s
)
. \\,\\
ouquesneuct ere.-
L Tn g
I DU'TJESME LICFT COMPANY he I
j Seever V. alley Power Station Post Of fice Box 4 C
J-I ship,tospect, rA t3077
&o o
j Tabruary 22, 1980 8VPS: JAW: 794
~
~
Aesver Valley Pever Sentlen. Unit %.1 Docket W. 50-3M, License No. DFM-46 t.ER 30-7/0!P
~
'f r.
R. H. Crier. Ofrector of Regulation V *Leod States Mucitar Regulatory Comnission Renton 1 6.}1 P1rk Avet'9*.
Eing of Frussia, rgnasylvania 19404
Dear Mr. Grier:
~
~
to secerdanca vith Technic.sl Spec t f testion 6.9.1.8.1. the totiowEng occurrenea is caverted.
This incident was discua *cd with Mr. D. A. Beelnnen, mase. MMC Re=L4ent inspector, at 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br /> ett F=bruary-21, 1980.
\\
ISn F*bevery 21, 1990, a condit ten was found. vnich resulted in no Suopic rentary Leak Cellection aa.d Retesse- (SLCM) flew through the osin filter bent s ditring fuel a vac.
Durins a shift reviaw of re<tuired refueling t
technical spec tf testiona, th=r Stat Lon Operatinet Foreruin (SOT) discovered that the ?t.CR Systn should ba se beetr lined up to the e.ain filter banks.
At 0945 hours0.0109 days <br />0.263 hours <br />0.00156 weeks <br />3.595725e-4 months <br />, he-Stoppad fuel mswnt and lenediately lined up the flow through the-esin f Liter banks by repoettioning the switch in the Centrol Rotm.
A check vss than ade to verify correct SLCR System flow out of contain seat and the fuel ahuffle wes reco*weenced.
.w e The Incident ' vss the result.of procedure inndeouscy.
The refueling checklists had not been revised to tscorporate the new technical specif teation change that requires ficar through the main filter banks.
g s
v 4
3%
_ Mr.
- 1. ff. crice rehr., srr 2 2
(?*O acts ).\\u:13s l
Pest 2 Melvar V.11's.v L*n i t I ta tr==ently in Operatt nat F*,fe 6 vo have determined chare vere no S.,fety iseo!Icatlens to this incident = 1nec = 1l rad tat tem soon itorg wae* crard t-ttw. ve u td have 5.:v:n catenary fr r Init tat ten of neitmtie transfer of the 3!.CM Syste: t hrt ugh the min filter b.mkg had there been a radiation probles (wh ich t h tre wa s en t ).
Corrective.1ct ion h4= t-*en cciptered, ennstattnr. of a revision to the Opera t ing Sierve i t i.me e regt (OST 1.67.3) to include the recent techn ica l cpec if ica tien chang.
Very truly youes.
~
I J3/6 J. A. Verling
'~
Superintendent cc:
Director of Managewest & Prostras Analysts United State.s Muele v 9.egulatory C m tssten Washington, D. C.
2033)
D. L. Utsgtnton, MVPS titansing Projec*. Maoiger