ML040980184
ML040980184 | |
Person / Time | |
---|---|
Site: | Pilgrim |
Issue date: | 03/26/2004 |
From: | Entergy Operations |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
Download: ML040980184 (4) | |
Text
ORA4 A O NUCLEAR~~~
NUCLEARs OR.GANIZATION CONTROLLED D0CUZ-1ENT TRPŽtSMITTAL NOTICE DOCuME3NT TITLV: 5 ft1 f V
.75_,46 A::,,l -16 To: ?ii /SxT.1NNTA 0. _AL CONTROLLED COPY NO.: T/RNSMITTAL NO.:
FOP. DOCUMENT CONTROL USE ONLY 1 The atsach-d controlled document(s) a-re transmitted for your u--.
lase .nserz/remove as indicated on the attached Change 7nstructicn Notice. Please cheaklEJock 6, s-in this fpon and return upon receipz.
/ 2. The controlled document (s) listed on the attached Change Instruction Notice have been retired from use. Please check Block 7, signr this form and return upon receipt.
- 3. This is your notice; The document(s) indicat-ed above were transmit.ed to you on _ . Please check the status of your ccntrclled copyv, sian this document and return.
If you do not ha-:e these documents, check Block 5 and a new copy will be issued.
- 7. A hur n-. has been removed frm the Distributicn Tis' of the control'led doc-ument listed above. Please check Bl :7ock 7, sian this form and- return it with t^he document to the Document Control Sursnviso-.
COPY HOLDER CEECK ONE S/7. I am not currently inr. possession of the above documents. Please issue another set to me.
/7 6. _ ha-ie received _rom the sender the material and attachments. as indic_=ted above, and I hi--ve updated my controlled manual accord ingly.
!7 7. _ am -eturnan.h-e accum.nt- s 1s 5 -ho-e.
PLEASE SIC-N IM RE-TURN TO: Controlled Document Clerk, MAIL S-T7 -19 NO EbTiELOPE REQUIRED FOR INTEPRAL COMPANY MAIL Entaercy, Controlled Documen Clerk Pilgrim Nuclear -ower Station 600 Rocky Hill R.oad, Suport Building Plymouth, Massachusetts 02360
- Date. Signature of Holder Controlled Copy No.
p/DQ~4;
CHANGE INSTRUCTION NOTICE (CIN)
Transmittal No. 06QA5-T Date 6 1626(oA Please update your copy of F22 5 09 ,- A=
With the attachments to this transmiftal as rnstructed below.
REMOVEAND DISCARD REV# _ . .
INSERT REV
- i/2A f6 4 I;2o1 A IO Aq do t' 11
-1) O-r ... e =v
(-(~. CI.7 A. . .
.I
.. I
PNPS I Emergency Plan Implementing Procedure Manual Number:
N/A RType H8.24 TABLE OF CONTENTS Effective Number Title Revision Date EP-IP-100 Emergency Classification and Notification 22 01/16/04 EP-IP-100.1 Emergency Action Levels (EALs) 0 08/29/02 EP-IP-200 On-Call Emergency Director 11 12/10/03 EP-IP-201 Emergency Plant Manager 4 12/10/03 EP-IP-202 Company Spokesperson 4 12110/03 EP-IP-210 Control Room Augmentation 8 08/29/02 EP-IP-220 TSC Activation and Response 12 03/25/04 EP-IP-225 Severe accident Management Support 0 02/15/02 EP-IP-229 TSC/OSC Equipment Operation 6 03/25/04 EP-IP-230 OSC Activation and Response 4 08/08/01 EP-IP-231 Onsite Radiation Protection 6 08/29/01 EP-IP-240 Emergency Security Organization Activation and 10 08/29/02
Response
EP-I P-250 EOF Activation and Response 9 02/07/01 EP-IP-251 Offsite Radiation Protection 6 03/25/04 EP-IP-252 Facilities Support 8 08/29/02 EP-IP-253 Relocation of the EOF 3 07/13/00 EP-IP-254 Communications Support 4 11/25/03 EP-IP-259 EOF Equipment Operation 4 09/17/01 EP-IP-300 Offsite Radiological Dose Assessment 5 07/17/03 EP-IP-31 0 Radiation Monitoring Team Activation and Response 5 11/22/02 EP-IP-315 Personnel Monitoring Team Activation and Response 4 05/24/00 EP-IP-330 Core Damage 4 12/10/01 1 of 2 Page 1 of 2 Revision 86 3/25/2004 Page Revision 86
Emergency Plan Implementing Number:
PN PS Procedure Manual N/A RType H8.24 TABLE OF CONTENTS Effective Number Title Revision Date EP-IP-400 Protective Action Recommendations 9 10/03/01 EP-I P-41 0 Evacuation/Assembly 5 09/17/01 EP-IP-420 Search and Rescue 3 02/12/01 EP-IP-440 Emergency Exposure Controls 7 11/22/02 EP-IP-501 Transport of Contaminated Injured Personnel 3 05/24/00 EP-IP-520 Transition and Recovery 5 02/07/01 2 of 2 Revision 86 Page Page 2of 2 3/25/2004 Revision 86