ML040980184

From kanterella
Jump to navigation Jump to search
Emergency Plan Implementing Procedure Manual Table of Contents
ML040980184
Person / Time
Site: Pilgrim
Issue date: 03/26/2004
From:
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML040980184 (4)


Text

ORA4 A O NUCLEAR~~~

NUCLEARs OR.GANIZATION CONTROLLED D0CUZ-1ENT TRPŽtSMITTAL NOTICE DOCuME3NT TITLV: 5 ft1 f V

.75_,46 A::,,l -16 To: ?ii /SxT.1NNTA 0. _AL CONTROLLED COPY NO.: T/RNSMITTAL NO.:

FOP. DOCUMENT CONTROL USE ONLY 1 The atsach-d controlled document(s) a-re transmitted for your u--.

lase .nserz/remove as indicated on the attached Change 7nstructicn Notice. Please cheaklEJock 6, s-in this fpon and return upon receipz.

/ 2. The controlled document (s) listed on the attached Change Instruction Notice have been retired from use. Please check Block 7, signr this form and return upon receipt.

3. This is your notice; The document(s) indicat-ed above were transmit.ed to you on _ . Please check the status of your ccntrclled copyv, sian this document and return.

If you do not ha-:e these documents, check Block 5 and a new copy will be issued.

7. A hur n-. has been removed frm the Distributicn Tis' of the control'led doc-ument listed above. Please check Bl :7ock 7, sian this form and- return it with t^he document to the Document Control Sursnviso-.

COPY HOLDER CEECK ONE S/7. I am not currently inr. possession of the above documents. Please issue another set to me.

/7 6. _ ha-ie received _rom the sender the material and attachments. as indic_=ted above, and I hi--ve updated my controlled manual accord ingly.

!7 7. _ am -eturnan.h-e accum.nt- s 1s 5 -ho-e.

PLEASE SIC-N IM RE-TURN TO: Controlled Document Clerk, MAIL S-T7 -19 NO EbTiELOPE REQUIRED FOR INTEPRAL COMPANY MAIL Entaercy, Controlled Documen Clerk Pilgrim Nuclear -ower Station 600 Rocky Hill R.oad, Suport Building Plymouth, Massachusetts 02360

  • Date. Signature of Holder Controlled Copy No.

p/DQ~4;

CHANGE INSTRUCTION NOTICE (CIN)

Transmittal No. 06QA5-T Date 6 1626(oA Please update your copy of F22 5 09 ,- A=

With the attachments to this transmiftal as rnstructed below.

REMOVEAND DISCARD REV# _ . .

INSERT REV

  • i/2A f6 4 I;2o1 A IO Aq do t' 11

-1) O-r ... e =v

(-(~. CI.7 A. . .

.I

.. I

PNPS I Emergency Plan Implementing Procedure Manual Number:

N/A RType H8.24 TABLE OF CONTENTS Effective Number Title Revision Date EP-IP-100 Emergency Classification and Notification 22 01/16/04 EP-IP-100.1 Emergency Action Levels (EALs) 0 08/29/02 EP-IP-200 On-Call Emergency Director 11 12/10/03 EP-IP-201 Emergency Plant Manager 4 12/10/03 EP-IP-202 Company Spokesperson 4 12110/03 EP-IP-210 Control Room Augmentation 8 08/29/02 EP-IP-220 TSC Activation and Response 12 03/25/04 EP-IP-225 Severe accident Management Support 0 02/15/02 EP-IP-229 TSC/OSC Equipment Operation 6 03/25/04 EP-IP-230 OSC Activation and Response 4 08/08/01 EP-IP-231 Onsite Radiation Protection 6 08/29/01 EP-IP-240 Emergency Security Organization Activation and 10 08/29/02

Response

EP-I P-250 EOF Activation and Response 9 02/07/01 EP-IP-251 Offsite Radiation Protection 6 03/25/04 EP-IP-252 Facilities Support 8 08/29/02 EP-IP-253 Relocation of the EOF 3 07/13/00 EP-IP-254 Communications Support 4 11/25/03 EP-IP-259 EOF Equipment Operation 4 09/17/01 EP-IP-300 Offsite Radiological Dose Assessment 5 07/17/03 EP-IP-31 0 Radiation Monitoring Team Activation and Response 5 11/22/02 EP-IP-315 Personnel Monitoring Team Activation and Response 4 05/24/00 EP-IP-330 Core Damage 4 12/10/01 1 of 2 Page 1 of 2 Revision 86 3/25/2004 Page Revision 86

Emergency Plan Implementing Number:

PN PS Procedure Manual N/A RType H8.24 TABLE OF CONTENTS Effective Number Title Revision Date EP-IP-400 Protective Action Recommendations 9 10/03/01 EP-I P-41 0 Evacuation/Assembly 5 09/17/01 EP-IP-420 Search and Rescue 3 02/12/01 EP-IP-440 Emergency Exposure Controls 7 11/22/02 EP-IP-501 Transport of Contaminated Injured Personnel 3 05/24/00 EP-IP-520 Transition and Recovery 5 02/07/01 2 of 2 Revision 86 Page Page 2of 2 3/25/2004 Revision 86