ML20195B418: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:F      ,.                                                                                                            1
  ~.          'E                                            N ES892S222SES2S2
              .;  ,                                          li O    O    O  O      O    O    O  O gj e
e                                                2    5    5    5  5      5    5    5  5                  .
C    5    5    5  5      5    5    5  5
                                                                  >    >    >  >      >    >    >  >        W  e gE      c                                                                            e        i 3                                                                                                "
O        "E      3                            0 >      >    >  >      >    >    >  >
E il        5 ti        .!
gb
            =
                      ! .3 "'
8 g,,  jl    j
                                                              %    5    5    5  5 - ~. ll  5    5  5  5m8 mgz      o hp        b        $'Ef        $u
                                                              ~
5    5    5  5      5    5    5  5  s0<      $
it gg                                                                      [L E $  z l  F lg E [us 38
                                ,l 0 5
                                          *t                                                          0 > 0 o
l          5g          g;ggg                        -
                                                                                                    >          m 6
(    2 5      5    5  5      5    5    5  5          gI 8o                                    b    e    -
g                                              5    5    5  5      5    5    5  5                  l 5                '
                                  -                          r-  5    5    5  5      5    5    5  5
                $                  h
* 5    5    5  5      5    5    5  5 S.b s            =p-                            -
5    5    5  5      5    5    5  5 35z .S5  E        8 5    5    5  5      5    5    5  5
                                                              -    5    5    5  5      5    5    5  5 flm m
E lllsg e!
5
{
                                                              ~
                                                              -  5 5
5 5
5 5
5 5
5 5
5 5
5 5
5 5
4d                                      <    <              <    <  <  p
    !c                      0N                              E  $$$$$        $      $$$$$$$        N us                                                        a  222222222222222                    8 g  000000000000000                    %            .
                                                                                                      $                i I  x l E$$$$$$33$$$$$$
                                                              ~  EgsssssRlsssssa 5
a l
4 e    O    OOOOOO          OOOOOO 5                                                        9    ll11ll1llllllll                  2 5                                                                                                8 8                                                        0                                      W S i, 2
                                          '                  8  11111111111111s                    S    n l              g 5                                                                                $ 5o!E g
b lB"W 885 e                            g llglleg@
t E8e              I !E8        6 5 88 68          D
                !il                                0!s!                                              $!!'g 1igggiIlslglglg$1
                        .e l
l.el,t,el a      3    e                                      e.
l E5bbbbbgUEbEbbEEd$                                                                          0 g$$2gEgE22y$$%$
eggggggetses$$                    f" IREEEngS9ggegggggeg 55888          08
              =nswacces??S??????
E          E dmmnamdm m mdm m m m [a g 0999o90999o9399                                      i i
j
 
o                                                                        L A    939
.                        N                                                                        T    1 81 O
* T cL
                '                                                                                          0 8        1 8        s s                                                                      1        V 1
e ez 0        YYs          An 0                    ro t
7        1 1
8                    rn n
V 3                  ~
                                        .e                      5 4
1                    or                        7                                6 9              D r                              9                                1        1                E 9              E ns  rr                        2                                          V                T    R K              R ua                                                                                          S I
E U ror                n I
U                                                                                                                T o                                            5        1                R    /
D              Q no n E >r i
t            a 1        V                A  P K
R      =x          t a    t n    i n                                                        T EL  T T                                                                                        N O E C N
e                                    4 r.
e m S d          l                                          1
:            N          r              am      o                              1 V                U
                  #            E M
me              roe aRg r
a                                                    S D  N  C
: r. er          e      a    C                                                      R S I
R la            E      t l dn 3
1 1
E E A    1 t
it          G          r          cra        h                                          V          T R  B  0 D                    uoM                                                                          N s
m          E
                                      ,e Ar            Nc nt t
u o                              2 1
E P
PW  A  C l
9 wap            bCeM  aon                                          1 9
          /
n a                                        n S                                          V          R CE TA  R 8      r    N                          w        Dk,                                                          I U
T O o        N mr r
a0    u4                                                          G V C 1
          /
x o                  t0 c0 r                                      1        1                    O 5      t n                                a8 oN o                                      1        V                    S 0                                              DCY                                                                    A e
mN    mAcong D                      C4                                    y 0
P e
u O R Ac    E B            1 1
V Y K a co CA d
t H rr                                                  'c e
Me                    s B T T
D D O o                                                                  R      D    9        1 V
8        1 V
M                                                                              1 7        V m                        S yL                              T                                          6 1
n                              N E
V a
p                              M B
S T                                          5          1 m                  E N          I                                                    V o                  CO  I M    M                                  f o
C                  N T O                                                  4          1 E A C                                                            V r                  R TS E                                          B e                  E            E                                  2 1
w                  F R S                                                  3        V o                  E A N R E E                                            e P                      L C g
a                1 2
e k
C I U L                                        P                V N
u                              D                                          1        1 D                      A E B T                                                          V WC                                                      A          A  S A E                                                                    N o                                          T L                                                r  333 T                                          A E                                                o o  000- - -
O I
EQ                                        C S                                                c  MMM            T sT                                                                                            n  DDD            C N                                                                                                              U uE                                                                                            i s  AAA            R wfP                                                                                            r c  CCC            T TC                                                                                                                S uE ER                                                                                                                N uS                                                                                            E    999 I
oS                                                                                            T    999          G cE  L                                                                                          A
                                                                                                        ///
555          N oN                                                                                            D    000          I oU w                                                                                                ///
555 L
I tE A RO                                                                                          /
000          F u
r UE L                                                                                    #
R oTE                                                                                            V                  O RND oGE A
I E
R      ---        F O
E SF D                  M I
mLT AN                                                                                        N                  E RTE                                                                                            O oTD II C                  M sME oSS                          H                                P S                              A    AAA          D              _
NI                      C                                2      P                        Q    NNN          E              _
MAW sRR 3
O          H C
0 0
N      S 2  A E                                    H              _
oTE                    H N              3 5
0          C      0 S C3                                      C pEH P s
C C              O          C          C      N  1 0 O                                    A rHT          0        3 Y O                NHC E C                      C      C  N  N            C                      T oTO          2 0        N R  A              3 Y                W      GCC                  D,                    T N        C    D          E 0 R                  R      C                                            A C        R N              DN A S  CR                G      W GORS              H S                      E              _
T                            I B          M      R G ML U A                      E F
E AO T    CE N 50 TOi    RU                                            W                      S
:HC3 WWS                                        W                  1 S
C HHGCD OA                      M UR PO8  0          G                      E SO      Y Y E Y i N WM P N RR R R I      4 D 0 R S O 0 N T 1
K  S  O T E C        E R                      S              _
h OC ST ST E                  T  ins  N 3 N N WCOA GS sE C C K Y Y TY NOA I
S M A R1 0 A                          E A
RN T FE AG RHA TC EL I      !        I EE  EMMAE E MMC R
s u        L
: R H H A H H L
MG N E E U. ES TU ROMA CCMCC TC UM N I
K V R F H
I K S S I
S E S S A  N B AAO N C O Y U  N N      2 1 1-L P
Y      C E NS N SP A          N NSL SE E H N                  N N GM L S d                1      -
3    s T        AWCC0CC              E CJ CR CCY P J U                                          :  9- 3  1 1
K 0 1                8 4 0 7 5                  7  4 5 4 0 8 9 9                  r I
R        4 5 7 1
n8        9  1      6 8 9 1
1  3 8 0 0 3 7 5                n  6 6 6          R            _
O        6 9 1 1 1 i 2 2 2 1  2 3 4 5 6 7 8 8 9 2 5 6 7 2 2 2 2 2 2 2 2 2 3 3 3 3                                u  1 1
1 A            _
R I
00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0                                                  C L C  L L C    M E
P        ) )
1 2 3
                          )      )
4
                                                )
: 5) 6) 7 8 9) 0  )      )
1
                                                                    )
1 1
                                                                      )
2 1
3) 1  1
                                                                                  )
: 4) 5 6 7 1
                                                                                      )
1
                                                                                        )
1 8) 1 h  S. S S.        R
 
E                                          ''
L,
;                                                                                              oou.        ,
r]
[      g ,                                                                      Catawba Nudear Station m%%                                                                          4800 Concord Road t ' rN                                                                                        York, SC 29745
                  .                                                                          (803) 831-3000 i
May 12,1999 i
RE:    Catawba Nuclear Station Selected Licensee Commitments Manual Revision Date 5/5/99 Attached are revisions to the Catawba Nuclear Station Selected Licensee Commit.nents Manual.
Please remove and replace the following pages:
REMOVE                                                      INSERT LIST OF EFFECTIVE PAGES Page 2 of 8 (03/11/99)                                  Page 2 of 8 (05/05/99) v            Page 3 of 8 (01/16/99)                                  Page 3 of 8 (05/05/99)
Page 4 of 8 (03/11/99)                                  Page 4 of 8 (05/05/99)
Page 5 of 8 (03/11/99)                                  Page 5 of 8 (05/05/99)
Page 8 of 8 (01/16/99)                                  Page 8 of 8 (05/05/99)
TAB 16.7 i
Chapter 16.7-7, page 1 of 2                              Chapter 16.7-7, page 1 of 2                  ;
dated 01/16/99                                          dated 05/05/99                                '
Chapter 16.7-8, page 2 of 2                              Chapter 16.7-8, page 2 of 2 dated 01/16/99                                          dated 05/05/99 Chapter 16.8-1, page 1 of 49                            Chapter 16.8-1, page 1 of 49                  ,
dated 01/16/99                                          dated 05/05/99                                '
Chapter 16.9-1, page 1 of 4                              Chapter 16.9-1, page 1 of 4 Dated 1/16/99                                            dated 5/05/99 Chapter 16.9-1, page 2 of 4                              Chapter 16.9-1, page 2 of 4 Dated 1/16/99                                            dated 5/05/99                                ,
O
 
              . Selected Licensee Commitm:nts Revision Date 5/5/99 Page Two Cliapter 16.9-3, page 1 of 4                              Chapter 16.9-3, page 1 of 4 i              dated 3/11/99                                            dated 5/05/99 l
Chapter 16.9-3, page 3 of 4                              Chapter 16.9-3, page 3 of 4 dated 3/11/99                                            dated 5/05/99 Chapter 16.9-3, page 4 of 4                              Chapter 16.9-3, page 4 of 4 dated 3/11/99                                            dated 5/05/99 l
1 Chapter 16.9-5, page 4 of 6                              Chapter 16.9-5, page 4 of 6 dated 1/16/99                                            dated 5/05/99 l
Chapter 16.9-5, page 5 of 6                              Chapter 16.9-5, page 5 of 6 dated 1/16/99                                            dated 5/05/99 l              Chapter 16.9-6, page 10 of 11                            Chapter 16.9-6, page 10 of1I i              dated 3/11/99                                            dated 5/05/99 Chapter 16.9-12, page 3 of 3                              Chapter 16.912, page 3 of 3 dated 1/16/99                                            dated 5/05/99 Chapter 16.13-1, page 1 of 2                              Chapter 16.13-1, page 1 of 2 O          dated 12/90                                              dated 5/05/99 Ifyou have any questions concerning the contents of this package update, contact Toni Pasour at (803) 831-3566.
Gary D. Gilbert Regulatory Compliance Manager O
 
      .      .                      CATAWBA NUCLEAR STATION SELECTED LICENSEE COMMITMENTS MANUAL
  ,Q                                    List of Effective Pages V      -
Tab 16.6 16.6-1 Page 1 of 1                    01/16/99 16.6-2 Page 1 of 2                    01/16/99            ;
16.6-2 Page 2 of 2                    01/16/99 16.6-3 Page 1 of 2                    01/16/99 16.6-3 Page 2 of 2                    01/16/99 16.6-4 Page 1 of 2                    01/16/99 16.6-4 Page 2 of 2                    01/16/99            i Tab 16.7 16.7-1 Page 1 of 2                    05/04/98            1 16.7-1 Page 2 of 2                    05/04/98            !
16.7-2 Page 1 of 4                    01/16/99 16.7-2 Page 2 of 4                    01/16/99 16.7-2 Page 3 of 4                    01/16/99 16.7-2 Page 4 of 4                    01/16/99 16.7-3 Page 1 of 4                    03/11/99            !
16.7-3 Page 2 of 4                    03/11/99 l
16.7-3 Page 3 of 4                    01/16/99            i 16.7-3 Page 4 of 4                    01/16/99            I 16.7-4 Page 1 of 2                    01/16/99 16.7-4 Page 2 of 2                    01/16/99 16.7-5 Page 1 of 2                    05/04/98 16.7-5 Page 2 of 2                    05/04/98 16.7-6 Page 1 of 2                    01/16/99 16.7-6 Page 2 of 2                    01/16/99 16.7-7 Page 1 of 2                    05/05/99 16.7-7 Page 2 of 2                    01/16/99 16.7-8 Page 1 of 2                    01/16/99            l 16.7-8 Page 2 of 2                    05/05/99            '
16.7-9 Page 1 of 4                    01/16/99 16.7-9 Page 2 of 4                    01/16/99 16.7-9 Page 3 of 4                    01/16/99 16.7-9 Page 4 of 4                    01/16/99 16.7-10 Page 1 of 6                    01/16/99 16.7-10 Page 2 of 6                    01/16/99 16.7-10 Page 3 of 6                    01/16/99 16.7-10 Page 4 of 6                    01/16/99 16.7-10 Page 5 of 6                    03/11/99 16.7-10 Page 6 of 6                    01/16/99 16.7-11 Page 1 of 1                    01/16/99 16.7-12 Page 1 of 2                    01/16/99 t          16.7-12 Page 2 of 2                    01/16/99 Page 2 of 8            05/05/99
 
CATAWBA NUCLEAR STATION SELECTED LICENSEE COMMITMENTS MANUAL
{
i List of Effective Pages i
Tab 16.8 16.8-1 Page 1 of 49                  05/05/99 16.8-1 Page 2 of 49                  01/16/99 16.8-1 Page 3 of 49                  01/16/99
,          16.8-1 Page 4 of 49                  05/04/98 16.8-1 Page 5 of 49                  05/04/98            j 16.8-1 Page 6 of 49                  05/04/98 16.8-1 Page 7 of 49                  05/04/98 16.8-1 Page 8 of 49                  05/04/98 16.8-1 Page 9 of 49                  05/04/98 16.8-1 Page 10 of 49                  05/04/98 16.8-1 Page 11 of 49                  05/04/98 16.8-1 Page 12 of 49                  05/04/98          '
16.'8-1 Page 13 of 49                05/04/98 16.8-1 Page 14 of 49                  05/04/98 16.8-1 Page 15 of 49                05/04/98            !
16.8-1 Page 16 of 49                05/04/98 10.8-1 Page 17 of 49                05/04/98 16.8-1 Page 18 of 49                  05/04/98 16.8-1 Page 19 of 49                  05/04/98 O      16.8-1 Page 20 of 49 16.8-1 Page 21 of 49 05/04/98-05/04/98 l
j l
16.8-1 Page 22 of 49                  05/04/98            '
16.8-1 Page 23 of 49                  05/04/98 16.8-1 Page 24 of 49                  05/04/98 16.8-1 Page 25 of 49                  05/04/98 16.8-1 Page 26 of 49                  05/04/98 16.8-1 Page 27 of 49                  05/04/98 16.8-1 Page 28 of 49                  05/04/98 16.8-1 Page 29 of 49 05/04/98 16.8-1 Page 30 of 49                  05/04/98 16.8-1 Page 31 of 49                  05/04/98 16.8-1 Page 32 of 49                  05/04/98            l 16.8-1 Page 33 of 49                  05/04/98 16.8-1 Page 34 of 49                  05/04/98            i 16.8-1 Page 35 of 49                  05/04/98 16.8-1 Page 36 of 49                  05/04/98
        .16.8-1 Page 37 of 49                  05/04/98            l 16.8-1 Page 38 of 49                  05/04/98 16.8-1 Page 39 of 49                  05/04/98            !
16.8-1 Page 40 of 49                  05/04/98            ;
16.8-1 Page 41 of 49                  05/04/98            ;
16.8-1 Page 42 of 49                  05/04/98              '
16.8-1 Page 43 of 49                  05/04/98 Page 3 of 8            05/05/99 l
 
r l
                ,                      CATAWBA NUCLEAR STATION SELECTED LICENSEE COMMITMENTS MANUAL
!f]                        .
List of Effective Pages
(/      -
Ipb 16.8 (continued)
[              '16.8-1 Pago 44 of 49                    05/04/98 l'
16.8-1 Page 45 of 49                  05/04/98 16.8-1 Page 46 of 49                  05/04/98 16.8-1 Page 47 of 49                  05/04/98 16.8-1 Page 48 of 49                  05/04/98 16.8-1 Page 49 of 49                  05/04/98 16.8-2 Page 1 of 2                    01/16/99                ,
16.8-2 Page 2 of 2                    01/16/99                l 16.8-3 Page 1 of 2                    01/15/97                ;
16.8-3 Page 2 of 2                    01/15/97                1 16.8-4 Page 1 of 2                    05/29/97            '
16.8-4 Page 2 of 2                    05/29/97 16.8-5 Page 1 of 2                  01/16/99 16.8-5 Page 2 of 2                    01/16/99 Tab 16.9 16.9-1 Page 1 of 4                    05/05/99 16.9-1 Page 2 of 4                    05/05/99 16.9-1 Page 3 of 4                    01/16/99 16.9-1 Page 4 of 4                    01/16/99 16.9-2 Page 1 of 5                    01/16/99 16.9-2 Page 2 of 5                    01/16/99
!                16.9-2 Page 3 of 5                    01/16/99 16.9-2 Page 4 of 5                    01/16/99 16.9-2 Page 5 of 5                    01/16/99 16.9-3 Page 1 of 4                    05/05/99 16.9-3 Page 2 of 4                    03/11/99 16.9-3 Page 3 of 4                    05/05/99 16.9-3 Page 4 of 4                    05/05/99 16.9-4 Page 1 of 5                    01/16/99 16.9-4 Page 2 of 5                    01/16/99 l                16.9-4 Page 3 of 5                    01/16/99 16.9-4 Page 4 of 5                    01/16/99 16.9-4 Page 5 of 5                    01/16/99 16.9-5 Page 1 of 6                    01/16/99 i                16.9-5 Page 2 of 6                    01/16/99 16.9-5 Page 3 of 6                    01/16/99 16.9-5 Page 4 of 6                    05/05/99 16.9-5 Page 5 of 6                    01/16/99 16.9-5 Page 6 of 6                    01/16/99 16.9-6 Page 1 of 11                    03/11/99 (O            16.9-6 Page 2 of 11                    03/11/99
  \            16.9-6 Page 3 of 11                    03/11/99 Page 4 of 8            05/05/99 L
 
7
    ,          .                    CATAWBA NUCLEAR STATION SELECTED LICENSEE COMMITMENTS MANUAL O                                      List of Effective Pages V        .
Tab 16.9 (continued) 16.9-6 Page 4 of 11                  03/11/99
              -16.9-6 Page 5 of 11                    03/11/99 16.9-6 Page 6 of 11                    03/11/99 16.9-6 Page 7 of 11                    03/11/99 16.9-6 Page 8 of 11                    03/11/99 16.9-6 Page 9 of 11                    03/11/99 16.9-6 Page 10 of 11                  05/05/99 16.9-6 Page 11 of 11                  03/11/99 16.9-7 Page 1 of 2                    01/16/99 16.9-7 Page 2 of 2                    01/16/99 16.9-8 Page 1 of 2                    01/16/99 16.9-8 Page 2 of 2                    01/16/99 16.9-9 Page 1 of 2                    01/16/99 16.9-9 Page 2 of 2                    01/16/99 16.9-10 Page 1 of 1                    01/16/99 16.9-11 Page 1 of 3                  01/16/99 16.9-11 Page 2 of 3                    01/16/99 16.9-11 Page 3 of 3                  01/16/99 16.9-12 Page 1 of 3                  01/16/99 16.9-12 Page 2 of 3                  01/16/99 16.9-12 Page 3 of 3                  05/05/99 16.9-13 Page 1 of 11                  04/22/99 16.9-13 Page 2 of 11                  04/22/99 16.9-13 Page 3 of 11                  04/22/99 16.9-13 Page 4 of 11                  04/22/99 16.9-13 Page 5 of 11                  04/22/99 16.9-13 Page 6 of 11                  04/22/99 16.9-13 Page 7 of 11                  04/22/99 16.9-13 Page 8 of 11                  04/22/99 16.9-13 Page 9 of 11                  04/22/99 16.9-13 Page 10 of 11                  04/22/99 16.9-13 Page 11 of 11                  04/22/99 16.9-14 Page 1 of 2                    01/16/99 16.9-14 Page 2 of 2                    01/16/99 16.9-15 Pago 1 of 1                                        l 01/16/99 16.9-16 Page 1 of 1                    01/16/99            ,
16.9-17 Page 1 of 1                    01/16/99            l 16.9-18 Page 1 of 1                    01/16/99-            l 16.9-19 Page 1 of 2                    01/16/99            !
16.9-19 Page 2 of 2                    01/16/99            !
16.9-20 Page 1 of 1                    01/16/99            J O)
D 16.9-21 Page 1 of 1 16.9-22 Page 1 of 2 01/16/99 01/16/99 1
Page 5 of 8            05/05/99 !
l 1
 
I CATAWBA NUCLEAR STATION SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages Tab 16.11 (continued) 16.11-19 Page 2 of 2                  01/16/99 16.11-20 Page 1 of 3                01/16/99 16.11-20 Page 2 of 3                01/16/99 16.11-20 Page 3 of 3                01/16/99 16.11-21 Page 1 of 2                01/16/99 16.11-21 Page 2 of 2                01/16/99 Tab 16.12 i
16.12-1 Page 1 of 2                  01/16/99 16.12-1 Page 2 of 2                  01/16/99              i Tab 16.13                                                    !
16.13-1 Page 1 of 2                  05/05/99 16.13-1 Page 2 of 2                  12/90 16.13-2 Page 1 of 3                  01/16/99              1 16.13-2 Page 2 of 3                  01/16/99 16.13-2 Page 3 of 3                  01/16/99
;            16.13-3 Page 1 of 2                  01/16/99 16.13-3 Page 2 of 2                  01/16/99 l
l l
Q                                                                    l Page 8 of 8            05/05/99 l
1 I
 
p              16.7          INSTRUMENTATION 0        .
16.7-7        MOVABLE INCORE DETECTORS COMMITMENT:
The Movable Incore Detection system shall be OPERABLE with:
: a.      At least 75% of the detector thimbles,
: b.      A minimum of two detector thimbles per core quadrant, and
: c.      Sufficient movable detectors, drive, and readout equiprnent to map these thimbles.
APPLICABILITY:
When the Movable incore Detection System is used for:
: a.      Recalibration of the Excore Neutron Flux Detection System, or
: b.      Monitoring the QUADRANT POWER TILT RATIO, or
: c.      Measurement of F,s", and Fo(Z).
REMEDIAL ACTION:
With the Movable Incore Detection System inoperable, do not use the system for the above applicable monitoring or calibration functions.
TESTING REQUIREMENTS:
The Movable incore Detection System shall be demonstrated OPERABLE at least          l once per 24 hours by irradiating each detector used and determining the acceptability of its voltage curve for:
: a.      Recalibration of the Excore Neutron Flux Detection system, or
: b.      Monitoring the QUADRANT POWER TILT RATIO, or N
: c.      Measurement of F,s , and Fo(Z).
Chapter 16.7-7 Page 1 of 2                                                  05/05/99
 
l                -
l REMEDIAL ACTION (con't)
O        .
the following 30 hours. If the rate of rise is less than 0.5 feet per hour, comply with the requirements of REMEDIAL ACTIONS a., b., and c. above.
TESTING REQUIREMENTS:
    ,                The groundwater level shall be determined at the following frequencies by monitoring the water level and by verifying the absence of alarm in the six groundwater monitor wells as shown in UFSAR Figure 2-60 installed around the perimeter of the Reactor and Auxiliary Buildings:
: a.      At least once per 7 days when the groundwater level is at or below the top of the adjacent floor slab, and
: b.      At least once per 24 hours when the groundwater level is above the top of the l adjacent floor slab.
 
==REFERENCES:==
: 1.      Letter from NRC to Gary R. Peterson, Duke, issuance of Improved Technical Specifications Amendments for Catawba, September 30,1998.
BASES:
This COMMITMENT is provided to ensure that groundweter levels will be monitored and prevented from rising to unacceptable levels. High groundwater levels could result in unacceptable structural stresses in the Containment and/or Auxiliary Building due to uplift and hydrostatic forces during design basis events. Although i
these buildings have been statically analyzed to withstand soil pressure along with the uplift and hydrostatic forces resulting from groundwater rebound to yard elevation (593'6"),this analysis did not include any other loadings and was not a design condition for these buildings.
l l
O Chapter 16.7-8 Page 2 of 2                                                        05/05/99 j
 
1 q
I l  .
                .19.A          ELECTRICAL POWER SYSTEMS 16,A-1        CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES COMMITMENT:
Primary and backup containment penetration conduction overcurrent protective devices shown in Table 16.8-1 A'and 16.8-1B shall be operable.                          l APPLICABILITY:
MODES 1,2,3, and 4.
REMEDIAL ACTION:
              ' With one or more of the primaiy or backup containment penetration conductor overcurrent protective device (s) shown in Table 16.8-1 A and 16.8-1B inoperable:
l              a. Restore the protective device (s) to OPERABLE status or de-energize the circuit (s) by tripping the associated backup circuit breaker or racking out or
,                      removing the inoperable circuit breaker within 72 hours, declare the affected system or component inoperable, and verify the backup circuit breaker to be tripped or the inoperable circuit breaker racked out or removed at least once per 7 days thereafter; the provisions of SLC 16.2.3 are not applicable to l                      overcurrent devices in circuits which have their backup circuit breakers tripped, their inoperable circuit breakers racked out, or removed, or I              b. Be in at least HOT STANDBY within the next 6 hours and in COLD L                    SHUTDOWN within the following 30 hours.
TESTING REQUIREMENTS:                                                                      ,
The above noted primary and backup containment penetration conductor overcurrent protective devices shall be demonstrated OPERABLE:
: a. At least once per 18 months:                                                        i
: 1)      By verifying that the medium voltage (4-15 kV) circuit breakers are OPERABLE by selecting, on a rotating basis, at least 10% of the              !
circuit breakers of each voltage level, and performing the following:      !
O Chapter 16.8 Page 1 of 49                                                  05/05/99    '
L-
 
Iga              AUXILIARY SYSTEMS - FIRE PROTECTION SYSTEMS Iga-1            FIRE SUPPRESSION WATER SYSTEM COMMITMENT:
The Fire Suppression Water System shall be OPERABLE with:
: a.      At least two fire suppression pumps, each with a capacity of 2500 gpm, with their discharge aligned to the fire suppression header, and
: b.        An OPERABLE flow path capable of taking suction from Lake Wylie and transferring the water through distribution piping with OPERABLE sectionalizing control valves and isolation valves for each sprinkler, hose standpipe, or Spray System riser required to be OPERABLE per Commitments 16.9-2 and 16.9-4.
APPLICABILITY:
At all times.
REMEDIAL ACTION:
: a.        With one of the above required pumps and/or one Water Supply / Distribution System inoperable, restore the inoperable equipment to OPERABLE status within 7 days or provide an altemate backup pump or supply,
: b.        With the Fire Suppression Water System otherwise inoperable establish a backup Fire Suppression Water System within 24 hours.
TESTING REQUIREMENTS:
: a.      The Fire Suppression Water System shall be demonstrated OPERABLE:
: i.      At least once per 10 days on a STAGGERED TEST BASIS by starting l each electric motor-driven pump and operating it for at least 15 minutes on recirculation flow, ii.      By visual verification that each valve (manual, power-operated, or automatic) in the flow path, which is accessible during plant operations, is in the correct position. The frequency of the verification shall be determined by the performance based criteria stated in the Bases Section.
O Chapter 16.9-1          Page 1 of 4                                              05/05/99
 
l I
  ,- s      TESTING REQUIREMENTS (con't)
I
      )
lii. At least once per 6 months by performance of a system flush of the outside distribution loop to verify no flow blockage by fully opening the hydraulically most remote hydrant, iv. At least once per 12 months by cycling each testable valve in the flow l
path through at least one complete cycle of full travel,
: v. At least once per 18 months by verifying that each valve (manual, power-operated, or automatic) in the flow path which is inaccessible          i during plant operations is in its correct position, vi. At least once per 18 months by performing a system functional test        l which includes simulated automatic actuation of the system throughout its operating sequence, and:
: 1)    Verifying that each automatic valve in the flow path actuates to its correct position,
: 2)    Verifying that each pump develops at least 2500 gpm at a net pressure of 144 psig by testing at three points on the pump performance curve, b,a                    3)    Cycling each valve in the flow path which is not testable during plant operation through at least one complete cycle of full travel, and                                                                    ;
: 4)    Verifying that each fire suppression pump starts within 10 psig of its intended starting pressure (A pump, primary switch-95 psig; B pump, primary switch -90 psig; and C pump, primary switch-85 psig).                                                                ;
i vii. At least once per 3 years by performing a flow test of the system in      l l accordance with Chapter 8, Section 16 of the Fire Protection                l Handbook,15th Edition, published by the National Fire Protection Association.
a
 
==REFERENCES:==
 
l            1)    Catawba FSAR, Section 9.5.1
: 2)    Catawba SER, Section 9.5.1
: 3)    Catawba SER, Supplement 2, Section 9.5.1
: 4)    Catawba SER, Supplement 3, Section 9.5.1 O}
8 l            Chapter 16.9-1    Page 2 of 4                                                05/05/99 i
!                                                                                                      I
 
l
    .        .                                                                                          1 i        .                                                                                                l
!n
'\    )  '
IRA            AUXILIARY SYSTEMS - FIRE PROTECTION SYSTEMS l                1Ea-2          CO2 SYSTEMS COMMITMENT:
The following High Pressure and Low Pressure CO2 Systems shall be OPERABLE:
: a. Low Pressure CO2 System - Diesel generator rooms, and
: b. High Pressure CO2 System - Auxiliary feedwater pump rooms APPLICABILITY:
Whenever equipment protected by the Systems is required to be OPERABLE.                  l l
REMEDIAL ACTION:                                                                          l l
: a. With one or more of the Low Pressure CO2 System (Diesel Generator Rooms) inoperable, within one hour establish an hourly fire watch with backup fire suppression equipment as long as the fire barrier between the affected A and B train D/G rooms is intact. If the fire barrier between the affected A and B train D/G rooms is not intact or backup fire suppression equipment is not available, establish a continuous fire watch
: b. With one or more of the High Pressure CO2 Systems (Aux. Feedwater Pump Rooms) inoperable, within one hour establish a continuous fire watch.
TESTING REQUIREMENTS:
l 1
: a. Each of the above required CO2 Systems shall be demonstrated OPERABLE              l by visual verification that each valve (manual, power operated, or automatic)      !
in the flow path is in the correct position.
;                      The frequency of the verification shall be determined by the performance based criteria in the Bases Section.
l
: b. Each of the above required Low Pressure CO2 Systems shall be l                      demonstrated OPERABLE:
: i.      At least once per 31 days by verifying the CO  2 storage tank level to be l greater than 44% of full capacity, and O
CHAPTER 16.9-3 Page 1 of 4                                                    05/05/99 l
 
1 Q
I TESTING REQUIREMENTS (cont'd) v                            replace all non-restorable spot type heat detectors at least once every  !
15 years.
iv. At least once per 6 months by verifying the supervisory function of the alarm circuits operate properly and provide the correct alarm responses.
REFERENCES
: 1)      Catawba FSAR, Section 9.5.1
: 2)        Catawba SER, Section 9.5.1
: 3)        Catawba SER, Supplement 3, Section 9.5.1 BASES:
The OPERABILITY of the Fire Suppression Systems ensures that adequate fire suppression capability is available to confine and extinguish fires occurring in any portion of the facility where safety-related equipment is located. The Fire Suppression System consists of the water system, spray, and/or sprinklers, CO2,          '
f) v and fire hose stations. The collective capability of the Fire Suppression Systems is adequate to minimize potential damage to safety-related equipment and is a major element in the facility Fire Protection Program.
The proper positioning of RF/RY valves is critical to delivering fire suppression CO 2 at the fire source as quickly as possible. The option of increasing or decreasing the frequency of valve position verification allows the ability to optimize plant operational resources. Should an adverse trend develop with CO2 Systems valve positions, the          ,
frequency of verification shall be increased. Similarly if the CO2Systems valve position trends are positive, the frequency of verification could be decreased.
Through programmed trending of CO2 Systems as found valve positions, the CO2 fire protection systems will be maintained at predetermined reliability standards.
The RF/RY System Engineer is responsible for trending and determining verification frequencies based on the following:
Initially the frequency will be monthly.
Annually review the results of the completed valve position verification procedures.
* If the results demonstrates that the valves are found in the correct position at least 99% of the time, the frequency of conducting the valve position verification may be decreased from - monthly to quarterly or - quarterly to semiannually or -
g3 O
CHAPTER 16.9-3 Page 3 of 4                                                      05/05/99 i
 
R&&gg (cont'd)
(
semiannually to annually - as applicable. The frequency shall not be extended beyond annually (plus grace period).'.
if the results demonstrates that the valves are not found in the correct position at least 99% of the time, the frequency of conducting the valve position verification shal! be increased from - annually to semiannually or - semiannually to quarterly or - quarterly to monthly - as applicable. . The valve position verification need not be conducted more often than monthly, in the event that portions of the Fire Suppression Systems are inoperable, attemate backup fire-fighting equipment is required to be made available in the affected areas until the inoperable equipment is restored to service. When the inoperable fire-fighting equipment is intended for use as a backup means of fire suppression,- a longer period of time is allowed to provide an attemate means of fire fighting than if the inoperable equipment is the primary means of fire suppression.
This Selected Licensee Commitment is part of the Catawba Fire Protection Program and therefore subject to the provisions of the Catawba Facility Operating License Conditions #6 for NPF-52 and #8 for NPF-35.
O V
O CHAPTER 16.9-3 Page 4 of 4                                                                    05/05/99
 
    #q                                          TABLE 16.9-4            j U        ,
COMMITTED FIRE DOORS Elevation 543+0 AX217D                52-53, BB AX217F                51, AA-BB AX217G                52-53, BB                        i AX228A                56-57, EE AX228B                57-58, EE AX248                  57-58, OO AX260B                61-62, BB-CC AX260F                62, AA-BB AX260G                61-62, BB-CC AX260H                61-62, BB-CC T527#1                52-43, BB-CC Elevation 5544 AX354A                55, DD-EE AX354B                59, DD-EE AX418                  57, BB AX419 '                57, DD-EE AX420A                  59, DD-EE AX421A                  55, DD EE S102A                  53-54, AA Elevation 560+0                                          l AX352B                  53, CC-DD                        i AX352C                  53, CC-DD AX352D                  46-47, BB-CC AX353B                  45, AA-BB                      l  l AX353C                  45, AA-BB                        i AX393B                  61, CC-DD AX393C                  61, CC-DD                        l AX393D                  67-68, BB-CC AX394B                  69,  AA-BB                    l  l AX394C                  69,  AA-BB AX395                  61,  AA-BB AX396                  53,  AA-BB AX415                  45-46, CC-DD AX416                  68-69, CC-DD                      4 AX417                  57, 00 i                                                                        l i
I l              Chapter 16.9-5 Page 4 of 6                    05/05/99  l 1
t
 
s TABLE 16.9-4 (v      ..
COMMITTED FIRE DOORS Elevation 574+0 AX515                  54, BB AX516                  56-57, DD AX516A                  57-58, DD AX516K                  57, AA-BB AX517A                  53-54, DD-EE AX517B                60-61, DD-EE AX517C                57, DD-EE AX517D                57, DD-EE AX517E                56-57, DD-EE AX518                  60, BB S303A                  54, AA S304A                  60, AA Elevation 577+0 AX513B                  53, CC-DD AX514B                  45-46, AA-BB
                                                                                  .l AX517                  57, EE AX525                  55-56, OO AX525B                  56, OO AXf26D                  58, OO O
A314#3                  61, CC-DD AX533C                  61, CC DD AX534B                  68-69, AA-BB AX535                                                                l 61, AA-BB AX536                    53, AA-BB AX656                  53, CC-DD Chapter 16.9-5 Page 5 of 6                          05/05/99
 
ll
_                                                                                                                                9 O.              1 1 1 1 e e ee e e e 1    1  1                        1    1 1 1 1 1 1 1 1 1 1 1 9
                                                                                                                                  /
5 0
                                                                                                                                  /
5 t    t  t ooo o o o o  t    t    t    t                      te e e e e e e e e e e e t    t  t    t 0
NNNN N N N                                              o o o oo oo oo o o o  t  t  t  t  t  t  t N NNNNNNNNNNN 1 1 1 1              1    1  1      0 0 0 0 1              1 1 1 1 1 1 1 1 1 1 1 0                            -
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 2 2 0 0 0 0 0 0 0 0 0 0 0 0 6 S                2 2 2 2 T                / / / /
1      1    1  1 N
E                2 2 2 2 3 3 M  2 2 2 + + + + + +
                  / / /
1 1 1 U                3 3 3 3 5 5 3 RT 2+ 2  + + 59 l5 2        9 9 9 6 6 3 3 0 0 0 5 5 0 0 0 0 5 5 0 6 l            l5 l5 l5 5 + + + + + + + + + + + + + + +
i
: 9. S  3 3 3 E E E E E E5 5 1                                        3 4 9 9 4            1  3 4 9 9 4 6N    9 9 9                                        6  6 6 8 0 2 4 6 6 8 0 2 4 6 3 1
l5 l5 l5 le le I                    .    .          .
: l.          .
e le le el l5 l5 l5 l6 l6 6 I6 5 5 6 l6 l6 1                                                l. 5 E                                                                                                              l6 6 LON O
l      l I
EEE B B B B BBEEE EEEEE EEEE EEE                                                        l  l                l BT AC TE T                                                                                                              4 E                                                                                                              6-    _
D                                                                                                              N E                                                                                                              N      _
R I    g g g                                g g g g F  d d      d                          d ld i                                                                      -
l    l  l l        d  dl BBB                                  BBBB                                                                        _
r r r                                r r r r o o o                                o o  o  o                                                                _
t    t  t                          t    t  t c c c                                c c  c  c t                                                            -
a a a e e e '5
                                      '5 3 2
                                            '5  '5 1
a a e e a
e a
e RRR4                  1    2 3 RRRR                                                                              _
                                                                                                                            )
2    _
it    _
n 1 U
(  1  .
f m  o o
o 0 ABAB                                                                  R  1 1 1 2 2                                                                e g  e it  it it  it 8CDA B C D                            n n n n                                                                r u
g 1
1 1 2 2 2 2 UUUU                                                                                      P    a p p p p p p p d d d d                                                                                          P mmmmmmme u u u u u u u BBBB u ee e s s su s                                    u s u us us s s      u su us s o lo 6-PP P P P P P                                        r lu  lu u lu lu tu lu lu lu      u lu u lu uP l      l r r r
_                                                      eeeen lt          t        nn nn nn nn nn nn nn nn nn nn nnuleu              9 CCCC        N N C  N FCi C        i i FF Fi A AAAAAAAAAA AF lt lt NNNN l
n                                                      6 1
r 0    1 2 3 4 5 6 7 8 9 0 a b cd ef ab cd 2                                        ef                          t e
8 8 8 8 8 8 8 828282828283 o
7 7 7 7 7 7 7 7 7 7 181 1 1 1 1 1 1    1    1  1  1    1 p
1    1  1                  1 1    1    1  1  1    1  1  1  1  1  1  1  1    a h
C
 
4 BASES (con't) rninimum water volume at a minimum boron concentration, as presented in the CORE OPERATING LIMITS REPORT, is required from the boric acid storage tanks or the refueling water storage tank.
A minimum contained water volume and boron concentration, as presented in the CORE OPERATING LIMITS REPORT (COLR), is required to be available from the borated water sources in MODES 1,2,3, and 4. This volume is based on the required volume for maintaining SDM, unusable volume (to allow for a full suction pipe), instrument error, and additional margin for conservatism as follows:
Boric Acid Tank i
(                        Required Volume for Maintaining SDM              presented in the COLR Additional Margin (Unit 1)                        854 gallons Additional Margin (Unit 2)                        1,303 gallons Unusable Volume (to maintain full suction pipe)    7,230 gallons 14" of water equivalent Vortexing (4" of water above top of suction pipe) 2,066 gallons Instrumentation Error (Based on Total Loop Acc. 1,550 gallons for 1 & 2 NV5740 loops) - 2" of water equivalent Refuelina Water Storace Tank Required Volume for Maintaining SDM                presented in the COLR Unusable Volume (below nozzle)                      13,442 gallons Instrument inaccuracy                              11,307 gallons Vortexing                                          13,247 gallons Additional Margin                                    3,504 gallons The contained water volume limits include allowance for water not available because of discharge line location and other physical characteristics.
(3 V
Chapter 16.9-12 Page 3 of 3                                                  05/05/99 l
 
r
                                                                                                                  .l If.H                  CONDUCT OF OPERATIONS 16.13-1              FIRE BRIGADE COMMITMENT:
A site Fire Brigade of at least five members shall be maintained onsite at all times.
The Fire Brigade shall not include three members of the minimum shift crew necessary for safety shutdown of the unit and any personnel required for other essential functions during a fire emergency.
APPLICABILITY:
At all times.
REMEDIAL ACTION:
With the Fire Brigade composition less than the minimum requirements for a period of time not to exceed 2 hours in order to accommodate unexpected absence, take immediate action to fill the required positions.
TESTING PROCEDURES:
O              1.      Operations Management Procedure 1-10 l
REFERENQgg;
: 1.      Catawba FSAR, Chapter 13.2
: 2.        Catawba SER, Section 9.5.1 and Appendix D
: 3.        Catawba Fire Protection Review, as revised
: 4.        Catawba Fire Protection Commitment index BASES:
The primary purpose of the Fire Brigade Training Program is to develop a group of station employees skilled in fire prevention, fire fighting techniques, first aid procedures, and emergency response. They are trained and equipped to function as a team for the fighting of fires. The station fire brigade organization is intended to be self sufficient with respect to fire fighting activities.
Chapter 16.13-1 Page 1 of 2                                                  05/05/99
                                                                                                            - - -}}

Latest revision as of 23:37, 16 December 2020

Revised Pages to Catawba Nuclear Station Selected Licensee Commitments Manual
ML20195B418
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 05/18/1999
From:
DUKE POWER CO.
To:
References
PROC-990518, NUDOCS 9906010021
Download: ML20195B418 (22)


Text

F ,. 1

~. 'E N ES892S222SES2S2

.; , li O O O O O O O O gj e

e 2 5 5 5 5 5 5 5 5 .

C 5 5 5 5 5 5 5 5

> > > > > > > > W e gE c e i 3 "

O "E 3 0 > > > > > > > >

E il 5 ti .!

gb

=

! .3 "'

8 g,, jl j

% 5 5 5 5 - ~. ll 5 5 5 5m8 mgz o hp b $'Ef $u

~

5 5 5 5 5 5 5 5 s0< $

it gg [L E $ z l F lg E [us 38

,l 0 5

  • t 0 > 0 o

l 5g g;ggg -

> m 6

( 2 5 5 5 5 5 5 5 5 gI 8o b e -

g 5 5 5 5 5 5 5 5 l 5 '

- r- 5 5 5 5 5 5 5 5

$ h

  • 5 5 5 5 5 5 5 5 S.b s =p- -

5 5 5 5 5 5 5 5 35z .S5 E 8 5 5 5 5 5 5 5 5

- 5 5 5 5 5 5 5 5 flm m

E lllsg e!

5

{

~

- 5 5

5 5

5 5

5 5

5 5

5 5

5 5

5 5

4d < < < < < p

!c 0N E $$$$$ $ $$$$$$$ N us a 222222222222222 8 g 000000000000000  % .

$ i I x l E$$$$$$33$$$$$$

~ EgsssssRlsssssa 5

a l

4 e O OOOOOO OOOOOO 5 9 ll11ll1llllllll 2 5 8 8 0 W S i, 2

' 8 11111111111111s S n l g 5 $ 5o!E g

b lB"W 885 e g llglleg@

t E8e I !E8 6 5 88 68 D

!il 0!s! $!!'g 1igggiIlslglglg$1

.e l

l.el,t,el a 3 e e.

l E5bbbbbgUEbEbbEEd$ 0 g$$2gEgE22y$$%$

eggggggetses$$ f" IREEEngS9ggegggggeg 55888 08

=nswacces??S??????

E E dmmnamdm m mdm m m m [a g 0999o90999o9399 i i

j

o L A 939

. N T 1 81 O

  • T cL

' 0 8 1 8 s s 1 V 1

e ez 0 YYs An 0 ro t

7 1 1

8 rn n

V 3 ~

.e 5 4

1 or 7 6 9 D r 9 1 1 E 9 E ns rr 2 V T R K R ua S I

E U ror n I

U T o 5 1 R /

D Q no n E >r i

t a 1 V A P K

R =x t a t n i n T EL T T N O E C N

e 4 r.

e m S d l 1

N r am o 1 V U
  1. E M

me roe aRg r

a S D N C

r. er e a C R S I

R la E t l dn 3

1 1

E E A 1 t

it G r cra h V T R B 0 D uoM N s

m E

,e Ar Nc nt t

u o 2 1

E P

PW A C l

9 wap bCeM aon 1 9

/

n a n S V R CE TA R 8 r N w Dk, I U

T O o N mr r

a0 u4 G V C 1

/

x o t0 c0 r 1 1 O 5 t n a8 oN o 1 V S 0 DCY A e

mN mAcong D C4 y 0

P e

u O R Ac E B 1 1

V Y K a co CA d

t H rr 'c e

Me s B T T

D D O o R D 9 1 V

8 1 V

M 1 7 V m S yL T 6 1

n N E

V a

p M B

S T 5 1 m E N I V o CO I M M f o

C N T O 4 1 E A C V r R TS E B e E E 2 1

w F R S 3 V o E A N R E E e P L C g

a 1 2

e k

C I U L P V N

u D 1 1 D A E B T V WC A A S A E N o T L r 333 T A E o o 000- - -

O I

EQ C S c MMM T sT n DDD C N U uE i s AAA R wfP r c CCC T TC S uE ER N uS E 999 I

oS T 999 G cE L A

///

555 N oN D 000 I oU w ///

555 L

I tE A RO /

000 F u

r UE L #

R oTE V O RND oGE A

I E

R --- F O

E SF D M I

mLT AN N E RTE O oTD II C M sME oSS H P S A AAA D _

NI C 2 P Q NNN E _

MAW sRR 3

O H C

0 0

N S 2 A E H _

oTE H N 3 5

0 C 0 S C3 C pEH P s

C C O C C N 1 0 O A rHT 0 3 Y O NHC E C C C N N C T oTO 2 0 N R A 3 Y W GCC D, T N C D E 0 R R C A C R N DN A S CR G W GORS H S E _

T I B M R G ML U A E F

E AO T CE N 50 TOi RU W S

HC3 WWS W 1 S

C HHGCD OA M UR PO8 0 G E SO Y Y E Y i N WM P N RR R R I 4 D 0 R S O 0 N T 1

K S O T E C E R S _

h OC ST ST E T ins N 3 N N WCOA GS sE C C K Y Y TY NOA I

S M A R1 0 A E A

RN T FE AG RHA TC EL I  ! I EE EMMAE E MMC R

s u L

R H H A H H L

MG N E E U. ES TU ROMA CCMCC TC UM N I

K V R F H

I K S S I

S E S S A N B AAO N C O Y U N N 2 1 1-L P

Y C E NS N SP A N NSL SE E H N N N GM L S d 1 -

3 s T AWCC0CC E CJ CR CCY P J U  : 9- 3 1 1

K 0 1 8 4 0 7 5 7 4 5 4 0 8 9 9 r I

R 4 5 7 1

n8 9 1 6 8 9 1

1 3 8 0 0 3 7 5 n 6 6 6 R _

O 6 9 1 1 1 i 2 2 2 1 2 3 4 5 6 7 8 8 9 2 5 6 7 2 2 2 2 2 2 2 2 2 3 3 3 3 u 1 1

1 A _

R I

00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C L C L L C M E

P ) )

1 2 3

) )

4

)

5) 6) 7 8 9) 0 ) )

1

)

1 1

)

2 1

3) 1 1

)

4) 5 6 7 1

)

1

)

1 8) 1 h S. S S. R

E

L,

oou. ,

r]

[ g , Catawba Nudear Station m%% 4800 Concord Road t ' rN York, SC 29745

. (803) 831-3000 i

May 12,1999 i

RE: Catawba Nuclear Station Selected Licensee Commitments Manual Revision Date 5/5/99 Attached are revisions to the Catawba Nuclear Station Selected Licensee Commit.nents Manual.

Please remove and replace the following pages:

REMOVE INSERT LIST OF EFFECTIVE PAGES Page 2 of 8 (03/11/99) Page 2 of 8 (05/05/99) v Page 3 of 8 (01/16/99) Page 3 of 8 (05/05/99)

Page 4 of 8 (03/11/99) Page 4 of 8 (05/05/99)

Page 5 of 8 (03/11/99) Page 5 of 8 (05/05/99)

Page 8 of 8 (01/16/99) Page 8 of 8 (05/05/99)

TAB 16.7 i

Chapter 16.7-7, page 1 of 2 Chapter 16.7-7, page 1 of 2  ;

dated 01/16/99 dated 05/05/99 '

Chapter 16.7-8, page 2 of 2 Chapter 16.7-8, page 2 of 2 dated 01/16/99 dated 05/05/99 Chapter 16.8-1, page 1 of 49 Chapter 16.8-1, page 1 of 49 ,

dated 01/16/99 dated 05/05/99 '

Chapter 16.9-1, page 1 of 4 Chapter 16.9-1, page 1 of 4 Dated 1/16/99 dated 5/05/99 Chapter 16.9-1, page 2 of 4 Chapter 16.9-1, page 2 of 4 Dated 1/16/99 dated 5/05/99 ,

O

. Selected Licensee Commitm:nts Revision Date 5/5/99 Page Two Cliapter 16.9-3, page 1 of 4 Chapter 16.9-3, page 1 of 4 i dated 3/11/99 dated 5/05/99 l

Chapter 16.9-3, page 3 of 4 Chapter 16.9-3, page 3 of 4 dated 3/11/99 dated 5/05/99 Chapter 16.9-3, page 4 of 4 Chapter 16.9-3, page 4 of 4 dated 3/11/99 dated 5/05/99 l

1 Chapter 16.9-5, page 4 of 6 Chapter 16.9-5, page 4 of 6 dated 1/16/99 dated 5/05/99 l

Chapter 16.9-5, page 5 of 6 Chapter 16.9-5, page 5 of 6 dated 1/16/99 dated 5/05/99 l Chapter 16.9-6, page 10 of 11 Chapter 16.9-6, page 10 of1I i dated 3/11/99 dated 5/05/99 Chapter 16.9-12, page 3 of 3 Chapter 16.912, page 3 of 3 dated 1/16/99 dated 5/05/99 Chapter 16.13-1, page 1 of 2 Chapter 16.13-1, page 1 of 2 O dated 12/90 dated 5/05/99 Ifyou have any questions concerning the contents of this package update, contact Toni Pasour at (803) 831-3566.

Gary D. Gilbert Regulatory Compliance Manager O

. . CATAWBA NUCLEAR STATION SELECTED LICENSEE COMMITMENTS MANUAL

,Q List of Effective Pages V -

Tab 16.6 16.6-1 Page 1 of 1 01/16/99 16.6-2 Page 1 of 2 01/16/99  ;

16.6-2 Page 2 of 2 01/16/99 16.6-3 Page 1 of 2 01/16/99 16.6-3 Page 2 of 2 01/16/99 16.6-4 Page 1 of 2 01/16/99 16.6-4 Page 2 of 2 01/16/99 i Tab 16.7 16.7-1 Page 1 of 2 05/04/98 1 16.7-1 Page 2 of 2 05/04/98  !

16.7-2 Page 1 of 4 01/16/99 16.7-2 Page 2 of 4 01/16/99 16.7-2 Page 3 of 4 01/16/99 16.7-2 Page 4 of 4 01/16/99 16.7-3 Page 1 of 4 03/11/99  !

16.7-3 Page 2 of 4 03/11/99 l

16.7-3 Page 3 of 4 01/16/99 i 16.7-3 Page 4 of 4 01/16/99 I 16.7-4 Page 1 of 2 01/16/99 16.7-4 Page 2 of 2 01/16/99 16.7-5 Page 1 of 2 05/04/98 16.7-5 Page 2 of 2 05/04/98 16.7-6 Page 1 of 2 01/16/99 16.7-6 Page 2 of 2 01/16/99 16.7-7 Page 1 of 2 05/05/99 16.7-7 Page 2 of 2 01/16/99 16.7-8 Page 1 of 2 01/16/99 l 16.7-8 Page 2 of 2 05/05/99 '

16.7-9 Page 1 of 4 01/16/99 16.7-9 Page 2 of 4 01/16/99 16.7-9 Page 3 of 4 01/16/99 16.7-9 Page 4 of 4 01/16/99 16.7-10 Page 1 of 6 01/16/99 16.7-10 Page 2 of 6 01/16/99 16.7-10 Page 3 of 6 01/16/99 16.7-10 Page 4 of 6 01/16/99 16.7-10 Page 5 of 6 03/11/99 16.7-10 Page 6 of 6 01/16/99 16.7-11 Page 1 of 1 01/16/99 16.7-12 Page 1 of 2 01/16/99 t 16.7-12 Page 2 of 2 01/16/99 Page 2 of 8 05/05/99

CATAWBA NUCLEAR STATION SELECTED LICENSEE COMMITMENTS MANUAL

{

i List of Effective Pages i

Tab 16.8 16.8-1 Page 1 of 49 05/05/99 16.8-1 Page 2 of 49 01/16/99 16.8-1 Page 3 of 49 01/16/99

, 16.8-1 Page 4 of 49 05/04/98 16.8-1 Page 5 of 49 05/04/98 j 16.8-1 Page 6 of 49 05/04/98 16.8-1 Page 7 of 49 05/04/98 16.8-1 Page 8 of 49 05/04/98 16.8-1 Page 9 of 49 05/04/98 16.8-1 Page 10 of 49 05/04/98 16.8-1 Page 11 of 49 05/04/98 16.8-1 Page 12 of 49 05/04/98 '

16.'8-1 Page 13 of 49 05/04/98 16.8-1 Page 14 of 49 05/04/98 16.8-1 Page 15 of 49 05/04/98  !

16.8-1 Page 16 of 49 05/04/98 10.8-1 Page 17 of 49 05/04/98 16.8-1 Page 18 of 49 05/04/98 16.8-1 Page 19 of 49 05/04/98 O 16.8-1 Page 20 of 49 16.8-1 Page 21 of 49 05/04/98-05/04/98 l

j l

16.8-1 Page 22 of 49 05/04/98 '

16.8-1 Page 23 of 49 05/04/98 16.8-1 Page 24 of 49 05/04/98 16.8-1 Page 25 of 49 05/04/98 16.8-1 Page 26 of 49 05/04/98 16.8-1 Page 27 of 49 05/04/98 16.8-1 Page 28 of 49 05/04/98 16.8-1 Page 29 of 49 05/04/98 16.8-1 Page 30 of 49 05/04/98 16.8-1 Page 31 of 49 05/04/98 16.8-1 Page 32 of 49 05/04/98 l 16.8-1 Page 33 of 49 05/04/98 16.8-1 Page 34 of 49 05/04/98 i 16.8-1 Page 35 of 49 05/04/98 16.8-1 Page 36 of 49 05/04/98

.16.8-1 Page 37 of 49 05/04/98 l 16.8-1 Page 38 of 49 05/04/98 16.8-1 Page 39 of 49 05/04/98  !

16.8-1 Page 40 of 49 05/04/98  ;

16.8-1 Page 41 of 49 05/04/98  ;

16.8-1 Page 42 of 49 05/04/98 '

16.8-1 Page 43 of 49 05/04/98 Page 3 of 8 05/05/99 l

r l

, CATAWBA NUCLEAR STATION SELECTED LICENSEE COMMITMENTS MANUAL

!f] .

List of Effective Pages

(/ -

Ipb 16.8 (continued)

[ '16.8-1 Pago 44 of 49 05/04/98 l'

16.8-1 Page 45 of 49 05/04/98 16.8-1 Page 46 of 49 05/04/98 16.8-1 Page 47 of 49 05/04/98 16.8-1 Page 48 of 49 05/04/98 16.8-1 Page 49 of 49 05/04/98 16.8-2 Page 1 of 2 01/16/99 ,

16.8-2 Page 2 of 2 01/16/99 l 16.8-3 Page 1 of 2 01/15/97  ;

16.8-3 Page 2 of 2 01/15/97 1 16.8-4 Page 1 of 2 05/29/97 '

16.8-4 Page 2 of 2 05/29/97 16.8-5 Page 1 of 2 01/16/99 16.8-5 Page 2 of 2 01/16/99 Tab 16.9 16.9-1 Page 1 of 4 05/05/99 16.9-1 Page 2 of 4 05/05/99 16.9-1 Page 3 of 4 01/16/99 16.9-1 Page 4 of 4 01/16/99 16.9-2 Page 1 of 5 01/16/99 16.9-2 Page 2 of 5 01/16/99

! 16.9-2 Page 3 of 5 01/16/99 16.9-2 Page 4 of 5 01/16/99 16.9-2 Page 5 of 5 01/16/99 16.9-3 Page 1 of 4 05/05/99 16.9-3 Page 2 of 4 03/11/99 16.9-3 Page 3 of 4 05/05/99 16.9-3 Page 4 of 4 05/05/99 16.9-4 Page 1 of 5 01/16/99 16.9-4 Page 2 of 5 01/16/99 l 16.9-4 Page 3 of 5 01/16/99 16.9-4 Page 4 of 5 01/16/99 16.9-4 Page 5 of 5 01/16/99 16.9-5 Page 1 of 6 01/16/99 i 16.9-5 Page 2 of 6 01/16/99 16.9-5 Page 3 of 6 01/16/99 16.9-5 Page 4 of 6 05/05/99 16.9-5 Page 5 of 6 01/16/99 16.9-5 Page 6 of 6 01/16/99 16.9-6 Page 1 of 11 03/11/99 (O 16.9-6 Page 2 of 11 03/11/99

\ 16.9-6 Page 3 of 11 03/11/99 Page 4 of 8 05/05/99 L

7

, . CATAWBA NUCLEAR STATION SELECTED LICENSEE COMMITMENTS MANUAL O List of Effective Pages V .

Tab 16.9 (continued) 16.9-6 Page 4 of 11 03/11/99

-16.9-6 Page 5 of 11 03/11/99 16.9-6 Page 6 of 11 03/11/99 16.9-6 Page 7 of 11 03/11/99 16.9-6 Page 8 of 11 03/11/99 16.9-6 Page 9 of 11 03/11/99 16.9-6 Page 10 of 11 05/05/99 16.9-6 Page 11 of 11 03/11/99 16.9-7 Page 1 of 2 01/16/99 16.9-7 Page 2 of 2 01/16/99 16.9-8 Page 1 of 2 01/16/99 16.9-8 Page 2 of 2 01/16/99 16.9-9 Page 1 of 2 01/16/99 16.9-9 Page 2 of 2 01/16/99 16.9-10 Page 1 of 1 01/16/99 16.9-11 Page 1 of 3 01/16/99 16.9-11 Page 2 of 3 01/16/99 16.9-11 Page 3 of 3 01/16/99 16.9-12 Page 1 of 3 01/16/99 16.9-12 Page 2 of 3 01/16/99 16.9-12 Page 3 of 3 05/05/99 16.9-13 Page 1 of 11 04/22/99 16.9-13 Page 2 of 11 04/22/99 16.9-13 Page 3 of 11 04/22/99 16.9-13 Page 4 of 11 04/22/99 16.9-13 Page 5 of 11 04/22/99 16.9-13 Page 6 of 11 04/22/99 16.9-13 Page 7 of 11 04/22/99 16.9-13 Page 8 of 11 04/22/99 16.9-13 Page 9 of 11 04/22/99 16.9-13 Page 10 of 11 04/22/99 16.9-13 Page 11 of 11 04/22/99 16.9-14 Page 1 of 2 01/16/99 16.9-14 Page 2 of 2 01/16/99 16.9-15 Pago 1 of 1 l 01/16/99 16.9-16 Page 1 of 1 01/16/99 ,

16.9-17 Page 1 of 1 01/16/99 l 16.9-18 Page 1 of 1 01/16/99- l 16.9-19 Page 1 of 2 01/16/99  !

16.9-19 Page 2 of 2 01/16/99  !

16.9-20 Page 1 of 1 01/16/99 J O)

D 16.9-21 Page 1 of 1 16.9-22 Page 1 of 2 01/16/99 01/16/99 1

Page 5 of 8 05/05/99 !

l 1

I CATAWBA NUCLEAR STATION SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages Tab 16.11 (continued) 16.11-19 Page 2 of 2 01/16/99 16.11-20 Page 1 of 3 01/16/99 16.11-20 Page 2 of 3 01/16/99 16.11-20 Page 3 of 3 01/16/99 16.11-21 Page 1 of 2 01/16/99 16.11-21 Page 2 of 2 01/16/99 Tab 16.12 i

16.12-1 Page 1 of 2 01/16/99 16.12-1 Page 2 of 2 01/16/99 i Tab 16.13  !

16.13-1 Page 1 of 2 05/05/99 16.13-1 Page 2 of 2 12/90 16.13-2 Page 1 of 3 01/16/99 1 16.13-2 Page 2 of 3 01/16/99 16.13-2 Page 3 of 3 01/16/99

16.13-3 Page 1 of 2 01/16/99 16.13-3 Page 2 of 2 01/16/99 l

l l

Q l Page 8 of 8 05/05/99 l

1 I

p 16.7 INSTRUMENTATION 0 .

16.7-7 MOVABLE INCORE DETECTORS COMMITMENT:

The Movable Incore Detection system shall be OPERABLE with:

a. At least 75% of the detector thimbles,
b. A minimum of two detector thimbles per core quadrant, and
c. Sufficient movable detectors, drive, and readout equiprnent to map these thimbles.

APPLICABILITY:

When the Movable incore Detection System is used for:

a. Recalibration of the Excore Neutron Flux Detection System, or
b. Monitoring the QUADRANT POWER TILT RATIO, or
c. Measurement of F,s", and Fo(Z).

REMEDIAL ACTION:

With the Movable Incore Detection System inoperable, do not use the system for the above applicable monitoring or calibration functions.

TESTING REQUIREMENTS:

The Movable incore Detection System shall be demonstrated OPERABLE at least l once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by irradiating each detector used and determining the acceptability of its voltage curve for:

a. Recalibration of the Excore Neutron Flux Detection system, or
b. Monitoring the QUADRANT POWER TILT RATIO, or N
c. Measurement of F,s , and Fo(Z).

Chapter 16.7-7 Page 1 of 2 05/05/99

l -

l REMEDIAL ACTION (con't)

O .

the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. If the rate of rise is less than 0.5 feet per hour, comply with the requirements of REMEDIAL ACTIONS a., b., and c. above.

TESTING REQUIREMENTS:

, The groundwater level shall be determined at the following frequencies by monitoring the water level and by verifying the absence of alarm in the six groundwater monitor wells as shown in UFSAR Figure 2-60 installed around the perimeter of the Reactor and Auxiliary Buildings:

a. At least once per 7 days when the groundwater level is at or below the top of the adjacent floor slab, and
b. At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> when the groundwater level is above the top of the l adjacent floor slab.

REFERENCES:

1. Letter from NRC to Gary R. Peterson, Duke, issuance of Improved Technical Specifications Amendments for Catawba, September 30,1998.

BASES:

This COMMITMENT is provided to ensure that groundweter levels will be monitored and prevented from rising to unacceptable levels. High groundwater levels could result in unacceptable structural stresses in the Containment and/or Auxiliary Building due to uplift and hydrostatic forces during design basis events. Although i

these buildings have been statically analyzed to withstand soil pressure along with the uplift and hydrostatic forces resulting from groundwater rebound to yard elevation (593'6"),this analysis did not include any other loadings and was not a design condition for these buildings.

l l

O Chapter 16.7-8 Page 2 of 2 05/05/99 j

1 q

I l .

.19.A ELECTRICAL POWER SYSTEMS 16,A-1 CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES COMMITMENT:

Primary and backup containment penetration conduction overcurrent protective devices shown in Table 16.8-1 A'and 16.8-1B shall be operable. l APPLICABILITY:

MODES 1,2,3, and 4.

REMEDIAL ACTION:

' With one or more of the primaiy or backup containment penetration conductor overcurrent protective device (s) shown in Table 16.8-1 A and 16.8-1B inoperable:

l a. Restore the protective device (s) to OPERABLE status or de-energize the circuit (s) by tripping the associated backup circuit breaker or racking out or

, removing the inoperable circuit breaker within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, declare the affected system or component inoperable, and verify the backup circuit breaker to be tripped or the inoperable circuit breaker racked out or removed at least once per 7 days thereafter; the provisions of SLC 16.2.3 are not applicable to l overcurrent devices in circuits which have their backup circuit breakers tripped, their inoperable circuit breakers racked out, or removed, or I b. Be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD L SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

TESTING REQUIREMENTS: ,

The above noted primary and backup containment penetration conductor overcurrent protective devices shall be demonstrated OPERABLE:

a. At least once per 18 months: i
1) By verifying that the medium voltage (4-15 kV) circuit breakers are OPERABLE by selecting, on a rotating basis, at least 10% of the  !

circuit breakers of each voltage level, and performing the following:  !

O Chapter 16.8 Page 1 of 49 05/05/99 '

L-

Iga AUXILIARY SYSTEMS - FIRE PROTECTION SYSTEMS Iga-1 FIRE SUPPRESSION WATER SYSTEM COMMITMENT:

The Fire Suppression Water System shall be OPERABLE with:

a. At least two fire suppression pumps, each with a capacity of 2500 gpm, with their discharge aligned to the fire suppression header, and
b. An OPERABLE flow path capable of taking suction from Lake Wylie and transferring the water through distribution piping with OPERABLE sectionalizing control valves and isolation valves for each sprinkler, hose standpipe, or Spray System riser required to be OPERABLE per Commitments 16.9-2 and 16.9-4.

APPLICABILITY:

At all times.

REMEDIAL ACTION:

a. With one of the above required pumps and/or one Water Supply / Distribution System inoperable, restore the inoperable equipment to OPERABLE status within 7 days or provide an altemate backup pump or supply,
b. With the Fire Suppression Water System otherwise inoperable establish a backup Fire Suppression Water System within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

TESTING REQUIREMENTS:

a. The Fire Suppression Water System shall be demonstrated OPERABLE:
i. At least once per 10 days on a STAGGERED TEST BASIS by starting l each electric motor-driven pump and operating it for at least 15 minutes on recirculation flow, ii. By visual verification that each valve (manual, power-operated, or automatic) in the flow path, which is accessible during plant operations, is in the correct position. The frequency of the verification shall be determined by the performance based criteria stated in the Bases Section.

O Chapter 16.9-1 Page 1 of 4 05/05/99

l I

,- s TESTING REQUIREMENTS (con't)

I

)

lii. At least once per 6 months by performance of a system flush of the outside distribution loop to verify no flow blockage by fully opening the hydraulically most remote hydrant, iv. At least once per 12 months by cycling each testable valve in the flow l

path through at least one complete cycle of full travel,

v. At least once per 18 months by verifying that each valve (manual, power-operated, or automatic) in the flow path which is inaccessible i during plant operations is in its correct position, vi. At least once per 18 months by performing a system functional test l which includes simulated automatic actuation of the system throughout its operating sequence, and:
1) Verifying that each automatic valve in the flow path actuates to its correct position,
2) Verifying that each pump develops at least 2500 gpm at a net pressure of 144 psig by testing at three points on the pump performance curve, b,a 3) Cycling each valve in the flow path which is not testable during plant operation through at least one complete cycle of full travel, and  ;
4) Verifying that each fire suppression pump starts within 10 psig of its intended starting pressure (A pump, primary switch-95 psig; B pump, primary switch -90 psig; and C pump, primary switch-85 psig).  ;

i vii. At least once per 3 years by performing a flow test of the system in l l accordance with Chapter 8, Section 16 of the Fire Protection l Handbook,15th Edition, published by the National Fire Protection Association.

a

REFERENCES:

l 1) Catawba FSAR, Section 9.5.1

2) Catawba SER, Section 9.5.1
3) Catawba SER, Supplement 2, Section 9.5.1
4) Catawba SER, Supplement 3, Section 9.5.1 O}

8 l Chapter 16.9-1 Page 2 of 4 05/05/99 i

! I

l

. . 1 i . l

!n

'\ ) '

IRA AUXILIARY SYSTEMS - FIRE PROTECTION SYSTEMS l 1Ea-2 CO2 SYSTEMS COMMITMENT:

The following High Pressure and Low Pressure CO2 Systems shall be OPERABLE:

a. Low Pressure CO2 System - Diesel generator rooms, and
b. High Pressure CO2 System - Auxiliary feedwater pump rooms APPLICABILITY:

Whenever equipment protected by the Systems is required to be OPERABLE. l l

REMEDIAL ACTION: l l

a. With one or more of the Low Pressure CO2 System (Diesel Generator Rooms) inoperable, within one hour establish an hourly fire watch with backup fire suppression equipment as long as the fire barrier between the affected A and B train D/G rooms is intact. If the fire barrier between the affected A and B train D/G rooms is not intact or backup fire suppression equipment is not available, establish a continuous fire watch
b. With one or more of the High Pressure CO2 Systems (Aux. Feedwater Pump Rooms) inoperable, within one hour establish a continuous fire watch.

TESTING REQUIREMENTS:

l 1

a. Each of the above required CO2 Systems shall be demonstrated OPERABLE l by visual verification that each valve (manual, power operated, or automatic)  !

in the flow path is in the correct position.

The frequency of the verification shall be determined by the performance based criteria in the Bases Section.

l

b. Each of the above required Low Pressure CO2 Systems shall be l demonstrated OPERABLE:
i. At least once per 31 days by verifying the CO 2 storage tank level to be l greater than 44% of full capacity, and O

CHAPTER 16.9-3 Page 1 of 4 05/05/99 l

1 Q

I TESTING REQUIREMENTS (cont'd) v replace all non-restorable spot type heat detectors at least once every  !

15 years.

iv. At least once per 6 months by verifying the supervisory function of the alarm circuits operate properly and provide the correct alarm responses.

REFERENCES

1) Catawba FSAR, Section 9.5.1
2) Catawba SER, Section 9.5.1
3) Catawba SER, Supplement 3, Section 9.5.1 BASES:

The OPERABILITY of the Fire Suppression Systems ensures that adequate fire suppression capability is available to confine and extinguish fires occurring in any portion of the facility where safety-related equipment is located. The Fire Suppression System consists of the water system, spray, and/or sprinklers, CO2, '

f) v and fire hose stations. The collective capability of the Fire Suppression Systems is adequate to minimize potential damage to safety-related equipment and is a major element in the facility Fire Protection Program.

The proper positioning of RF/RY valves is critical to delivering fire suppression CO 2 at the fire source as quickly as possible. The option of increasing or decreasing the frequency of valve position verification allows the ability to optimize plant operational resources. Should an adverse trend develop with CO2 Systems valve positions, the ,

frequency of verification shall be increased. Similarly if the CO2Systems valve position trends are positive, the frequency of verification could be decreased.

Through programmed trending of CO2 Systems as found valve positions, the CO2 fire protection systems will be maintained at predetermined reliability standards.

The RF/RY System Engineer is responsible for trending and determining verification frequencies based on the following:

Initially the frequency will be monthly.

Annually review the results of the completed valve position verification procedures.

  • If the results demonstrates that the valves are found in the correct position at least 99% of the time, the frequency of conducting the valve position verification may be decreased from - monthly to quarterly or - quarterly to semiannually or -

g3 O

CHAPTER 16.9-3 Page 3 of 4 05/05/99 i

R&&gg (cont'd)

(

semiannually to annually - as applicable. The frequency shall not be extended beyond annually (plus grace period).'.

if the results demonstrates that the valves are not found in the correct position at least 99% of the time, the frequency of conducting the valve position verification shal! be increased from - annually to semiannually or - semiannually to quarterly or - quarterly to monthly - as applicable. . The valve position verification need not be conducted more often than monthly, in the event that portions of the Fire Suppression Systems are inoperable, attemate backup fire-fighting equipment is required to be made available in the affected areas until the inoperable equipment is restored to service. When the inoperable fire-fighting equipment is intended for use as a backup means of fire suppression,- a longer period of time is allowed to provide an attemate means of fire fighting than if the inoperable equipment is the primary means of fire suppression.

This Selected Licensee Commitment is part of the Catawba Fire Protection Program and therefore subject to the provisions of the Catawba Facility Operating License Conditions #6 for NPF-52 and #8 for NPF-35.

O V

O CHAPTER 16.9-3 Page 4 of 4 05/05/99

  1. q TABLE 16.9-4 j U ,

COMMITTED FIRE DOORS Elevation 543+0 AX217D 52-53, BB AX217F 51, AA-BB AX217G 52-53, BB i AX228A 56-57, EE AX228B 57-58, EE AX248 57-58, OO AX260B 61-62, BB-CC AX260F 62, AA-BB AX260G 61-62, BB-CC AX260H 61-62, BB-CC T527#1 52-43, BB-CC Elevation 5544 AX354A 55, DD-EE AX354B 59, DD-EE AX418 57, BB AX419 ' 57, DD-EE AX420A 59, DD-EE AX421A 55, DD EE S102A 53-54, AA Elevation 560+0 l AX352B 53, CC-DD i AX352C 53, CC-DD AX352D 46-47, BB-CC AX353B 45, AA-BB l l AX353C 45, AA-BB i AX393B 61, CC-DD AX393C 61, CC-DD l AX393D 67-68, BB-CC AX394B 69, AA-BB l l AX394C 69, AA-BB AX395 61, AA-BB AX396 53, AA-BB AX415 45-46, CC-DD AX416 68-69, CC-DD 4 AX417 57, 00 i l i

I l Chapter 16.9-5 Page 4 of 6 05/05/99 l 1

t

s TABLE 16.9-4 (v ..

COMMITTED FIRE DOORS Elevation 574+0 AX515 54, BB AX516 56-57, DD AX516A 57-58, DD AX516K 57, AA-BB AX517A 53-54, DD-EE AX517B 60-61, DD-EE AX517C 57, DD-EE AX517D 57, DD-EE AX517E 56-57, DD-EE AX518 60, BB S303A 54, AA S304A 60, AA Elevation 577+0 AX513B 53, CC-DD AX514B 45-46, AA-BB

.l AX517 57, EE AX525 55-56, OO AX525B 56, OO AXf26D 58, OO O

A314#3 61, CC-DD AX533C 61, CC DD AX534B 68-69, AA-BB AX535 l 61, AA-BB AX536 53, AA-BB AX656 53, CC-DD Chapter 16.9-5 Page 5 of 6 05/05/99

ll

_ 9 O. 1 1 1 1 e e ee e e e 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 9

/

5 0

/

5 t t t ooo o o o o t t t t te e e e e e e e e e e e t t t t 0

NNNN N N N o o o oo oo oo o o o t t t t t t t N NNNNNNNNNNN 1 1 1 1 1 1 1 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1 0 -

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 2 2 0 0 0 0 0 0 0 0 0 0 0 0 6 S 2 2 2 2 T / / / /

1 1 1 1 N

E 2 2 2 2 3 3 M 2 2 2 + + + + + +

/ / /

1 1 1 U 3 3 3 3 5 5 3 RT 2+ 2 + + 59 l5 2 9 9 9 6 6 3 3 0 0 0 5 5 0 0 0 0 5 5 0 6 l l5 l5 l5 5 + + + + + + + + + + + + + + +

i

9. S 3 3 3 E E E E E E5 5 1 3 4 9 9 4 1 3 4 9 9 4 6N 9 9 9 6 6 6 8 0 2 4 6 6 8 0 2 4 6 3 1

l5 l5 l5 le le I . . .

l. .

e le le el l5 l5 l5 l6 l6 6 I6 5 5 6 l6 l6 1 l. 5 E l6 6 LON O

l l I

EEE B B B B BBEEE EEEEE EEEE EEE l l l BT AC TE T 4 E 6- _

D N E N _

R I g g g g g g g F d d d d ld i -

l l l l d dl BBB BBBB _

r r r r r r r o o o o o o o _

t t t t t t c c c c c c c t -

a a a e e e '5

'5 3 2

'5 '5 1

a a e e a

e a

e RRR4 1 2 3 RRRR _

)

2 _

it _

n 1 U

( 1 .

f m o o

o 0 ABAB R 1 1 1 2 2 e g e it it it it 8CDA B C D n n n n r u

g 1

1 1 2 2 2 2 UUUU P a p p p p p p p d d d d P mmmmmmme u u u u u u u BBBB u ee e s s su s u s u us us s s u su us s o lo 6-PP P P P P P r lu lu u lu lu tu lu lu lu u lu u lu uP l l r r r

_ eeeen lt t nn nn nn nn nn nn nn nn nn nn nnuleu 9 CCCC N N C N FCi C i i FF Fi A AAAAAAAAAA AF lt lt NNNN l

n 6 1

r 0 1 2 3 4 5 6 7 8 9 0 a b cd ef ab cd 2 ef t e

8 8 8 8 8 8 8 828282828283 o

7 7 7 7 7 7 7 7 7 7 181 1 1 1 1 1 1 1 1 1 1 1 p

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 a h

C

4 BASES (con't) rninimum water volume at a minimum boron concentration, as presented in the CORE OPERATING LIMITS REPORT, is required from the boric acid storage tanks or the refueling water storage tank.

A minimum contained water volume and boron concentration, as presented in the CORE OPERATING LIMITS REPORT (COLR), is required to be available from the borated water sources in MODES 1,2,3, and 4. This volume is based on the required volume for maintaining SDM, unusable volume (to allow for a full suction pipe), instrument error, and additional margin for conservatism as follows:

Boric Acid Tank i

( Required Volume for Maintaining SDM presented in the COLR Additional Margin (Unit 1) 854 gallons Additional Margin (Unit 2) 1,303 gallons Unusable Volume (to maintain full suction pipe) 7,230 gallons 14" of water equivalent Vortexing (4" of water above top of suction pipe) 2,066 gallons Instrumentation Error (Based on Total Loop Acc. 1,550 gallons for 1 & 2 NV5740 loops) - 2" of water equivalent Refuelina Water Storace Tank Required Volume for Maintaining SDM presented in the COLR Unusable Volume (below nozzle) 13,442 gallons Instrument inaccuracy 11,307 gallons Vortexing 13,247 gallons Additional Margin 3,504 gallons The contained water volume limits include allowance for water not available because of discharge line location and other physical characteristics.

(3 V

Chapter 16.9-12 Page 3 of 3 05/05/99 l

r

.l If.H CONDUCT OF OPERATIONS 16.13-1 FIRE BRIGADE COMMITMENT:

A site Fire Brigade of at least five members shall be maintained onsite at all times.

The Fire Brigade shall not include three members of the minimum shift crew necessary for safety shutdown of the unit and any personnel required for other essential functions during a fire emergency.

APPLICABILITY:

At all times.

REMEDIAL ACTION:

With the Fire Brigade composition less than the minimum requirements for a period of time not to exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> in order to accommodate unexpected absence, take immediate action to fill the required positions.

TESTING PROCEDURES:

O 1. Operations Management Procedure 1-10 l

REFERENQgg;

1. Catawba FSAR, Chapter 13.2
2. Catawba SER, Section 9.5.1 and Appendix D
3. Catawba Fire Protection Review, as revised
4. Catawba Fire Protection Commitment index BASES:

The primary purpose of the Fire Brigade Training Program is to develop a group of station employees skilled in fire prevention, fire fighting techniques, first aid procedures, and emergency response. They are trained and equipped to function as a team for the fighting of fires. The station fire brigade organization is intended to be self sufficient with respect to fire fighting activities.

Chapter 16.13-1 Page 1 of 2 05/05/99

- - -