{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 September 4, 2014 MEETING | ||
==SUMMARY== | ==SUMMARY== | ||
LICENSEE: PPL SUSQUEHANNA, LLC. | LICENSEE: PPL SUSQUEHANNA, LLC. | ||
FACILITY: SUSQUEHANNA GENERATING STATION, UNIT 2 | |||
FACILITY: SUSQUEHANNA GENERATING STATION, UNIT 2 | |||
==SUBJECT:== | ==SUBJECT:== | ||
==SUMMARY== | ==SUMMARY== | ||
OF PUBLIC MEETING | OF PUBLIC MEETING On September 3, 2014 at 5:00 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a meeting with PPL Susquehanna senior managers at the Susquehanna Energy Information Center in Berwick, PA. The NRC discussed the performance deficiencies and proposed corrective actions associated with the NRCs Supplemental Inspection Procedure 95002, "Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Performance Area, conducted at SSES Unit 2 during the weeks of July 14 and July 28, 2014. | ||
The inspection was performed as the result of two White Performance Indicators, both in the Initiating Events Cornerstone of the NRCs Action Matrix. The meeting was open for public observation. | |||
On September 3, 2014 at 5:00 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a meeting with PPL Susquehanna senior managers at the Susquehanna Energy Information Center in Berwick, PA. The NRC discussed the performance deficiencies and proposed corrective actions associated with the | A notice of the meeting was issued on August 20, 2014, and was posted on the NRCs external (public) Web page. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. ML14232A345. ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html. | ||
The NRC presentation is attached. During the meeting, PPL management discussed the status of the corrective actions taken to correct the deficiencies and improve performance. | |||
observation. | |||
A notice of the meeting was issued on August 20, 2014, and was posted on the | |||
Additional information relative to the NRC's Annual Assessment Process and safety performance of Susquehanna Units 1 and 2 can be found on the NRC's web site at: | Additional information relative to the NRC's Annual Assessment Process and safety performance of Susquehanna Units 1 and 2 can be found on the NRC's web site at: | ||
www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. | www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. | ||
The meeting with PPL managers was completed within approximately one hour. The NRC staff then hosted a question and answer discussion with members of the public and media in attendance regarding | The meeting with PPL managers was completed within approximately one hour. The NRC staff then hosted a question and answer discussion with members of the public and media in attendance regarding Susquehannas performance and the role of the agency in ensuring safe plant operations. | ||
/RA/ | |||
Fred L. Bower, III, Chief Projects Branch 4 Division of Reactor Projects | |||
==Enclosures:== | ==Enclosures:== | ||
Attendee List | Attendee List (ML14247A254) | ||
NRC Presentation | NRC Presentation (ML14247A261) | ||
ML14247A608 SUNSI Review Non-Sensitive | ML14247A608 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME ATurilin/ AT FBower/ FLB DATE 09/04/14 09/04/14}} |
Latest revision as of 00:43, 4 November 2019
ML14247A608 | |
Person / Time | |
---|---|
Site: | Susquehanna |
Issue date: | 09/04/2014 |
From: | Fred Bower Reactor Projects Region 1 Branch 4 |
To: | |
BOWER, FL | |
Shared Package | |
ML14247A237 | List: |
References | |
ML14232A345 | |
Download: ML14247A608 (2) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 September 4, 2014 MEETING
SUMMARY
LICENSEE: PPL SUSQUEHANNA, LLC.
FACILITY: SUSQUEHANNA GENERATING STATION, UNIT 2
SUBJECT:
SUMMARY
OF PUBLIC MEETING On September 3, 2014 at 5:00 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a meeting with PPL Susquehanna senior managers at the Susquehanna Energy Information Center in Berwick, PA. The NRC discussed the performance deficiencies and proposed corrective actions associated with the NRCs Supplemental Inspection Procedure 95002, "Inspection for One Degraded Cornerstone or Any Three White Inputs in a Strategic Performance Area, conducted at SSES Unit 2 during the weeks of July 14 and July 28, 2014.
The inspection was performed as the result of two White Performance Indicators, both in the Initiating Events Cornerstone of the NRCs Action Matrix. The meeting was open for public observation.
A notice of the meeting was issued on August 20, 2014, and was posted on the NRCs external (public) Web page. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. ML14232A345. ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html.
The NRC presentation is attached. During the meeting, PPL management discussed the status of the corrective actions taken to correct the deficiencies and improve performance.
Additional information relative to the NRC's Annual Assessment Process and safety performance of Susquehanna Units 1 and 2 can be found on the NRC's web site at:
www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
The meeting with PPL managers was completed within approximately one hour. The NRC staff then hosted a question and answer discussion with members of the public and media in attendance regarding Susquehannas performance and the role of the agency in ensuring safe plant operations.
/RA/
Fred L. Bower, III, Chief Projects Branch 4 Division of Reactor Projects
Enclosures:
Attendee List (ML14247A254)
NRC Presentation (ML14247A261)
ML14247A608 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME ATurilin/ AT FBower/ FLB DATE 09/04/14 09/04/14