2NRC-7-118 Beaver Valley No. 2 Unit Project Organization Telecopy
. Box May 13, 1987 Shippingport, PA 15077 i
United States Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, DC 20555
SUBJECT:
Beaver Valley Power Station Unit No. 2 Docket No. 50-412 SER Confirmatory Item 30 Bypass and Inoperative Status Panel Gentlemen:
The Bypass and Inoperative Status Panel has been installed.
The comple-tion is documented by Engineering and Design Coordination Report number D-5109-S01.
DLC considers this item closed.
If you should have any questions, please call Mr. A. N. DiCesaro at (412) 393-7742.
DUQUESNE LIGHT COMPANY By G
SeniorVicePreside[]nt J. J. Carey AND/ijr NR/AND/ITM/30 AR/NAR cc: Mr. P. Tam, Project Manager Mr. J. Beall, NRC Sr. Resident Inspector Mr. L. Prividy, NRC Resident Inspector INP0 Records Center
\\ b