ML16362A188

From kanterella
Jump to navigation Jump to search
Transmittal of Emergency Plan Revision
ML16362A188
Person / Time
Site: Pilgrim
Issue date: 12/16/2016
From: Calabrese D
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML16362A410 List:
References
2.16.077 EP-PP-01, Rev. 47
Download: ML16362A188 (2)


Text

~Entergx Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth. MA 02360 December 16, 2016 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

SUBJECT:

PNPS Emergency Plan Revision Pilgrim Nuclear Power Station Docket No. 50-293 Renewed License No. DPR-35 LETTER NUMBER: 2.16.077

Dear Sir or Madam:

In accordance with 10 Code of Federal Regulations (CFR) 50.4, Entergy Nuclear Operations, Inc. is providing the latest revision to the PNPS Emergency Plan EP-PP-01. The plan revision was reviewed in accordance with 10 CFR 50.54(q). The 50.54(q) reviews are also provided in the letter attachment.

The PNPS Emergency Plan continues to meet the planning standards outlined in 10 CFR 50.47, the effectiveness of the emergency plan is not reduced, and the changes did not require prior U.S. Nuclear Regulatory Commission approval.

If you have any questions regarding this information, please contact me at (508) 830-8227.

There are no regulatory commitments contained in this letter.

Donna Calabrese Emergency Planning Manager DMC/jc

Attachment:

EP-PP-01, Revision 47 procedure and associated 50.54(q) Review

+P/5.

µtrL

Entergy Nuclear Operations, Inc. Letter No. 2.16.077 Pilgrim Nuclear Power Station Page 2 cc:

Director of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555 U.S. Nuclear Regulatory Commission Region 1 - Incident Response Center 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 NRC Senior Resident Inspector Pilgrim Nuclear Power Station