ML21223A006

From kanterella
Jump to navigation Jump to search
Emergency Plan Implementing Procedure Revision. Includes EPIP-2, Revision 45, Notification of Unusual Event
ML21223A006
Person / Time
Site: Watts Bar  Tennessee Valley Authority icon.png
Issue date: 08/11/2021
From: Anthony Williams
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
WBL-21-03
Download: ML21223A006 (2)


Text

TENNESSEE VALLEY AUTHORITY PostOftleeBox 2000 Spring CityTennessee 3738I WBL-21-039 August 11,2021 10CFR50.54(q)(5) 10CFR72.44(f)

ATTN:Document Control Desk U.S.Nuclear Regulatory Commission Washington, D.C.20555-0001 WattsBarNuclear

Plant, Unit1and Unit 2 Facility Operating License Nos.

NPF-90 and NPF-96 NRCDocket Nos.50-390, 50-391, and72-1048

Subject:

Emergency PlanImplementing Procedure Revision Pursuant toTitle 10,CodeofFederal Regulations (10CFR) 50.54(q)(5),

and 10CFR72.44(f),

theTennessee Valley Authority (TVA) issubmitting adescription ofchange to theWattsBar Nuclear Plant(WBN)

Radiological Emergency Plan(REP).

Theaffected document istheWBN Emergency PlanImplementing Procedure (EPIP) listed below:

EPIP Revision Title EffectiveDate 2

45 Notification ofUnusual Event 07/30/2021 M

EPIP-2 revision 45enacted thefollowing changes:

a Addedanentry totherevision logforRevision 44.

a Revised step3.1.[1) toremove thewords"Site AreaEmergency",

andreplace with "Notification ofUnusual Event" Theabovechange wasevaluated inaccordance with10CFR50.54(q)(3) and10CFR72.44(f).

TVAdetermined that thechange didnotreduce theeffectiveness oftheWBNREP.TheWBN REP,asrevised, continues tomeettherequirements inAppendix Eto10CFR50andthe planning standards of10CFR50.47(b).

U.S.

Nuclear RegulatoryCommission WBL-21-039 Page 2

August11, 2021 Therearenonewregulatory commitments inthis letter.

Please direct allquestions concerning this matter toMike

White, Emergency PreparednessManager, at(423) 365-3232.

,-m

,AEspectfully, Anthony L.Williams IV Site VicePresident WattsBarNuclear Plant cc:

NRCRegional Administrator

- Region II NRCSenior Resident Inspector

- WattsBarNuclear Plant NRCProject Manager

- WattsBarNuclear Plant NRCDirector

- Division ofSpentFuelManagement, NMSS