Informs That Bypass & Inoperative Status Panel Installed,Per SER Confirmatory Item 30.Installation Documented by Engineering & Design Coordination Rept D-5109-S01.Item Considered Closed
ML20214E056
Person / Time
Site: Beaver Valley
Issue date: 05/13/1987
From: Carey J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
2NRC-7-118, TAC-62913, NUDOCS 8705210621
Download: ML20214E056 (1)


Text

'A@

2NRC-7-118 Beaver Valley No. 2 Unit Project Organization Telecopy .

. Box May 13, 1987 i Shippingport, PA 15077 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

SUBJECT:

Beaver Valley Power Station Unit No. 2 Docket No. 50-412 SER Confirmatory Item 30 Bypass and Inoperative Status Panel Gentlemen:

The Bypass and Inoperative Status Panel has been installed. The comple-tion is documented by Engineering and Design Coordination Report number D-5109-S01. DLC considers this item closed.

If you should have any questions, please call Mr. A. N. DiCesaro at (412) 393-7742.

DUQUESNE LIGHT COMPANY By G .

J. J. Carey SeniorVicePreside[]nt AND/ijr NR/AND/ITM/30 AR/NAR cc: Mr. P. Tam, Project Manager Mr. J. Beall, NRC Sr. Resident Inspector Mr. L. Prividy, NRC Resident Inspector INP0 Records Center