{{#Wiki_filter:April 25, 2006LICENSEE:Virginia Electric and Power Company (VEPCO)
{{#Wiki_filter:April 25, 2006 LICENSEE:       Virginia Electric and Power Company (VEPCO)
FACILITY:North Anna Power Station, Unit Nos. 1 and 2 (North Anna)
FACILITY:       North Anna Power Station, Unit Nos. 1 and 2 (North Anna)


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF FEBRUARY 8, 2006, MEETING WITH VEPCO TO DISCUSS APROPOSED INCREASE OF THE ALLOWED-OUTAGE TIMES FOR SEVERAL SYSTEMS AT NORTH ANNA. On February 8, 2006, a Category 1 public meeting was held between the U.S. NuclearRegulatory Commission (NRC) and representatives of VEPCO at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting wasto discuss VEPCO's proposed license amendment to extend the allowed-outage times (AOTs)for several systems from 72 hours to 7 days at North Anna. A list of attendees is provided asEnclosure 1. By letter dated December 17, 2004, as supplemented by letter dated October 7, 2005, VEPCOsubmitted a license amendment request to extend the AOTs for the low head safety injection (LHSI), auxiliary feedwater, quench spray and chemical addition systems from 72 hours to 7days. During the review, the NRC staff identified several issues that prevented the approval ofthis amendment. As a result, VEPCO requested this meeting to understand the NRC staff'sconcerns. The NRC staff opened the meeting by presenting its reasons for not approving thelicense amendment. Refer to Enclosure 2 for the NRC staff's handouts. The NRC staff statedthat VEPCO had not adequately considered the external event risk for Tier 1, 2 and 3evaluations, and did not consider compensatory measures as described in Regulatory Guides 1.174 and 1.177. In addition, the NRC staff stated that VEPCO's Tier 3 evaluations had notbeen adequately reviewed by VEPCO. After this presentation, VEPCO indicated it intended to submit an amendment request to extend the AOT for the LHSI system at North Anna andsubmit another amendment request to add an AOT for the chilled water system at Surry PowerStation, Unit Nos. 1 and 2.
OF FEBRUARY 8, 2006, MEETING WITH VEPCO TO DISCUSS A PROPOSED INCREASE OF THE ALLOWED-OUTAGE TIMES FOR SEVERAL SYSTEMS AT NORTH ANNA.
VEPCO- 2 -Members of the public were in attendance. Public Meeting Feedback forms were not received. Please direct any inquiries to me at 301-415-1544, or srm2@nrc.gov.
On February 8, 2006, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of VEPCO at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss VEPCOs proposed license amendment to extend the allowed-outage times (AOTs) for several systems from 72 hours to 7 days at North Anna. A list of attendees is provided as .
  /RA/Stephen Monarque, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket Nos. 50-338 and 50-339
By letter dated December 17, 2004, as supplemented by letter dated October 7, 2005, VEPCO submitted a license amendment request to extend the AOTs for the low head safety injection (LHSI), auxiliary feedwater, quench spray and chemical addition systems from 72 hours to 7 days. During the review, the NRC staff identified several issues that prevented the approval of this amendment. As a result, VEPCO requested this meeting to understand the NRC staffs concerns. The NRC staff opened the meeting by presenting its reasons for not approving the license amendment. Refer to Enclosure 2 for the NRC staffs handouts. The NRC staff stated that VEPCO had not adequately considered the external event risk for Tier 1, 2 and 3 evaluations, and did not consider compensatory measures as described in Regulatory Guides 1.174 and 1.177. In addition, the NRC staff stated that VEPCOs Tier 3 evaluations had not been adequately reviewed by VEPCO. After this presentation, VEPCO indicated it intended to submit an amendment request to extend the AOT for the LHSI system at North Anna and submit another amendment request to add an AOT for the chilled water system at Surry Power Station, Unit Nos. 1 and 2.
 
VEPCO                                         Members of the public were in attendance. Public Meeting Feedback forms were not received.
Please direct any inquiries to me at 301-415-1544, or srm2@nrc.gov.
                                            /RA/
Stephen Monarque, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-338 and 50-339


==Enclosures:==
==Enclosures:==
: 1. List of Attendees
: 1. List of Attendees
: 2. NRC Staff's H andout cc w/encls: See next page VEPCO- 2 -April 25, 2006Members of the public were in attendance. Public Meeting Feedback forms were not received. Please direct any inquiries to me at 301-415-1544, or srm2@nrc.gov.
: 2. NRC Staffs Handout cc w/encls: See next page
  /RA/Stephen Monarque, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket Nos. 50-338 and 50-339
 
VEPCO                                                                                   April 25, 2006 Members of the public were in attendance. Public Meeting Feedback forms were not received.
Please direct any inquiries to me at 301-415-1544, or srm2@nrc.gov.
                                            /RA/
Stephen Monarque, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-338 and 50-339


==Enclosures:==
==Enclosures:==
: 1. List of Attendees
: 1. List of Attendees
: 2. NRC Staff's H andout cc w/encls: See next page Distribution
: 2. NRC Staffs Handout cc w/encls: See next page Distribution:
: Public     RidsNrrLAMO'BrienSLee, EDO RgnII LPL2-1 r/f     RidsOgcRpRidsNrrDssSpwb(JNakoski)
Public                           RidsNrrLAMOBrien                SLee, EDO RgnII LPL2-1 r/f                       RidsOgcRp                        RidsNrrDssSpwb(JNakoski)
RidsNrrDorlLplc(EMarinos)     RidsAcrsAcnwMailCenterRidsNrrDraApla(MRubin)
RidsNrrDorlLplc(EMarinos)         RidsAcrsAcnwMailCenter          RidsNrrDraApla(MRubin)
RidsNrrPMSMonarque     Rjasinski,NRRSLingam RidsNrrDorl(CHaney/EHackett)   TBoyceSLaur RidsRgn2MailCenter(KLandis)     BTjaderAHoweRLobel      KDesaiMStutzke AHoweADAMS Accession No.: ML060830088Package No.:ML061090372       NRC-001OFFICENRR/LPL2-1/PMNRR/LPL2-1/LANRR/LPL2-1/BCNAMESMonarque:srmMO'BrienEMarinos DATE4/24/064/24/064/25/06OFFICIAL RECORD LIST OF ATTENDEES - FEBRUARY 8, 2006, MEETINGTO DISCUSS THE INCREASE TO THE ALLOWED-OUTAGE TIMES FOR FLUID SYSTEMSAT NORTH ANNA POWER STATION, UNIT NOS. 1 AND 2NAMEORGANIZATIONStephen MonarqueNRCMartin StutzkeNRC David A. SommersDominion Leslie Hartz Dominion Chris FunderburkDominion Page KempDominion Thomas HookDominion Biff Bradley Nuclear Energy Institute Jerry AndreWestinghouse Jim AndrachekWestinghouse Thomas ShaubDominion Angelo MarinosNRC Kulin DesaiNRC John NakoskiNRC Ed HackettNRC Tom BoyceNRC Richard LobelNRC Bob TjaderNRC Andrew HoweNRC Steven LaurNRC Mark RubinNRC Siva LingamNRC Cathy HaneyNRC Ronald YoungNRCEnclosure 1 North Anna Power Station, Units 1 & 2 cc:Mr. C. Lee LintecumCounty Administrator Louisa County Post Office Box 160 Louisa, Virginia 23093Ms. Lillian M. Cuoco, EsquireSenior Counsel Dominion Resources Services, Inc.
RidsNrrPMSMonarque               Rjasinski,NRR                    SLingam RidsNrrDorl(CHaney/EHackett)     TBoyce                          SLaur RidsRgn2MailCenter(KLandis)       BTjader                          AHowe RLobel                            KDesai                          MStutzke AHowe ADAMS Accession No.: ML060830088 Package No.: ML061090372                                         NRC-001 OFFICE NRR/LPL2-1/PM NRR/LPL2-1/LA NRR/LPL2-1/BC NAME        SMonarque:srm      MOBrien            EMarinos DATE        4/24/06            4/24/06            4/25/06 OFFICIAL RECORD
Millstone Power StationBuilding 475, 5th Floor Rope Ferry Road Waterford, Connecticut 06385Dr. W. T. LoughVirginia State Corporation Commission Division of Energy Regulation Post Office Box 1197 Richmond, Virginia 23218Old Dominion Electric Cooperative4201 Dominion Blvd.
 
Glen Allen, Virginia 23060Mr. Chris L. Funderburk, DirectorNuclear Licensing & Operations Support Dominion Resources Services, Inc.
LIST OF ATTENDEES - FEBRUARY 8, 2006, MEETING TO DISCUSS THE INCREASE TO THE ALLOWED-OUTAGE TIMES FOR FLUID SYSTEMS AT NORTH ANNA POWER STATION, UNIT NOS. 1 AND 2 NAME                                  ORGANIZATION Stephen Monarque                      NRC Martin Stutzke                        NRC David A. Sommers                      Dominion Leslie Hartz                         Dominion Chris Funderburk                      Dominion Page Kemp                            Dominion Thomas Hook                          Dominion Biff Bradley                         Nuclear Energy Institute Jerry Andre                          Westinghouse Jim Andrachek                        Westinghouse Thomas Shaub                          Dominion Angelo Marinos                        NRC Kulin Desai                          NRC John Nakoski                          NRC Ed Hackett                            NRC Tom Boyce                            NRC Richard Lobel                        NRC Bob Tjader                            NRC Andrew Howe                          NRC Steven Laur                          NRC Mark Rubin                            NRC Siva Lingam                          NRC Cathy Haney                          NRC Ronald Young                          NRC Enclosure 1
 
North Anna Power Station, Units 1 & 2 cc:
Mr. C. Lee Lintecum                    Mr. Jack M. Davis County Administrator                   Site Vice President Louisa County                         North Anna Power Station Post Office Box 160                   Virginia Electric and Power Company Louisa, Virginia 23093                Post Office Box 402 Mineral, Virginia 23117 Ms. Lillian M. Cuoco, Esquire Senior Counsel                         Mr. David A. Christian Dominion Resources Services, Inc.     Sr. Vice President and Chief Nuclear Officer Millstone Power Station                Virginia Electric and Power Company Building 475, 5th Floor               Innsbrook Technical Center Rope Ferry Road                       5000 Dominion Blvd.
Waterford, Connecticut 06385          Glen Allen, Virginia 23060-6711 Dr. W. T. Lough                        Mr. Robert B. Stroube, MD, MPH Virginia State Corporation Commission State Health Commissioner Division of Energy Regulation         Office of the Commissioner Post Office Box 1197                   Virginia Department of Health Richmond, Virginia 23218              Post Office Box 2448 Richmond, Virginia 23218 Old Dominion Electric Cooperative 4201 Dominion Blvd.
Glen Allen, Virginia 23060 Mr. Chris L. Funderburk, Director Nuclear Licensing & Operations Support Dominion Resources Services, Inc.
Innsbrook Technical Center 5000 Dominion Blvd.
Innsbrook Technical Center 5000 Dominion Blvd.
Glen Allen, Virginia 23060-6711Office of the Attorney GeneralCommonwealth of Virginia 900 East Main Street Richmond, Virginia 23219Senior Resident InspectorNorth Anna Power Station U.S. Nuclear Regulatory Commission 1024 Haley Drive Mineral, Virginia 23117Mr. Jack M. DavisSite Vice President North Anna Power Station Virginia Electric and Power Company Post Office Box 402 Mineral, Virginia  23117Mr. David A. ChristianSr. Vice President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Blvd.
Glen Allen, Virginia 23060-6711 Office of the Attorney General Commonwealth of Virginia 900 East Main Street Richmond, Virginia 23219 Senior Resident Inspector North Anna Power Station U.S. Nuclear Regulatory Commission 1024 Haley Drive Mineral, Virginia 23117}}
Glen Allen, Virginia  23060-6711Mr. Robert B. Stroube, MD, MPH State Health Commissioner Office of the Commissioner Virginia Department of Health Post Office Box 2448 Richmond, Virginia  23218}}

Revision as of 21:48, 23 November 2019

02/08/2006, North Anna, Units 1 and 2, Meeting Summary, Increase in Allowed-Outage Times for Several Systems
ML060830088
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 04/25/2006
From: Stephen Monarque
Plant Licensing Branch III-2
To:
Monarque, S R, NRR/DORL, 415-1544
References
Download: ML060830088 (5)


Text

April 25, 2006 LICENSEE: Virginia Electric and Power Company (VEPCO)

FACILITY: North Anna Power Station, Unit Nos. 1 and 2 (North Anna)

SUBJECT:

SUMMARY

OF FEBRUARY 8, 2006, MEETING WITH VEPCO TO DISCUSS A PROPOSED INCREASE OF THE ALLOWED-OUTAGE TIMES FOR SEVERAL SYSTEMS AT NORTH ANNA.

On February 8, 2006, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of VEPCO at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss VEPCOs proposed license amendment to extend the allowed-outage times (AOTs) for several systems from 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to 7 days at North Anna. A list of attendees is provided as .

By letter dated December 17, 2004, as supplemented by letter dated October 7, 2005, VEPCO submitted a license amendment request to extend the AOTs for the low head safety injection (LHSI), auxiliary feedwater, quench spray and chemical addition systems from 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to 7 days. During the review, the NRC staff identified several issues that prevented the approval of this amendment. As a result, VEPCO requested this meeting to understand the NRC staffs concerns. The NRC staff opened the meeting by presenting its reasons for not approving the license amendment. Refer to Enclosure 2 for the NRC staffs handouts. The NRC staff stated that VEPCO had not adequately considered the external event risk for Tier 1, 2 and 3 evaluations, and did not consider compensatory measures as described in Regulatory Guides 1.174 and 1.177. In addition, the NRC staff stated that VEPCOs Tier 3 evaluations had not been adequately reviewed by VEPCO. After this presentation, VEPCO indicated it intended to submit an amendment request to extend the AOT for the LHSI system at North Anna and submit another amendment request to add an AOT for the chilled water system at Surry Power Station, Unit Nos. 1 and 2.

VEPCO Members of the public were in attendance. Public Meeting Feedback forms were not received.

Please direct any inquiries to me at 301-415-1544, or srm2@nrc.gov.

/RA/

Stephen Monarque, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-338 and 50-339

Enclosures:

1. List of Attendees
2. NRC Staffs Handout cc w/encls: See next page

VEPCO April 25, 2006 Members of the public were in attendance. Public Meeting Feedback forms were not received.

Please direct any inquiries to me at 301-415-1544, or srm2@nrc.gov.

/RA/

Stephen Monarque, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-338 and 50-339

Enclosures:

1. List of Attendees
2. NRC Staffs Handout cc w/encls: See next page Distribution:

Public RidsNrrLAMOBrien SLee, EDO RgnII LPL2-1 r/f RidsOgcRp RidsNrrDssSpwb(JNakoski)

RidsNrrDorlLplc(EMarinos) RidsAcrsAcnwMailCenter RidsNrrDraApla(MRubin)

RidsNrrPMSMonarque Rjasinski,NRR SLingam RidsNrrDorl(CHaney/EHackett) TBoyce SLaur RidsRgn2MailCenter(KLandis) BTjader AHowe RLobel KDesai MStutzke AHowe ADAMS Accession No.: ML060830088 Package No.: ML061090372 NRC-001 OFFICE NRR/LPL2-1/PM NRR/LPL2-1/LA NRR/LPL2-1/BC NAME SMonarque:srm MOBrien EMarinos DATE 4/24/06 4/24/06 4/25/06 OFFICIAL RECORD

LIST OF ATTENDEES - FEBRUARY 8, 2006, MEETING TO DISCUSS THE INCREASE TO THE ALLOWED-OUTAGE TIMES FOR FLUID SYSTEMS AT NORTH ANNA POWER STATION, UNIT NOS. 1 AND 2 NAME ORGANIZATION Stephen Monarque NRC Martin Stutzke NRC David A. Sommers Dominion Leslie Hartz Dominion Chris Funderburk Dominion Page Kemp Dominion Thomas Hook Dominion Biff Bradley Nuclear Energy Institute Jerry Andre Westinghouse Jim Andrachek Westinghouse Thomas Shaub Dominion Angelo Marinos NRC Kulin Desai NRC John Nakoski NRC Ed Hackett NRC Tom Boyce NRC Richard Lobel NRC Bob Tjader NRC Andrew Howe NRC Steven Laur NRC Mark Rubin NRC Siva Lingam NRC Cathy Haney NRC Ronald Young NRC Enclosure 1

North Anna Power Station, Units 1 & 2 cc:

Mr. C. Lee Lintecum Mr. Jack M. Davis County Administrator Site Vice President Louisa County North Anna Power Station Post Office Box 160 Virginia Electric and Power Company Louisa, Virginia 23093 Post Office Box 402 Mineral, Virginia 23117 Ms. Lillian M. Cuoco, Esquire Senior Counsel Mr. David A. Christian Dominion Resources Services, Inc. Sr. Vice President and Chief Nuclear Officer Millstone Power Station Virginia Electric and Power Company Building 475, 5th Floor Innsbrook Technical Center Rope Ferry Road 5000 Dominion Blvd.

Waterford, Connecticut 06385 Glen Allen, Virginia 23060-6711 Dr. W. T. Lough Mr. Robert B. Stroube, MD, MPH Virginia State Corporation Commission State Health Commissioner Division of Energy Regulation Office of the Commissioner Post Office Box 1197 Virginia Department of Health Richmond, Virginia 23218 Post Office Box 2448 Richmond, Virginia 23218 Old Dominion Electric Cooperative 4201 Dominion Blvd.

Glen Allen, Virginia 23060 Mr. Chris L. Funderburk, Director Nuclear Licensing & Operations Support Dominion Resources Services, Inc.

Innsbrook Technical Center 5000 Dominion Blvd.

Glen Allen, Virginia 23060-6711 Office of the Attorney General Commonwealth of Virginia 900 East Main Street Richmond, Virginia 23219 Senior Resident Inspector North Anna Power Station U.S. Nuclear Regulatory Commission 1024 Haley Drive Mineral, Virginia 23117