N.TO*l'isIOs' April 15, 1986 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation Unites States Nuclear Regulatory Commission l
Washington, DC 20555 ATTENTION:
Mr. Peter Tam, Project Manager Division of PWR Licensing - A Office of Nuclear Reactor Regulations l
SUBJECT:
Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 Bypass And Inoperable Status Panel
REFERENCES:
(a) 2NRC-4-165, dated October 11, 1984.
(b) 2NRC-4-079, dated June 13, 1984.
(c) NUREG-1057, Safety Evaluation Report related to the Opera-tion of Beaver Valley Power Station Unit 2, dated October 1985.
Gentlemen:
In Reference (a) Duquesne Light Company committed to make two changes Inoperable Systems Indication logic.
These new design to the Bypassed and changes have been included in Amendment 11 in January 1986 to the Beaver Valley Unit No. 2 Final Safety Analysis Report (FS AR).
The first change involved inoperability of the residual heat removal system when the primary component cooling water system is inoperable.
This The second change involved inoperability 4
change is shown in FSAR Figure 7.5-6.
of the primary component cooling water system, diesel generator and recircula-tion spray system when the service water system is inoperable.
These changes are shown in FSAR Figures 7.5-16, 7.5-28, and 7.5-12 respectively.
In Reference (b) Duquesne Light Company committed to revise the FS AR to address Regulatory Guide 1.47.
Amendment 7 to the FSAR in July 1984 revised Section 7.5.5 to address this issue.
I
$$0TooN g
E el
' 0 afs Y
United States Nuclear Regulatory Commission Mr. Harold R. Denton, Director Bypass And Inoperable Status Panel Page 2 With the above modifications, Duquesne Light Company believes that all requests in Confirmatory Item No. 30 from Table 1.4 of the Safety Evalua-(Reference b) have been completed and Confirmatory Item No. 30 can tion Report be closed.
I DUQUESNE LIGHT COMPANY I
By J. J. Tarey Vice President 1
il RWF/ sip cc: Mr. P. Tam, Project Manager l