{{#Wiki_filter: | {{#Wiki_filter:John Richmond From: John Richmond , ("I Sent: Thursday, December 04, 2008 6:46 AM To: Richard Conte | ||
==Subject:== | ==Subject:== | ||
Revised OC Exit Notes Attachments: OC LRI 2008-07_Exit Notes_12-3-08_rev-3.doc Importance: High attached I*n'W I~~I aloiefwd wmasts In 1 acordacewiwth the Freedom of InfoaOflq Att 1 1A113 Exemptio5' | |||
Received: from R1CLSTRO1 .nrc.gov ([148.184.99.7]) by R1 MS01 .nrc.gov | |||
from R1CLSTRO1 .nrc.gov ([148.184.99.7]) | ([148.184.99.10]) with mapi; Thu, 4 Dec 2008 06:45:16 -0500 Content-Type: application/ms-tnef; name="winmail.dat" Content-Transfer-Encoding: binary From: John Richmond <John. Richmond@nrc.gov> | ||
by R1 MS01 .nrc.gov ([148.184.99.10]) | |||
with mapi; Thu, 4 Dec 2008 06:45:16 -0500 Content-Type: | |||
application/ms-tnef; name="winmail.dat" Content-Transfer-Encoding: | |||
binary From: John Richmond <John. Richmond@nrc.gov> | |||
To: Richard Conte <Richard.Conte@nrc.gov> | To: Richard Conte <Richard.Conte@nrc.gov> | ||
Importance: | Importance: high Date: Thu, 4 Dec 2008 06:45:36 -0500 | ||
high Date: Thu, 4 Dec 2008 06:45:36 -0500 | |||
==Subject:== | ==Subject:== | ||
Revised OC Exit Notes Thread-Topic: | Revised OC Exit Notes Thread-Topic: Revised OC Exit Notes Thread-Index: AcIWBdJaCW+jYBd+SOOS9Wy21 IpPjQ== | ||
Revised OC Exit Notes Thread-Index: | Message-ID: | ||
AcIWBdJaCW+jYBd+SOOS9Wy21 IpPjQ==Message-ID: | |||
<2856BC46F6A308418F033D973BBOEE72AA5CAF1 B3E@R1 CLSTRO1.nrc.gov> | <2856BC46F6A308418F033D973BBOEE72AA5CAF1 B3E@R1 CLSTRO1.nrc.gov> | ||
Accept-Language: | Accept-Language: en-US Content-Language: en-US X-MS-Has-Attach: yes X-MS-Exchange-Organization-SCL: -1 X-MS-TNEF-Correlator: | ||
en-US Content-Language: | <2856BC46F6A308418FO33D973BBOEE72AA5CAF1 B3E@R1 CLSTRO1 .nrc.gov> | ||
en-US X-MS-Has-Attach: | MIME-Version: 1.0 | ||
yes X-MS-Exchange-Organization-SCL: | |||
-1 X-MS-TNEF-Correlator: | Pr ýi~si ýaln ti-ff Jaý Oyster Creek License Renewal Commitments Inspection Exit Meeting - Dec 3, 2008 | ||
<2856BC46F6A308418FO33D973BBOEE72AA5CAF1 B3E@R1 CLSTRO1 .nrc.gov>MIME-Version: | |||
1.0 | ===Introductions=== | ||
Excellent Overall Cooperation from everybody>>> use of the Certrec Internet Database was quite helpful Special Thanks 9 Pete Tamburro (LR Program Owner)* Chris Hawkins (NDE Level-Ill)" Cal Taylor & Jhansi Kandasamy Tough Inspection Schedule & Difficult Inspection" LR outage schedule slipped due to unexpected issues* Some NDE UTs re-scheduled, due to unanticipated physical interference issues" Bay 11 Coating Blisters" Bay 3 Moisture Barrier Seal Problem" Cavity Leakage and. Water Intrusion into.4 bays" As a result, our inspection ran into a 2nd on-site week and a 3rd in-office week Documentation Team Report 45 days after the Exit Meeting (mid Jan)Exec Summary of Inspection Results" Satisfactory Actions to evaluate, primary containment structural integrity* (b)(5)These items were also commitments to Generic Letter 87-05* Strippable Coating to Prevent Water Intrusion" Monitoring of Sand Bed Drain Lines" For the selected samples: (b)(5)* Sampled 9 AMPs to Verify Commitment Implementation" No Problems or Issues Identified, with Two/Three | " NRC Region 1 | ||
(??) Notable Exceptions | * NRC HQ | ||
* (b)(5)" Perform Full Scope inspections of sand bed region every other outage" Monitor drywell trenches for water every refueling outage, until trenches are restored* Verified 2 commitment changes were done iaw Exelon commitment management program" Bolting Integrity Program (commitment 12)* Rx Vessel Axial Weld Examination Relief Request (commitment 48)(b)(5)(b)(5)Pay Page 1 of 5 on a/n ,o-"atn .. Off'tial Ute /.I, Inspection Details -- Two (?? Three) Minor Issues Will be Documented (1) Commitment 27, ASME Section Xl, Subsection IWE, Item (2) Not Fully Implemented A strippable coating will be applied to the reactor cavity liner to prevent water intrusion into the gap between the drywell shield wall and- the drywell shell during periods when the reactor cavity is flooded.o The strippable coating initially limited leakage into the cavity drain trough at < 1 gpm. On Nov 7, the leakage rate took a step change to 4 to 6 gpm. Water was subsequently identified in 4 sand bed bays.This was also a previous commitment made in response to Generic Letter 87-05 V | * NRC Residents | ||
ý6fomn on -- OffjaI U~e O'f Pg | " AmerGen | ||
>>> I recommend we NOT document this issue in the IR>>> This issue is NOT in the public domain>>> make this an Observation that does NOT go into the report (3) Commitment 27, ASME Section XI, Subsection IWE, Item (3) --:.Commitment Satisfied Reactor cavity seal leakage trough drains and the drywell sand bed region drains will be monitored for leakage. Periodically. | " NJ DEP (Observers) | ||
* Drain line was found isolated during a boroscope examination to verify no * | Excellent Overall Cooperation from everybody | ||
-- | >>> use of the Certrec Internet Database was quite helpful Special Thanks 9 Pete Tamburro (LR Program Owner) | ||
* Chris Hawkins (NDE Level-Ill) | |||
" Cal Taylor & Jhansi Kandasamy Tough Inspection Schedule & Difficult Inspection | |||
" LR outage schedule slipped due to unexpected issues | |||
* Some NDE UTs re-scheduled, due to unanticipated physical interference issues | |||
" Bay 11 Coating Blisters | |||
" Bay 3 Moisture Barrier Seal Problem | |||
" Cavity Leakage and. Water Intrusion into.4 bays | |||
" As a result, our inspection ran into a 2nd on-site week and a 3rd in-office week Documentation Team Report 45 days after the Exit Meeting (mid Jan) | |||
Exec Summary of Inspection Results | |||
" Satisfactory Actions to evaluate, primary containment structural integrity | |||
* (b)(5) | |||
These items were also commitments to Generic Letter 87-05 | |||
* Strippable Coating to Prevent Water Intrusion | |||
" Monitoring of Sand Bed Drain Lines | |||
" For the selected samples: (b)(5) | |||
* Sampled 9 AMPs to Verify Commitment Implementation | |||
" No Problems or Issues Identified, with Two/Three (??) Notable Exceptions | |||
* (b)(5) | |||
" Perform Full Scope inspections of sand bed region every other outage | |||
" Monitor drywell trenches for water every refueling outage, until trenches are restored | |||
* Verified 2 commitment changes were done iaw Exelon commitment management program | |||
" Bolting Integrity Program (commitment 12) | |||
* Rx Vessel Axial Weld Examination Relief Request (commitment 48) | |||
(b)(5) | |||
(b)(5) | |||
Pay Page 1 of 5 | |||
P/r*-De on a/n ,o-"atn .. Off'tial Ute /.I, Inspection Details -- Two (?? Three) Minor Issues Will be Documented (1) Commitment 27, ASME Section Xl, Subsection IWE, Item (2) Not Fully Implemented A strippable coating will be applied to the reactor cavity liner to prevent water intrusion into the gap between the drywell shield wall and-the drywell shell during periods when the reactor cavity is flooded. | |||
o The strippable coating initially limited leakage into the cavity drain trough at < 1 gpm. On Nov 7, the leakage rate took a step change to 4 to 6 gpm. Water was subsequently identified in 4 sand bed bays. | |||
This was also a previous commitment made in response to Generic Letter 87-05 V (b)(5) | |||
I (2) Commitment 27, ASME Section XI, Subsection IWE, Item (3) Not Fully Implemented Sand bed region drains will be monitored daily during refueling outages. | |||
9 Sand bed drains were remotely monitored by checking poly bottles, attached via tygon tubing to funnels hanging below the drain lines. The drain lines were not directly observed. | |||
* This was also a previous commitment made in response to Generic Letter 87-05 (b)(5) | |||
ANY QUESTIONS at this point Prle'-dec,~ional ý6fomn on -- OffjaI U~e O'f Page Pg 2o2 of 5 | |||
>>> I recommend we NOT document this issue in the IR | |||
>>> This issue is NOT in the public domain | |||
>>> make this an Observation that does NOT go into the report (3) Commitment 27, ASME Section XI, Subsection IWE, Item (3) -- :.Commitment Satisfied Reactor cavity seal leakage trough drains and the drywell sand bed region drains will be monitored for leakage. Periodically. | |||
* Drain line was found isolated during a boroscope examination to verify no *ineblockage. | |||
* ?? This was also a previous commitment made in response to Generic Letter 87-05 (b)(5) | |||
Pr.4ecýý l~ In~rrn1~ion -- ýclal ,ye 0Q1 c/YPae3f Page 3 of 5 | |||
Pages 6 through 7 redacted for the following reasons: | |||
(b)(5)}} |
Latest revision as of 04:17, 14 November 2019
ML091900513 | |
Person / Time | |
---|---|
Site: | Oyster Creek |
Issue date: | 12/04/2008 |
From: | Richmond J NRC Region 1 |
To: | Conte R NRC Region 1 |
References | |
FOIA/PA-2009-0070 | |
Download: ML091900513 (6) | |
Text
John Richmond From: John Richmond , ("I Sent: Thursday, December 04, 2008 6:46 AM To: Richard Conte
Subject:
Revised OC Exit Notes Attachments: OC LRI 2008-07_Exit Notes_12-3-08_rev-3.doc Importance: High attached I*n'W I~~I aloiefwd wmasts In 1 acordacewiwth the Freedom of InfoaOflq Att 1 1A113 Exemptio5'
Received: from R1CLSTRO1 .nrc.gov ([148.184.99.7]) by R1 MS01 .nrc.gov
([148.184.99.10]) with mapi; Thu, 4 Dec 2008 06:45:16 -0500 Content-Type: application/ms-tnef; name="winmail.dat" Content-Transfer-Encoding: binary From: John Richmond <John. Richmond@nrc.gov>
To: Richard Conte <Richard.Conte@nrc.gov>
Importance: high Date: Thu, 4 Dec 2008 06:45:36 -0500
Subject:
Revised OC Exit Notes Thread-Topic: Revised OC Exit Notes Thread-Index: AcIWBdJaCW+jYBd+SOOS9Wy21 IpPjQ==
Message-ID:
<2856BC46F6A308418F033D973BBOEE72AA5CAF1 B3E@R1 CLSTRO1.nrc.gov>
Accept-Language: en-US Content-Language: en-US X-MS-Has-Attach: yes X-MS-Exchange-Organization-SCL: -1 X-MS-TNEF-Correlator:
<2856BC46F6A308418FO33D973BBOEE72AA5CAF1 B3E@R1 CLSTRO1 .nrc.gov>
MIME-Version: 1.0
Pr ýi~si ýaln ti-ff Jaý Oyster Creek License Renewal Commitments Inspection Exit Meeting - Dec 3, 2008
Introductions
" NRC Region 1
- NRC HQ
- NRC Residents
" AmerGen
" NJ DEP (Observers)
Excellent Overall Cooperation from everybody
>>> use of the Certrec Internet Database was quite helpful Special Thanks 9 Pete Tamburro (LR Program Owner)
- Chris Hawkins (NDE Level-Ill)
" Cal Taylor & Jhansi Kandasamy Tough Inspection Schedule & Difficult Inspection
" LR outage schedule slipped due to unexpected issues
" Bay 11 Coating Blisters
" Bay 3 Moisture Barrier Seal Problem
" Cavity Leakage and. Water Intrusion into.4 bays
" As a result, our inspection ran into a 2nd on-site week and a 3rd in-office week Documentation Team Report 45 days after the Exit Meeting (mid Jan)
Exec Summary of Inspection Results
" Satisfactory Actions to evaluate, primary containment structural integrity
- (b)(5)
These items were also commitments to Generic Letter 87-05
- Strippable Coating to Prevent Water Intrusion
" Monitoring of Sand Bed Drain Lines
" For the selected samples: (b)(5)
- Sampled 9 AMPs to Verify Commitment Implementation
" No Problems or Issues Identified, with Two/Three (??) Notable Exceptions
- (b)(5)
" Perform Full Scope inspections of sand bed region every other outage
" Monitor drywell trenches for water every refueling outage, until trenches are restored
- Verified 2 commitment changes were done iaw Exelon commitment management program
" Bolting Integrity Program (commitment 12)
- Rx Vessel Axial Weld Examination Relief Request (commitment 48)
(b)(5)
(b)(5)
Pay Page 1 of 5
P/r*-De on a/n ,o-"atn .. Off'tial Ute /.I, Inspection Details -- Two (?? Three) Minor Issues Will be Documented (1) Commitment 27, ASME Section Xl, Subsection IWE, Item (2) Not Fully Implemented A strippable coating will be applied to the reactor cavity liner to prevent water intrusion into the gap between the drywell shield wall and-the drywell shell during periods when the reactor cavity is flooded.
o The strippable coating initially limited leakage into the cavity drain trough at < 1 gpm. On Nov 7, the leakage rate took a step change to 4 to 6 gpm. Water was subsequently identified in 4 sand bed bays.
This was also a previous commitment made in response to Generic Letter 87-05 V (b)(5)
I (2) Commitment 27, ASME Section XI, Subsection IWE, Item (3) Not Fully Implemented Sand bed region drains will be monitored daily during refueling outages.
9 Sand bed drains were remotely monitored by checking poly bottles, attached via tygon tubing to funnels hanging below the drain lines. The drain lines were not directly observed.
- This was also a previous commitment made in response to Generic Letter 87-05 (b)(5)
ANY QUESTIONS at this point Prle'-dec,~ional ý6fomn on -- OffjaI U~e O'f Page Pg 2o2 of 5
>>> I recommend we NOT document this issue in the IR
>>> This issue is NOT in the public domain
>>> make this an Observation that does NOT go into the report (3) Commitment 27, ASME Section XI, Subsection IWE, Item (3) -- :.Commitment Satisfied Reactor cavity seal leakage trough drains and the drywell sand bed region drains will be monitored for leakage. Periodically.
- Drain line was found isolated during a boroscope examination to verify no *ineblockage.
- ?? This was also a previous commitment made in response to Generic Letter 87-05 (b)(5)