Unit status updates can be gained from the ICS computer utilizing the TSC Mimics and the following subgroups:

REP1, REP2, 2PS1, 3MS1, 4S11, or SPDS.Refer to the ICS System User's Guide for additional information.

lf the ICS is inoperable, utilize the sheets of this appendix to trend/track needed data.1. CST LEVEL: (Ll-2-230A)_(Lt-2-233A)_GAL

2. SG HEAT SINK: E CONDENSER tr ATMOSPHERE
3. AFW PUMPS RUNNING: E A-A 4. SG LEVELS: NR: (1) (2)(Lr-3-3e)wR: (1) (2)(Lr-3-43A)
5. SG PRESSURES:

(1) (2)(Pr-1-24)RVLIS: DYNAMIC RANGE PZR LEVEL: (LI-68-335A)(coLD cAL)PZR PRESSURE: (Pl-68-342A) tr B.B E] TD Grffa (3) (Lr{-%)@ (3) Gr+eBA)(Pt-1-eA)

(3) (@STATIC %tloa-z+nl (3) @@(3) @(4)(4)(4)(Lr-68-320)

%(HOr CAL)(Pr-68-340A)_PSrG (Pr-68-64)_PSrG o/o@ffi1 (Pr-127APSlG

%6.7.8.9.10.RCS PRESSURE: (LOOP 3 HOT LEG)HL TEMP: WR (1) (2)(r-68-1)oF (4)(rrc8-65)11. CLTEMP: WR (1) @ (2)(4) _"F (Tt-68-83)

WBN Unit 0 Activation and Operation of the Technical Support Genter (TSG)EPIP.6 Rev. 0049 Paqe 65 of 74 6:3:i',:};)

Plant Parameter Data Sheets DATE: T!ME: UNIT: 12. RCSFLOW: RCP'SRUNNING:

tr1 Fl2El3 tr4 tr NATURALCIRC

13. ECCS STATUS: U STANDBY tr INJECT U RECIRC tr SPRAY 14. RWST LEVEL: (Ll-63-50)_cAL (Ll-63-51)_cAL
15. CNTMT SUMP LEVEL: (Lt-63-180, 181)_%16. FLOWRATE: (Fl-62-93)_GPM (Fl-63-170) cPM CHARGING BIT 17. CNTMT PRESSURE:

NR (Pl-30-44) (Pl-30-45)

PSID 18. INCORETHERMOCOUPLES:

QUAD 1 (1 of H1 ,28,24,56,55,29,6)

_"F QUAD 2 - (1 of #44,22,58

,21,16,63

,64) _"F QUAD 3 - (1 of #54,12,8,40,4,3,7)

QUAD 4 - (1 of #60 ,9,45,6,46

,42,36)"F oF 19. NIS SOURCE RANGE: (N-131 )_CPS (N-132)_CPS

20. SUB COOLING MARGIN OF OF tr-oe-rosl lfloe-r rs1 21. STATUS TREE INDICATING:

RED tr ORANGE tr REASON: REASON: DATA BY:

WBN Unit 0 Activation and Operation of the Technical Support Center (TSG)EPIP.6 Rev. 0049 Paqe 66 of 74 Appendix S (Page 3 of 6)Plant Parameter Data Sheets DATE: TIME: UNIT: RADIATION MONITORS NOTE Unit Status Update Sheets (For Use When TSC/ICS Computer ls lnoperable)

2. UPPER CNTMT (RE-90-112) (A) PARTICULATE_CPM tr TSoLATED tr TO UPPER (B) TOTAL GAS _CPM tr TO LOWER (C) IODINE _CPM 1. LOWER CNTMT (RE-90-106) tr ISOLATED tr TO LOWER 3. SHIELD BLDG VENT (1&2-RE-e0-400)

FLOW CFM tr ISOLATED FLOW CFM 5. CONDENSER EXHAUST (LR)(A) PARTICULATE CPM (B) TOTAL GAS _CPM TOTAL GAS U1_ U2 frCi/cc (B) TOTAL GAS CPM (c) roDrNE cPM CPM FLOW CFM (RE-e0-1 1e)(Fr-2-256) 4.AUxlLlARYBLDGVENT(0-RE-90-101)(A)PARTlcULATE-cPM WBN Unit 0 Activation and Operation of the Technical Support Center (TSC)EPIP.6 Rev. 0049 Paqe 67 of 74 Appendix S (Page 4 of 6)Plant Parameter Data Sheets DATE: TIME: UNIT: NOTE ICS radiation monitor(s)

RE identifications may be referenced as RM in the MCR.6. STEAM LINE RAD MONITORS: RE-90-421 RE-90-422 RE-90-423 RE-90-424 STEAMFLOW (MCR)Fr-1-3A(3B)

Fr- 1-10A(1 0B)Fr-1-21 A(21 B)Fr-1-28A(2BB)

SERVICE BLDG VENT SG BLOWDOWN: ERCW DISCHARGE:

HEADER A: 0-RE-90-133 HEADER B: 0-RE 134 10. Additional monitors in alarm (trend as needed).DATA BY: 7.B.9.SG1 SG2 SG3 SG4 0-RE 132 RE-90-120 mR/hr mR/hr mR/hr mR/hr lbmlhr.Ibm/hr.lbm/hr.Ibm/hr.CPM FLOW CPM CPM CPM CFM CPM RE-90-121 0-RE 140 0-RE 141 CPM CPM WBN Unit 0 Activation and Operation of the Technical Support Genter (TSG)EPIP-6 Rev. 0049 Paqe 68 of 74 6:3:i',:}3)

Plant Parameter Data Sheets DATE: TIME: UNIT: POST-ACCI DENT RADIATION MON ITORS NOTE Unit Status Update (For Use When TSC/ICS Computer ls lnoperable) 1.UPPERCNTMT:(ToPoF#2&#3SG)RE-90-271:-R/hr (TOP OF #1 & #4 SG) RE-90-272:_R/hr 2.LoWERCNTMT:(BETWEEN#2&#3SG)RE.90.273:-R/hr (BETWEEN #1 & #4 SG) RE-90-274:_Rl/hr

3. COND VAC EXHAUST: (mid.R/1-RE-90-255)_(HRv1-RE-90-256)_CPM (mid. R/2-RE-90-255)_( H R/2-RE-e0-256)_CPM
4. Additional monitors in alarm (trend as needed): DATA BY:

WBN Activation and Operation of the I EPIP-6 Unit 0 Technical Support Center (TSG) lRev. 0049 Paqe 69 of 74 Appendix S (Page 6 of 6)Plant Parameter Data Sheets RADIATION RELEASES Date: Time: Unit Release Point: Release Inforrnation:

Release Began at _ and expected to end at _ (for duration of _ hours).Release Potential of _ Ci in volume of _ ft3/gal Release Rates: EI Lowering tr Stable n Rising tr Unknown Airborne Releases Liquid Releases Gross Release Rates (uCi/sec)Concentration FIow Total Release Noble Gas lsotope Value Units Value Units Value Units lodines Particulate lsotopic Release Rates (uCi/sec)lsotope Release Rate Met Data Date Time Sensor Elevation (m)Wind Speed (m/sec)Wind Direction (from)Stability Layer Stability Class Remarks/Comments:

Data Collected by:

WBN I Activation and Operation of the I EPIP-6 Unit 0 l Technical Support Center (TSC) lRev. 0049 Paqe 7A of 74 Appendix T (Page 1 of 1)Predictive Release Data Sheet DATE: TIME: UNIT: DATA NEEDED FOR CECC TO PERFORM PREDICTIVE RELEASE METHODOLOGY

1. PRIMARY COOLANT CONCENTRATION IN GAS IN LIQ ISOTOPE prCi/cc pCi/ml I-131 t-132 t-133 l-134 I-135 cs- 137 cs-138 KR-B5m KR-85 KR.B7 KR-BB xE-133 xE-135 SAMPLE DATA DATE: TIME: LOCATION: TEMPERATURE:

OF PRESSURE PSIA GAS VOLUME: CC WATER MASS: GRAM WATER LEVEL: 2. CONCENTRATION OF HYDROGEN IN CONTAINMENT ATMOSPHERE H2 CONC (MOLE %): DATE: CNTMT TEMP: F TIME: CNTMT PRESS PSI LOCATION: 3. OPERATTNG POWER HTSTORY (tF CECC/lCS DATALTNK TNOPERABLE)

DATEffIME OF SHUTDOWN:_

START END AVG POWER START END AVG POWER PERIOD PERIOD IN MWt PERIOD PERIOD IN MWt 4. CORE EXlT THERMOCOUPLE READTNGS (rF CECC/lCS DATALTNK TNOPERABLE)

THERMOCOUPLE DATE TIME READING NOTES: NUMBER (F)5. REACTOR WATER LEVEL HTSTORY (rF CECC/lCS DATALINK INOPERABLE)

DATE TIME READING RCS VOL NOTES: (uNrrs) (cu Fr)Send to: CECC Plant Assessment Team DATA BY WBN I Activation and Operation of the I EPIP-G Unit 0 l Technical Support Center (TSC) lRev. 0049 Paqe 71 of 74 Appendix U (Page 1 of 1)TSC Accident Assessment Summary Sheet NOTE This Status Update Sheet is for use when the TSC ICS/ERDS data systems are inoperable.

TO: Tech. Assmt. Mgr. & NRC Coordinator and CECC Plant Assessment Team FROM: WBN Tech. Assmt. Team L HEAT REMOVAL CAPABILITY (Core Cooling, Heat Sink, RSC lnventory):

Status Tree: ll. FUEL INTEGRITY (Subcriticality, RCS Radionuclide):

III. RADIOACTIVITY IN CONTAINMENT; IV. CONTAINMENT INTEGRITY:

Status Tree: V. OVERALL ASSESSMENT

& RECOMMENDATIONS:

Prepared by WBN /EXT Time WBN I Activation and Operation of the I EPIP-6 Unit 0 l Technical Support Center (TSC) lRev. 0049 Paoe 72 of 74 Appendix V (Page 1 of 1)EMERGENCY RESPONDER NOTIFICATION FORM Person Calling Fitness for Duty Date Department Refer to NPG-SPP-03.21 Fatigue Rule and Work Hour Limits (1)Name Time Called Time Needed to Report Alcohol 5 Hrs.Prior to Report (Y/N)Fit for Duty (Y/N)Overtime restricted (1)Duty Official Comments WBN Unit 0 Activation and Operation of the Technical Support Center (TSC)EPIP.6 Rev. 0049 Paqe 73 of 74 Appendix W (Page 1 of 1)WBN TSC Sign ln Roster Date of TSC Activation NAME (Print)Signature Position/Role EP Review WBN Unit 0 Activation and Operation of the Technical Support Center (TSC)EPIP.6'l Rev. 0049 Paqe 74 of 74 Appendix X (Page 1 of 1)TSC LOG POSITION: TSC DATE: PAGE OF Time Gomments NOTE: Upon relief or termination of the emergency, ensure that the log is completed by checking the log for completeness, then printing and signing your name.Signatu re (print/sign

)Date