Ro:On 810527-29,during Routine Review of Surveillance Records,Discovered That Sample of Gaseous Waste Discharge Path Not Taken on 810528 as Required When Radiation Monitor Was Out of Svc.Required Samples Taken on 810527-29
ML20004C481
Person / Time
Site: Beaver Valley
Issue date: 05/29/1981
From: Werling J
DUQUESNE LIGHT CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
BVPS:JAW:1190, NUDOCS 8106040154
Download: ML20004C481 (2)


Text

, A %

'Af 512: GM000

- e. -

wm DUQUESNE LIGHT COMPANY Beaver ValJey Power Station Post Office Box 4 i

Shippingport, PA 15077 May 29, 1981 .

BVPS: JAW:1190 Beaver Valley Power Station, Unit No.1

~

Docket No. 50-334, License No. DPR-66 LER 81-046/01P

.- p Mr. B. H. Grier, Director of Regulation 'd 'M 6 8 h' .

United States Nuclear Regulatory Commission ,

Region 1 -

631 Park Avenue

, gy Qg 2?

, 7, King of Prussia, Pennsylvania 19406 ,' Yyg 3

Dear Mr. Grier:

,/ ,

~

~':.,..' .

In accordance with Environmental Technical Spedification 2.4.4.2',' the following occurrence is reported. The report was discussed with our Resident Inspector; Mr. D.. A. Beckman, at approximately 1400 hours0.0162 days <br />0.389 hours <br />0.00231 weeks <br />5.327e-4 months <br /> on May 29, 1981.

During routine review of Radcon surveillance reccrds for the period of May 27 through May 29, 1981, it was discovered that a sample of the gaseous waste discharge path was not taken on May 28,' as required with the radiation monitor, (RM-GW-108A, B], out of service. -The required samples were taken on May 27 and 29.

The health and safety of the general public was not jeopardized since no

. gaseous waste releases occurred during the period. Any additional information or corrective action will be included in the follow-up report.

I Very truly yours, y

la IVA I

g J. A. Werling "V Superintendent 009 S

//

8146040 151 .

F- w---s , , v-+-

1

, es . .,

Mr. B.'N. Grier May M 1981 . .

BVFS:JW:1190  ?

Fage 2 e

cc: Director Of Management & Progr.sm Analysis United States Nolear Regulatory Commission .

Washington, D. C. 20555 Director, Office of Inspection t.nd Enforcement Headquarters /

United . States Nuclear Regulatorf Commission Washington, D. C. 20555 D. A. Chaney, BVPS Licensing Project Manager United States Nuclear Regulatory Commission Washington, D. C. 20555 D. A. Beckman, Nuclear Regulatory Connission, BVPS Site Inspector

. Mr. Alex Timme, CAPCO Nuclear Projects Coordinator, Toledo Edison Nuclear Safety Analysis Center, Palo Alto, California G. E. Muckle, Factory Mutual Engineering, Pittsburgh

.R. C. Wittschen, Stone & Web' ster / Boston e