ML24081A026
ML24081A026 | |
Person / Time | |
---|---|
Site: | Watts Bar |
Issue date: | 03/21/2024 |
From: | Anthony Williams Tennessee Valley Authority |
To: | Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation, Document Control Desk |
References | |
Download: ML24081A026 (1) | |
Similar Documents at Watts Bar | |
---|---|
Category:Emergency Preparedness-Emergency Plan Implementing Procedures
MONTHYEARCNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024
[Table view]Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions WBL-24-043, Emergency Plan Implementing Procedure Revisions2024-09-16016 September 2024 Emergency Plan Implementing Procedure Revisions WBL-24-030, Emergency Plan Implementing Procedure Revisions2024-07-17017 July 2024 Emergency Plan Implementing Procedure Revisions WBL-24-028, Emergency Plan Implementing Procedure Revisions2024-07-0202 July 2024 Emergency Plan Implementing Procedure Revisions WBL-24-025, Emergency Plan Implementing Procedure Revisions. Includes EPIP-7, Revision 43, Activation and Operation of the Operations Support Center (OSC)2024-05-23023 May 2024 Emergency Plan Implementing Procedure Revisions. Includes EPIP-7, Revision 43, Activation and Operation of the Operations Support Center (OSC) CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions WBL-24-016, Rev. 60 to Radiological Emergency Plan EPIP 1, Emergency Plan Classification Logic2024-04-11011 April 2024 Rev. 60 to Radiological Emergency Plan EPIP 1, Emergency Plan Classification Logic WBL-24-018, Rev. 30 to Radiological Emergency Plan EPIP 14, Radiological Control Response2024-04-11011 April 2024 Rev. 30 to Radiological Emergency Plan EPIP 14, Radiological Control Response ML24081A0262024-03-21021 March 2024 Emergency Plan Implementing Procedure Revisions WBL-24-003, Emergency Plan Implementing Procedure Revision. Includes EPIP-6, Revision 58, Activation and Operation of the Technical Support Center (TSC)2024-01-30030 January 2024 Emergency Plan Implementing Procedure Revision. Includes EPIP-6, Revision 58, Activation and Operation of the Technical Support Center (TSC) CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions WBL-23-058, Emergency Plan Implementing Procedure Revision. Includes EPIP-5, Revision 63, General Emergency2023-12-19019 December 2023 Emergency Plan Implementing Procedure Revision. Includes EPIP-5, Revision 63, General Emergency CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 WBL-23-033, Emergency Plan Implementing Procedure Revision. Includes EPIP 1, Revision 59, Emergency Plan Classification Logic2023-07-13013 July 2023 Emergency Plan Implementing Procedure Revision. Includes EPIP 1, Revision 59, Emergency Plan Classification Logic CNL-23-049, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan .2023-06-26026 June 2023 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan . CNL-23-042, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-05-16016 May 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions WBL-23-015, Emergency Plan Implementing Procedure Revision2023-03-21021 March 2023 Emergency Plan Implementing Procedure Revision CNL-23-021, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-03-0808 March 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions WBL-23-003, Emergency Plan Implementing Procedure Revision. Includes EPIP-16, Revision 25, Termination of the Emergency and Recovery2023-01-12012 January 2023 Emergency Plan Implementing Procedure Revision. Includes EPIP-16, Revision 25, Termination of the Emergency and Recovery WBL-23-001, Emergency Plan Implementing Procedure Revision. Includes EPIP-1, Revision 57, Emergency Plan Classification Logic2023-01-10010 January 2023 Emergency Plan Implementing Procedure Revision. Includes EPIP-1, Revision 57, Emergency Plan Classification Logic CNL-23-008, Tennessee Valley Authority Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-12-22022 December 2022 Tennessee Valley Authority Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions WBL-22-068, Submittal of Emergency Plan Implementing Procedure Revision2022-12-12012 December 2022 Submittal of Emergency Plan Implementing Procedure Revision CNL-22-106, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-14, Revision 38, Nuclear Emergency Public Information Organization and Operat2022-11-28028 November 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-14, Revision 38, Nuclear Emergency Public Information Organization and Operatio WBL-22-062, Emergency Plan Implementing Procedure Revision. Includes EPIP-13, Revision 34, Initial Dose Assessment for Radiological Emeregencies2022-11-0101 November 2022 Emergency Plan Implementing Procedure Revision. Includes EPIP-13, Revision 34, Initial Dose Assessment for Radiological Emeregencies WBL-22-061, Unit 2 - Emergency Plan Implementing Procedure Revisions2022-10-17017 October 2022 Unit 2 - Emergency Plan Implementing Procedure Revisions WBL-22-060, Unit 2 - Emergency Plan Implementing Procedure Revisions. Includes EPIP-6, Revision 56, Activation and Operation of the Technical Support Center (TSC)2022-10-17017 October 2022 Unit 2 - Emergency Plan Implementing Procedure Revisions. Includes EPIP-6, Revision 56, Activation and Operation of the Technical Support Center (TSC) CNL-22-077, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-08-11011 August 2022 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions WBL-22-037, Emergency Plan Implementing Procedure Revision. Including EPIP-13, Revision 33, Initial Dose Assessment for Radiological Emergencies2022-07-14014 July 2022 Emergency Plan Implementing Procedure Revision. Including EPIP-13, Revision 33, Initial Dose Assessment for Radiological Emergencies WBL-22-033, Emergency Plan Implementing Procedure Revisions2022-06-0101 June 2022 Emergency Plan Implementing Procedure Revisions CNL-22-047, Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2022-05-23023 May 2022 Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions WBL-22-030, Emergency Plan Implementing Procedure Revision2022-05-18018 May 2022 Emergency Plan Implementing Procedure Revision CNL-22-046, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan.2022-04-28028 April 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan. WBL-22-024, Unit 2 - Emergency Plan Implementing Procedure Revisions. Includes EPIP 14, Revision 292022-04-27027 April 2022 Unit 2 - Emergency Plan Implementing Procedure Revisions. Includes EPIP 14, Revision 29 CNL-22-050, Brown Ferry, Sequoyah and Watts Bar - Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-04-18018 April 2022 Brown Ferry, Sequoyah and Watts Bar - Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-031, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-03-22022 March 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-21-096, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing2021-12-17017 December 2021 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing WBL-21-054, Unit 2 - Emergency Plan Implementing Procedure Revision2021-12-0909 December 2021 Unit 2 - Emergency Plan Implementing Procedure Revision CNL-21-088, Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-17, Revision 242021-11-12012 November 2021 Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-17, Revision 24 CNL-21-087, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revisions2021-11-0303 November 2021 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revisions WBL-21-044, Emergency Plan Implementing Procedure Revision2021-09-23023 September 2021 Emergency Plan Implementing Procedure Revision CNL-21-071, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2021-08-13013 August 2021 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML21223A0062021-08-11011 August 2021 Emergency Plan Implementing Procedure Revision. Includes EPIP-2, Revision 45, Notification of Unusual Event WBL-21-035, Emergency Plan Implementing Procedure EPIP-12, Revision 51, Emergency Equipment and Supplies2021-07-13013 July 2021 Emergency Plan Implementing Procedure EPIP-12, Revision 51, Emergency Equipment and Supplies WBL-21-034, Emergency Plan Implementing Procedure Revision2021-07-0101 July 2021 Emergency Plan Implementing Procedure Revision WBL-21-011, Unit 2 - Emergency Plan Implementing Procedure Revisions2021-03-0909 March 2021 Unit 2 - Emergency Plan Implementing Procedure Revisions WBL-21-003, Unit 2 - Emergency Plan Implementing Procedure Revision2021-01-26026 January 2021 Unit 2 - Emergency Plan Implementing Procedure Revision WBL-20-061, Unit 2 - Emergency Plan Implementing Procedure Revision2020-11-23023 November 2020 Unit 2 - Emergency Plan Implementing Procedure Revision WBL-20-057, Unit 2 - Emergency Plan Implementing Procedure Revision2020-11-0505 November 2020 Unit 2 - Emergency Plan Implementing Procedure Revision 2024-09-16 Category:Letter MONTHYEARCNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024
[Table view]Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20243012024-10-17017 October 2024 Operator Licensing Examination Approval 05000390/2024301 and 05000391/2024301 ML24282B0412024-10-15015 October 2024 Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 ML24261C0062024-10-0404 October 2024 Correction to Amendment No. 134 to Facility Operating License No. NPF-90 and Amendment No. 38 to Facility Operating License No. NPF-96 ML24260A1682024-10-0404 October 2024 Regulatory Audit Summary Related to Request to Add and Revise Notes Related to Technical Specification Table 3.3.2-1, Function 5 ML24284A1072024-09-26026 September 2024 Affidavit for Request for Withholding Information from Public Disclosure for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2 CNL-24-047, Decommitment of Flood Mode Mitigation Improvement Systems2024-09-24024 September 2024 Decommitment of Flood Mode Mitigation Improvement Systems CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000390/LER-2024-002, Automatic Reactor Trip Due to Main Generator Protection Relay Actuation2024-09-0505 September 2024 Automatic Reactor Trip Due to Main Generator Protection Relay Actuation IR 05000390/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390-2024005 and 05000391-2024005 ML24218A1442024-08-27027 August 2024 Issuance of Amendment Nos. 169 and 75 Regarding Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate IR 05000390/20244022024-08-20020 August 2024 – Security Baseline Inspection Report 05000390-2024402 and 05000391/2024402 - Public CNL-24-061, Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08),2024-08-19019 August 2024 Supplement to Application to Revise Function 5 of Technical Specification Table 3.3.2-1, ‘Engineered Safety Feature Actuation System Instrumentation,’ for the Sequoyah and Watts Bar (SQN-TS-23-02 and WBN-TS-23-08), ML24219A0262024-08-12012 August 2024 Request for Withholding Information from Public Disclosure IR 05000390/20240022024-08-0707 August 2024 Integrated Inspection Report 05000390/2024002 and 05000391/2024002 Rev ML24204A2652024-07-25025 July 2024 Regulatory Audit Summary Related to Request to Revise Technical Specification Surveillance Requirement 3.9.5.1 to Reduce the Residual Heat Removal Flow Rate ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24170A8002024-07-15015 July 2024 Issuance of Amendment Nos. 168 and 74 Regarding Revision to Technical Specification Table 1.1-1 for Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter IR 05000390/20244402024-07-12012 July 2024 95001 Supplemental Inspection Supplemental Report 05000390-2024440 and 05000391-2024440 and Follow-Up Assessment Letter 05000391/LER-2024-003, Inoperability of Both Trains of Unit 2 Low Head Safety Injection2024-07-11011 July 2024 Inoperability of Both Trains of Unit 2 Low Head Safety Injection ML24131A0012024-07-0202 July 2024 Issuance of Amendment Nos. 167 and 73 Regarding Adoption of Technical Specification Task Force Traveler TSTF-427-A, Revision 2 CNL-24-052, Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-06-27027 June 2024 Response to Request for Additional Information Regarding Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-24-018, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS2024-06-25025 June 2024 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A, Revision 2, Regarding TS 3.8.1 AC Sources – Operating to Clarify Requirements for Diesel Generator Testing (WBN-TS ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24100A7642024-05-16016 May 2024 Issuance of Amendment No. 166 Regarding Revision to Technical Specification 3.8.2, AC Sources-Shutdown, to Remove Reference to C-S Diesel Generator (CNL-23-062) IR 05000390/20240012024-05-14014 May 2024 Integrated Inspection Report 05000390/2024001 and 05000391/2024001 CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 05000391/LER-2024-002, Re Automatic Reactor Trip Due to Steam Generator 3 Level LO-LO2024-05-0606 May 2024 Re Automatic Reactor Trip Due to Steam Generator 3 Level LO-LO IR 05000391/20240072024-04-30030 April 2024 Assessment Follow-up Letter for Watts Bar Nuclear Plant, Unit 2 – Report 05000391/2024007 ML24120A1182024-04-29029 April 2024 – Notification of NRC Supplemental Inspection (95001) and Request for Information CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 422024-04-22022 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 ML24087A1912024-04-18018 April 2024 Exemption from Select Requirements of 10 CFR Part 73, Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting CNL-24-024, Hydrologic Engineering Center River Analysis System Project Milestone Status Update2024-04-17017 April 2024 Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-24-010, License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19)2024-04-17017 April 2024 License Amendment Request to Recapture Low-Power Testing Time (WBN-TS-23-19) ML24072A0052024-04-15015 April 2024 Issuance of Amendment Nos. 165 and 72 Regarding Increase in the Maximum Number of Tritium Producing Burnable Absorber Rods and Supporting Changes, and Revision to the Updated Final Safety Analysis Report CNL-24-004, Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13)2024-04-0404 April 2024 Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-23-13) IR 05000390/20244012024-04-0202 April 2024 – Security Baseline Inspection Report 05000390/2024401 and 05000391/2024401 - (Public) CNL-24-020, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements2024-04-0101 April 2024 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Units 1 and 2, Request for Approval of Quality Assurance Program Description and Application to Revise the Technical Specifications Associated with QAPD Requirements CNL-24-008, Guarantee of Payment of Deferred Premiums - 2023 Annual Report2024-03-27027 March 2024 Guarantee of Payment of Deferred Premiums - 2023 Annual Report CNL-24-007, Annual Insurance Status Report2024-03-27027 March 2024 Annual Insurance Status Report CNL-24-025, Notice of Intent to Pursue License Renewal for Watts Bar Nuclear Plant, Unit 1 - Submittal Schedule2024-03-25025 March 2024 Notice of Intent to Pursue License Renewal for Watts Bar Nuclear Plant, Unit 1 - Submittal Schedule ML24081A0262024-03-21021 March 2024 Emergency Plan Implementing Procedure Revisions ML24079A0312024-03-19019 March 2024 Wb 2024-301, Corporate Notification Letter (210-day Ltr) CNL-24-031, Supplement to Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance2024-03-18018 March 2024 Supplement to Request for Exemption from Various Part 72 Regulations Resulting from Fuel Basket Design Control Compliance CNL-24-029, Response to Request for Additional Information Regarding Tennessee Valley Authority - Request for Exemption from Specific Requirements of 10 CFR Part 372024-03-14014 March 2024 Response to Request for Additional Information Regarding Tennessee Valley Authority - Request for Exemption from Specific Requirements of 10 CFR Part 37 2024-09-05 |
Text
TENNESSEE VALLEY 1\\14 AUTHORITY
Post Office Box 2000, Spring City, Tennessee 37381
WBL-24-014
March 21, 2024
10 CFR 50.54(q)(5) 10 CFR 72.44(f)
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001
Watts Bar Nuclear Plant, Units 1 and 2 Facility Operating License Nos. NPF-90 and NPF-96 NRC Docket Nos. 50-390, 50-391, and 72-1048
Subject:
Emergency Plan Implementing Procedure Revisions
Pursuant to Title 10, Code of Federal Regulations (10 CFR) 50.54(q)(5), and 10 CFR 72.44(f),
Tennessee Valley Authority (TVA) is submitting a description of changes to the Watts Bar Nuclear Plant (WBN) Radiological Emergency Plan (REP). The affected documents are the WBN Emergency Plan Implementing Procedures (EPIP) listed below:
EPIP Revision Title Effective Date
3 52 Alert 02/26/2024 8 36 Personnel Accountability and Evacuation 03/04/2024
Description of Changes
EPIP-3 Revision 52 enacted the following changes:
Section 3.5: Removal of Caution referencing Early Dismissal.
Section 3.5: Removal of Note referring to Early Dismissal, removal of step 2 initiating EPIP-8 Attachment 8 for Early Dismissal, and renumbered the following step accordingly.
U.S. Nuclear Regulatory Commission WBL-24-014 Page 2 March 21, 2024
- Attachment 5 Section 2.0: Removal of Caution regarding timing of Early Dismissal and removal of reference to "Early Dismissal" from step 1.
- Attachment 5 Section 2.0: Removal of step 2 for initiation of EPIP-8 Attachment 8, "Early Dismissal," and renumbered the following step accordingly; Removal of Note regarding timing of Early Dismissal.
- Attachment 7 Section 4.0: Removal of Caution regarding timing of Early Dismissal and removal of "Early Dismissal" from step 1.
- Attachment 7 Section 4.0: Removal of step 2 initiation of EPIP-8 Attachment 8, "Early Dismissal," and renumbered the following step accordingly.
EPIP-8 Revision 36 enacted the following changes:
- Removed all reference to "Early Dismissal" including deletion of General Information regarding Early Dismissal in section 3. 1 and former section 3.2, "Early Dismissal."
- Removal of Attachment 8, "Early Dismissal," from Section 4.2 Non QA Records, and removal of former Attachment 8, "Early Dismissal Instructions. "
- Some pages, attachments, and sections have been re-numbered due to deletions.
The above changes were evaluated in accordance with 10 CFR 50.54(q)(3) and 10 CFR 72.44(f). TVA determined that the changes did not reduce the effectiveness of the WBN REP. The WBN REP, as revised, continues to meet the requirements in Appendix E to 10 CFR 50 and the planning standards of 10 CFR 50.47(b).
There are no new regulatory commitments in this letter. Please direct all questions concerning this matter to Michael White, Emergency Preparedness Manager, at mrwhite@tva.gov.
/ !3-esp*~
/
Anthony L. Williams IV Site Vice President Watts Bar Nuclear Plant
cc :
NRC Regional Administrator - Region II NRC Senior Resident Inspector - Watts Bar Nuclear Plant NRC Project Manager - Watts Bar Nuclear Plant NRC Director - Division of Fuel Management, NMSS