| #REDIRECT [[IR 05000413/1996016]]
| | {{Adams |
| | | number = ML20136B577 |
| | | issue date = 02/21/1997 |
| | | title = Forwards Insp Repts 50-413/96-16 & 50-414/96-19 on 961007, 961127, & 970206.Violation Noted Re Failure to Identify USQ & Seek Licenseamend.Concludes While Violation Did Occur, Enforcement Discretion Warranted & NOV Inappropriate |
| | | author name = Reyes L |
| | | author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| | | addressee name = Mccollum W |
| | | addressee affiliation = DUKE POWER CO. |
| | | docket = 05000413, 05000414 |
| | | license number = |
| | | contact person = |
| | | document report number = EA-96-404, NUDOCS 9703110033 |
| | | package number = ML20136B580 |
| | | document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE |
| | | page count = 3 |
| | }} |
| | See also: [[see also::IR 05000414/1996019]] |
| | |
| | =Text= |
| | {{#Wiki_filter:__ _ _ . _ ___ _ . . . _ _ _ _ . . .. .. _ |
| | , |
| | - |
| | . |
| | , |
| | , |
| | i \ |
| | ! |
| | February 21, 1997 ) |
| | EA 96-404 |
| | Duke Power Com)any |
| | ATTN: Mr, W. R. McCollum |
| | Site Vice President. |
| | Catawba Site l |
| | 4800 Concord Road |
| | York. South Carolina 29745-9635 |
| | . SUBJECT: EXERCISE OF ENFORCEMENT DISCRETION |
| | (NRC INSPECTION REPORT NOS. 50-413 AND 50-414/96-19) l |
| | Dear Mr. McCollum: |
| | This refers to an inspection conducted in the Region II office on Octob6r 7. |
| | 1996.' November 27, 1996, and February 6,1997, and to our letter dat6d . |
| | March 18, 1992. which forwarded Ins)ection Report 50-413, 414/92-01, and l |
| | included a Notice of Deviation for Juke Power Com)any's (DPC) failure to l |
| | implement commitments with regard to circuit breacer coordination as described |
| | in the Catawba Updated Final Safety Analysis Report (UFSAR). The purpose of |
| | j ' |
| | the inspection was to review issues and evaluate facts and circumstances i |
| | related to circuit breaker coordination for the 600-VAC essential Motor l |
| | Control Centers (MCCs) and the 125-VDC system at your Catawba facility. Our ; |
| | review of this issue is described in the enclosed inspection report. 1 |
| | By' letter dated December 29, 1994 DPC submitted an amendment to'the Catawba |
| | Nuclear Station, Units 1 and 2, UFSAR to the NRC for formal review. DPC's |
| | safety evaluation for the UFSAR update concluded that no Unreviewed Safety |
| | Ouestion (US0) existed with regard to circuit breaker coordination. |
| | Notwithstanding DPC's evaluation. the NRC identified a USQ related to the |
| | circuit breaker protection for the 600-VAC essential MCCs and the 125-VDC |
| | systems. DPC was notified of the USO by letter dated September 17. 1996. As |
| | a result.'DPC submitted an operating license amendment on Seatember 21, 1996. |
| | The NRC approved the September 21, 1996. amendment on Septem)er 28. 1996. The |
| | amendment clarified the statement regarding conformance to IEEE 308-1974, |
| | noting the exceptions on the 600 VAC MCCs and the 125 VDC systems. |
| | Based on the information develo)ed during the inspection, the NRC has |
| | determined that a violation of 1RC requirements occurred. The failure to |
| | identify a USQ and seek a license amendment, in accordance with 10 CFR 50.59. |
| | is. generally categorized as a Severity Level III violation in accordance with |
| | l' the " General Statement of Policy and Procedures for Enforcement Actions" |
| | (Enforcement Policy). NUREG-1600. However, as provided in Section VII.B.6 of |
| | the Enforcement Policy, the NRC may refrain from issuing a Notice of Violation |
| | (Notice) and proposing a civil penalty for a Severity Level III violation |
| | - |
| | which involves special circumstances. ; |
| | , |
| | i After review of this violation and consultation with the Director. Office of |
| | 4 Enforcement, the NRC has concluded that while a violation did occur. |
| | , enforcement discretion is warranted and that issuance of a Notice is not |
| | ' |
| | appropriate in this case. me specific bases for the decision to exercise i |
| | ;Te2188827J88811a |
| | O PDR |
| | 8.8888pp.assa N I |
| | L - , .. -. - - - . |
| | |
| | . - . - - , . .. .- |
| | - |
| | . |
| | , |
| | . |
| | / DPC 2 |
| | enforcement discretion are: 1) although an error did exist in your safety |
| | evaluation i.e. you concluded that no USQ existed, you did complete a safety |
| | evaluation of circuit breaker coordination in response to the 1992 Notice of |
| | Deviation and you voluntarily submitted changes to the Catawba Nuclear |
| | Station. Units 1 and 2. UFSAR to the NRC for formal review in your letter 4 |
| | dated December 29. 1994: 2) the NRC review of your December 29, 1994, letter l |
| | took almost two years and you were not notified of the USQ issue until l |
| | ' |
| | September 17, 1996: 3) you implemented prompt and appropriate corrective i |
| | action when the violation was identified including delay of restart of the I |
| | 4 |
| | ' |
| | Catawba units as necessary, and submittal of an operating license amendment l |
| | ! |
| | on September 21,1996; and 4) you have provided guidance to your staff to ! |
| | ' |
| | increase their level of awareness to 10 CFR 50.59 issues and instituted a I |
| | policy for management review of potential US0s. 1 |
| | This letter serves to document the closure of the apparent violation and |
| | completes NRC action in this matter. No formal response to this letter is |
| | ; required. In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice." a l |
| | copy of this letter will be placed in the NRC Public Document Room. l |
| | If you should have any questions regarding this letter, please contact |
| | Mr. Charles Casto, Chief, Branch 1. Division of Reactor Projects, at |
| | > |
| | 404-331-5506. |
| | l |
| | Sincerely. |
| | i |
| | Original Signed by ' |
| | L. A. Reyes |
| | Luis A Reyes l |
| | 4 |
| | Regional Administrator |
| | Docket Nos. 50-413 and 50-414 i |
| | : License Nos. NPF-35 and NPF-52 l |
| | i |
| | Enclosure: Inspection Report Nos. 50-413 and 50-414/96-19 l |
| | 1 , |
| | cc w/ encl: ! |
| | ' |
| | M. S. Kitlan |
| | Regulatory Compliance Manager |
| | Duke Power Company ; |
| | 4800 Concord Road |
| | York, SC 29745-9635 |
| | Paul R. Newton i |
| | Legal Department (PB05E) |
| | Duke Power Company |
| | 422 South Church Street j |
| | Charlotte, NC 28242-0001 9 |
| | cc: Continued on Page 3 i |
| | ! |
| | I |
| | |
| | _. _ _ |
| | * |
| | . |
| | ' |
| | , .' |
| | J |
| | - |
| | DPC 4 |
| | Distribution'w/ encl: |
| | J. Lieberman. OE |
| | C. Casto. RII |
| | P. Tam, NRR |
| | R. Carroll. RII |
| | L. Wert. RII |
| | B. Uryc. RII |
| | R. Moore. RII |
| | G. Hallstrom. RII- |
| | OE:EA (BSummers)(2) |
| | PUBLIC |
| | NRC Resident Inspector |
| | U.S. Nuclear Regulatory Commission |
| | 4830 Concord Road |
| | York. SC 29745 |
| | . |
| | -m |
| | SEND TO PUBLIC DOCUMENT ROOM? , (YES) / |
| | OFFICE Ril:DRS Ril:DK RTl:DK Ril:0RA Ril:jlCS yll:0RA OE/ |
| | SIGNATURE / NW / |
| | NAME CCab JJau on JJ son CE Mer ff JLieberman |
| | DATE VJ1/ V'/97 0 j1//97 GP/ TD97 Ol/g97 hffy97 01/ % 01/ 6 /97 |
| | COPY? tf$ NO (fES) NO (YEfp NO YES QLQ) YES NO YES NO \(YES) NO . |
| | 7 FFICIAL RECORD COPi W CUMENT 9AME: H:\1960 PEN.ENF\96404 CAT.D..R\ FINAL.RV2 " f |
| | }} |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217F8231999-10-13013 October 1999 Informs That on 990930,NRC Completed mid-cycle PPR of Catawba Nuclear Station.Based on Review,Nrc Did Not Identify Any New Areas That Warranted More than Core Insp Program Over Next Five Months.Historical Listing of Issues,Encl ML20217H0041999-10-13013 October 1999 Forwards MOR for Sept 1999 & Revised MOR for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217F1301999-10-0707 October 1999 Forwards Rev 1 to Request for Relief 99-03 from Requirements of ASME B&PV Code,In Order to Seek Relief from Performing Individual Valve Testing for Certain Valves in DG Starting (Vg) Sys ML20212J3011999-10-0101 October 1999 Forwards Exemption from Certain Requirements of 10CFR54.17(c) Re Schedule for Submitting Application for Operating License Renewal.Se Also Encl ML20217K2651999-10-0101 October 1999 Forwards Retake Exams Repts 50-413/99-302 & 50-414/99-302 on 990921-23.Two of Three ROs & One SRO Who Received Administrative Section of Exam Passed Retake Exam, Representing 75 Percent Pass Rate 05000414/LER-1999-004, Forwards LER 99-004-01,providing Correction to Info Previously Provided in Rev 0 of Rept.Planned Corrective Actions Contain Commitments1999-09-27027 September 1999 Forwards LER 99-004-01,providing Correction to Info Previously Provided in Rev 0 of Rept.Planned Corrective Actions Contain Commitments 05000413/LER-1999-015, Forwards LER 99-015-00 Re Inoperability of Auxiliary Bldg Ventilation Sys That Exceeded TS Limits Due to Improperly Positioned Vortex Damper.Commitments Are Contained in Corrective Actions Section of Encl Rept1999-09-27027 September 1999 Forwards LER 99-015-00 Re Inoperability of Auxiliary Bldg Ventilation Sys That Exceeded TS Limits Due to Improperly Positioned Vortex Damper.Commitments Are Contained in Corrective Actions Section of Encl Rept ML20217A7911999-09-24024 September 1999 Forwards Insp Repts 50-413/99-05 & 50-414/99-05 on 990718- 0828 at Catawba Facility.Nine NCVs Identified Involving Inadequate Corrective Actions Associated with Degraded Svc Water Supply Piping to Auxiliary Feedwater Sys ML20212E6471999-09-24024 September 1999 Discusses GL 98-01 Issued by NRC on 980511 & DPC Responses for Catawba NPP & 990615.Informs That NRC Reviewed Response for Catawba & Concluded That All Requested Info Provided.Considers GL 98-01 to Be Closed for Catawba ML20212F0941999-09-21021 September 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals for Cns,Units 1 & 2 ML20212M2001999-09-20020 September 1999 Confirms 990913 Telcon Between M Purser & R Carroll Re Management Meeting to Be Conducted on 991026 in Atlanta,Ga to Discuss Operator Licensing Issues 05000414/LER-1999-005, Forwards LER 99-005-00 Re Missed EDG TS Surveillance Concerning Verification of Availability of Offsite Power Sources Resulted from Defective Procedure.Planned Corrective Actions Stated in Rept Represent Regulatory Commitments1999-09-20020 September 1999 Forwards LER 99-005-00 Re Missed EDG TS Surveillance Concerning Verification of Availability of Offsite Power Sources Resulted from Defective Procedure.Planned Corrective Actions Stated in Rept Represent Regulatory Commitments ML20212D5321999-09-15015 September 1999 Informs That Duke Energy Corp Agrees to Restrict Max Fuel Rod Average Burnup to 60,000 Mwd/Mtu,In Order to Support NRC Final Approval & Issuance of Requested Amend ML20212B4641999-09-14014 September 1999 Forwards Monthly Operating Repts for Aug 1999 & Revised Monthly Operating Rept for Catawba Nuclear Station,Units 1 & 2 ML20212A4131999-09-14014 September 1999 Informs That TR DPC-NE-2009P Submitted in 990817 Affidavit, Marked Proprietary,Will Be Withheld from Public Disclosure, Pursuant to 10CFR2.709(b) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20212M1931999-09-13013 September 1999 Refers to 990909 Meeting Conducted at Region II Office Re Presentation of Licensee self-assessment of Catawba Nuclear Station Performance.List of Attendees & Licensee Presentation Handout Encl ML20212A3751999-09-10010 September 1999 Informs That Postponing Implementation of New Conditions Improved by RG 1.147,rev 12,acceptable Since Evaluation on Relief Based on Implementation Code Case for Duration of Insp Interval ML20212A5191999-09-0808 September 1999 Requests NRC Approval for Relief from Requirements of ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,App VI,VI-2430(c) & 2440(b).Approval of 99-GO-002 Is Requested by 000301 05000413/LER-1999-014, Forwards LER 99-014-00, Missed Surveillance & Operation Prohibited by TS Occurred as Result of Defective Procedures or Program & Inappropriate TS Requirements. Planned Corrective Action Stated in Rept Represents Commitment1999-09-0101 September 1999 Forwards LER 99-014-00, Missed Surveillance & Operation Prohibited by TS Occurred as Result of Defective Procedures or Program & Inappropriate TS Requirements. Planned Corrective Action Stated in Rept Represents Commitment 05000414/LER-1999-003, Forwards LER 99-003-01, Unplanned Actuation of ESFAS Due to a SG High Level Caused by Inadequate Procedural Guidance. Suppl Rept Provides Info Re Root Cause & Corrective Actions Associated with Event Developed Subsequent to Rev1999-08-31031 August 1999 Forwards LER 99-003-01, Unplanned Actuation of ESFAS Due to a SG High Level Caused by Inadequate Procedural Guidance. Suppl Rept Provides Info Re Root Cause & Corrective Actions Associated with Event Developed Subsequent to Rev 0 of LER ML20211H1741999-08-30030 August 1999 Forwards Comments on Catawba Nuclear Station Units 1 & 2 & McGuire Nuclear Station,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid.Ltr Dtd 990107,rept ATI-98-012-T005 & Partial marked-up Rept WCAP-14995 Encl ML20211M4451999-08-30030 August 1999 Forwards Summary of Util Conclusions Re Outstanding Compliance Issue Re Staff Interpretation of TS SR 3.0.1,per Insp Repts 50-369/99-03 & 50-370/99-03,as Discussed with NRC During 990618 Meeting 05000413/LER-1999-013, Forwards LER 99-013-00,re RHR Heat Exchanger Bypass Valves Not Verified Per TS Surveillance.Surveillance Procedures Have Been Revised & There Are No Further Planned Corrective Actions or Commitments in LER1999-08-25025 August 1999 Forwards LER 99-013-00,re RHR Heat Exchanger Bypass Valves Not Verified Per TS Surveillance.Surveillance Procedures Have Been Revised & There Are No Further Planned Corrective Actions or Commitments in LER ML20211M8191999-08-25025 August 1999 Confirms 990825 Telcon Between G Gilbert & R Carroll Re Mgt Meeting to Be Held on 990909 in Atlanta,Ga,To Allow Licensee to Present self-assessment of Catawba Nuclear Station Performance ML20211A9641999-08-20020 August 1999 Forwards SE Authorizing Licensee 990118 Request for Approval of Proposed Relief from Volumetric Exam Requirements of ASME B&PV Code,Section XI for Plant,Units 2 ML20211C1191999-08-18018 August 1999 Forwards ISI Rept Unit 1 Catawba 1999 RFO 11, Providing Results of ISI Effort Associated with End of Cycle 11 ML20211B9471999-08-18018 August 1999 Forwards Request for Relief 99-02,associated with Limited Exam Results for Welds Which Were Inspected During Unit 1 End of Cycle 11 RFO ML20211C3651999-08-17017 August 1999 Forwards Rev 25 to Catawba Nuclear Station Units 1 & 2 Pump & Valve Inservice Testing Program, Which Includes Reformatting of Manual & Addl Changes as Noted in Attached Summary of Changes ML20211F2971999-08-17017 August 1999 Forwards non-proprietary & Proprietary Updated Pages for DPC-NE-2009,submitted 980722.Pages Modify Fuel Design & thermal-hydraulic Analysis Sections of DPC-NE-2009. Proprietary Page 2-4 Withheld,Per 10CFR2.790 05000413/LER-1999-011, Forwards LER 99-011-00,re Missed Surveillance on Both Trains of CR Area Ventilation Sys Resulting in TS Violation.Planned Corrective Actions Stated in LER Represent Regulatory Commitment1999-08-16016 August 1999 Forwards LER 99-011-00,re Missed Surveillance on Both Trains of CR Area Ventilation Sys Resulting in TS Violation.Planned Corrective Actions Stated in LER Represent Regulatory Commitment ML20211B1121999-08-16016 August 1999 Forwards Topical Rept DPC-NE-2012, Dynamic Rod Worth Measurement Using Casmo/Simulate, Describing Results of Six Drwm Benchmark Cycles at Catawba & McGuire & Discusses Qualification to Use Drwm at Catawba & McGuire ML20210V0321999-08-13013 August 1999 Forwards Insp Repts 50-413/99-04 & 50-414/99-04 on 990606- 0717.Six Violations of NRC Requirements Identified & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20210S2751999-08-12012 August 1999 Forwards Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2.Revised Rept for June 1999,encl ML20210Q3751999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Authorized Representative of Facility Must Submit Ltr as Listed,Thirty Days Before Exam Date,In Order to Register Individuals for Exam ML20210N9521999-08-0404 August 1999 Forwards Changes to Catawba Nuclear Station Selected Licensee Commitments Manual.Documents Constitutes Chapter 16 of Ufsar.With List of Effective Pages IR 05000413/19980131999-08-0202 August 1999 Discusses Integrated Insp Repts 50-413/98-13,50-414/98-13, 50-413/98-16,50-414/98-16 & NRC Special Repts 50/413/99-11 & 50-414/99-11 Conducted Between Aug 1998 & May 1999.Six Violations Occurred,Based on OI Investigation & Insp ML20210M6411999-07-29029 July 1999 Forwards Request for Relief 99-03 from Requirements of ASME Boiler & Pressure Vessel Code,In Order to Seek Relief from Performing Individual Valve Testing for Certain Valves in DG Starting Air (Vg) Sys 05000413/LER-1999-010, Forwards LER 99-010-01 Which Replaces LER 99-002.Rept Number Has Been Changed in Order to Conform to Numbering Convention Specified in NUREG-1022,since Primary Event Involved Both Units1999-07-22022 July 1999 Forwards LER 99-010-01 Which Replaces LER 99-002.Rept Number Has Been Changed in Order to Conform to Numbering Convention Specified in NUREG-1022,since Primary Event Involved Both Units IR 05000413/19990101999-07-22022 July 1999 Discusses Insp Rept 50-413/99-10 & 50-414/99-10 on 990314- 0424 & Forwards Notice of Violation Re Failure to Comply with TS 3.7.13,when Misalignment of Two Electrical Breakers Rendered SSS Inoperable from 981216-29 ML20217G5241999-07-20020 July 1999 Forwards Exam Repts 50-413/99-301 & 50-414/99-301 on 990524- 27,0603,07-10 & 16.Of Fourteen SRO & RO Applicants Who Received Written Exams & Operating Tests,Eight Applicants Passed & Six Failed Exam 05000413/LER-1999-009, Forwards LER 99-009-00,re Inoperability of Containment Valve Injection Water Sys Valve in Excess of TS Limits.Root Cause & Corrective Actions Associated with Event Are Being Finalized & Will Be Provided in Supplement to Rept1999-07-19019 July 1999 Forwards LER 99-009-00,re Inoperability of Containment Valve Injection Water Sys Valve in Excess of TS Limits.Root Cause & Corrective Actions Associated with Event Are Being Finalized & Will Be Provided in Supplement to Rept 05000414/LER-1999-001, Forwards LER 99-001-01 Re Unanalyzed Condition Associated with Relay Failure in Auxiliary Feedwater Sys,Due to Inadequate Single Failure Analysis.Rev Is Being Submitted to Include Results of Failure Analysis Which Was Performed1999-07-15015 July 1999 Forwards LER 99-001-01 Re Unanalyzed Condition Associated with Relay Failure in Auxiliary Feedwater Sys,Due to Inadequate Single Failure Analysis.Rev Is Being Submitted to Include Results of Failure Analysis Which Was Performed ML20209H4431999-07-14014 July 1999 Forwards Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2.Revised Rept for May 1999 on Unit Shutdowns Also Encl ML20210A5771999-07-14014 July 1999 Forwards Revsied Catawba Nuclear Station Selected Licensee Commitments Manual, Per 10CFR50.71(e),changing Sections 16.7-5,16.8-5,16.9-1,16.9-3,16.9-5 & 16.11-7.Manual Constitute Chapter 16 of UFSAR ML20216D3941999-07-14014 July 1999 Forwards Revs to Catawba Nuclear Station Selected Licensee Commitments Manual NUREG-1431, Forwards SER Agreeing with Util General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation1999-07-0909 July 1999 Forwards SER Agreeing with Util General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation ML20196L0371999-07-0808 July 1999 Approves Requested Schedule Change of Current two-year Requalification Examinations to non-outage dates.Two-year Cycle Will Start on 991001 & Will End on 020930 05000413/LER-1999-008, Forwards LER 99-008-00,re Operation Prohibited by TS 3.5.2. Rev to LER Will Be Submitted by 990812 Which Will Include All Required Info About Ventilation Sys Pressure Boundry Breach1999-07-0808 July 1999 Forwards LER 99-008-00,re Operation Prohibited by TS 3.5.2. Rev to LER Will Be Submitted by 990812 Which Will Include All Required Info About Ventilation Sys Pressure Boundry Breach ML20196J9001999-07-0606 July 1999 Informs That 990520 Submittal of Rept DPC-NE-3004-PA,Rev 1, Mass & Energy Release & Containment Response Methodology, Marked Proprietary Will Be Withheld Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 IR 05000413/19990031999-07-0101 July 1999 Discusses Insp Repts 50-413/99-03 & 50-414/99-03 Completed on 990605 & Transmitted by Ltr .Results of Delibrations for Violation Re Discovery of Potentially More Limiting Single Failure Affecting SGTS Analysis Provided 1999-09-08
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217F8231999-10-13013 October 1999 Informs That on 990930,NRC Completed mid-cycle PPR of Catawba Nuclear Station.Based on Review,Nrc Did Not Identify Any New Areas That Warranted More than Core Insp Program Over Next Five Months.Historical Listing of Issues,Encl ML20217K2651999-10-0101 October 1999 Forwards Retake Exams Repts 50-413/99-302 & 50-414/99-302 on 990921-23.Two of Three ROs & One SRO Who Received Administrative Section of Exam Passed Retake Exam, Representing 75 Percent Pass Rate ML20212J3011999-10-0101 October 1999 Forwards Exemption from Certain Requirements of 10CFR54.17(c) Re Schedule for Submitting Application for Operating License Renewal.Se Also Encl ML20212E6471999-09-24024 September 1999 Discusses GL 98-01 Issued by NRC on 980511 & DPC Responses for Catawba NPP & 990615.Informs That NRC Reviewed Response for Catawba & Concluded That All Requested Info Provided.Considers GL 98-01 to Be Closed for Catawba ML20217A7911999-09-24024 September 1999 Forwards Insp Repts 50-413/99-05 & 50-414/99-05 on 990718- 0828 at Catawba Facility.Nine NCVs Identified Involving Inadequate Corrective Actions Associated with Degraded Svc Water Supply Piping to Auxiliary Feedwater Sys ML20212F0941999-09-21021 September 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals for Cns,Units 1 & 2 ML20212M2001999-09-20020 September 1999 Confirms 990913 Telcon Between M Purser & R Carroll Re Management Meeting to Be Conducted on 991026 in Atlanta,Ga to Discuss Operator Licensing Issues ML20212A4131999-09-14014 September 1999 Informs That TR DPC-NE-2009P Submitted in 990817 Affidavit, Marked Proprietary,Will Be Withheld from Public Disclosure, Pursuant to 10CFR2.709(b) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20212M1931999-09-13013 September 1999 Refers to 990909 Meeting Conducted at Region II Office Re Presentation of Licensee self-assessment of Catawba Nuclear Station Performance.List of Attendees & Licensee Presentation Handout Encl ML20212A3751999-09-10010 September 1999 Informs That Postponing Implementation of New Conditions Improved by RG 1.147,rev 12,acceptable Since Evaluation on Relief Based on Implementation Code Case for Duration of Insp Interval ML20211M8191999-08-25025 August 1999 Confirms 990825 Telcon Between G Gilbert & R Carroll Re Mgt Meeting to Be Held on 990909 in Atlanta,Ga,To Allow Licensee to Present self-assessment of Catawba Nuclear Station Performance ML20211A9641999-08-20020 August 1999 Forwards SE Authorizing Licensee 990118 Request for Approval of Proposed Relief from Volumetric Exam Requirements of ASME B&PV Code,Section XI for Plant,Units 2 ML20210V0321999-08-13013 August 1999 Forwards Insp Repts 50-413/99-04 & 50-414/99-04 on 990606- 0717.Six Violations of NRC Requirements Identified & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20210Q3751999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Authorized Representative of Facility Must Submit Ltr as Listed,Thirty Days Before Exam Date,In Order to Register Individuals for Exam IR 05000413/19980131999-08-0202 August 1999 Discusses Integrated Insp Repts 50-413/98-13,50-414/98-13, 50-413/98-16,50-414/98-16 & NRC Special Repts 50/413/99-11 & 50-414/99-11 Conducted Between Aug 1998 & May 1999.Six Violations Occurred,Based on OI Investigation & Insp IR 05000413/19990101999-07-22022 July 1999 Discusses Insp Rept 50-413/99-10 & 50-414/99-10 on 990314- 0424 & Forwards Notice of Violation Re Failure to Comply with TS 3.7.13,when Misalignment of Two Electrical Breakers Rendered SSS Inoperable from 981216-29 ML20217G5241999-07-20020 July 1999 Forwards Exam Repts 50-413/99-301 & 50-414/99-301 on 990524- 27,0603,07-10 & 16.Of Fourteen SRO & RO Applicants Who Received Written Exams & Operating Tests,Eight Applicants Passed & Six Failed Exam NUREG-1431, Forwards SER Agreeing with Util General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation1999-07-0909 July 1999 Forwards SER Agreeing with Util General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation ML20196L0371999-07-0808 July 1999 Approves Requested Schedule Change of Current two-year Requalification Examinations to non-outage dates.Two-year Cycle Will Start on 991001 & Will End on 020930 ML20196J9001999-07-0606 July 1999 Informs That 990520 Submittal of Rept DPC-NE-3004-PA,Rev 1, Mass & Energy Release & Containment Response Methodology, Marked Proprietary Will Be Withheld Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 IR 05000413/19990031999-07-0101 July 1999 Discusses Insp Repts 50-413/99-03 & 50-414/99-03 Completed on 990605 & Transmitted by Ltr .Results of Delibrations for Violation Re Discovery of Potentially More Limiting Single Failure Affecting SGTS Analysis Provided ML20209E2701999-07-0101 July 1999 Forwards Insp Repts 50-413/99-03 & 50-414/99-03 on 990425- 0605.Six Violations of NRC Requirements Occurred & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20209E3931999-06-28028 June 1999 Informs of 990618 Meeting Conducted at Facility to Present Results of Most Recent Periodic Plant Performance Review for Plant.List of Attendees Encl ML20196G8861999-06-24024 June 1999 Discusses GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structrual Integrity 950816 & 960729 Responses.Rvid,Version 2 Released as Result of Review.Rvid Should Be Reviewed & Comments Should Be Received by 990901 If Not Acceptable for Plant ML20196G6541999-06-17017 June 1999 Confirms 990614 Telephone Conversation Re Rescheduling of Two Predecisional Enforcement Conferences Originally Scheduled for 990623.SSS Conference Rescheduled for 990712 & Ice Condenser Conference Rescheduled for 990720 ML20196A5781999-06-14014 June 1999 Discusses Notice of Enforcement Discretion for Duke Energy Corp Re Catawba Nuclear Station Unit 1 TSs 3.5.2 & 3.7.12 ML20195E9171999-06-0303 June 1999 Confirms Conversation with Bradshaw on 990526 Re Rescheduling 990607 Predecisional Enforcement Conference to Discuss Apparent Violation in Insp Repts 50-413/99-10 & 50-414/99-10.Conference Will Be on 990623 in Atlanta,Ga ML20195F4141999-06-0202 June 1999 Forwards Insp Repts 50-413/99-11 & 50-414/99-11 on 990422-23 & 0503.Apparent Violation Identified & Being Considered for Escalated Enforcement Action.Violation Involved Failure to Maintain Unit 1 Ice Condenser Lower Inlet Door Operable ML20207D0671999-05-20020 May 1999 Informs That During Meeting on 990512,arrangements Modified for Administration of Licensing Exams at Catawba Nuclear Station During Weeks of 990524 & 0607,respectively ML20207C8721999-05-20020 May 1999 Forwards Insp Repts 50-413/99-02 & 50-414/99-02 on 990314-0424.Three Violations Occurred & Being Treated as non-cited Violations.Activities Generally Characterized by Safety Conscious Operations & Sound Engineering & Maint ML20207C8061999-05-19019 May 1999 Confirms 990510 Telcon with R Jones Re Predecisional Enforcement Conference Requested by NRC & Scheduled for 990607 in Atlanta,Ga to Discuss Apparent Violation Associated with Potential Inoperability of SSS ML20207C7761999-05-19019 May 1999 Informs That on 990618,NRC Will Meet with Mgt of Duke Energy Corp to Discuss Performance of Catawba Facility & Extends Invitation to Attend Meeting as Observer ML20206P4911999-05-14014 May 1999 Forwards Safety Evaluation Accepting GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20206M4201999-05-11011 May 1999 Informs That NRC Ofc of Nuclear Regulation (NRR) Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt (DLPM) Created.Reorganization Chart Encl ML20206U4091999-05-10010 May 1999 Forwards Insp Repts 50-413/99-10 & 50-414/99-10 on 990314-0424.One Violation Occurred & Being Considered for Escalated Enforcement Action Involving Inoperability of Standby Shutdown Sys from 981216-29 ML20206N4191999-05-0606 May 1999 Informs That Team Will Inspect Dam at Standby Nuclear Service Water Pond on 990609.Purpose of Insp Will Be to Confirm That Structure Conforms with Design Documents & Capability of Performing Design Functions ML20205S5491999-04-21021 April 1999 Forwards SE Discussing DPC Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions. Response Acceptable ML20206B7941999-04-16016 April 1999 Confirms 990331 Telcon Between M Purser of Util & R Franovich of NRC Re Public Meeting Scheduled for 990618 in York,Sc to Discuss Results of NRC Recent Plant Performance Review for Catawba Nuclear Station ML20205N3471999-04-12012 April 1999 Forwards Safety Evaluation & Eri/Nrc 95-506, Technical Evaluation Rept on Submittal Only Review of IPE of External Events at Catawba Nuclear Station,Units 1 & 2 ML20205T3491999-04-0909 April 1999 Informs That on 990317,T Beedle & Ho Christensen Confirmed Initial Operator Licensing Exam Schedule for Catawba Nuclear Station for Y2K.No Y2K Exam Scheduled.Initial Exam Requested for Apr 2001 for Approx 18 Candidates ML20205N0531999-04-0606 April 1999 Forwards Insp Repts 50-413/99-01 & 50-414/99-01 on 990124-0313.DPC Conduct of Activities at Catawba Facility Generally Characterized by Safety Conscious Operations & Sound Engineering.Five Violations Noted & Treated as NCVs ML20196K9961999-03-30030 March 1999 Forwards Synopsis of NRC OI Completed Rept Re Alleged Compromise of Initial Licensed Operator Exam at Cns.Oi Did Not Substantiate Allegation That Initial Operator Exam Compromised.Plans No Further Action Re Matter ML20205M2651999-03-25025 March 1999 Discusses PPR Completed 990201.Advises of Planned Insp Effort Resulting from Catawba PPR Review.Forwards Plant Issues Matrix & Insp Plan ML20207L7741999-03-15015 March 1999 Requests That NRC Exercise Discretion Not to Enforce Compliance with Actions Required by Plant,Units 1 & 2 Re TS Limiting Conditions for Operation 3.3.7 & 3.3.8 ML20207M9091999-03-0505 March 1999 Informs That Info Submitted by Application, Marked as Proprietary Will Be Withheld from Public Disclosure Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended ML20207A5821999-02-17017 February 1999 Forwards Insp Repts 50-413/98-12 & 50-414/98-12 & Notice of Violation.One Violation Being Considered for Escalated Enforcement Action ML20203G5161999-02-0505 February 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 990407. Representative of Facility Must Submit Either Ltr Indicating No Candidates or Listing of Candidates for Exam ML20203A2421999-02-0505 February 1999 Forwards SE Accepting Proposal to Revise Methodology in TR DPC-NE-3002-A,to Permit Use of single-node Model,Instead of multi-node Model,To Represent SG Secondary Sys for post-trip Phase of Loss of Normal Feedwater Analysis for Plant,Unit 2 ML20202J4751999-01-29029 January 1999 Responds to Concern Raised on 981020 Re Appropriateness of Interaction of NRC Headquarters Operations Officer with on-shift Operations Staff During Event ML20202C2511999-01-27027 January 1999 Forwards Request for Addl Info Re Util 980331 Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, for Catawba Nuclear Station. Response Requested within 60 Days of Date of Ltr 1999-09-24
[Table view] |
See also: IR 05000414/1996019
Text
__ _ _ . _ ___ _ . . . _ _ _ _ . . .. .. _
,
-
.
,
,
i \
!
February 21, 1997 )
EA 96-404
Duke Power Com)any
ATTN: Mr, W. R. McCollum
Site Vice President.
Catawba Site l
4800 Concord Road
York. South Carolina 29745-9635
. SUBJECT: EXERCISE OF ENFORCEMENT DISCRETION
(NRC INSPECTION REPORT NOS. 50-413 AND 50-414/96-19) l
Dear Mr. McCollum:
This refers to an inspection conducted in the Region II office on Octob6r 7.
1996.' November 27, 1996, and February 6,1997, and to our letter dat6d .
March 18, 1992. which forwarded Ins)ection Report 50-413, 414/92-01, and l
included a Notice of Deviation for Juke Power Com)any's (DPC) failure to l
implement commitments with regard to circuit breacer coordination as described
in the Catawba Updated Final Safety Analysis Report (UFSAR). The purpose of
j '
the inspection was to review issues and evaluate facts and circumstances i
related to circuit breaker coordination for the 600-VAC essential Motor l
Control Centers (MCCs) and the 125-VDC system at your Catawba facility. Our ;
review of this issue is described in the enclosed inspection report. 1
By' letter dated December 29, 1994 DPC submitted an amendment to'the Catawba
Nuclear Station, Units 1 and 2, UFSAR to the NRC for formal review. DPC's
safety evaluation for the UFSAR update concluded that no Unreviewed Safety
Ouestion (US0) existed with regard to circuit breaker coordination.
Notwithstanding DPC's evaluation. the NRC identified a USQ related to the
circuit breaker protection for the 600-VAC essential MCCs and the 125-VDC
systems. DPC was notified of the USO by letter dated September 17. 1996. As
a result.'DPC submitted an operating license amendment on Seatember 21, 1996.
The NRC approved the September 21, 1996. amendment on Septem)er 28. 1996. The
amendment clarified the statement regarding conformance to IEEE 308-1974,
noting the exceptions on the 600 VAC MCCs and the 125 VDC systems.
Based on the information develo)ed during the inspection, the NRC has
determined that a violation of 1RC requirements occurred. The failure to
identify a USQ and seek a license amendment, in accordance with 10 CFR 50.59.
is. generally categorized as a Severity Level III violation in accordance with
l' the " General Statement of Policy and Procedures for Enforcement Actions"
(Enforcement Policy). NUREG-1600. However, as provided in Section VII.B.6 of
the Enforcement Policy, the NRC may refrain from issuing a Notice of Violation
(Notice) and proposing a civil penalty for a Severity Level III violation
-
which involves special circumstances. ;
,
i After review of this violation and consultation with the Director. Office of
4 Enforcement, the NRC has concluded that while a violation did occur.
, enforcement discretion is warranted and that issuance of a Notice is not
'
appropriate in this case. me specific bases for the decision to exercise i
- Te2188827J88811a
O PDR
8.8888pp.assa N I
L - , .. -. - - - .
. - . - - , . .. .-
-
.
,
.
/ DPC 2
enforcement discretion are: 1) although an error did exist in your safety
evaluation i.e. you concluded that no USQ existed, you did complete a safety
evaluation of circuit breaker coordination in response to the 1992 Notice of
Deviation and you voluntarily submitted changes to the Catawba Nuclear
Station. Units 1 and 2. UFSAR to the NRC for formal review in your letter 4
dated December 29. 1994: 2) the NRC review of your December 29, 1994, letter l
took almost two years and you were not notified of the USQ issue until l
'
September 17, 1996: 3) you implemented prompt and appropriate corrective i
action when the violation was identified including delay of restart of the I
4
'
Catawba units as necessary, and submittal of an operating license amendment l
!
on September 21,1996; and 4) you have provided guidance to your staff to !
'
increase their level of awareness to 10 CFR 50.59 issues and instituted a I
policy for management review of potential US0s. 1
This letter serves to document the closure of the apparent violation and
completes NRC action in this matter. No formal response to this letter is
- required. In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice." a l
copy of this letter will be placed in the NRC Public Document Room. l
If you should have any questions regarding this letter, please contact
Mr. Charles Casto, Chief, Branch 1. Division of Reactor Projects, at
>
404-331-5506.
l
Sincerely.
i
Original Signed by '
L. A. Reyes
Luis A Reyes l
4
Regional Administrator
Docket Nos. 50-413 and 50-414 i
- License Nos. NPF-35 and NPF-52 l
i
Enclosure: Inspection Report Nos. 50-413 and 50-414/96-19 l
1 ,
cc w/ encl: !
'
M. S. Kitlan
Regulatory Compliance Manager
Duke Power Company ;
4800 Concord Road
York, SC 29745-9635
Paul R. Newton i
Legal Department (PB05E)
Duke Power Company
422 South Church Street j
Charlotte, NC 28242-0001 9
cc: Continued on Page 3 i
!
I
_. _ _
.
'
, .'
J
-
DPC 4
Distribution'w/ encl:
J. Lieberman. OE
C. Casto. RII
P. Tam, NRR
R. Carroll. RII
L. Wert. RII
B. Uryc. RII
R. Moore. RII
G. Hallstrom. RII-
OE:EA (BSummers)(2)
PUBLIC
NRC Resident Inspector
U.S. Nuclear Regulatory Commission
4830 Concord Road
York. SC 29745
.
-m
SEND TO PUBLIC DOCUMENT ROOM? , (YES) /
OFFICE Ril:DRS Ril:DK RTl:DK Ril:0RA Ril:jlCS yll:0RA OE/
SIGNATURE / NW /
NAME CCab JJau on JJ son CE Mer ff JLieberman
DATE VJ1/ V'/97 0 j1//97 GP/ TD97 Ol/g97 hffy97 01/ % 01/ 6 /97