ML091520499: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE  
{{#Wiki_filter:NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM:        RO SYSTEM g TITLE:        ALIGN BACKUP COOLING TO ENGINEERED SAFEGUARDS PUMPS CANDIDATE:  _____________________________________________
EXAMINER:  _____________________________________________


JPM: RO SYSTEM g TITLE: ALIGN BACKUP COOLING TO ENGINEERED SAFEGUARDS PUMPS
JPM: RO SYSTEM g JOB PERFORMANCE MEASURE DATA PAGE Task:   Align backup cooling to Engineered Safeguards Pumps Alternate Path: NO Facility JPM #: NEW K/A: 008A4.01                 Importance:       RO: 3.3     SRO: 3.1 K/A Statement: Ability to manually operate and/or monitor in the control room: CCW indications and controls Task Standard: Service Water aligned to ESS pumps per SOP-16.
 
Preferred Evaluation Location: Simulator         __X__   In Plant     _____
CANDIDATE: _____________________________________________
Preferred Evaluation Method:       Perform     __X__   Simulate     _____
 
EXAMINER: _____________________________________________
 
JPM: RO SYSTEM g  PALISADES NUCLEAR PLANT Page 2 of 7 JULY 2008  JOB PERFORMANCE MEASURE DATA PAGE Task: Align backup cooling to Engineered Safeguards Pumps  
 
Alternate Path: NO  
 
Facility JPM #: NEW  
 
K/A: 008A4.01   Importance: RO: 3.3   SRO: 3.1  
 
K/A Statement: Ability to manually operate and/or monitor in the control room: CCW indications and controls  
 
Task Standard: Service Water aligned to ESS pumps per SOP-16.  
 
Preferred Evaluation Location: Simulator __X__ In Plant _____  
 
Preferred Evaluation Method: Perform __X__ Simulate _____  


==References:==
==References:==
SOP-16, Component Cooling Water System  
SOP-16, Component Cooling Water System Validation Time:10 minutes         Time Critical:     NO Candidate:
 
Time Start: ________         Time Finish:       ________
Validation Time: 10 minutes Time Critical: NO  
Performance Time:         ________ minutes Performance Rating:       SAT______         UNSAT ______
 
Comments:
Candidate:
Examiner: _______________________________                 Date:   ______________
 
Signature PALISADES NUCLEAR PLANT                   Page 2 of 7                         JULY 2008
Time Start: ________ Time Finish: ________  
 
Performance Time: ________ minutes  
 
Performance Rating: SAT______ UNSAT ______  
 
Comments:  
 
Examiner: _______________________________ Date: ______________ Signature JPM: RO SYSTEM g  PALISADES NUCLEAR PLANT Page 3 of 7 JULY 2008 EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
 
SOP-16, Component Cooling Water System, Rev. 31
 
Also see Simulator Operator Instructions (last page of this document).
 
READ TO CANDIDATE
 
DIRECTION TO CANDIDATE:
 
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.


JPM: RO SYSTEM g EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
SOP-16, Component Cooling Water System, Rev. 31 Also see Simulator Operator Instructions (last page of this document).
READ TO CANDIDATE DIRECTION TO CANDIDATE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
INITIAL CONDITIONS:
* CV-0913, ESS Pumps CCW Supply, had a severe packing leak requiring the valve to have a packing adjustment.
* CV-0913, ESS Pumps CCW Supply, had a severe packing leak requiring the valve to have a packing adjustment.
* CV-0913 must be closed to ensure the valve will move and that the packing is not leaking with the valve closed.
* CV-0913 must be closed to ensure the valve will move and that the packing is not leaking with the valve closed.
* Chemistry has been notified of the operation.  
* Chemistry has been notified of the operation.
 
INITIATING CUES:
INITIATING CUES:
* The CRS directs you to align Service Water to the ESS Pumps per Section 7.6.1 of SOP-16, Component Cooling Water System.  
* The CRS directs you to align Service Water to the ESS Pumps per Section 7.6.1 of SOP-16, Component Cooling Water System.
 
PALISADES NUCLEAR PLANT                     Page 3 of 7                             JULY 2008
JPM: RO SYSTEM g  PALISADES NUCLEAR PLANT Page 4 of 7 JULY 2008 Proc. Step TASK ELEMENT 1 STANDARD Graden/a Locate SOP-16, Section 7.6.1, To Align Service Water to ESS Pumps SOP-16, Section 7.6.1 located S  U Comment:  Evaluator provides candidate with a Working Copy.
 
Proc. Step TASK ELEMENT 2 STANDARD Grade7.6.1a ENSURE in the CLOSED position, handswitches for the following valves:  CV-0879, ESS Pumps SW Supply  CV-0880, ESS Pumps SW Supply  CV-0951, ESS Pumps SW Return Handswitches for the following valves verified closed:  CV-0879, ESS Pumps SW Supply  CV-0880, ESS Pumps SW Supply  CV-0951, ESS Pumps SW Return S  U Comment: 
 
Proc. Step TASK ELEMENT 3 STANDARD Grade7.6.1b OPEN the Air Supply Valves to the following valves:  CV-0879, ESS Pumps SW Supply  CV-0880, ESS Pumps SW Supply  CV-0951, ESS Pumps SW Return Auxiliary Operator contacted to open air supplies to the following valves:  CV-0879, ESS Pumps SW Supply  CV-0880, ESS Pumps SW Supply  CV-0951, ESS Pumps SW Return S  U Comment:  NOTE: Operator will have to contact AO to complete step, Simulator Operator takes Remotes to OPEN, and reports back to operator that Step 7.6.1b is complete.
CRITICAL STEP
 
JPM: RO SYSTEM g  PALISADES NUCLEAR PLANT Page 5 of 7 JULY 2008 Proc. Step TASK ELEMENT 4 STANDARD Grade7.6.1c CLOSE the following valves:  CV-0913, ESS Pumps CCW Supply  CV-0950, ESS Pump CCW Return CV-0913, ESS Pumps CCW Supply, AND CV-0950, ESS Pump CCW Return, closed.
S  U Comment:
CRITICAL STEP
 
Proc. Step TASK ELEMENT 5 STANDARD Grade7.6.1d OPEN CV-0879 OR CV-0880, ESS Pumps SW Supply CV-0879 OR CV-0880 placed in the OPEN position.
S  U Comment:  NOTE: Only one of these valves needs to be placed to open to satisfy the critical step.
CRITICAL STEP
 
Proc. Step TASK ELEMENT 6 STANDARD Graden/a EK-1155, WEST ENG SAFEGUARDS PPS CLG WTR LO FLOW, and EK-1156, EAST ENG SAFEGUARDS PPS CLG WTR LO FLOW alarms annunciate (CV-0879 or CV-0880 opening)
ARP-7 checked for alarms EK-1155 and EK-1156 alarming. (Alarms due to opening of CV-0879 or CV-0880). No operator action needed.
S  U Comment:  NOTE: EK-1155 and EK-1156 alarms annunciated due to no cooling water flow to ESS Pumps
 
JPM: RO SYSTEM g  PALISADES NUCLEAR PLANT Page 6 of 7 JULY 2008 Proc. Step TASK ELEMENT 7 STANDARD Grade7.6.1e OPEN CV-0951, ESS Pumps SW Return CV-0951 placed to open.
S  U Comment:  NOTE: EK-1155 and EK-1156 alarms will clear with the opening of CV-0951 (SW established to ESS Pump Cooling).
CRITICAL STEP


Proc. Step TASK ELEMENT 8 STANDARD Grade7.6.1f NOTIFY Chemistry Department to sample mixing basin for sodium nitrite.
JPM: RO SYSTEM g Proc. Step               TASK ELEMENT 1                                      STANDARD                     Grade Locate SOP-16, Section 7.6.1, To Align SOP-16, Section 7.6.1 located n/a      Service Water to ESS Pumps                                                                    S U Comment:
Chemistry notified to sample.
Evaluator provides candidate with a Working Copy.
S U Comment: NOTE: Evaluator: If operator starts to notify Chemistry, STATE: the CRS will notify them.
Proc. Step              TASK ELEMENT 2                                      STANDARD                    Grade ENSURE in the CLOSED position,                Handswitches for the following valves verified handswitches for the following valves:       closed:
Proc. Step TASK ELEMENT 9 STANDARD Grade n/a Notify the CRS that SOP-16, Section 7.6.1 is complete.
CV-0879, ESS Pumps SW Supply                CV-0879, ESS Pumps SW Supply 7.6.1a                                                                                                    S U CV-0880, ESS Pumps SW Supply                CV-0880, ESS Pumps SW Supply CV-0951, ESS Pumps SW Return                CV-0951, ESS Pumps SW Return Comment:
CRS notified Section 7.6.1 of SOP-16 complete.
Proc. Step               TASK ELEMENT 3                                      STANDARD                     Grade OPEN the Air Supply Valves to the            Auxiliary Operator contacted to open air following valves:                            supplies to the following valves:
S  U Comment: 
CV-0879, ESS Pumps SW Supply                CV-0879, ESS Pumps SW Supply 7.6.1b                                                                                                    S U CV-0880, ESS Pumps SW Supply                CV-0880, ESS Pumps SW Supply CV-0951, ESS Pumps SW Return                CV-0951, ESS Pumps SW Return Comment:
NOTE: Operator will have to contact AO to complete step, Simulator Operator takes Remotes to OPEN, and reports back to operator that Step 7.6.1b is complete.
CRITICAL STEP PALISADES NUCLEAR PLANT                          Page 4 of 7                                    JULY 2008


END OF TASK  
JPM: RO SYSTEM g Proc. Step          TASK ELEMENT 4                                  STANDARD                    Grade CLOSE the following valves:
CV-0913, ESS Pumps CCW Supply, AND CV-CV-0913, ESS Pumps CCW Supply 7.6.1c                                            0950, ESS Pump CCW Return, closed.            S U CV-0950, ESS Pump CCW Return Comment:
CRITICAL STEP Proc. Step          TASK ELEMENT 5                                  STANDARD                    Grade OPEN CV-0879 OR CV-0880, ESS            CV-0879 OR CV-0880 placed in the OPEN 7.6.1d    Pumps SW Supply                          position.                                      S U Comment:
NOTE: Only one of these valves needs to be placed to open to satisfy the critical step.
CRITICAL STEP Proc. Step          TASK ELEMENT 6                                  STANDARD                    Grade EK-1155, WEST ENG SAFEGUARDS PPS CLG WTR LO FLOW, and EK-1156,        ARP-7 checked for alarms EK-1155 and EK-EAST ENG SAFEGUARDS PPS CLG              1156 alarming. (Alarms due to opening of CV-n/a    WTR LO FLOW alarms annunciate (CV-      0879 or CV-0880). No operator action needed. S U 0879 or CV-0880 opening)
Comment:
NOTE: EK-1155 and EK-1156 alarms annunciated due to no cooling water flow to ESS Pumps PALISADES NUCLEAR PLANT                  Page 5 of 7                                  JULY 2008


JPM: RO SYSTEM g PALISADES NUCLEAR PLANT Page 7 of 7 JULY 2008 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
JPM: RO SYSTEM g Proc. Step              TASK ELEMENT 7                                    STANDARD                    Grade OPEN CV-0951, ESS Pumps SW Return            CV-0951 placed to open.
7.6.1e                                                                                                  S U Comment:
NOTE: EK-1155 and EK-1156 alarms will clear with the opening of CV-0951 (SW established to ESS Pump Cooling).
CRITICAL STEP Proc. Step              TASK ELEMENT 8                                    STANDARD                    Grade NOTIFY Chemistry Department to sample Chemistry notified to sample.
7.6.1f    mixing basin for sodium nitrite.                                                            S U Comment:
NOTE: Evaluator: If operator starts to notify Chemistry, STATE: the CRS will notify them.
Proc. Step              TASK ELEMENT 9                                    STANDARD                    Grade Notify the CRS that SOP-16, Section 7.6.1 CRS notified Section 7.6.1 of SOP-16 complete.
n/a      is complete.                                                                                S U Comment:
END OF TASK PALISADES NUCLEAR PLANT                         Page 6 of 7                                   JULY 2008


JPM: RO SYSTEM g CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
INITIAL CONDITIONS:
* CV-0913, ESS Pumps CCW Supply, had a severe packing leak requiring the valve to have a packing adjustment.
* CV-0913, ESS Pumps CCW Supply, had a severe packing leak requiring the valve to have a packing adjustment.
* CV-0913 must be closed to ensure the valve will move and that the packing is not leaking with the valve closed.  
* CV-0913 must be closed to ensure the valve will move and that the packing is not leaking with the valve closed.
 
INITIATING CUES:
INITIATING CUES:
* The CRS directs you to align Service Water to the ESS Pumps per Section 7.6.1 of SOP-16, Component Cooling Water System.}}
* The CRS directs you to align Service Water to the ESS Pumps per Section 7.6.1 of SOP-16, Component Cooling Water System.
PALISADES NUCLEAR PLANT              Page 7 of 7                          JULY 2008}}

Latest revision as of 05:12, 14 November 2019

NRC Region III, Initial License Exam, Job Performance Measure, JPM: RO System G, Title: Align Backup Cooling to Engineered Safeguards Pumps
ML091520499
Person / Time
Site: Palisades Entergy icon.png
Issue date: 07/07/2008
From:
NRC/RGN-III
To:
Entergy Nuclear Palisades
Shared Package
ML082200319 List:
References
Download: ML091520499 (7)


Text

NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM: RO SYSTEM g TITLE: ALIGN BACKUP COOLING TO ENGINEERED SAFEGUARDS PUMPS CANDIDATE: _____________________________________________

EXAMINER: _____________________________________________

JPM: RO SYSTEM g JOB PERFORMANCE MEASURE DATA PAGE Task: Align backup cooling to Engineered Safeguards Pumps Alternate Path: NO Facility JPM #: NEW K/A: 008A4.01 Importance: RO: 3.3 SRO: 3.1 K/A Statement: Ability to manually operate and/or monitor in the control room: CCW indications and controls Task Standard: Service Water aligned to ESS pumps per SOP-16.

Preferred Evaluation Location: Simulator __X__ In Plant _____

Preferred Evaluation Method: Perform __X__ Simulate _____

References:

SOP-16, Component Cooling Water System Validation Time:10 minutes Time Critical: NO Candidate:

Time Start: ________ Time Finish: ________

Performance Time: ________ minutes Performance Rating: SAT______ UNSAT ______

Comments:

Examiner: _______________________________ Date: ______________

Signature PALISADES NUCLEAR PLANT Page 2 of 7 JULY 2008

JPM: RO SYSTEM g EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:

SOP-16, Component Cooling Water System, Rev. 31 Also see Simulator Operator Instructions (last page of this document).

READ TO CANDIDATE DIRECTION TO CANDIDATE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

  • CV-0913, ESS Pumps CCW Supply, had a severe packing leak requiring the valve to have a packing adjustment.
  • CV-0913 must be closed to ensure the valve will move and that the packing is not leaking with the valve closed.
  • Chemistry has been notified of the operation.

INITIATING CUES:

  • The CRS directs you to align Service Water to the ESS Pumps per Section 7.6.1 of SOP-16, Component Cooling Water System.

PALISADES NUCLEAR PLANT Page 3 of 7 JULY 2008

JPM: RO SYSTEM g Proc. Step TASK ELEMENT 1 STANDARD Grade Locate SOP-16, Section 7.6.1, To Align SOP-16, Section 7.6.1 located n/a Service Water to ESS Pumps S U Comment:

Evaluator provides candidate with a Working Copy.

Proc. Step TASK ELEMENT 2 STANDARD Grade ENSURE in the CLOSED position, Handswitches for the following valves verified handswitches for the following valves: closed:

CV-0879, ESS Pumps SW Supply CV-0879, ESS Pumps SW Supply 7.6.1a S U CV-0880, ESS Pumps SW Supply CV-0880, ESS Pumps SW Supply CV-0951, ESS Pumps SW Return CV-0951, ESS Pumps SW Return Comment:

Proc. Step TASK ELEMENT 3 STANDARD Grade OPEN the Air Supply Valves to the Auxiliary Operator contacted to open air following valves: supplies to the following valves:

CV-0879, ESS Pumps SW Supply CV-0879, ESS Pumps SW Supply 7.6.1b S U CV-0880, ESS Pumps SW Supply CV-0880, ESS Pumps SW Supply CV-0951, ESS Pumps SW Return CV-0951, ESS Pumps SW Return Comment:

NOTE: Operator will have to contact AO to complete step, Simulator Operator takes Remotes to OPEN, and reports back to operator that Step 7.6.1b is complete.

CRITICAL STEP PALISADES NUCLEAR PLANT Page 4 of 7 JULY 2008

JPM: RO SYSTEM g Proc. Step TASK ELEMENT 4 STANDARD Grade CLOSE the following valves:

CV-0913, ESS Pumps CCW Supply, AND CV-CV-0913, ESS Pumps CCW Supply 7.6.1c 0950, ESS Pump CCW Return, closed. S U CV-0950, ESS Pump CCW Return Comment:

CRITICAL STEP Proc. Step TASK ELEMENT 5 STANDARD Grade OPEN CV-0879 OR CV-0880, ESS CV-0879 OR CV-0880 placed in the OPEN 7.6.1d Pumps SW Supply position. S U Comment:

NOTE: Only one of these valves needs to be placed to open to satisfy the critical step.

CRITICAL STEP Proc. Step TASK ELEMENT 6 STANDARD Grade EK-1155, WEST ENG SAFEGUARDS PPS CLG WTR LO FLOW, and EK-1156, ARP-7 checked for alarms EK-1155 and EK-EAST ENG SAFEGUARDS PPS CLG 1156 alarming. (Alarms due to opening of CV-n/a WTR LO FLOW alarms annunciate (CV- 0879 or CV-0880). No operator action needed. S U 0879 or CV-0880 opening)

Comment:

NOTE: EK-1155 and EK-1156 alarms annunciated due to no cooling water flow to ESS Pumps PALISADES NUCLEAR PLANT Page 5 of 7 JULY 2008

JPM: RO SYSTEM g Proc. Step TASK ELEMENT 7 STANDARD Grade OPEN CV-0951, ESS Pumps SW Return CV-0951 placed to open.

7.6.1e S U Comment:

NOTE: EK-1155 and EK-1156 alarms will clear with the opening of CV-0951 (SW established to ESS Pump Cooling).

CRITICAL STEP Proc. Step TASK ELEMENT 8 STANDARD Grade NOTIFY Chemistry Department to sample Chemistry notified to sample.

7.6.1f mixing basin for sodium nitrite. S U Comment:

NOTE: Evaluator: If operator starts to notify Chemistry, STATE: the CRS will notify them.

Proc. Step TASK ELEMENT 9 STANDARD Grade Notify the CRS that SOP-16, Section 7.6.1 CRS notified Section 7.6.1 of SOP-16 complete.

n/a is complete. S U Comment:

END OF TASK PALISADES NUCLEAR PLANT Page 6 of 7 JULY 2008

JPM: RO SYSTEM g CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)

INITIAL CONDITIONS:

  • CV-0913, ESS Pumps CCW Supply, had a severe packing leak requiring the valve to have a packing adjustment.
  • CV-0913 must be closed to ensure the valve will move and that the packing is not leaking with the valve closed.

INITIATING CUES:

  • The CRS directs you to align Service Water to the ESS Pumps per Section 7.6.1 of SOP-16, Component Cooling Water System.

PALISADES NUCLEAR PLANT Page 7 of 7 JULY 2008