ML091520499: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE | {{#Wiki_filter:NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM: RO SYSTEM g TITLE: ALIGN BACKUP COOLING TO ENGINEERED SAFEGUARDS PUMPS CANDIDATE: _____________________________________________ | ||
EXAMINER: _____________________________________________ | |||
JPM: RO SYSTEM g | JPM: RO SYSTEM g JOB PERFORMANCE MEASURE DATA PAGE Task: Align backup cooling to Engineered Safeguards Pumps Alternate Path: NO Facility JPM #: NEW K/A: 008A4.01 Importance: RO: 3.3 SRO: 3.1 K/A Statement: Ability to manually operate and/or monitor in the control room: CCW indications and controls Task Standard: Service Water aligned to ESS pumps per SOP-16. | ||
Preferred Evaluation Location: Simulator __X__ In Plant _____ | |||
Preferred Evaluation Method: Perform __X__ Simulate _____ | |||
Alternate Path: NO | |||
Facility JPM #: NEW | |||
K/A: 008A4.01 | |||
K/A Statement: Ability to manually operate and/or monitor in the control room: CCW indications and controls | |||
Task Standard: Service Water aligned to ESS pumps per SOP-16. | |||
Preferred Evaluation Location: Simulator __X__ | |||
Preferred Evaluation Method: Perform | |||
==References:== | ==References:== | ||
SOP-16, Component Cooling Water System | SOP-16, Component Cooling Water System Validation Time:10 minutes Time Critical: NO Candidate: | ||
Time Start: ________ Time Finish: ________ | |||
Validation Time: 10 minutes | Performance Time: ________ minutes Performance Rating: SAT______ UNSAT ______ | ||
Comments: | |||
Candidate: | Examiner: _______________________________ Date: ______________ | ||
Signature PALISADES NUCLEAR PLANT Page 2 of 7 JULY 2008 | |||
Time Start: ________ | |||
Performance Time: | |||
Performance Rating: SAT______ | |||
Comments: | |||
Examiner: _______________________________ | |||
JPM: RO SYSTEM g EXAMINER COPY ONLY Tools/Equipment/Procedures Needed: | |||
SOP-16, Component Cooling Water System, Rev. 31 Also see Simulator Operator Instructions (last page of this document). | |||
READ TO CANDIDATE DIRECTION TO CANDIDATE: | |||
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. | |||
INITIAL CONDITIONS: | INITIAL CONDITIONS: | ||
* CV-0913, ESS Pumps CCW Supply, had a severe packing leak requiring the valve to have a packing adjustment. | * CV-0913, ESS Pumps CCW Supply, had a severe packing leak requiring the valve to have a packing adjustment. | ||
* CV-0913 must be closed to ensure the valve will move and that the packing is not leaking with the valve closed. | * CV-0913 must be closed to ensure the valve will move and that the packing is not leaking with the valve closed. | ||
* Chemistry has been notified of the operation. | * Chemistry has been notified of the operation. | ||
INITIATING CUES: | INITIATING CUES: | ||
* The CRS directs you to align Service Water to the ESS Pumps per Section 7.6.1 of SOP-16, Component Cooling Water System. | * The CRS directs you to align Service Water to the ESS Pumps per Section 7.6.1 of SOP-16, Component Cooling Water System. | ||
PALISADES NUCLEAR PLANT Page 3 of 7 JULY 2008 | |||
Proc. Step TASK ELEMENT | JPM: RO SYSTEM g Proc. Step TASK ELEMENT 1 STANDARD Grade Locate SOP-16, Section 7.6.1, To Align SOP-16, Section 7.6.1 located n/a Service Water to ESS Pumps S U Comment: | ||
Evaluator provides candidate with a Working Copy. | |||
S | Proc. Step TASK ELEMENT 2 STANDARD Grade ENSURE in the CLOSED position, Handswitches for the following valves verified handswitches for the following valves: closed: | ||
Proc. Step TASK ELEMENT | CV-0879, ESS Pumps SW Supply CV-0879, ESS Pumps SW Supply 7.6.1a S U CV-0880, ESS Pumps SW Supply CV-0880, ESS Pumps SW Supply CV-0951, ESS Pumps SW Return CV-0951, ESS Pumps SW Return Comment: | ||
Proc. Step TASK ELEMENT 3 STANDARD Grade OPEN the Air Supply Valves to the Auxiliary Operator contacted to open air following valves: supplies to the following valves: | |||
CV-0879, ESS Pumps SW Supply CV-0879, ESS Pumps SW Supply 7.6.1b S U CV-0880, ESS Pumps SW Supply CV-0880, ESS Pumps SW Supply CV-0951, ESS Pumps SW Return CV-0951, ESS Pumps SW Return Comment: | |||
NOTE: Operator will have to contact AO to complete step, Simulator Operator takes Remotes to OPEN, and reports back to operator that Step 7.6.1b is complete. | |||
CRITICAL STEP PALISADES NUCLEAR PLANT Page 4 of 7 JULY 2008 | |||
JPM: RO SYSTEM g Proc. Step TASK ELEMENT 4 STANDARD Grade CLOSE the following valves: | |||
CV-0913, ESS Pumps CCW Supply, AND CV-CV-0913, ESS Pumps CCW Supply 7.6.1c 0950, ESS Pump CCW Return, closed. S U CV-0950, ESS Pump CCW Return Comment: | |||
CRITICAL STEP Proc. Step TASK ELEMENT 5 STANDARD Grade OPEN CV-0879 OR CV-0880, ESS CV-0879 OR CV-0880 placed in the OPEN 7.6.1d Pumps SW Supply position. S U Comment: | |||
NOTE: Only one of these valves needs to be placed to open to satisfy the critical step. | |||
CRITICAL STEP Proc. Step TASK ELEMENT 6 STANDARD Grade EK-1155, WEST ENG SAFEGUARDS PPS CLG WTR LO FLOW, and EK-1156, ARP-7 checked for alarms EK-1155 and EK-EAST ENG SAFEGUARDS PPS CLG 1156 alarming. (Alarms due to opening of CV-n/a WTR LO FLOW alarms annunciate (CV- 0879 or CV-0880). No operator action needed. S U 0879 or CV-0880 opening) | |||
Comment: | |||
NOTE: EK-1155 and EK-1156 alarms annunciated due to no cooling water flow to ESS Pumps PALISADES NUCLEAR PLANT Page 5 of 7 JULY 2008 | |||
JPM: RO SYSTEM g | JPM: RO SYSTEM g Proc. Step TASK ELEMENT 7 STANDARD Grade OPEN CV-0951, ESS Pumps SW Return CV-0951 placed to open. | ||
7.6.1e S U Comment: | |||
NOTE: EK-1155 and EK-1156 alarms will clear with the opening of CV-0951 (SW established to ESS Pump Cooling). | |||
CRITICAL STEP Proc. Step TASK ELEMENT 8 STANDARD Grade NOTIFY Chemistry Department to sample Chemistry notified to sample. | |||
7.6.1f mixing basin for sodium nitrite. S U Comment: | |||
NOTE: Evaluator: If operator starts to notify Chemistry, STATE: the CRS will notify them. | |||
Proc. Step TASK ELEMENT 9 STANDARD Grade Notify the CRS that SOP-16, Section 7.6.1 CRS notified Section 7.6.1 of SOP-16 complete. | |||
n/a is complete. S U Comment: | |||
END OF TASK PALISADES NUCLEAR PLANT Page 6 of 7 JULY 2008 | |||
JPM: RO SYSTEM g CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK) | |||
INITIAL CONDITIONS: | INITIAL CONDITIONS: | ||
* CV-0913, ESS Pumps CCW Supply, had a severe packing leak requiring the valve to have a packing adjustment. | * CV-0913, ESS Pumps CCW Supply, had a severe packing leak requiring the valve to have a packing adjustment. | ||
* CV-0913 must be closed to ensure the valve will move and that the packing is not leaking with the valve closed. | * CV-0913 must be closed to ensure the valve will move and that the packing is not leaking with the valve closed. | ||
INITIATING CUES: | INITIATING CUES: | ||
* The CRS directs you to align Service Water to the ESS Pumps per Section 7.6.1 of SOP-16, Component Cooling Water System.}} | * The CRS directs you to align Service Water to the ESS Pumps per Section 7.6.1 of SOP-16, Component Cooling Water System. | ||
PALISADES NUCLEAR PLANT Page 7 of 7 JULY 2008}} |
Latest revision as of 05:12, 14 November 2019
ML091520499 | |
Person / Time | |
---|---|
Site: | Palisades |
Issue date: | 07/07/2008 |
From: | NRC/RGN-III |
To: | Entergy Nuclear Palisades |
Shared Package | |
ML082200319 | List: |
References | |
Download: ML091520499 (7) | |
Text
NRC REGION III INITIAL LICENSE EXAM JOB PERFORMANCE MEASURE JPM: RO SYSTEM g TITLE: ALIGN BACKUP COOLING TO ENGINEERED SAFEGUARDS PUMPS CANDIDATE: _____________________________________________
EXAMINER: _____________________________________________
JPM: RO SYSTEM g JOB PERFORMANCE MEASURE DATA PAGE Task: Align backup cooling to Engineered Safeguards Pumps Alternate Path: NO Facility JPM #: NEW K/A: 008A4.01 Importance: RO: 3.3 SRO: 3.1 K/A Statement: Ability to manually operate and/or monitor in the control room: CCW indications and controls Task Standard: Service Water aligned to ESS pumps per SOP-16.
Preferred Evaluation Location: Simulator __X__ In Plant _____
Preferred Evaluation Method: Perform __X__ Simulate _____
References:
SOP-16, Component Cooling Water System Validation Time:10 minutes Time Critical: NO Candidate:
Time Start: ________ Time Finish: ________
Performance Time: ________ minutes Performance Rating: SAT______ UNSAT ______
Comments:
Examiner: _______________________________ Date: ______________
Signature PALISADES NUCLEAR PLANT Page 2 of 7 JULY 2008
JPM: RO SYSTEM g EXAMINER COPY ONLY Tools/Equipment/Procedures Needed:
SOP-16, Component Cooling Water System, Rev. 31 Also see Simulator Operator Instructions (last page of this document).
READ TO CANDIDATE DIRECTION TO CANDIDATE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
- CV-0913, ESS Pumps CCW Supply, had a severe packing leak requiring the valve to have a packing adjustment.
- CV-0913 must be closed to ensure the valve will move and that the packing is not leaking with the valve closed.
- Chemistry has been notified of the operation.
INITIATING CUES:
- The CRS directs you to align Service Water to the ESS Pumps per Section 7.6.1 of SOP-16, Component Cooling Water System.
PALISADES NUCLEAR PLANT Page 3 of 7 JULY 2008
JPM: RO SYSTEM g Proc. Step TASK ELEMENT 1 STANDARD Grade Locate SOP-16, Section 7.6.1, To Align SOP-16, Section 7.6.1 located n/a Service Water to ESS Pumps S U Comment:
Evaluator provides candidate with a Working Copy.
Proc. Step TASK ELEMENT 2 STANDARD Grade ENSURE in the CLOSED position, Handswitches for the following valves verified handswitches for the following valves: closed:
CV-0879, ESS Pumps SW Supply CV-0879, ESS Pumps SW Supply 7.6.1a S U CV-0880, ESS Pumps SW Supply CV-0880, ESS Pumps SW Supply CV-0951, ESS Pumps SW Return CV-0951, ESS Pumps SW Return Comment:
Proc. Step TASK ELEMENT 3 STANDARD Grade OPEN the Air Supply Valves to the Auxiliary Operator contacted to open air following valves: supplies to the following valves:
CV-0879, ESS Pumps SW Supply CV-0879, ESS Pumps SW Supply 7.6.1b S U CV-0880, ESS Pumps SW Supply CV-0880, ESS Pumps SW Supply CV-0951, ESS Pumps SW Return CV-0951, ESS Pumps SW Return Comment:
NOTE: Operator will have to contact AO to complete step, Simulator Operator takes Remotes to OPEN, and reports back to operator that Step 7.6.1b is complete.
CRITICAL STEP PALISADES NUCLEAR PLANT Page 4 of 7 JULY 2008
JPM: RO SYSTEM g Proc. Step TASK ELEMENT 4 STANDARD Grade CLOSE the following valves:
CV-0913, ESS Pumps CCW Supply, AND CV-CV-0913, ESS Pumps CCW Supply 7.6.1c 0950, ESS Pump CCW Return, closed. S U CV-0950, ESS Pump CCW Return Comment:
CRITICAL STEP Proc. Step TASK ELEMENT 5 STANDARD Grade OPEN CV-0879 OR CV-0880, ESS CV-0879 OR CV-0880 placed in the OPEN 7.6.1d Pumps SW Supply position. S U Comment:
NOTE: Only one of these valves needs to be placed to open to satisfy the critical step.
CRITICAL STEP Proc. Step TASK ELEMENT 6 STANDARD Grade EK-1155, WEST ENG SAFEGUARDS PPS CLG WTR LO FLOW, and EK-1156, ARP-7 checked for alarms EK-1155 and EK-EAST ENG SAFEGUARDS PPS CLG 1156 alarming. (Alarms due to opening of CV-n/a WTR LO FLOW alarms annunciate (CV- 0879 or CV-0880). No operator action needed. S U 0879 or CV-0880 opening)
Comment:
NOTE: EK-1155 and EK-1156 alarms annunciated due to no cooling water flow to ESS Pumps PALISADES NUCLEAR PLANT Page 5 of 7 JULY 2008
JPM: RO SYSTEM g Proc. Step TASK ELEMENT 7 STANDARD Grade OPEN CV-0951, ESS Pumps SW Return CV-0951 placed to open.
7.6.1e S U Comment:
NOTE: EK-1155 and EK-1156 alarms will clear with the opening of CV-0951 (SW established to ESS Pump Cooling).
CRITICAL STEP Proc. Step TASK ELEMENT 8 STANDARD Grade NOTIFY Chemistry Department to sample Chemistry notified to sample.
7.6.1f mixing basin for sodium nitrite. S U Comment:
NOTE: Evaluator: If operator starts to notify Chemistry, STATE: the CRS will notify them.
Proc. Step TASK ELEMENT 9 STANDARD Grade Notify the CRS that SOP-16, Section 7.6.1 CRS notified Section 7.6.1 of SOP-16 complete.
n/a is complete. S U Comment:
END OF TASK PALISADES NUCLEAR PLANT Page 6 of 7 JULY 2008
JPM: RO SYSTEM g CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER TO UPON COMPLETION OF TASK)
INITIAL CONDITIONS:
- CV-0913, ESS Pumps CCW Supply, had a severe packing leak requiring the valve to have a packing adjustment.
- CV-0913 must be closed to ensure the valve will move and that the packing is not leaking with the valve closed.
INITIATING CUES:
- The CRS directs you to align Service Water to the ESS Pumps per Section 7.6.1 of SOP-16, Component Cooling Water System.
PALISADES NUCLEAR PLANT Page 7 of 7 JULY 2008