Special Rept:On 900305,east Cable Vault Exhaust Damper VS-D-180 Failed to Close During Trip Testing of Fire Dampers Under Air Flow Conditions.Caused by Inadequate Spring Closure Mechanism.Springs Replaced W/Helical Coil Springs
ML20042E643
Person / Time
Site: Beaver Valley
Issue date: 04/18/1990
From: Noonan T
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ND3MNO:2054, NUDOCS 9004260308
Download: ML20042E643 (3)


Text

~

i%

'Af telephone (4th 3934000 0

a4 Shippingport PA 16077 00D4 April 18, 1990 ND3MNO:2054 Beaver Valley Power Station, Unit-No. 1 50-44f,M icense No. DPR-64 Docket No.

L Special Report United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen In accordance with Site Administrative Procedure 9D,

" Fire Protection", Table 1,

Item 4 (CO2 System),

the following Special Report is submitted.

Site Administrative Procedure 9D requires the repair of an identified discrepancy within fourteen days and a Special Report within the following thirty days if the discrepancy is not resolved within the fourteen day period.

This report is being submitted because the corrective actions were not completed within the initial fourteen day time period after discovery.

On March 5,

1990, during the performance of trip' testing of fire dampers under air flow conditions, East Cable Vault Exhaust Damper VS-D-180 failed to fully close.

VS-D-180 is a Category F damper located in the ceiling (elevation 756') between the East Cable Vault and the Motor Control Center Room.

Air is ' withdrawn from the East Cable Vault using the Supplementary Leak Collection and Release System.

The East Cable Vault utilizes a Carbon Dioxide System to provide fire suppression.

The failure of this damper to close ander air flow conditions, degrades the carbon dioxide fire suppression:for the East Cable Vault.

The cause for the event was an inadequate spring closure mechanism.

The spring closure assembly has been upgraded with helical coil springs and torsion springs to the blade ends to improve the damper closure.

These actions could not be completed during the fourteen day time period as the necessary parts were required to be ordered and were not received during that time period.

This is an interim corrective action until this damper is replaced during the Eighth Refueling Outage, scheduled for April 1991.

gf[0 9004260300 900410

/

PDR ADDCK 05000334 S

PNV

April 11, 1990

  • ND3MNO:2054 Page 2 There were no safety implications as a result of this event.

A fire watch had previously been established in the East cable Vault due to identified problems with the Underwriters Laboratory qualification for this and other dampers in that area (

Reference:

Special Report ND3MNO 1953, dated September 15, 1989 end LER 89-010).

These previous, non-similar problems involved improperly field-fabricated dampers that did not meet the required fire rating for the East cable Vault Area.

Very truly yours.

w l. [,jk.paWb

f*C ye T.

p. Noonan General Manager Nuclear Operations JGT/sl Attachment

k

'o April-11, 1990 ND3MNO:2054 m.

Page 3, cct Mr. William T. Russell Regional Administrator.

United States Nuclear Regulatory Commission Region 1 475 Allendale Road King.of Prussia, PA 19406 C. A. Roteck, Ohio Edison Mr. Peter Tam United States Nuclear Regulatory Commission Washington, DC 20555 J.

Beall, Nuclear Regulatory Commission BVPS; Senior Resident. Inspector Dave Amerine Centerior Energy 6200 Oak Tree Blvd.

Independence, Ohio 44101 INPO Records Center Suite 1500 1100 Circle 75 Parhway Atlanta, GA 30339 G. E. Muckle, Factory Mutual Engineering, Pittsburgh Mr. J. N. Steinmetz, Operating Plant Projects Manager' Mid Atlantic Area Westinghouse Electric Corporation Energy Systems Service Division Box 355 Pittsburgh, PA 15230 American Nuclear Insurers c/o Dottie Sherman, ANI Library The Exchange Suite 245 270 Farmington Avenue Farmington, CT 06032 Mr. Richard Janati Department of Environmental Resources P. O. Box 2063 16th Floor, Fulton Building Harrisburg, PA 17120-Director, Safety Evaluation & Control Virginia Electric & Power Co.

P. O. Box 26666 One James River Plaza Richmond, VA 23261 1