{{#Wiki_filter:INDIANEA Indiana Michigan PowerMICHIGAN Cook Nuclear PlantOne Cook PlaceA unit of American Electric Power Indiagnaihgn, PowercomSeptember 11, 2015 AEP-NRC-201 5-9110 CFR 50.55aDocket Nos.: 50-31550-316U. S. Nuclear Regulatory CommissionATTN: Document Control DeskWashington, D. C. 20555-0001Donald C. Cook Nuclear Plant Units 1 and 2Supplement to 10 CFR 50.55a Requests Associated with the Fifth Ten-Year InserviceTesting Interval
==References:==
: 1. Letter from J. P. Gebbie, Indiana Michigan Power Company (I&M), to U. S. Nuclear RegulatoryCommission (NRC), "Donald C. Cook Nuclear Plant Units 1 and 2, 10 CFR 50.55a RequestsAssociated with the Fifth Ten-Year Inservice Testing Interval," AEP-NRC-2015-31, datedJuly 31, 2015, Agencywide Documents Access and Management System AccessionNo. ML15216A121.2. Letter from A. W. Dietrich, NRC, to L. J. Weber, I&M, "Donald C. Cook Nuclear Plant, Units 1and 2 -Supplemental Information Needed for Acceptance of Requested Licensing Action Re:Relief Request REL-PP1 (TAC Nos. MF6548 and MF6549)," dated September 2, 2015.By Reference 1, Indiana Michigan Power Company (I&M), the licensee for Donald C. Cook NuclearPlant (CNP) Units 1 and 2, requested U. S. Nuclear Regulatory Commission (NRC) authorizationfor approval of the 10 CFR 50.55a relief requests associated with the Fifth Inservice Testing Intervalfor CNP. The NRC staff provided a request for supplemental information (Reference 2) to completethe review of Reference 1.This letter is being submitted as a supplement to Reference 1 to correct an incorrect reference tothe applicable 10 CER 50.55a paragraph in Relief Request REL-PPI. I&M's initial submittal.(Reference 1) identified Relief Request REL-PP1 as being requested under the provisions of 10CFR 50.55a(z)(1), which was incorrect. Relief Request REL-PP1 is being requested under theprovisions of 10 CFR 50.55a(z)(2).Additionally, Enclosure 2 of Reference 1 incorrectly identified Agencywide Documents Access andManagement System (ADAMS) Accession No. ML061730715 as a precedent for REL-PPI. Thecorrect ADAMS No. is ML061730175.I&M requests approval of the relief requests prior to the start of the Fifth 10-Year Test Interval,which will begin July 1, 2016.4QO47 U. S. Nuclear Regulatory Commission AEP-NRC-201 5-91Page 2This letter contains no new commitments. Should you have any questions, please contactMr. Michael K. Scarpello, Regulatory Affairs Manager, at (269) 466-2649.Sincerely,Joel P. GebbieSite Vice PresidentJMT/amsc: A. W. Dietrich, NRC Washington, D.C.J. T. King, MPSCMDEQ -RMD/RPSNRC Resident InspectorC. D. Pederson, NRC Region IllA. J. Williamson, AEP Ft. Wayne, w/o enclosures  Ito AEP-NRC-2015-91AFFI RMATI ONI, Joel P. Gebbie, being duly sworn, state that I am the Site Vice President of Indiana MichiganPower Company (I&M), that I am authorized to sign and file this request with the U. S. NuclearRegulatory Commission on behalf of I&M, and that the statements made and the matters setforth herein pertaining to I&M are true and correct to the best of my knowledge, information, andbelief.Indiana Michigan Power CompanyJoel P. GebbieSite Vice PresidentSWORN TO AND SUBSCRIBED BEFORE METHIS Uf DAY OFS ,,c', 2015Notary PublicANNE M. PALMANotary Public, State of Michigan.County of BerrienMy Commission Expires 10-).,6-2017Acting in the Countyof .My Commission ExpiresIn-/#-&o/7-}}

Revision as of 10:46, 6 June 2018

D.C. Cook, Units 1 and 2 - Supplement to 10 CFR 50.55a Requests Associated with the Fifth Ten-Year Inservice Testing Interval
ML15258A024
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 09/11/2015
From: Gebbie J P
Indiana Michigan Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
AEP-NRC-201 5-91
Download: ML15258A024 (3)


Text

INDIANEA Indiana Michigan PowerMICHIGAN Cook Nuclear PlantOne Cook PlaceA unit of American Electric Power Indiagnaihgn, PowercomSeptember 11, 2015 AEP-NRC-201 5-9110 CFR 50.55aDocket Nos.: 50-31550-316U. S. Nuclear Regulatory CommissionATTN: Document Control DeskWashington, D. C. 20555-0001Donald C. Cook Nuclear Plant Units 1 and 2Supplement to 10 CFR 50.55a Requests Associated with the Fifth Ten-Year InserviceTesting Interval

References:

1. Letter from J. P. Gebbie, Indiana Michigan Power Company (I&M), to U. S. Nuclear RegulatoryCommission (NRC), "Donald C. Cook Nuclear Plant Units 1 and 2, 10 CFR 50.55a RequestsAssociated with the Fifth Ten-Year Inservice Testing Interval," AEP-NRC-2015-31, datedJuly 31, 2015, Agencywide Documents Access and Management System AccessionNo. ML15216A121.2. Letter from A. W. Dietrich, NRC, to L. J. Weber, I&M, "Donald C. Cook Nuclear Plant, Units 1and 2 -Supplemental Information Needed for Acceptance of Requested Licensing Action Re:Relief Request REL-PP1 (TAC Nos. MF6548 and MF6549)," dated September 2, 2015.By Reference 1, Indiana Michigan Power Company (I&M), the licensee for Donald C. Cook NuclearPlant (CNP) Units 1 and 2, requested U. S. Nuclear Regulatory Commission (NRC) authorizationfor approval of the 10 CFR 50.55a relief requests associated with the Fifth Inservice Testing Intervalfor CNP. The NRC staff provided a request for supplemental information (Reference 2) to completethe review of Reference 1.This letter is being submitted as a supplement to Reference 1 to correct an incorrect reference tothe applicable 10 CER 50.55a paragraph in Relief Request REL-PPI. I&M's initial submittal.(Reference 1) identified Relief Request REL-PP1 as being requested under the provisions of 10CFR 50.55a(z)(1), which was incorrect. Relief Request REL-PP1 is being requested under theprovisions of 10 CFR 50.55a(z)(2).Additionally, Enclosure 2 of Reference 1 incorrectly identified Agencywide Documents Access andManagement System (ADAMS) Accession No. ML061730715 as a precedent for REL-PPI. Thecorrect ADAMS No. is ML061730175.I&M requests approval of the relief requests prior to the start of the Fifth 10-Year Test Interval,which will begin July 1, 2016.4QO47 U. S. Nuclear Regulatory Commission AEP-NRC-201 5-91Page 2This letter contains no new commitments. Should you have any questions, please contactMr. Michael K. Scarpello, Regulatory Affairs Manager, at (269) 466-2649.Sincerely,Joel P. GebbieSite Vice PresidentJMT/amsc: A. W. Dietrich, NRC Washington, D.C.J. T. King, MPSCMDEQ -RMD/RPSNRC Resident InspectorC. D. Pederson, NRC Region IllA. J. Williamson, AEP Ft. Wayne, w/o enclosures Ito AEP-NRC-2015-91AFFI RMATI ONI, Joel P. Gebbie, being duly sworn, state that I am the Site Vice President of Indiana MichiganPower Company (I&M), that I am authorized to sign and file this request with the U. S. NuclearRegulatory Commission on behalf of I&M, and that the statements made and the matters setforth herein pertaining to I&M are true and correct to the best of my knowledge, information, andbelief.Indiana Michigan Power CompanyJoel P. GebbieSite Vice PresidentSWORN TO AND SUBSCRIBED BEFORE METHIS Uf DAY OFS ,,c', 2015Notary PublicANNE M. PALMANotary Public, State of Michigan.County of BerrienMy Commission Expires 10-).,6-2017Acting in the Countyof .My Commission ExpiresIn-/#-&o/7-