Entergy Nuclear Operations, Inc.

En tergy Pilgrim Nuclear Station 600 Rocky Hill Road Plymouth. MA 02360 February 4, 2016 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Evacuation Time Estimates, TR510 Pilgrim Nuclear Power Station Docket No. 50-293 Renewed License No. DPR-35 LETTER NUMBER: 2.16.007

Dear Sir or Madam:

In accordance with 10 Code of Federal Regulations (CFR) 50.4, Entergy Nuclear Operations, Inc. is providing the latest revision to the Pilgrim Nuclear Power Station Evacuation Time Estimates, TR510. The procedure revisions were reviewed in accordance with 10 CFR 50.54(q). The 50.54(q) reviews are also provided in the letter attachment.

The PNPS Emergency Plan continues to meet the planning standards outlined in 10 CFR 50.47, the effectiveness of the emergency plan is not reduced, and the changes did not require prior U.S. Nuclear Regulatory Commission approval.

If you have any questions or require additional information, please contact me at (508) 830-8227.

There are no regulatory commitments contained in this letter.

Emergency Planning Manager KLS/jc

Attachment:

TR510, Evacuation Time Estimates, Revision 2 and associated 10 CFR 50.54(q) Review

~4S I * , : ,,

Entergy Nuclear Operations, Inc. Letter No. 2.16.007 Pilgrim Nuclear Power Station Page 2 cc:

Director of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555 U.S. Nuclear Regulatory Commission Region 1 - Incident Response Center 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 NRC Resident Inspector Pilgrim Nuclear Power Station

Entergy Nuclear Operations, Inc.

En tergy Pilgrim Nuclear Station 600 Rocky Hill Road Plymouth. MA 02360 February 4, 2016 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Evacuation Time Estimates, TR510 Pilgrim Nuclear Power Station Docket No. 50-293 Renewed License No. DPR-35 LETTER NUMBER: 2.16.007

Dear Sir or Madam:

In accordance with 10 Code of Federal Regulations (CFR) 50.4, Entergy Nuclear Operations, Inc. is providing the latest revision to the Pilgrim Nuclear Power Station Evacuation Time Estimates, TR510. The procedure revisions were reviewed in accordance with 10 CFR 50.54(q). The 50.54(q) reviews are also provided in the letter attachment.

The PNPS Emergency Plan continues to meet the planning standards outlined in 10 CFR 50.47, the effectiveness of the emergency plan is not reduced, and the changes did not require prior U.S. Nuclear Regulatory Commission approval.

If you have any questions or require additional information, please contact me at (508) 830-8227.

There are no regulatory commitments contained in this letter.

Emergency Planning Manager KLS/jc

Attachment:

TR510, Evacuation Time Estimates, Revision 2 and associated 10 CFR 50.54(q) Review

~4S I * , : ,,

Entergy Nuclear Operations, Inc. Letter No. 2.16.007 Pilgrim Nuclear Power Station Page 2 cc:

Director of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555 U.S. Nuclear Regulatory Commission Region 1 - Incident Response Center 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 NRC Resident Inspector Pilgrim Nuclear Power Station