PILGRIM NUCLEAR POWER STATION CONTROLLED DOCUMENT TRANSMITTAL NOTICE
)OCUMENT TITLE: <f Z!/
~
Y~r
7/j
i7
- Th-..
CONTROLLED COPY NO.:
I1 TRANSMITTAL NO. : 0-ji DATE: 5 -
6'`0--2__
FOR DOCUMENT CONTROL USE ONLY
- 1. The attached controlled document(s) are transmitted for your use.
Please insert/remove as indicated on the attached Chance Instruction Notice.
Please check Block 6, sign this form and return upon receipt.
/7
- 2.
The controlled document(s) listed on the attached Chance instruction Notice have been retired from use.
Please check Block 7, sign this f.orm and return upon receipt.
/7
- 3. This is your notice.
The document(s) indicated above were transmitted to you on Please check the status of your controlled copy, sign this document and return.
If you do not have these documents, check Block 5 and a new copy will be issued.
/7
- 4. Your name has been removed from the Distribution List of the controlled document listed above.
Please check Block 7, sign this form and return it with the document to the Document Control Supervisor.
COPY HOLDER CHECK ONE
/_7 5.
I am not currently in possession of the above documents.
Please issue another set to me.
/7
- 6.
I have received from the sender the material and attachments as indicated above, and I have updated my controlled manual accordingly.
/7 7.
I am returninc the documents listed above.
PLEASE SIGN AND RETURN TO: Controlled Document Clerk, M-AIL STOP #19 NO ENTVELOPE REQUIRED FOR INTERNAL COMPANY MAIL Entergy, Controlled Document Cler Pilgrim Nuclear Power Station 600 Rocky Hill Road, Support Building Plymouth, Massachusetts 02360 Signature of Holder vArT.*
ho Controlled Copy No.
Date
transmittal~ No.
Dte Please update your copy of with the attachments to this transmittal as insrutdbow P7-MOVE AM DISCARD REV.
NO.
1.
1
Date-J*
,2
Emergency Plan Implementing Number:
I PNPS Procedure Manual N/A RType H8.24 TABLE OF CONTENTS Effective Revision Date Title EP-IP-100 EP-IP-200 EP-IP-201 EP-IP-202 EP-IP-210 EP-IP-220 EP-IP-225 EP-IP-229 EP-IP-230 EP-IP-231 EP-IP-240 EP-IP-250 EP-IP-251 EP-IP-252 EP-IP-253 EP-IP-254 EP-IP-259 EP-IP-300 EP-IP-310 EP-IP-315 EP-l P-330 EP-IP-400 Emergency Classification and Notification On-Call Emergency Director Emergency Plant Manager Company Spokesperson Control Room Augmentation TSC Activation and Response Severe accident Management Support TSC/OSC Equipment Operation OSC Activation and Response Onsite Radiation Protection Emergency Security Organization Activation and
Response
EOF Activation and Response Offsite Radiation Protection Facilities Support Relocation of the EOF Communications Support EOF Equipment Operation Offsite Radiological Dose Assessment Radiation Monitoring Team Activation and Response Personnel Monitoring Team Activation and Response Core Damage Protective Action Recommendations 18 9
2 3
7 11 0
5 4
6 9
9 5
7 3
3 4
4 4
4 4
9 05/20/02 Page 1 of 2 Revision 77 Number 02/26/02 02/07/01 08/08/01 02/07/01 12/12/00 11/15/00 02/15/02 07/25/00 08/08/01 08/29/01 09/17/01 02/07/01 12/26/00 02/01/01 07/13/00 05/20/02 09/17/01 05/01/01 11/15/00 05/24/00 12/10/01 10/03/01 Revision 77 Page 1 of 2 05/20/02
Emergency Plan Implementing Number: N/AI PNPS Procedure Manual N/A RType H8.24 TABLE OF CONTENTS Title Evacuation/Assembly Search and Rescue Emergency Exposure Controls Transport of Contaminated Injured Personnel Transition and Recovery Effective Revision Date 5
09/17/01 3
02/12/01 6
08/08/01 3
05/24/00 5
02/07/01 05/20/02 Page 2 of 2 Revision 77 Number EP-IP-410 EP-IP-420 EP-IP-440 EP-IP-501 EP-IP-520 Page 2 of 2 Revision 77 05/20/02
RTYPE H8.24 PILGRIM NUCLEAR POWER STATION Procedure No. EP-IP-254 COMMUNICATIONS SUPPORT Stop Think STAR Act Review SAFETY RELATED EP-IP-254 Rev. 3
REVISION LOG REVISION 3
Pages Affected 6
6 6
6,7 7
7 8
9 9
9 REVISION 2
Pages Affected All 3,5 3,7,8 7
Date Originated 4/02 Description Revise Note and Step 6.3[1] to notify Commonwealth and local
.communities within 15 minutes to reflect the PNPS Emergency Plan.
Add Note to direct communicators to DNN and BECONS instructions.
Add step to ensure NRC is notified immediately after Commonwealth and local communities.
Change name of status board.
Add Note regarding use of PDP information.
Clarify Step 6.3[5](b) by adding reference to SPDS.
Add step to ensure visuals and status boards are maintained.
Change "talker" to "communicator" to agree with other Procedures.
Delete table from distribution list.
Revise fax instructions.
Date Originated 8/00 Description Revise Procedure to reflect PNPS 1.3.4-1 format. Revision bars are not shown for reformatting.
Refer PDP Communicator to the Emergency Telephone Directory for phone instructions, thereby deleting PDP operating instructions Attachment.
Move information source references to Attachment 1.
Provide Procedure reference for Plant Data Form.
EP-IP-254 Rev. 3 Page 2 of 11
TABLE OF CONTENTS Paqe 1.0 P U R P O S E....................................................................................................................
4
2.0 REFERENCES
4 3.0 DEFINITIONS......................................................................................................
4 4.0 DISCUSSIO N.......................................................................................................
4 5.0 RESPONSIBILITIES.................................................................................................
4 6.0 PROCEDURE.......................................................................................................
5 6.1 NOTIFICATION O F AN EM ERGENCY........................................................
5 6.2 ACTIVATION.................................................................................................
5 6.3 OPERATION.................................................................................................
6 7.0 R E C O R D S....................................................................................................................
8 8.0 ATTACHM ENTS..................................................................................................
8 ATTACHMENT 1 - EMERGENCY INFORMATION SOURCE AND DISTRIBUTION MATRIX................................................................................................
9 ATTACHMENT 2 - DOCUMENT CROSS-REFERENCES...............................................
10 ATTACHMENT 3 - IDENTIFICATION OF COMMITMENTS.............................................
11 EP-IP-254 Rev. 3 Page 3 of 11
1.0 PURPOSE This Procedure provides the initial guidance, directions, and reference to the Communications Supervisor for responding to an emergency and for the management of PNPS emergency communications.
2.0 REFERENCES
[1]
EP-PP-01, "PNPS Emergency Plan"
[2]
NRC Letter 1.87.263, dated 8/31/87; "NRC/Licensee Technical Information Flow During Exercises and Emergencies"
[3]
NRC Letter, Docket No. 50-293, dated 1/23/89; Region I "Incident Response Center Data Handling Capability" 3.0 DEFINITIONS None 4.0 DISCUSSION None 5.0 RESPONSIBILITIES
[1]
Ensuring the timely documentation. and completion of the offsite notifications.
[2]
Supervising communications with local, Commonwealth, and federal emergency organizations.
EP-IP-254 Rev. 3 Page 4 of 11
6.0 PROCEDURE 6.1 NOTIFICATION OF AN EMERGENCY
[1]
In the event that a meaningless pager display appears, call the Computerized Automated Notification System (CANS) to verify that an emergency situation does not exist at PNPS.
[2]
Upon receiving the Unusual Event (1111) classification code on your pager:
(a)
Call CANS to indicate that you have been notified.
(b)
When asked to enter a security code, enter your Social Security number.
[3]
Upon receiving an Alert (2222), Site Area Emergency (3333), or a General Emergency (4444) classification code on your pager:
(a)
Call CANS to indicate that you have been notified.
(b)
When asked to enter a security code, enter your Social Security number.
(c)
Provide the system with an estimate of the time (in minutes) it will take to travel to the Emergency Operations Facility (EOF).
[4]
Upon receiving the Recovery (0000) classification code on your pager:
(a)
Call CANS to indicate that you have been notified.
(b)
When asked to enter a security code, enter your Social Security number.
6.2 ACTIVATION
[1]
Report to the EOF and sign in on the roster board.
[2]
Begin and maintain a communications log of all pertinent announcements, actions, and decisions made during the course of the response.
[3]
Verify that personnel are assigned to the following positions:
(a)
Local/Commonwealth Communicator (b)
Plant Data Communicator/Status Board Keeper
[4]
Direct the Local/Commonwealth Communicator to review the notification form transmission instructions and stand by to assume responsibility from the Control Room for the communication of initial and follow-up information to offsite agencies.
[5]
Direct the Plant Data Communicator to coordinate with the TSC and man the Plant Data Phone (PDP) in accordance with pages 6 to 12 of Section 6.0 of the Emergency Telephone Directory.
EP-IP-254 Rev. 3 Page 5 of 11
[6]
Obtain transmitted copies of any Initial Notification and Follow-Up Information Forms from the DNN facsimile machine, make five copies, and deliver one each to:
(a)
The Emergency Director (b)
MEMA (c)
MDPH (d)
Public Information Advisor (e)
Regulatory Affairs Liaison If individuals are not yet present, leave the forms at their station.
[7]
Determine when the next Follow-Up Information Form must be delivered to offsite agencies (information is required hourly or as conditions change). Place "Time due" on the Offsite Notifications Board.
[8]
Contact the Logistics Supervisor if additional personnel are required.
[9]
Inform the Emergency Offsite Manager when the communications area is ready to activate.
6.3 OPERATION NOTE Instructions for operating the DNN and BECONS are posted next to the equipment.
[1]
Ensure that the Commonwealth and local communities are notified within 15 minutes of any change in emergency classification using the Initial Notification Form.
[2]
Ensure that the NRC is notified immediately after the Commonwealth and local communities; not later than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> after classification.
[3]
Ensure that periodic updates are given to offsite authorities using the Follow-Up Information Form.
EP-IP-254 Rev. 3 Page 6 of 11 NOTE Initial notifications are made within 15 minutes to the Commonwealth and local communities whenever the event is reclassified (upgraded, downgraded, terminated, or Recovery).
Follow-up notifications are made throughout the event at least hourly or whenever conditions change or additional information becomes available.
[4]
Provide copies of transmitted notification forms to the following personnel in the EOF (when present):
(a)
Emergency Director (b)
MEMA (c)
MDPH (d)
Public Information Advisor (e)
Regulatory Affairs Liaison
[5]
Direct the Plant Data Communicator to:
(a)
Fill out a Plant Data Form (EP-IP-210 Attachment 1) approximately every 15 to 30 minutes (data can be obtained from SPDS or over the PDP).
(b)
Update the Plant Data Status Board as new information is obtained if SPDS data is not available.
[6]
Direct a member of the communications staff to collect the following and distribute them approximately every hour in accordance with Attachment 1 (usually in conjunction with the follow-up notifications or as agreed upon by the receiving individual):
(a)
Radiological Information Form (b)
Plant Data (c)
Area Radiation Monitors Data (d)
Process Radiation Monitors Data See Attachment 1 (Emergency Information Source and Distribution Matrix).
[7]
Maintain the Offsite Notifications Board noting completion and time due for the initial and follow-up notifications.
EP-IP-254 Rev. 3 Page 7 of 11 NOTE The primary means of data transmission is through the Safety Parameter Display System (SPDS). The PDP Communicator should be limited to providing data not available in SPDS.
The Plant Data Form is to be used if the SPDS is unavailable.
[8]
Monitor and update EOF visual aids as necessary:
"This is a Drill" signs Wind direction arrows on maps Emergency Classification Level signs Assigned status boards
[9]
Assist the Emergency Offsite Manager in maintaining proper flow of communications.
7.0 RECORDS All log sheets, forms, and other documentation shall be reviewed for completeness and provided to the Emergency Offsite Manager for final disposition.
8.0 ATTACHMENTS ATTACHMENT 1 - EMERGENCY INFORMATION SOURCE AND DISTRIBUTION MATRIX ATTACHMENT 2 - DOCUMENT CROSS-REFERENCES ATTACHMENT 3 - IDENTIFICATION OF COMMITMENTS EP-IP-254 Rev. 3 Page 8 of 11
ATTACHMENT 1 Sheet 1 of 1 EMERGENCY INFORMATION SOURCE AND DISTRIBUTION MATRIX INFORMATION SOURCES DISTRIBUTION Location NRC Region 1 Incident Response Center (via facsimile)
MEMA Tech Liaison at the state EOC in Framingham (via facsimile)
MDPH (directly if present in the EOF, otherwise via facsimile)
MEMA (directly if present in the EOF, otherwise via facsimile)
State of Rhode Island (via facsimile)
Public Information Advisor Regulatory Affairs Liaison Refer to the EOF Fax Directory posted next to the Communications fax for notification instructions and phone numbers.
EP-IP-254 Rev. 3 Page 9 of 11 Information Primary Source Alternate Source Rad Radiological Information HPN Phone Talker HPN Phone Sheet Communicator Plant Plant Data SPDS Plant Data Phone I_
Communicator ARM Area Radiation Monitor Data SPDS Radiological Data Phone Communicator PRM Process Radiation Monitor SPDS Radiological Data Phone Data I
Communicator
ATTACHMENT 2 Sheet 1 of I DOCUMENT CROSS-REFERENCES This Attachment lists those documents, other than source documents, which may be affected by changes to this Procedure.
Document Number Document Title EP-IP-100 Emergency Classification and Notification EP-AD-122 Maintenance of the Emergency Telephone Directory EP-IP-254 Rev. 3 Page 10 of 11
ATTACHMENT 3 Sheet 1 of 1 IDENTIFICATION OF COMMITMENTS This Attachment lists those external commitments (i.e., NRC commitments, QA audit findings, and INPO inspection items) implemented in this Procedure.
Reference Document Commitment Affected Section(s)/Step(s)
None EP-IP-254 Rev. 3 Page 11 of 11