| | Site | Start date | Title | Description |
|---|
| IR 05000390/2025002 | Watts Bar | 13 August 2025 | Integrated Inspection Report 05000390/2025002 and 05000391/2025002 | |
| WBL-25-026, Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual | Watts Bar | 5 June 2025 | Periodic Submission for Changes Made to the Technical Specification Bases and Technical Requirements Manual | |
| IR 05000327/2025001 | Sequoyah | 8 May 2025 | Integrated Inspection Report 05000327/2025001, 05000328/2025001, and 07200034/2025001 | |
| IR 05000327/2024003 | Sequoyah | 6 November 2024 | Integrated Inspection Report 05000327/2024003 and 05000328/2024003 | |
| CNL-24-004, Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13) | Watts Bar | 4 April 2024 | Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13) | |
| IR 05000390/2024010 | Watts Bar | 8 March 2024 | Age-Related Degradation Inspection Report 05000390/2024010 and 05000391/2024010 | |
| ML23171A886 | Browns Ferry | 24 July 2023 | Issuance of Amend. Nos. 331, 354, and 314; 365 and 359 Regarding Adoption of TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position | |
| ML23059A335 | Millstone | 22 February 2023 | Draft Written Exam and Outline | |
| ML23059A351 | Millstone | 22 February 2023 | Final Written Exam and Outline | |
| CNL-22-037, Application to Revise Technical Specifications to Adopt TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (BFN TS-533) | Browns Ferry Sequoyah | 31 January 2023 | Application to Revise Technical Specifications to Adopt TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position (BFN TS-533) | |