ML19331C635: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:-            _      .                        .
{{#Wiki_filter:-            _      .                        .
O
O 4
  ;
APPE!! DIX B AVERAGE DAILY POWER LEVEL DOCKET NO. 050-0325 UNIT BRUNSWICK UNIT I DATE 08/04/80 COMPLETED BY EULIS WILLIS TELEPHONE 919-457-9521 JULY 80 DAY      AVG. DAILY POWER LEVEL                                            DAY                AVG. DAILY POWER LEVEL (MWE-NET)                                                                              (MWE-flET) 1                                      0.                                  17                                        0.
4 APPE!! DIX B AVERAGE DAILY POWER LEVEL DOCKET NO. 050-0325 UNIT BRUNSWICK UNIT I DATE 08/04/80 COMPLETED BY EULIS WILLIS TELEPHONE 919-457-9521 JULY 80 DAY      AVG. DAILY POWER LEVEL                                            DAY                AVG. DAILY POWER LEVEL (MWE-NET)                                                                              (MWE-flET) 1                                      0.                                  17                                        0.
  !              2                                      0.                                  18                                        0.
  !              2                                      0.                                  18                                        0.
  !              3                                      0.                                  19                                        0.
  !              3                                      0.                                  19                                        0.
Line 64: Line 63:
l l
l l


                          .;                                                                                                                    ,
DOCKET NO:      050-0325 UNIT: Brunswick No.1 DATE: August 1.980 COMPLETED BY: Eulis A. Willis OPERATIONS  
DOCKET NO:      050-0325 UNIT: Brunswick No.1 DATE: August 1.980 COMPLETED BY: Eulis A. Willis OPERATIONS  



Latest revision as of 13:35, 18 February 2020

Monthly Operating Repts for Jul 1980
ML19331C635
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 08/04/1980
From: Willis E
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML19331C633 List:
References
NUDOCS 8008190220
Download: ML19331C635 (6)


Text

- _ . .

O 4

APPE!! DIX B AVERAGE DAILY POWER LEVEL DOCKET NO. 050-0325 UNIT BRUNSWICK UNIT I DATE 08/04/80 COMPLETED BY EULIS WILLIS TELEPHONE 919-457-9521 JULY 80 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-flET) 1 0. 17 0.

! 2 0. 18 0.

! 3 0. 19 0.

4 0. 20 0.

5 O. 21 0.

6 0. 22 0.

7 0. 23 C.

! 6 0. 24 0.

9 0. 25 O.

10 0. 26 0.

II 0. 27 0.

12 0. 28 0.

13 0. 29 0.

14 0. 30 0.

15 O. 31 0.

16 0.

1.16 - 8 800819022.0

OPERATING DATA REPORT DOCKET NO. 050-0325 DATE 08/04/80 COMPLETED BY EULIS WILLIS TELEPHONE 919-457-9521 OPERATING STATUS

1. UNIT NAME: BRUNSWICK UNIT I I NOTES I
2. REPORTING PERIOD: JULY do I I
3. LICENSED THERMAL POWER (MWT): 2436 I I
4. NAMEPLATE RATING (GROSS MWE): 867.0 I I
5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 I I
6. MAX DEPENDABLE CAPACITY (GROSS ME): 815.0 I I
7. MAX DEPENDABLE CAPACITY (NET MWE): 790.0 - - -
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE
10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE II. HOURS IN REPORTING PERIOD 744.0 5111.0 29568.0

12. NUMBER OF HOURS REACTOR WAS CRITICAL 69.7 3340.1 20729.7
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1647.1
14. HOURS GENERATOR ON LINE 0.0 3148.3 19481.2
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 1 16. GROSS THERMAL ENERGY GENERATED (MWH) 0.0 6237934.0 40067431.0
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0.0 2087474.0 13326293.0
16. NET ELECTRICI AL ENERGY GENERATED (MWH) 0.0 2011410.0 12819220.0 19 UNIT SERVICE FACTOR 0.0 61.6 65.9 l 20. UNIT AVAILABILITY FACTOR 0.0 61.6 65.9 l 21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0 49.8 54.9 1 22. UNIT CAPACITY FACTOR (USING DER NET) 0.0 47.9 52.8
23. UNIT FORCED OUTAGE RATE 0.0 10 .7 19.9
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DUR ATION OF EACH):

l MAINTENANCE OUTAGE, 800919, 2184 HOURS l 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 8/ 9 / 80 1

26. UNITS IN TEST STATUS (PRIOR TO CCMMERICIAL OPERATION): FORCAST ACHEIVED INITIAL CRITICALITY - --

INITIAL ELECTRICITY --

COMMERICIAL OPERATION 1.15 - 9 l

l l

DOCKET NO: 050-0325 UNIT: Brunswick No.1 DATE: August 1.980 COMPLETED BY: Eulis A. Willis OPERATIONS

SUMMARY

BRUNSWICK NO. 1 Brunswick Unit No. I was shutdown the entire month of July for refueling. The unit is expected back on line August 9,1980. A more detailed description of the outage will be provided in this report the month the unit returns to service.

There are 476 BWR and 154 PWR spent fuel bundles stored in the Brunswick Unit No. 1 fuel pool.

._m._ _. . _m. _ _ . . . . _ . . . _ _ _ , . #_._ . _ . . _ , _ ,_._,,___._,_,.y., . - . _,y_ . , , , .--_. ,, ,

O 1

I i

i APPENDIX B j AVERAGE DAILY POWER LEVEL DOCKET NO.- 050-0324 UNIT BRUNSWICK UNIT.2 DATE 08/04/80 COMPLETED BY EULIS WILLIS I

TELEPHONE 919-457-9521 JULY 80

, DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POhER LEVEL (MWE-NET) (.V WE-N ET )

j I O. 17 0.

2 0. 18 0.

3 0. 19 0.

4 0. 20 0.

5 O. 21 0.

6 0. 22 0.
7 0. 23 0.

d O. 24 0.

9 0. 25 O.

10 0. 26 0.

11 0. 27 0.

12 0. 28 0.

i . 13 0. 29 0.

I 14 0. 30 0.

1

! 15 O. 31 0.

i 16 0.

4 l

1 t

1.is - e 1,

,-- .-....~c,my.c ,-,r -w 4.w . . . .-, c. r.,__r,-- ,- e m u. cy w ww. ,-, ,,.,-,-,w,----mm,_-o,_ ,w-w- .,,,,,,%v.-, . , ,

s _

OPERATING DATA REPORT DOCKET NO. 050-0324 DATE 08/04/80 COMPLETED BY EULIS MILLIS TELEPHONE 919-457-9521 OPERATING STATUS

1. UNIT NAME: BRUNSWICK UNIT 2 I NOTES I
2. REPORTING PERIOD: JULY 80 I I
3. LICENSED THERMAL POWER (i4WT): 2436 I I
4. NAMEPLATE RATING (GROSS MbE): 867.0 I I
5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 I I
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 I I
7. MAX DEPENDABLE CAPACITY (NET MWE): 790.0 - - - - - -
3. IF CHANGES OCCUR IN CAPACIT( RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE
10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE II. HOURS IN REPORTING PERIOD 744.0 5111.0 41592.0

12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 1365.7 26689.7
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 14 HOURS GENERATOR ON LINE 0.0 122o.1 25102.2
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 0.0 2604959.4 46339422.6
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0.0 872613.0 15487687.0 id. NET ELECTRICI AL ENERGY GENERATED (MWH) 0.0 842126.0 14882598.0 I
19. UNIT SERVICE FACTOR 0.0 24.0 60.4 l
20. UNIT AVAILABILITY FACTOR 0.0 24.0 60.4
21. UNIT CAPACITY FACTOR,(USING MDC NET) 0.0 20.9 45.3
22. UNIT CAPACITY FACTOR (USING DER NET) 0.0 20.1 43.6
23. Ul;IT FORCED OUTAGE RATE 0.0 d.I I 2. 7
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MJNTHS (TYPE, DATE, AND DURATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTI'4ATED DATE OF START UP: 8/13/80
26. UNITS IN TEST STATUS (PRIOR TO CD'JMERICIAL OPERATION): FORCAST ACHEIVED INITI AL CRITICALITY - - - - - - - -

IdITIAL ELdCIRICIT( - - --------

COMMERICIAL OPERATION 1.15 - 9

...~

DOCKET NO: 050-0324 UNIT: Brunswick No. 2 DATE: July 1980 COMPLETED BY: Eulis A. Willis OPERATIONS

SUMMARY

BRUNSWICK NO. 2 Brunswick Unit No. 2 was shutdown the entire month of July for refueling.

The unit is expected back on line August 13, 1980. A more detailed description of the outage will be provided in this report the month the unit returns to service.

There are 264 BWR and 105 PWR spent fuel bundles stored in the Brunswick Unit No. 2 fuel pool.

m. . . _ , - . ,., , , , _ , . , . , . . . . . . . _ , . . - _ . . . . . ~ . ,,,.r -