| {{#Wiki_filter:-En tergy Entergy Nuclear Operations, Inc.Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth-, MA 02360 January 27, 2016 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 | | {{#Wiki_filter:- Entergy Entergy Nuclear Operations, Inc. |
| | Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth-, MA 02360 January 27, 2016 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| PNPS Emergency Plan Revision and-Emergency Plan Implementing Procedure Revision Pilgrim Nuclear Power Station Docket No. 50-293 License No. DPR-35 LETTER NUMBER: 2.16.003 | | PNPS Emergency Plan Revision and-Emergency Plan Implementing Procedure Revision Pilgrim Nuclear Power Station Docket No. 50-293 License No. DPR-35 LETTER NUMBER: 2.16.003 |
|
| |
|
| ==Dear Sir or Madam:== | | ==Dear Sir or Madam:== |
| In accordance with 10 Code of Federal Regulations (CFR) 50.4, Entergy Nuclear Operations, Inc. is providing the latest revision to the PNPS Emergency Plan EP-PP-01 and Entergy EP-IP-440. | | |
| The plan and procedure revisions were reviewed in accordance with 10 CER 50.54(q). | | In accordance with 10 Code of Federal Regulations (CFR) 50.4, Entergy Nuclear Operations, Inc. is providing the latest revision to the PNPS Emergency Plan EP-PP-01 and Entergy EP-IP-440. The plan and procedure revisions were reviewed in accordance with 10 CER 50.54(q). The 50.54(q) reviews are also provided in the letter attachment. |
| The 50.54(q) reviews are also provided in the letter attachment. | | The PNPS Emergency Plan continues to meet the planning standards outlined in 10 CER 50.47, the effectiveness of the emergency plan is not reduced, and the changes did not require prior U.S. Nuclear Regulatory Commission approval. |
| The PNPS Emergency Plan continues to meet the planning standards outlined in 10 CER 50.47, the effectiveness of the emergency plan is not reduced, and the changes did not require prior U.S. Nuclear Regulatory Commission approval.There are no commitments contained in this letter.If you have any questions or require additional information, please contact me at (508) 830-8227.Donna Calabl6's&- | | There are no commitments contained in this letter. |
| Emergency Planning Manager KLS/jc | | If you have any questions or require additional information, please contact me at (508) 830-8227. |
| | Donna Calabl6's&- |
| | Emergency Planning Manager KLS/jc |
|
| |
|
| ==Attachment:== | | ==Attachment:== |
| : 1. EP-PP-01, Revision 45 procedure and associated 50.54(q) Review 2. EP-IP-440, Revision 11 procedure and associated 50.54(q) Review Entergy Nuclear Operations, Ine.Pilgrim Nuclear Power Station CC: Director of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555 Letter No. 2.16. 003 Page 2 U.S. Nuclear Regulatory Commission Region 1 -Incident Response Center 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 NRC Resident Inspector Pilgrim Nuclear Power Station | | : 1. EP-PP-01, Revision 45 procedure and associated 50.54(q) Review |
| -En tergy Entergy Nuclear Operations, Inc.Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth-, MA 02360 January 27, 2016 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 | | : 2. EP-IP-440, Revision 11 procedure and associated 50.54(q) Review |
| | |
| | Entergy Nuclear Operations,Ine. Letter No. 2.16.003 PilgrimNuclear Power Station Page 2 CC: |
| | Director of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555 U.S. Nuclear Regulatory Commission Region 1 - Incident Response Center 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 NRC Resident Inspector Pilgrim Nuclear Power Station |
| | |
| | - Entergy Entergy Nuclear Operations, Inc. |
| | Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth-, MA 02360 January 27, 2016 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| PNPS Emergency Plan Revision and-Emergency Plan Implementing Procedure Revision Pilgrim Nuclear Power Station Docket No. 50-293 License No. DPR-35 LETTER NUMBER: 2.16.003 | | PNPS Emergency Plan Revision and-Emergency Plan Implementing Procedure Revision Pilgrim Nuclear Power Station Docket No. 50-293 License No. DPR-35 LETTER NUMBER: 2.16.003 |
|
| |
|
| ==Dear Sir or Madam:== | | ==Dear Sir or Madam:== |
| In accordance with 10 Code of Federal Regulations (CFR) 50.4, Entergy Nuclear Operations, Inc. is providing the latest revision to the PNPS Emergency Plan EP-PP-01 and Entergy EP-IP-440. | | |
| The plan and procedure revisions were reviewed in accordance with 10 CER 50.54(q). | | In accordance with 10 Code of Federal Regulations (CFR) 50.4, Entergy Nuclear Operations, Inc. is providing the latest revision to the PNPS Emergency Plan EP-PP-01 and Entergy EP-IP-440. The plan and procedure revisions were reviewed in accordance with 10 CER 50.54(q). The 50.54(q) reviews are also provided in the letter attachment. |
| The 50.54(q) reviews are also provided in the letter attachment. | | The PNPS Emergency Plan continues to meet the planning standards outlined in 10 CER 50.47, the effectiveness of the emergency plan is not reduced, and the changes did not require prior U.S. Nuclear Regulatory Commission approval. |
| The PNPS Emergency Plan continues to meet the planning standards outlined in 10 CER 50.47, the effectiveness of the emergency plan is not reduced, and the changes did not require prior U.S. Nuclear Regulatory Commission approval.There are no commitments contained in this letter.If you have any questions or require additional information, please contact me at (508) 830-8227.Donna Calabl6's&- | | There are no commitments contained in this letter. |
| Emergency Planning Manager KLS/jc | | If you have any questions or require additional information, please contact me at (508) 830-8227. |
| | Donna Calabl6's&- |
| | Emergency Planning Manager KLS/jc |
|
| |
|
| ==Attachment:== | | ==Attachment:== |
| : 1. EP-PP-01, Revision 45 procedure and associated 50.54(q) Review 2. EP-IP-440, Revision 11 procedure and associated 50.54(q) Review Entergy Nuclear Operations, Ine.Pilgrim Nuclear Power Station CC: Director of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555 Letter No. 2.16. 003 Page 2 U.S. Nuclear Regulatory Commission Region 1 -Incident Response Center 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 NRC Resident Inspector Pilgrim Nuclear Power Station}} | | : 1. EP-PP-01, Revision 45 procedure and associated 50.54(q) Review |
| | : 2. EP-IP-440, Revision 11 procedure and associated 50.54(q) Review |
| | |
| | Entergy Nuclear Operations,Ine. Letter No. 2.16.003 PilgrimNuclear Power Station Page 2 CC: |
| | Director of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555 U.S. Nuclear Regulatory Commission Region 1 - Incident Response Center 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 NRC Resident Inspector Pilgrim Nuclear Power Station}} |
|
---|
Category:Emergency Preparedness-Emergency Plan
[Table view] Category:Emergency Preparedness-Emergency Plan Implementing Procedures
MONTHYEARML18341A1432018-11-28028 November 2018 Revision 49 to Emergency Plan EP-PP-01 ML18194A5872018-07-11011 July 2018 Attachment 1 to 2.18.045, EP-AD-301, Emergency Action Level Technical Bases Document, Revision 9 and Associated 10 CFR50.54(q) Review ML18023A6912018-01-12012 January 2018 Revise the Pilgrim Emergency Plan to Address the Permanently Defueled Condition ML17299A1332017-08-22022 August 2017 EP-PP-01, Revision 48 Procedure and Associated 50.54(q) Review ML17202G6802017-07-17017 July 2017 Attachment 1 of Letter Number 2.17.053, EP-AD-601, Emergency Action Level Technical Bases Document, Revision 8 and Associated 10 CFR 50.54(q) Review ML17123A1852017-04-17017 April 2017 Revised 10 CFR 50.54(q) Review for the PNPS Emergency Plan, EP-PP-01, Revision 47 ML16265A6082016-09-0808 September 2016 Revised 10 CFR 50.54(q) for Emergency Plan Implementing Procedure EP-AD-601, Revision 7 ML16055A4612016-02-18018 February 2016 Emergency Plan Implementing Procedure Revisions, Including Revision 6 to EP-AD-601 and Revision 8 to EP-IP-261 ML16041A2042016-01-27027 January 2016 Emergency Plan Implementing Procedure EP-IP-440, Rev. 11, Emergency Exposure Controls. ML16035A5012016-01-27027 January 2016 Submittal of Emergency Plan Revision 45 to EP-PP-01 and Emergency Plan Implementing Procedure Revision 11 to 45 EP-IP-440 ML16020A3682016-01-12012 January 2016 Emergency Plan Implementing Procedure Revision, EP-IP-310, Offsite Monitoring Team Activation and Response, Revision 10 and Associated 10 CFR 50.54(q) Review ML16025A0932016-01-0707 January 2016 Revision 4 to Joint Information Center (JIC) Operations, EP-PI-261 ML16015A0112015-11-19019 November 2015 Revision 3 to Joint Information Center (JIC) Operations, EP-PI-261 ML0409801842004-03-26026 March 2004 Emergency Plan Implementing Procedure Manual Table of Contents ML0409203562004-03-25025 March 2004 Revised Epips, Including Rev. 86 to Table of Contents, Rev. 12 to EPIP-220, Rev. 6 to EPIP-229 & Rev.6 to EPIP-251 ML0402600082004-01-16016 January 2004 Emergency Plan Implementing Procedure EP-IP-100, Revision 22 ML0335102942003-12-10010 December 2003 Revision 84 to the Table of Contents, Revision 11 to EP-IP-200, Revision 4 to EP-IP-201, and Revision 4 to EP-IP-202 ML0334210202003-11-25025 November 2003 Revision 4 to EP-IP-254, Communications Support and Revision 83 to the Table of Contents ML0331000702003-10-28028 October 2003 Revision 82 to the Table of Contents and Revision 21 to EP-IP-100, Emergency Classification and Notification. ML0321905792003-07-17017 July 2003 Revision 5 to EP-IP-300 ,Offsite Radiological Dose Assessment ML0233803952002-11-22022 November 2002 Revision to Emergency Plan Implementing Procedures EPIP-310, EPIP-440 and TOC ML0220405102002-07-15015 July 2002 Emergency Preparedness Emergency Plan Implementing Procedures, EPIP-100, Revision 19 ML0215803142002-05-20020 May 2002 Emergency Plan Implementing Procedure, EP-IP-254, Rev. 3 ML0207105982002-02-26026 February 2002 8 to EP-IP-100, Emergency Classification & Notification. ML0206000932002-02-15015 February 2002 Transmittal of Revised Emergency Plan Implementing Procedures EP-IP-100 (Revision 17) & EP-IP-225 (Revision 0) for Pilgrim Nuclear Power Station ML0122604672001-08-0808 August 2001 Revision 2 to EP-IP-201, Emergency Plant Manager, Revision 4 to EP-IP-230 and Revison 6 to EP-IP-440 ML0109302492001-03-30030 March 2001 Rev 14 to EP-IP-100, Emergency Classification and Notification. ML0104402942001-02-0707 February 2001 Revision 9 to EPIP-200, Revision 3 to EPIP-202, Revision 9 to EPIP-250, Revision 7 to EPIP-252 and Revision 5 to EPIP-520 ML0103003422001-01-23023 January 2001 3 for EPIP-100 and Revision 8 for EPIP-400 for Pilgrim ML0037765322000-12-0606 December 2000 Emergency Plan Implementing Procedure Manual, Including Rev 2 to EP-IP-254 ML0037704152000-11-15015 November 2000 Revised Emergency Plan Implementing Procedures ML0037018472000-04-0404 April 2000 Pilgrim Nuclear Power Station Procedure No. EP-IP-200 ON-CALL Emergency Director 2018-07-11
[Table view] Category:Letter
MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000293/20240022024-08-21021 August 2024 NRC Inspection Report No. 05000293/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24129A1042024-05-26026 May 2024 Preapplication Readiness Assessment Plan for the Holtec Decommissioning International License Termination Plan ML24136A2382024-05-14014 May 2024 Annual Radiological Environmental Operating Report for 2023 ML24135A3212024-05-14014 May 2024 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2023 IR 05000293/20240012024-05-0707 May 2024 NRC Inspection Report No. 05000293/2024001 L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 L-24-010, Request for Preapplication Readiness Assessment of the Draft License Termination Plan2024-04-22022 April 2024 Request for Preapplication Readiness Assessment of the Draft License Termination Plan L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) IR 05000293/20230032024-02-29029 February 2024 NRC Inspection Report Nos. 05000293/2023003 and 05000293/2023004 L-24-002, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G2024-02-0202 February 2024 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML23342A1182024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23334A1822023-11-30030 November 2023 Biennial Report for the Defueled Safety Analysis Report Update, Technical Specification Bases Changes, 10 CFR 50.59 Evaluation Summary, and Regulatory Commitment Change Summary – November 2021 Through October 2023 L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23306A0992023-11-0202 November 2023 And Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) ML23300A0022023-10-27027 October 2023 10 CFR 72.48 Biennial Change Summary Report IR 05000293/20234012023-08-31031 August 2023 NRC Inspection Report No. 05000293/2023401 & 2023001 (Cover Letter Only) IR 05000293/20230022023-08-0404 August 2023 NRC Inspection Report No. 05000293/2023002 ML23143A0872023-05-23023 May 2023 Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) ML23135A2152023-05-15015 May 2023 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2022 ML23136A7792023-05-15015 May 2023 Annual Radiological Environmental Operating Report, January 1 Through December 31, 2022 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML23069A2782023-03-13013 March 2023 Request for Scoping Comments Concerning the Environmental Review of Monticello Nuclear Generating Plant, Unit 1 Subsequent License Renewal Application ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000293/20220042023-02-15015 February 2023 NRC Inspection Report No. 05000293/2022004 ML22356A0712023-01-31031 January 2023 Issuance of Exemption for Pilgrim Nuclear Power Station ISFSI Regarding Annual Radioactive Effluent Release Report - Cover Letter ML22347A2782022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 L-22-041, Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension2022-12-0909 December 2022 Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension IR 05000293/20220032022-11-18018 November 2022 NRC Inspection Report No. 05000293/2022003 L-22-036, Decommissioning Trust Fund Agreement2022-11-0808 November 2022 Decommissioning Trust Fund Agreement ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22266A1922022-09-23023 September 2022 And Pilgrim Nuclear Power Station - Request to Withdraw Prior Submissions from NRC Consideration ML22272A0352022-09-22022 September 2022 S. Lynch-Benttinen Letter Regarding U.S. Citizen Intent to Sue U.S. Fish and Wildlife and NOAA Fisheries Representing the Endangered Species (Na Right Whale) Which Will Be Adversely Affected by Holtec International Potential Actions ML22269A4202022-09-22022 September 2022 Citizen Lawsuit ML22241A1122022-08-29029 August 2022 Request for Exemption from 10 CFR 72.212(a)(2), (b)(2), (b)(3), (b)(4), (B)(5)(i), (b)(11), and 72.214 for Pilgrim ISFSI Annual Radioactive Effluent Release Report IR 05000293/20220022022-08-12012 August 2022 NRC Inspection Report No. 05000293/2022002 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22221A2592022-08-0101 August 2022 LTR-22-0217-1-NMSS - Town of Duxbury Letter Opposing the Irradiated Water Release from Pilgrim (Docket No. 05000293) ML22206A1512022-08-0101 August 2022 NRC Office of Investigations Case Nos. 1-2022-002 & 1-2022-006 ML22193A1662022-07-28028 July 2022 LTR-22-0154-1 - Heather Govern, VP, Clean Air and Water Program, Et Al., Letter Regarding Radioactive Wastewater Disposal from the Pilgrim Nuclear Power Station (Docket No. 05000293) ML22175A1732022-07-28028 July 2022 LTR-22-0153-1 - Response Letter to D. Turco, Cape Downwinders, from A. Roberts, NRC, Regarding Holtec-Pilgrim Plans to Dump One Million Gallons of Radioactive Waste Into Cape Cod Bay ML22154A4882022-06-0101 June 2022 Letter from Conservation Law Foundation Regarding Irradiated Water Release from Pilgrim ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22136A2602022-05-16016 May 2022 Submittal of Annual Radiological Environmental Operating Report for January 1 Through December 31, 2021 2024-09-18
[Table view] |
Text
- Entergy Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth-, MA 02360 January 27, 2016 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
SUBJECT:
PNPS Emergency Plan Revision and-Emergency Plan Implementing Procedure Revision Pilgrim Nuclear Power Station Docket No. 50-293 License No. DPR-35 LETTER NUMBER: 2.16.003
Dear Sir or Madam:
In accordance with 10 Code of Federal Regulations (CFR) 50.4, Entergy Nuclear Operations, Inc. is providing the latest revision to the PNPS Emergency Plan EP-PP-01 and Entergy EP-IP-440. The plan and procedure revisions were reviewed in accordance with 10 CER 50.54(q). The 50.54(q) reviews are also provided in the letter attachment.
The PNPS Emergency Plan continues to meet the planning standards outlined in 10 CER 50.47, the effectiveness of the emergency plan is not reduced, and the changes did not require prior U.S. Nuclear Regulatory Commission approval.
There are no commitments contained in this letter.
If you have any questions or require additional information, please contact me at (508) 830-8227.
Donna Calabl6's&-
Emergency Planning Manager KLS/jc
Attachment:
- 1. EP-PP-01, Revision 45 procedure and associated 50.54(q) Review
- 2. EP-IP-440, Revision 11 procedure and associated 50.54(q) Review
Entergy Nuclear Operations,Ine. Letter No. 2.16.003 PilgrimNuclear Power Station Page 2 CC:
Director of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555 U.S. Nuclear Regulatory Commission Region 1 - Incident Response Center 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 NRC Resident Inspector Pilgrim Nuclear Power Station
- Entergy Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth-, MA 02360 January 27, 2016 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
SUBJECT:
PNPS Emergency Plan Revision and-Emergency Plan Implementing Procedure Revision Pilgrim Nuclear Power Station Docket No. 50-293 License No. DPR-35 LETTER NUMBER: 2.16.003
Dear Sir or Madam:
In accordance with 10 Code of Federal Regulations (CFR) 50.4, Entergy Nuclear Operations, Inc. is providing the latest revision to the PNPS Emergency Plan EP-PP-01 and Entergy EP-IP-440. The plan and procedure revisions were reviewed in accordance with 10 CER 50.54(q). The 50.54(q) reviews are also provided in the letter attachment.
The PNPS Emergency Plan continues to meet the planning standards outlined in 10 CER 50.47, the effectiveness of the emergency plan is not reduced, and the changes did not require prior U.S. Nuclear Regulatory Commission approval.
There are no commitments contained in this letter.
If you have any questions or require additional information, please contact me at (508) 830-8227.
Donna Calabl6's&-
Emergency Planning Manager KLS/jc
Attachment:
- 1. EP-PP-01, Revision 45 procedure and associated 50.54(q) Review
- 2. EP-IP-440, Revision 11 procedure and associated 50.54(q) Review
Entergy Nuclear Operations,Ine. Letter No. 2.16.003 PilgrimNuclear Power Station Page 2 CC:
Director of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555 U.S. Nuclear Regulatory Commission Region 1 - Incident Response Center 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 NRC Resident Inspector Pilgrim Nuclear Power Station