ML040150077

From kanterella
Jump to navigation Jump to search
7 to EP-PP-01, Pilgrim Nuclear Power Station Emergency Plan.
ML040150077
Person / Time
Site: Pilgrim
Issue date: 01/07/2004
From:
Entergy Nuclear Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
EP-PP-01, Rev 27
Download: ML040150077 (129)


Text

NUCLEAkR OP.GANIZATION CONTROLLED DOCUMENT TULKSMITTA-7 NOTICE

.tUIENT TITLE: )0/? ,orn elo10e 6' Pr? &'q a rpAO$92 a iu 6?

TO: /6 . zq &WgtW46m)ezL&IL: -

CONTROLLED COPY NO.: . \

TRANSMITTAL NO.:

7 - __

D(ATE: /-7 0A I.

FOR DOCUKENT CONTROL USE ONLY

/,. The attached controlled document (s) are transmitted for your u-se.

Please insert/remove as indicated on the attached Change Instruction Notice. Please check Elock 6, sign this f orm and return upon receipt.

j,' 2. The controlled document(s) listed on the attached Change Instruction Notice have been retired from use. Please check Block 7, sign this form and return upon receipt.

3. This is your _notice; The document(s) indicated above were transmitted to you on . Please check the status of yoar c trcllled copy, sign this document and return.

if you do noz have these documents, check Block 5 and a new copy will be issued.

f .1 4. Your na-ra has been removed from the Di-stributin L-st o_ the con rolled document listed above. Please check Block 7, si-n A-4 s form and- return it with the document to the Document Control Sup ervisor`.

COPY HOLDER CHECK ONE

/7 i. I am not currently issue another set in possession of to me.

the above documents. Please

/7 6. I ha-;e received from the sander the material and attachments as inaicated above, and I heave updated mny controlled manual accord-ingly.

f7 7. am -eturninq,.the documents listed above.

-PLEASS SIGN AND RETURN TO: Controlled Document Clerk, NAIL STOP #19 NO ENVELOPE REQUIRED FOR INTERNAL COMPANY MAT L rnt eray, Ccntrolled Document Clerk Pilgrim Nuclear Power Station 600 Rocky Hill Road, Support Building Plymouth, Massachusetts 02360

. Date. Signature of Holder Controlled Copy No.

AvAS

CHANGE INSTRUCTION NOTICE (CIN) 41 Transmittal No. o(t b 005 Date - I

/I Q-6'Y'

- If

h-'ase update your copy of -

A

( /J6'

.` Jn '0 0 I e 1~~~'geI-) &9 AiJ With the attachments to this transmittal as instructed below.

REMOVE AND DISCARD REV# INSERT

/ REV#

,( I C PP:--O/ ~ //0 &)/ -C21z I I 11-3

PNPS EMERGENCY PLAN RType H8.22 FOREWORD As required in the conditions set forth by the Nuclear Regulatory Commission for the operating license for the Pilgrim Nuclear Power Station, the management of Entergy Nuclear Operations, Inc., ("Entergy") recognizes its responsibility and authority to operate and maintain the Pilgrim Nuclear Power Station in such a manner as to provide for the safety of the general public.

This Emergency Plan has been prepared to establish the procedures and practices for management control over unplanned or emergency events that may occur at the Pilgrim Nuclear Power Station.

The issuance and control of this Emergency Plan and the Activities associated with emergency preparedness at the Pilgrim Nuclear Power Station shall be the responsibility of the Senior Nuclear Executive. The Emergency Plan and its implementing procedures meet the requirements for quality assurance as set forth in the Entergy Quality Assurance Program Manual.

The Nuclear Assessment Director is assigned the responsibility for the maintenance of the Emergency Preparedness Programs associated with the operation of Pilgrim Nuclear Power Station as outlined in this document.

A S. ISva 's44' Date: /0/ 3 OSRC Chairm &fl a-Date: J/ "3 Date: 11/J 3 Date: I/ V/In Conformance to the practices described in this Emergency Plan and the procedures, which implement it, are required as of the effective date.

Effective Date: 01/07/0 i Revision 27

PNPS EMERGENCY PLAN LIST OF EFFECTIVE PAGES Page Revision itoii ...... 27 iii to viii ...... 27 Section A...... 27 Section B...... 27 Section C ...... 27 Section D ...... 27 Section E...... 27 Section F ...... 27 Section G ...... 27 Section H...... 27 Section I...... 27 Section J ...... 27 Section K...... 27 Section L ...... 27 Section M...... 27 Section N...... 27 Section 0 ...... 27 Section P...... 27 Appendix 1...... 27 Appendix 2...... 27 Appendix 3 ...... 27 Appendix 4 ...... 27 (Appendix 5 contained in separate volume) ii Revision 27

PNPS EMERGENCY PLAN Table of Contents Pae Part 1: INTRODUCTION Section A: Purpose ................. vii Section B: Background ................. vii Section C: Scope .................. vii Section D: Planning Basis .................... vii Section E: Form and Content of Plan .................. viii Part 2: PLANNING STANDARDS AND CRITERIA Section A: Assignment of ResDonsibility

1. Concept of Operations ................. A-1
2. Commonwealth and Local Functions and Responsibilities.A-8
3. Agreements in Planning Effort .A-8
4. Continuous Coverage .A-8 Section B: Station Emeraencv Organization
1. PNPS Emergency Response Organization Assignments .B-1
2. Authority Over PNPS Emergency Response Organization ..................... :.............. B-2
3. Succession to Emergency Director .............. .................................. B-2
4. Emergency Director Responsibilities ................................................ B-2
5. PNPS Emergency Response Organization ............................. ................... B-3
6. Emergency Response Organization Block Diagram ............................................... B-6
7. Corporate Emergency Response ................................................ B-6 B. Private Industry Support ................................................ B-6
9. Offsite Emergency Assistance to PNPS ................................................ B-7 Section C: Emergencv Response SuDport and Resources
1. Federal Response Support and Resources .. ................................................ C-1
2. Liaisons ................................................ C-1
3. Radiological Laboratories ................................................ C-1
4. Other Assistance .................................................. C-2 Section D: Emergency Classification System
1. Emergency Classification ................................................ D-1
2. Emergency Action Levels ..................................................D-4
3. Offsite Classification Systems................................................................................ D-4
4. Offsite Emergency Procedures .D-4 Section E: Notification Methods and Procedures
1. Response Organization Notification .E-1
2. Notification and Mobilization of Emergency Response Personnel .E-1
3. Initial Notification .E-1
4. Follow-up Messages .E-2
5. Commonwealth and Local Information Dissemination .E-3
6. Notification of the Public .E-3
7. Messages to the Public.E-4 ii Revision 27

PNPS EMERGENCY PLAN Table of Contents (Cont.)

PAge Section F: Emergency Communications

1. Communications/Notifications .................................................... F-1
2. Medical Communications .................................................... F-4
3. Communications Drills .................................................... F-4 Section G: Public Education and Information
1. Public Information Publication .................................................... G-1
2. Public Education Materials .................................................... G-1
3. Media Center .................................................... G-1
4. Coordination of Public Information .................................................... G-2
5. Media Orientation .................................................... G-2 Section H: Emeraency Facilities and Equipment
1. TSC, OSC, and the Control Room ..................................... H-1
2. Emergency Operations Facility ..................................... H-2
3. Emergency Operations Centers ..................................... H-2
4. Activation ..................................... H-3
5. Monitoring Equipment for Classification ..................................... H-3
6. Offsite Monitoring Equipment ..................................... H-4
7. Offsite Monitoring Equipment Storage .....................................H-5
8. Meteorological Monitoring ..................................... H-5
9. OSC Equipment ..................................... H-6
10. Facility and Equipment Readiness ..................................... H-7
11. General Use Emergency Equipment ..................................... H-7
12. Collection Point for Field Samples ..................................... H-7 Section l: Accident Assessment
1. Plant Parameters and Corresponding Emergency Classification . . 1-1
2. Onsite Accident Assessment Capabilities ................................................. 1-1
3. Release Source Term Determination ................................................. 1-2
4. Effluent Monitor Data and DAPAR ................................................. 1-2
5. Meteorological Information .................................................. 1-2
6. Unmonitored Release .................................. 1-2
7. Field Monitoring .................................. 1-3
8. Radiation Monitoring Teams ................................. 1-3
9. Iodine Monitoring .................................. 1-3
10. Dose Estimates .................................. 1-3
11. Commonwealth Monitoring Capabilities ................................. 1-3 Section J: Protective Response
1. Notification of Onsite Personnel ................................. J-1
2. Evacuation Locations ................................. J-1
3. Radiological Monitoring ................................. J-1
4. Evacuation ................................. J-1
5. Accountability ................................. J-1
6. Provisions for Onsite Personnel ................................. J-2
7. Protective Action Recommendations for the General Public .................................. J-2
8. Evacuation Time Estimates .............................................. J-3
9. Protective Measure Implementation .............................................. J-3
10. Factors Affecting Protective Measure Implementation ........................................... J-3 iv Revision 27

PNPS EMERGENCY PLAN Table of Contents (Cont.)

Page

11. Ingestion Pathway Protective Measures ................................ .................... J-4
12. Monitoring of Evacuees ..................................................... J-4 Section K: Radiological Exposure Control
1. Emergency Exposure Guidelines ..................................................... K-1
2. Emergency Radiation Protection Program ............................................ ........ K-1
3. Personnel Monitoring .................................................... K-2
4. Non-PNPS Personnel Exposure Authorization ..................................................... K-2
5. Decontamination and First Aid .................................................... K-2
6. Contamination Control ..................................................... K-3
7. Decontamination of Relocated Personnel ...................................... .............. K-3 Section L: Medical and Public Health Support
1. Hospital Services ..................................................... L-1
2. Onsite First Aid Capability ..................................................... L-1
3. Medical Service Facilities .................................................... L-1
4. Medical Transportation .................................................... L-1 Section M: Reentry and Recovery Planning
1. Reentry................................................................................................................. M-1
2. Recovery ..................................................... M-2
3. Recovery Phase Notifications ..................................................... M-5
4. Total Population Exposure .................................................... M-5 Section N: Drill and Exercise Program
1. Exercises/Drills .................................................... N-1
2. Specialized Drills .................................................... N-1
3. Conduct of Drills and Exercises ..................................................... N-3
4. Criteria and Evaluation .................................................... N-3
5. Resolution of Drill and Exercise Findings .................................................... N-3 Section 0: Emergency Response Training
1. Assurance of Training ..................................................... 0-1
2. Classroom and Hands-On Training .................................................... 0-1
3. First Aid Response ............... 0-2
4. PNPS Emergency Response Organization Training Program ............................... 0-2
5. General, Initial and Annual Training Program Maintenance .................................. 0-5 Section P: Responsibility for the Maintenance of the Planning Effort
1. Emergency Preparedness Staff ..................................................... P-1
2. Authority for Emergency Preparedness Effort ..................................................... P-1
3. Nuclear Assessment Director .................................................... P-1
4. PNPS Emergency Plan Revisions.................................................... P-5
5. Emergency Plan Distribution .................................................... P-5
6. Supporting Emergency Response Plans .................................................... P-5
7. Implementing and Supporting Procedures ........................................... ......... P-6
8. Cross Reference to Planning Criteria ..................................................... P-6
9. PNPS Emergency Preparedness Program Review ................................................ P-6
10. Maintenance of the PNPS Emergency Telephone Directory .................. ................ P-6 v Revision 27

PNPS EMERGENCY PLAN Table of Contents (Cont.)

Page Part 3: APPENDICES Appendix 1: References ...................................... Appendixes-1 Appendix 2: Procedure Cross-Reference to Sections of the Plan ..................Appendixes-2 Appendix 3: Sample Copies of Letters of Agreement ..................................... Appendixes-4 Appendix 4: Glossary of Terms ........................................Appendixes-1 2 Appendix 5: Evacuation Time Estimates ...................................... Appendixes-14 vi Revision 27

PNPS EMERGENCY PLAN Part 1: INTRODUCTION Section A: Purpose This document describes the emergency preparedness program for Entergy's Pilgrim Nuclear Power Station (PNPS). The philosophy that guides the development and maintenance of this program is the protection of the health and safety of the general public in the communities around PNPS and the personnel who work at the plant.

The PNPS Emergency Plan outlines the basis for response actions that would be implemented in an emergency. This document is not intended to be used as a procedure. Detailed PNPS Emergency Plan Implementing Procedures are maintained separately and used to guide those responsible for implementing emergency actions.

This Plan documents the methods by which the PNPS Emergency Preparedness Program meets the criteria set forth in Title 10 of the Code of Federal Regulation (CFR), Part 50, Section 47(b) and Appendix E.

Section B: Background PNPS is located in the town of Plymouth, Plymouth County, in the Commonwealth of Massachusetts at 410 56.69 min. North, 700 34.74 min. West. It is situated on the western coast of Cape Cod Bay, on approximately 1600 acres of land, owned by Entergy. The plant is a General Electric Boiling Water Reactor (BWR) design and produces a net electrical output of 670 megawatts. A detailed description of the plant is given in the PNPS Final Safety Analysis Report (FSAR).

The primary hazard consideration at PNPS is the potential unplanned release of radioactive material resulting from an accident at the plant. The probability of such a release is considered very low due to plant design and strict operational guidelines enforced by the Nuclear Regulatory Commission (NRC). However, Federal regulations and common sense require that a solid emergency preparedness program exist for each commercial nuclear power station.

Section C: Scope This document describes actions to be taken in the event of an accident at PNPS which might lead to impact on the health and safety of the general public.

If such an accident were to occur, thePNPS Emergency Response Organization (as defined in this plan) would be put in place and maintained until such time the plant was returned to a stable condition and the threat to the general public no longer existed. This plan describes the operation of the PNPS Emergency Response Organization. It does not, nor is it intended to provide guidance for actual plant equipment manipulations. These instructions are contained in PNPS normal and emergency operating procedures as required by Technical Specifications and other regulatory guidance. An emergency recovery phase is also described in this plan.

Section D: Planning Basis Development of this plan was based on NRC Regulatory Guide 1.101, uEmergency Planning and Preparedness for Nuclear Power Plants," and NUREG-0654, FEMA-REP-1, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants", Revision 1. Other applicable regulations, publications and guidance were used (see Appendix 1, "References") along with PNPS documents to ensure consistency in the planning effort.

vii Revision 27

PNPS EMERGENCY PLAN This plan was developed in coordination with the Commonwealth of Massachusetts' Comprehensive Emergency Response Plan, Appendix 3, "Radiological Emergency Response Plan for Fixed Nuclear Facilities" and local community emergency response plans.

Section E: Form and Content of Plan This plan is Appendix N of the PNPS Unit 1 FSAR but is maintained as a separate document.

This Plan has been formatted in a manner similar to NUREG-0654, FEMA-REP-1, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants", Revision 1.

The use of this format lends itself to verification of meeting the criteria set forth in NUREG-0654, FEMA-REP-1, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants". Appendix 2, "Procedure Cross-Reference to Sections of the Plan", provides a cross-reference between this plan and the PNPS Emergency Plan Implementing and Administrative Procedures.

This plan is updated as necessary, in accordance with guidance provided by Emergency Preparedness Administrative Procedures viil Revision 27

PNPS EMERGENCY PLAN Part 2: PLANNING STANDARDS AND CRITERIA Section A: Assignment of Responsibilitv This section describes the primary responsibilities for emergency response by Pilgrim Nuclear Power Station (PNPS), Federal, State, Commonwealth, and local organizations within the PNPS Plume Exposure Pathway and the Ingestion Pathway Emergency Planning Zones (EPZs). Various supporting organizations are also described as well as staffing for initial and continuous response.

1. Concept of Operations: The relationships and the concept of operations for the organizations and agencies supporting a response in the PNPS Emergency Planning Zones are as follows:
a. Identified below are Federal, Commonwealth, State, local, and private organizations that are involved in a response to an emergency at PNPS.

Federal Agencies: The Federal Radiological Emergency Response Plan (FRERP) outlines the statutory and regulatory responsibilities. The primary Federal response at PNPS supporting an emergency include:

  • Nuclear Regulatory Commission (NRC), who acts as technical/regulatory advisors to PNPS during an emergency. They provide Federal communications capabilities, coordination of Federal assistance, and assessment of onsite radiological incidents and potential offsite consequences.
  • U.S. Department of Energy (DOE), who maintains the Interagency Radiological Assistance Program (IRAP) which provides radiological assistance to utilities, state, and local governments upon request. This assistance is provided through Brookhaven National Laboratory located in Long Island, New York.
  • U.S. Coast Guard, who assists the Commonwealth and local authorities in the event of a radiological incident which involves a hazard over water.
  • National Weather Service, who provides meteorological information to PNPS in the event that the onsite meteorological tower or monitoring instrumentation becomes inoperative. The National Weather Service is located in Boston at the Logan International Airport.

Commonwealth Agencies: The Commonwealth of Massachusetts Radiological Emergency Response Plan (RERP), provides for assistance from the Commonwealth agencies described below. The plan calls for supplemental support from Federal, Commonwealth, and local agencies.

A-1 Revision 27

PNPS EMERGENCY PLAN The Massachusetts Emergency Management Agency (MEMA), Framingham, provides resources to support community response and perform technical response functions for the communities. Its supporting organization are:

  • MEMA State Emergency Operations Center (SEOC)

- Activates and manages the MEMA Headquarters EOC and activates the Emergency Alert System (EAS).

- Provides resources to support community response.

- Coordinates public notification.

- Performs offsite support response functions on behalf of the communities.

- Recommends protective actions to the Governor.

- Performs accident assessment functions, environmental monitoring and sampling.

- Provides for laboratory analysis of environmental samples.

- Provides support for traffic, access control, and security for MEMA Headquarters EOC.

- Coordinates the activation of the Prompt Alert Notification System (PANS) during a rapidly escalating incident.

- Assists in coordination and implementation of protective actions-in conjunction with MEMA.

- Provides traffic and access control equipment.

- Provides resources to keep roads passable.

- Supports law enforcement agencies for traffic and access control, and security for evacuated areas.

- Transports emergency supplies.

- Collects samples from public drinking water supplies within the Ingestion Exposure Pathway EPZ upon request of MDPH.

- Restricts the use of public drinking water supplies found to be contaminated.

- Provides emergency notification in state parks.

A-2 Revision 27

PNPS EMERGENCY PLAN

- Controls contaminated foodstuffs.

- Maintains list of agricultural facilities within the Ingestion Exposure Pathway EPZ.

  • Massachusetts Department of Fisheries, Wildlife and Environmental Law Enforcement

- Collects shellfish samples within the Ingestion Exposure Pathway EPZ.

- Controls contaminated aquatic foods.

  • MEMA Area 11,Bridgewater, supports community response and coordinates integrated community functions. It coordinates information and resources between the Commonwealth and communities. The MEMA Area 11supporting operations are:

- Directly supports EPZ and host community response and coordinates functions that require an integrated community effort.

- Coordinates information and resources between the Commonwealth and local government.

- Provides back-up emergency notification to Commonwealth and local governments.

- Activates and coordinates the State Police Traffic Control Plan.

- Coordinates Commonwealth traffic and access control equipment support.

- Assists local public works departments to assure that roads remain passable.

- Coordinates National Guard transportation resources.

- Coordinates National Guard support for traffic and access control, and security for evacuated areas.

Supports Area 11EOC operations.

- Coordinates Red Cross activities at mass care shelters.

State of Rhode Island Agencies

  • Rhode Island Emergency Management Agency (RIEMA)

- Assumes overall coordination of State activities in an emergency situation.

  • Rhode Island Atomic Energy Commission

- Provides technical guidance to state agencies.

A-3 Revision 27

PNPS EMERGENCY PLAN

  • Rhode Island State Police

- Coordinates communications between Rhode Island and other groups.

  • Rhode Island Department of Health (RIDOH)

- Coordinates all state sampling, analysis and protective action guides.

- Establishes a system of keeping medical records on events related to incident.

Typical Local Government Agencies: PNPS and the surrounding communities which comprise the PNPS Plume Exposure Pathway EPZ and Reception Centers, have developed integrated emergency response programs which call upon the resources of their community. The community organizations are responsible for implementing and coordinating the community response to an emergency at PNPS. Typical key departments/individuals are identified below:

  • Board of Selectmen

- Provides overall control of emergency response.

- Ensures 24-hour staffing of emergency organization.

- Approves public information news statements.

- Declares a local State of Emergency.

- Ensures activation of Prompt Alert Notification System (PANS).

- Ensures implementation of the protective action directives.

- Directs town recovery, re-entry, and relocation activities.

  • Emergency Management Agency -

- Activates and manages the EOC.

- Coordinates response operations.

- Provides information to the Commonwealth on local conditions.

- Obtains additional resources needed for response.

- Maintains the emergency response program.

- Coordinates training, drills and systems tests.

  • Police Department

- Receives and performs emergency notification.

- Provides security at the EOC.

- Provides police communications support from the EOC.

- Assists in notification to beach and pond population.

- Activates the siren system when directed.

- Assists in route alerting.

- Coordinates traffic flow for evacuation.

A-4 Revision 27

PNPS EMERGENCY PLAN

- Recommends alternate evacuation routes.

- Controls access to affected areas.

- Provides security for evacuated areas.

  • Fire Department/Emergency Medical Services

- Receives and performs emergency notification.

- Provides firefighting support to PNPS.

- Coordinates town ambulance service activities.

- Coordinates mutual aid emergency medical services as needed.

- Activates the siren system when directed.

- Conducts route alerting, as necessary.

  • Council on Aging

- Coordinates notification and assistance to the special needs population.

- Coordinates transportation for special needs population.

  • Public Works Department

- Maintains evacuation routes in passable condition.

- Provides traffic and access control equipment.

- Restricts surface water supply to public, if necessary.

- Maintains operation and integrity of sewer system.

- Assists in establishing alternate evacuation routes, as necessary.

- Provides transportation for emergency workers and equipment.

- Assists in route alerting and notification to beach and pond population.

  • Harbor Master

- Provides emergency notification to boaters.

- Assists in controlling access to marine areas.

- Coordinates response actions with U. S. Coast Guard.

  • School Department

- Notifies and implements protective actions for the school population.

- Coordinates transportation of school population.

- Provides facilities to support transportation assistance and/or sheltering of the public.

  • Health Department

- Notifies camps, campgrounds, and industries and coordinates transportation needs.

- Notifies key employers.

A-5 Revision 27

PNPS EMERGENCY PLAN

- Notifies the hospital and nursing homes and coordinates transportation needs.

  • Operations Officer

- Coordinates EOC operations.

- Assists EOC staff in resolving operational problems.

- Ensures EOC staff is updated on events.

  • Radiological Officer

- Distributes dosimetry, potassium iodide (KI), and record forms to emergency workers.

- Monitors radiation levels at EOC.

- Ensures emergency worker exposure limit procedures are followed.

- Advises EOC staff on emergency worker exposure.

- Maintains emergency worker radiological records.

- Ensures maintenance and availability of radiological equipment.

- Coordinates radiological monitoring and decontamination at REWMDS and the reception centers.

  • Transportation Officer

- Coordinates staging area operations.

- Ensures adequate transportation resources are mobilized to assist the general public schools, special facilities, and special needs persons.

  • Public Information Officer

- Provides information on town response to MEMAlPublic Information Officer (PlO) at the Media Center.

- Provides for rumor control on town -specific response actions.

  • Shelter Officer

- Coordinates operations of public shelters.

Industry/Private Organizations

  • Jordan Hospital, located in Plymouth, is the primary care facility for treatment of contaminated injured persons, and for evaluation of radiation exposure and radionuclide uptake (Radiological and the Medical Department determine who needs evaluation). Morton Hospital, located in Taunton, is designated as a back-up hospital and is equipped and trained to handle contaminated injured individuals.

Individuals with severe radiation injury may be taken to a hospital as designated by MDPH.

  • Framatome ANP DE&S, through a mutual agreement provides certain types of services, including environmental monitoring and analysis, engineering, design, consultation, whole body counting, and dosimetry evaluation and equipment.

A-6 Revision 27

PNPS EMERGENCY PLAN

  • The Institute of Nuclear Power Operations (INPO) is able to provide:

- Assistance in locating sources of emergency manpower and equipment.

- An organization of industry experts who could advise on technical matters.

- Analysis of operational aspects to the incident.

  • American Nuclear Insurers (ANI) provides insurance to cover PNPS legal liability up to the limits imposed by the Price-Anderson Act, for bodily injury and/or property damage caused by the nuclear energy hazard resulting from an incident at PNPS.
  • Other industry organizations (engineering firms, construction firms, etc.) may be called on to provide assistance as needed.
b. During an emergency condition at an Alert, Site Area Emergency, or General Emergency level, the PNPS Emergency Response Organization replaces the normal plant organization. The PNPS Emergency Response Organization consists of three major response sub-organizations:
  • The Onsite Organization, directed by the Emergency Plant Manager, provides for:

- Control and operation of the plant.

- Mitigation of the emergency condition.

- Protection of station personnel.

- Initial assessment of the emergency.

- Notification of the appropriate individuals and agencies prior to EOF activation.

- Emergency support for operations, enginegring, maintenance, fire fighting, material acquisition, security, and first aid.

  • The Offsite Organization, directed by the Emergency Offsite Manager, provides for:

- Emergency notifications

- Offsite radiological accident assessment and protective action recommendations to offsite authorities

- It serves as the primary interface between PNPS and outside organizations responsible for the protection of the public.

  • The Public Information Organization, directed by the Company Spokesperson, coordinates with public information officers from other organizations to provide emergency information to the public through the news media.
c. Interrelationships between major PNPS organizations and sub-organizations in the total response effort are illustrated in a block diagram in Figure A-1. For a more detailed diagram of the PNPS Emergency Response Organization, see Figure B-1.
d. The Emergency Director is the senior PNPS manager in charge of emergency response and has overall authority and responsibility for coordinating all emergency response actions at PNPS.

A-7 Revision 27

PNPS EMERGENCY PLAN

e. The PNPS Emergency Response Organization is composed of pre-designated Station personnel available and trained to augment the on-shift complement in an emergency.

Procedures for training and maintenance of the emergency organization are in place to assure 24-hour per day staffing for emergency response. The normal on-shift complement provides the initial response to an emergency. This group is trained to handle emergency situations, e.g. initiate the implementation of the PNPS Emergency Plan, make initial accident assessment, emergency classification, notifications, and protective action recommendations until Emergency Response Organization activation occurs.

2. Commonwealth and Local Functions and Responsibilities: The Commonwealth, the local towns and reception center communities have Radiological Emergency Response Plans (RERPs) that specify the responsibilities and functions for the major agencies, departments, and key individuals of their emergency response organizations. This information is located in their respective plans.
3. Agreements in Planning Effort: Written agreements with support organizations having an emergency response role within the PNPS EPZs (including hospitals and medical transportation) are provided in Appendix 3, "Copies of Letters of Agreement". These agreements identify the emergency measures to be provided, the mutually accepted criteria for implementation, and the arrangements for exchange of information. Federal, Commonwealth, State, and local agencies that have response functions covered by laws, regulations, or executive orders have developed plans to meet these functions. These approved Plans serve as written agreements for agencies response to an incident at PNPS.
4. Continuous Coverage: The PNPS Emergency Response Organization`ias sufficient numbers of qualified, trained personnel to provide the capability of continuous (24-hour) operations. The PNPS Emergency Telephone pirectory is reviewed and updated on a quarterly basis and identifies these individuals. The Nuclear Assessment Director administers the program to ensure availability of resources in the event of an emergency.

The Emergency Director has the authority and is responsible for assuring continuity of resources (technical, administrative, and material) in the event of the activation of the PNPS Emergency Response Organization.

A-8 Revision 27

PNPS EMERGENCY PLAN Fiaure A-1: Emercencv Response Oraanization Interrelationships PNPS Onsite Organization PNPS Offsite Organization PNPS Information Organization Notes:

1. The Control Room initially interfaces with offsite agencies
2. All PNPS Facilities interface directly with the Nuclear Regulatory Commission's Emergency I Response Team when they arrive.
3. The interface is depicted in italics, e.g. assessment actions, corrective actions, protective actions, and information transfer.

A-9 Revision 27

PNPS EMERGENCY PLAN Section B: Station Emergency Organization This section describes the Pilgrim Nuclear Power Station (PNPS) Emergency Response Organization, its key positions and associated responsibilities. It outlines the staffing requirements which provide initial emergency response actions and provisions for timely augmentation of on-shift personnel when required. It also describes interfaces among PNPS response personnel and specifies offsite support available to respond to the PNPS.

1. PNPS Emergency Response Organization Assignments: Table B-1 outlines the PNPS on-shift complement and their emergency duties. Members of the on-shift organization are trained on their responsibilities and duties in the event of an emergency, and are capable of performing all response actions in an Unusual Event, and the initial actions of higher classifications. Table B-1 further lists key PNPS Emergency Response Organization positions required to meet minimum augmentation capabilities for the on-shift complement at an Alert or higher classification. Each Emergency Response Facility lead has the authority to, if necessary to activate the facility, designate personnel to fill Emergency Response Organization positions. These designations should be limited to one shift or until assigned personnel arrive.

The normal PNPS personnel complement is established with the Senior Nuclear Executive having overall authority for Station operations (the Shift Manager always retains the responsibility for actual operation of plant systems). The Senior Nuclear Executive directs senior Nuclear Organization staff in the management of the various department/organizations. When an emergency is declared, the normal organization structure is replaced by the PNPS Emergency Response Organization. PNPS Emergency Response Organization personnel are selected based on comparison of the emergency functions they are to perform with their normal daily tasks and prior training. A Nuclear Organization Procedure outlines job descriptions for the PNPS Emergency Response Organization. Key positions are normally filled from the Nuclear Organization as listedfbelow. However, due to the large amount of cross training and diversification across all areas within the Nuclear Organization, positions can be staffed from any part of the Nuclear Organization where personnel may be found with the capacity and expertise to perform the assigned emergency function as described in NOP88A4.

a. The Emergency Director is a member of the PNPS senior management staff.
b. The Emergency Plant Manager is a member of the PNPS senior management staff.
  • The Emergency Plant Operations Supervisor is a member of Plant Operations who holds an operators license on PNPS.
  • The Operations Support Center Supervisor is assigned from Plant Operations or Engineering.
  • The Emergency Security Supervisor is the Nuclear Security Operations Supervisor or a designated alternate from Nuclear Security.
  • The Onsite Radiological Supervisor is the Radiation Protection Manager or a designated senior member of Radiation Protection.
c. The Emergency Offsite Manager is a senior member of Nuclear Assessment or designated alternate from PNPS staff.

B-1 Revision 27

PNPS EMERGENCY PLAN

  • The Offsite Radiological Supervisor is normally from the Nuclear Assessment Group or Radiation Protection.
  • The Emergency Communication Supervisor is normally selected from Nuclear Training (any management level supervisor who has communication skills and can coordinate emergency communication efforts may be used to fill this position).
  • The Logistics Supervisor is normally a member of Nuclear Business Management or Nuclear Administrative Services.
  • The Community and MEMA Technical Liaisons are members of the Nuclear Assessment Group and/or support organizations.
  • The Regulatory Liaison is a Senior Engineer or a designated alternate from the Nuclear Assessment Group.
  • The Corporate Support Coordinator is a member of the PNPS management staff.
d. The Company Spokesperson is a senior member of the PNPS management staff.
  • The Media Center Supervisoris a member of PNPS management staff familiar with Media Center operations.
2. Authority Over PNPS Emergency Response Organization: The Emergency Director has overall authority and responsibility for coordinating all emergency response activities at PNPS. Detailed responsibilities are described in Part 4 of this section. The Shift Manager, or in his absence from the Control Room, the Control Room Supervisor assumes th'e position of Emergency Director until the Senior Nuclear Executive or a designated alternate arrives at the Emergency Operations Facility and assumes the position.
3. Succession to Emergency Director: Initially, the Shift Manager or the Nuclear Control Room Supervisor assumes the duties and responsibilities as the Emergency Director. When augmentation of the on-shift complement occurs, the Senior Nuclear Executive or a designated alternate reports to the EOF and, once briefed, relieves the Shift Manager of all Emergency Director responsibilities. Once the on-call Emergency Director assumes the Emergency Director responsibilities, overall command and control of the emergency transfers from the Control Room to the EOF. The Emergency Plant Operations Supervisor may relieve the on-shift Emergency Director until such time as the on-call Emergency Director arrives, however he/she must report and remain in the Control Room until relieved.
4. Emergency Director Responsibilities: The Primary responsibilities assigned to the Emergency Director are to:
  • Classify the emergency situation using established Emergency Action Levels and periodically review the classification to ensure that it reflects current plant conditions. This responsibility is NON-DELEGABLE.
  • Approve notifications/communications to local, Commonwealth, State, and Federal government agencies and ensure that correct notifications and information updates are made in a timely manner. This responsibility is NON-DELEGABLE.

B-2 Revision 27

PNPS EMERGENCY PLAN

  • Provide Protective Action Recommendations (PARs) to authorities responsible for protection of the general public. This responsibility is NON-DELEGABLE.
  • Terminate the event and initiate the recovery phase. This responsibility is NON-DELEGABLE.
  • At an Alert or higher classification (or when the EOF is activated), authorize PNPS press releases. This responsibility is NON-DELEGABLE.
  • Waive initial requirements for access authorization to PNPS. This responsibility is NON-DELEGABLE.
  • Monitor plant status following a security or other event affecting plant and personnel safety to ensure ERO response and mobilization remains appropriate.
  • Ensure appropriate emergency procedures are implemented.
  • Ensure all PNPS emergency response facilities are activated and properly staffed.
  • Request required assistance from corporate and/or offsite organizations and agencies.
  • Authorize radiation exposures for PNPS emergency workers in excess of 10CFR20 limits and use of potassium iodide as a thyroid blocking agent. This responsibility may be and normally is delegated to the Emergency Plant Manager for onsite personnel.

The Emergency Director oversees the PNPS Emergency Response Organization's interfaces with local, Commonwealth, State, and Federal authorities. The Emergency Plant Manager, the Emergency Offsite Manager, and the Company Spokesperson report directly to the Emergency Director.

5. PNPS Emergency Response Organization The Emergency Plant Manager is the senior individual located at the site and is responsible for:
  • Activities associated with PNPS operations (the Shift Manager retains authority for actual operation of plant systems).
  • Plant accident assessment.
  • Emergency classification recommendations to the Emergency Director based on plant parameters.
  • Onsite actions taken to mitigate the emergency situation.
  • Protective actions for PNPS personnel, including directing site evacuation activities, authorizing emergency exposures and use of potassium iodide, if delegated by the Emergency Director.
  • Determination of emergency responders ability to perform their assigned duties under Fitness For Duty criteria at PNPS.

The Emergency Director normally delegates the responsibilities of authorizing onsite emergency worker exposures in excess of 10CFR20 limits and the use of potassium iodide to the Emergency Plant Manager. These responsibilities may not be delegated further.

The Emergency Plant Manager interfaces with the Emergency Offsite Manager. The Emergency Plant Manager is normally located in the Technical Support Center. The following positions report to the Emergency Plant Manager:

8-3 Revision 27

PNPS EMERGENCY PLAN The Emergency Plant Operations Supervisor is the senior management position in the Control Room and is responsible for coordination of the Control Room activities with all outside emergency facilities. The Emergency Plant Operations Supervisor does not relieve the Shift Manager of responsibilities for operation of the plant. This position advises the Emergency Plant Manager on plant status and trends and their potential impact.

The Emergency Plant Operations Supervisor interfaces with the Technical Support Center Supervisor, Operations Support Center Supervisor, Onsite Radiological Supervisor and the Emergency Security Supervisor.

The Technical Support Center Supervisor supervises engineering activities associated with mitigation of the emergency situation. This position advises the Emergency Plant Manager on proposed corrective actions and emergency classification from a technical standpoint (i.e. plant system damage, core damage, etc.). The TSC Supervisor is responsible for the activation and proper staffing of the TSC. This includes the Engineering Support/Technical Assessment Group.

The Technical Support Center Supervisor interfaces with the Emergency Plant Operations Supervisor, Operations Support Center Supervisor, Onsite Radiological Supervisor and the Emergency Security Supervisor.

The Operations Support Center Supervisor supervises emergency repair teams, search and rescue teams, first aid teams, fire fighting and chemistry teams associated with accident mitigation. This position works with the Operations Support Center Activities Coordinator to provide for maintenance of accountability for operations personnel dispatched into the plant during the emergency. The Operations Support Center Supervisor assesses the manpower requirements and technical skill levels required to mitigate the emergency situaion and requests augmentation of the Operations Support Center (OSC) staff as appropriate.

The Operations Suppo-rt Center Supervisor interfaces with the Technical Support Center Supervisor, Emergency Plant Operations Supervisor, Radiation Protection Coordinator, Emergency Security Supervisor and the Logistics Supervisor.

The Onsite Radiological Supervisor supervises the analysis of radiological data and radiation protection measures for personnel inside the Protected Area. This position is responsible for all radiological aspects of the emergency for the plant and making recommendations to the Emergency Plant Manager on classification, onsite protective actions and corrective actions based on this data.

Initially, unless directed to do otherwise by the Shift Manager, the on-shift Radiation Protection Supervisor/Technician performs the duties of Onsite Radiological Supervisor until relieved.

The Onsite Radiological Supervisor interfaces with the Technical Support Center Supervisor, the Operations Support Center Supervisor and the Offsite Radiological Supervisor.

The Emergency Security Supervisor supervises the Station security forces. This position is responsible for the coordination of Protected Area accountability and evacuation, emergency access to vital areas and physical security of the Station. The Emergency Security Supervisor keeps the Emergency Plant Manager informed of all security concerns as they pertain to mitigation of the emergency. In addition, the Emergency Security Supervisor coordinates the security activities of all Pilgrim Station emergency response facilities. Initially, the Security Shift Commander performs the duties of the Emergency Security Supervisor until relieved.

b-4 Revision 27

PNPS EMERGENCY PLAN The Emergency Security Supervisor interfaces with the Emergency Plant Operations Supervisor, the Operations Support Center Supervisor, the Technical Support Center Supervisor and the Logistics Supervisor, and the Emergency Director in response to events involving security threats to the site or site personnel.

The Emergency Offsite Manager is responsible for the overall operation of the Emergency Operations Facility (EOF) including:

  • Coordination of all radiological dose assessment activities, formulation of PARs, and presentation of PARs to the Emergency Director.
  • Determination of emergency responders ability to perform their assigned duties under Fitness For Duty criteria at the EOF following emergency response activation.
  • Interface with Entergy Nuclear Northeast through the Corporate Support Coordinator.
  • Ensure timely communications with local, Commonwealth, and federal agencies after activation of the EOF following emergency response activation.

The Emergency Offsite Manager interfaces with the Emergency Plant Manager. The following positions report to the Emergency Offsite Manager:

The Offsite Radiological Supervisor has the responsibility for computation and evaluation of projected dose rates, exposures, environmental impacts and PARs for areas outside of the Protected Area. This position utilizes Dose Assessment Engineers, the Radiation Laboratory and Monitoring Team Coordinator and Radiation Monitoring Teams and is the Emergency Offsite Manager's radiological advisor. The Offsite Radiological Supervisor is responsible for radiological exposure controls for all PNPS response~personnel outside the Protected Area.

The Offsite Radiological Supervisor interfaces with the EOF Operations Advisor and the Onsite Radiological Supervisor.

The Emergency Communications Supervisor is responsible for supervising communications and notifications with Federal, local, Commonwealth, and State emergency organizations and maintaining logs and status boards in the EOF.

The Logistics Supervisor is responsible for initial and relief staffing during an extended emergency and logistical support (food, transportation, equipment maintenance, etc.). The Logistics Supervisor coordinates with the Corporate Support Coordinator as necessary to obtain resources from Entergy Nuclear Northeast.

The Logistics Supervisor interfaces with the Technical Support Center Supervisor, the Operations Support Center Supervisor, the Corporate Support Coordinator, and the Emergency Security Supervisor.

The Regulatory Liaison is responsible for assisting the NRC and Federal Emergency Management Agency (FEMA) response teams located at the EOF or other PNPS facilities.

The Corporate Support Coordinator is responsible for interfacing with the Entergy Nuclear Northeast to ensure that Company resources are available to the Emergency Director, and to ensure that senior management has sufficient information to develop Company policy decisions in a timely manner.

BUS Revision 27

PNPS EMERGENCY PLAN The Company Spokesperson is authorized to deliver pubic statements on behalf of Pilgrim Station pertaining to information approved by the Emergency Director during emergency conditions at PNPS. The Company Spokesperson oversees the flow of information from the Media Center and assures that information is provided to the news media in an accurate and timely manner and is coordinated with responding government agencies.

The Company Spokesperson interfaces with the Emergency Director and Public Information Officers from Commonwealth and Federal government agencies.

The Media Center Supervisor is responsible for the efficient operation of the PNPS public information effort at the Media Center during an emergency at PNPS. This position assures coordination with Commonwealth and Federal agencies in providing information to the public through the news media.

Table B-1 outlines key emergency response positions, their expected response times and the major tasks assigned to each position.

6. PNPS Emergency Response Organization Block Diagram: Figure B-1 illustrates the positions of the PNPS. Emergency Response Organization and supporting positions. Positions are assigned to interface with Federal, Commonwealth, State, and local authorities. Section B.5 discusses specific responsibilities and the interrelationships for key positions.
7. Corporate Emergencv Response: The Entergy Nuclear Northeast office in White Plains, NY, provides support to the PNPS Emergency Response Organization. Provisions exist in the PNPS Emergency Plan Implementing Procedures to integrate support available at the corporate level.
8. Private Industry Support: PNPS Maintains a list of approved contractor and private organizations that provide technical assistance and can augment the PNPS staff during normal operations in the Emergerncy Telephone Directory. In addition, industry resource (Institute of Nuclear Power Operations, American Nuclear Insurers, etc.) lists are maintained that identify specialized resources.

These organizations may be called on to assist during an emergency or during the recovery phase.

B-6 Revision 27

PNPS EMERGENCY PLAN

9. Offsite Emergency Assistance to PNPS: PNPS is located in the Town of Plymouth and served by Town departments and local medical services. The following organizations have entered into agreements to support PNPS in the event of an emergency:
a. The Plymouth Fire Department has agreed to provide:
  • Fire protection assistance for the site.
  • Emergency ambulance service.
  • Rescue assistance to the public for the open areas of the site.
  • Storage of emergency equipment supplied by PNPS (back up breathing air compressor).
b. The Plymouth Police Department has agreed to:
  • Control access on town roads in the vicinity of the site, including the erection of barricades on Rocky Hill Road if needed.
  • Initiate evacuation of the public from the site.
  • Provide offsite storage of emergency equipment.
c. Jordan and Morton Memorial Hospitals have agreed to provide medical treatment to contaminated and injured personnel or radiation injury victims from PNPS and participate in at least one Emergency Medical Drill per calendar year rotating between hospitals. Additional hospitals have agreed to provide similar services for the treatment of offsite personnel contaminated and injured during an accident at PNPS.
d. American Medical Response Ambulance Service provides emergency ambulance service to PNPS through a contract with the Plymouth Fire Department. This includes the transport of contaminated and injured personnel or radiation injury victims.
e. The Town of Carver has agreed to provide facilities for the PNPS Alternate Emergency Operations Facility.
f. Bridgewater State College provides facilities for the PNPS Alternate Media Center.

Sample copies of these letters of agreement are displayed in Appendix 3 of this Plan. The original letters are maintained in the Emergency Preparedness files. Letters of Agreement are renewed annually.

B-7 Revision 27

PNPS EMERGENCY PLAN Table B-1: Minimum Staffing Requirements for the PNPS ERO (1) I Functional Area Major Task Position Title Response Plant Operations Plant Stabilization Shift Manager On Shift#

Assessment of Operational Aspects Accident Mitigation Control Room Supervisor On Shift#

Lic. Nuc. Plant Operator (2) On Shift#

Unlic. Nuc. Plant Operator (2) On Shift#

Emergency Direction Emergency Classification Shift Manager On Shift#

Emergency Control PARs Control Room Supervisor On Shift#

Emergency Director 60 min.

Emergency Plant Ops Supv 60 min.

Notification and Communications Notification of PNPS, Local, Engineer (Shift Control Rm)* On Shift#

Commonwealth, and Federal Emergency Comm Supv 30 min.

personnel and Maintain Communications Staff (2) 60 min.

Communications Rad Accident Assessment EOF Direction Emergency Offsite Manager 60 min.

Ops Accident Assessment Support Offsite Dose Assessment Offsite Radiological Supv 30 min.

Offsite Surveys RMT Member (2) 30 min.

RMT Member (2) 60 min.

Onsite and In-plant Surveys RP Technician (2) On Shift#

RP Technician (2) 30 min.

RP Technician (2) 60 min.

Chemistry / Radiochemistry Radio Chem. Technician On Shift#

Radio Chem. Technician 60 min.

Plant System Engineering TSC / OSC Direction Emergency Plant Manager 60 min.

Repair and Corrective Actions Technical Support Engineer (Shift Control Rm)* On Shift#

Engineer (Reactor) 30 min.

Engineer (Mechanical) 60 min.

_________________________ Engineer (Electrical) 60 min.

Equipment Repairs Nuclear Maint. Technician 30 min.

Corrective Actions Nuclear Maint. Technician 60 min.

Nuc. Plant Reactor Operator On Shift#

Nuc. Plant Reactor Operator 60 min.

Nuclear Maint. (Electrical)(2) 30 min.

Nuclear Maint. (Electrical) 60 min.

Nuclear Control Technician(2) 30 min.

Protective Actions (In Plant) Radiation Protection, Access RP Technician (2)**' On Shift#

Control, RP Coverage, RP Technician (2) 30 min.

Personnel Monitoring, and RP Technician (2) 60 min.

Dosimetry Fire fighting Fire Brigade* On Shift#

Plymouth Fire Dept. On Call Rescue Ops and First Aid EMP*** On Shift#

Ambulance Service On Call Site Access Control and Personnel Security Security Force" On Shift#

Accountability On Shift - A person is said to be on shift when, during normal or authorized overtime hours that person is within the PNPS owner controlled areas or on the connecting roads between them with Station Management approval.

Position staffed in accordance with technical specifications.

    • Position staffed in accordance with technical specifications and station procedures.

Task shared with RP Technicians assigned to in-plant surveys.

(EMP) Emergency Medical Personnel: individuals qualified as EMPs, RNs, First Responders, and Paramedics.

NOTE: Response times are based on optimum travel conditions.

(1) This table B-1 is incorporated into the Emergency Plan in accordance with USNRC Generic Letter 82-33 dated 12/17/82.

B-8 Revision 27

PNPS EMERGENCY PLAN Fioure B-la: PNPS Emeraencv Oroanization

  • Located at Commonwealth and Local EOCs B-9 Revision 27

PNPS EMERGENCY PLAN Fiaure B-i b: Operations Emercency Oroanization

  • Plant Rad Data Data Communicator Communicator Operations Assistant
    • Located in the OSC B-10 Revision 27

PNPS EMERGENCY PLAN Fiaure B-1c: Technical Support Oraanization Engineer (Computer)

  • Engineering Support/Technical Assessment Group (ES/TAG) located at the TSC. Group size determined by TSC Supervisor and ES/TAG Coordinator.

Based on the nature of the event, more than one Operations Engineer may be called

      • SCRE: Control Room Supervisor (SCRE)

B-1 1 Revision 27

PNPS EMERGENCY PLAN Figure B-1 d: Operations Support Organization

-Operators Data Comm -Chemistry I&C Materials B-1 2 Revision 27

PNPS EMERGENCY PLAN Figure B-i e: Emergency Security Organization Emergency Security Supervisor Security Shift Commander Offsite Onsite Security Security Force Force B-1 3 Revision 27

PNPS EMERGENCY PLAN Fiaure B-1f: Onsite Emerqency Radiation Protection Orqanization

    • Radiation Radiation Status Protection Protection Board Coordinator Engineer Keeper
    • Located in OSC B-14 Revision 27

PNPS EMERGENCY PLAN Figure B-1g: EOF Communications Organization

PNPS EMERGENCY PLAN Figure B-1 h: Offsite Radiological Assessment Organization

PNPS EMERGENCY PLAN Fioure B-1 i: Emeraencv P.1. Orcianization Pi Advisor Pi Computer Operator Assistant (2)

B-17 Revision 27

PNPS EMERGENCY PLAN Section C: Emergency Response Support and Resources This section describes the provisions for requesting and effectively utilizing support resources and for accommodating Commonwealth and local staff at the PNPS Emergency Operations Facility (EOF).

1. Federal Response Support and Resources: Assistance is available from Federal agencies through the Federal Radiological Emergency Response Plan (FRERP). The primary Federal agencies who provide assistance to the Commonwealth and PNPS, respectively, are the Federal Emergency Management Agency (FEMA) and the Nuclear Regulatory Commission (NRC). Other Federal agencies, through FRERP, provide assistance to the Commonwealth in an emergency.
a. Sections A and B of this Plan identify the specific persons by title who are authorized to request Federal assistance.
b. Federal agencies that may provide assistance in direct support of Pilgrim Nuclear Power Station (PNPS) in the event of an accident are identified in Section A of this plan. If needed, Federal resources are made available to PNPS in an expeditious and timely manner.
c. Each PNPS emergency response facility has the equipment and communications capability necessary for a continuous high level of response, interaction and communication among key personnel during emergency conditions. The Technical Support Center (TSC) is able to accommodate seven NRC representatives. Working areas are available and a desk has been provided for their use. The EOF has space to accommodate twelve NRC representatives as well as representatives from FEMA, the Massachusetts Department of Public Health (MDPH) and the Massachusetts Emergency Management Agency (MEMA).

In addition to PNPS facilities and equipment, Commonwealth and local facilities and equipment are available to support the Federal response. Among these are the Commonwealth Emergency Operations Centers (EOCs) in Framingham and Bridgewater and local EOCs in Plymouth, Duxbury, Carver, Kingston and Marshfield, and Reception Centers in Taunton, Bridgewater and Braintree.

2. Liaisons:
a. The NRC, FEMA, MEMA, and MDPH may dispatch representatives to the EOF where accommodations have been provided.
b. At the Alert level and above, PNPS liaisons are dispatched to the Commonwealth and local government EOCs to act as communications liaisons and to provide clarification of emergency response information.
3. Radiological Laboratories: Outside analytical assistance may be requested from Commonwealth and Federal agencies and other utilities if the offsite radiological monitoring and environmental sampling operation exceeds the capacity of the PNPS capabilities.

C-1 Revision 27

PNPS EMERGENCY PLAN PNPS maintains access to additional laboratory facilities through agreements with the Framatome ANP DE&S and the DOE Brookhaven Area office. A description of their general capabilities is provided in Section H of this Plan. It is estimated that these laboratories are able to respond within eight hours of initial notification.

4. Other Assistance: Contracted services, as listed in the Emergency Telephone Directory (ETD), are available and may be used in support of an emergency response at PNPS.

Though not a typical contracted service, the Institute of Nuclear Power Operation (INPO) is able to provide:

  • Assistance in locating sources of emergency manpower and equipment,
  • An organization of industry experts who could advise the utility on technical matters, and
  • Analysis of operational aspects of the incident.

Through INPO, nuclear utilities have identified technical experts and specialized equipment that could be provided upon request in an emergency. The INPO Emergency Resources Manual includes the information necessary to locate and request specialized equipment and technical assistance in the event of a nuclear emergency at PNPS. INPO member utilities and suppliers agree to provide assistance as outlined in the INPO Emergency Resources Manual.

C-2 Revision 27

PNPS EMERGENCY PLAN Section D: Emergency Classification System This section describes the classification and emergency action level scheme used to determine the minimum response to an abnormal event at the Station. This scheme is based on Pilgrim Nuclear Power Station (PNPS) systems, effluent parameters and operating procedures. The initial response of Federal, Commonwealth and local agencies is dependent upon information provided by PNPS. PNPS works closely with the Commonwealth and local agencies to ensure consistency in classification schemes and procedural interfaces.

1. Emergency Classification: This Plan provides for four classifications of emergency conditions. These mutually exclusive classifications cover the postulated spectrum of potential and actual emergencies. Each classification is associated with a particular set of immediate actions. However, during a safeguards contingency event, actions may be taken that depart from the immediate requirements specified for each of the four classification levels when those actions are immediately needed to protect the health and safety of members of the public or the plant staff. Those actions may include suspension, delay or modification of activities that could endanger the safety of members of the public, plant staff or security force or which could interfere with an effective response to the safeguards contingency event. Each classification is characterized by certain initiating symptoms or events called Emergency Action Levels (EALs). These action levels include specific sets of plant parameters (i.e., instrument indications, system status, etc.) that are used to determine the appropriate emergency classification. Table D-1 outlines the example conditions of abnormal symptoms and events, which would require declaration of an emergency at PNPS. The Emergency Plan Implementing Procedure used for classification of an event includes specific instrument readings and equipment status for establishing the symptoms and events appropriate for each classification. A conservative philosophy for classification is used to declare the highest emergency classification for which an EAL has been exceeded. The four classification levels are:
a. Unusual Event - Event(s) are in progress or have occurred which indicate a potential degradation of the level of safety of PNPS. No release of radioactive material requiring offsite response or monitoring is expected.

This is the least severe of the four (4) levels. The purpose of this classification is to bring the PNPS staff and offsite agencies to a state of readiness in the event the situation degrades.

Required actions at this classification include:

  • Notification, within 15 minutes, of the Commonwealth of Massachusetts and local communities.
  • Assessment of the situation and response as necessary which may include escalating to a higher classification if conditions warrant.
  • Notification of certain members PNPS Emergency Response Organization to standby (portions of the organization may be activated at this classification).
  • Notification of the Nuclear Regulatory Commission (NRC) immediately after notification of the appropriate Commonwealth and Local Agencies and not later than an hour after classification.

D-1 Revision 27

PNPS EMERGENCY PLAN

  • Keeping offsite authorities informed of plant status by providing one hour updates to include meteorological data and projected or actual doses for any releases which have occurred.
  • When the event is terminated, close-out is performed over communication links followed by transmission of an Initial Notification Form indicating that the event has been terminated.
b. Alert - Event(s) are in progress or have occurred which indicate an actual degradation of the level of safety of PNPS. No releases of radioactive material requiring offsite response or monitoring are expected. The purpose of this classification is to ensure emergency personnel are readily available to respond, if the situation becomes more serious, and relieve the Control Room of some required actions so that the operations shift can concentrate on restoring the level of safety to the plant.

Required actions at this classification include:

  • Notification, within 15 minutes, of the Commonwealth of Massachusetts and local communities.
  • Assessment of the situation and response as necessary which may include escalating to a higher classification if conditions warrant.

Emergency Operations Facility (EOF), Media Center (MC), and notification of Entergy Nuclear Northeast (ENN).

  • Notification of the NRC immediately after notification of the appropriate Commonwealth and Local Agencies and not later than an hour after classificGTion.
  • Keeping offsite authorities informed of plant status by providing one hour updates to include meteorological data and projected or actual doses for any releases which have occurred.
  • When the event is terminated, close-out is performed over communication links followed by an Initial Incident Report to offsite authorities participating in the response (i.e., NRC, State, Local) within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
c. Site Area Emergency - Event(s) are in progress with actual or likely major failures of plant systems needed to protect the general public. Any releases are not expected to exceed Environmental Protection Agency Protective Action Guideline exposure levels except near the site boundary. The Site Area Emergency class also includes events where a significant release of radioactive material is likely or is occurring but significant core degradation is not indicated based on current information.

The purpose of this classification is to ensure that all emergency response centers are manned, offsite monitoring teams are sent to staging areas or dispatched, personnel required to evacuate near-site areas are in position and provisions are made for information updates to the public through offsite authorities and the news media.

D-2 Revision 27

PNPS EMERGENCY PLAN Required actions at this classification include:

  • Notification, within 15 minutes, of the Commonwealth of Massachusetts and local communities.
  • Assessment of the situation and response as necessary, this includes escalating to a higher classification if conditions warrant.
  • Activation of the PNPS Emergency Response Organization which includes activation of the TSC, OSC, EOF, Media Center and Corporate Emergency Response Group.

Radiation Monitoring Teams are sent to staging areas or dispatched to monitor for releases of radiation to the environment.

  • Notification of the NRC immediately after notification of the appropriate Commonwealth and Local Agencies and not later than an hour after classification.
  • Keeping offsite authorities informed of plant status by providing one hour updates to

-include meteorological data and projected or actual doses for any releases which have occurred.

  • When the event is terminated, close-out is performed over communication links followed by an Initial Incident Report to offsite authorities participating in response (i.e., NRC, State and Local) within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
d. General Emergency - Event(s) are in progress or have occurred which involve actual or imminent core damage and the potential for a large release of radioactive material.

Releases can be reasonably expected to exceed EPA PAG exposure levels offsite for more than the immediate site area. This is the most severe classification of an emergency. The purpose of this classification is to initiate predetermined protective actions for the public, provide continuous assessment of information from monitoring groups and provide information updates to the public through offsite authorities and the news media.

Required actions at this classification include:

  • . Notification, within 15 minutes, of the Commonwealth of Massachusetts and local communities.
  • Assessment of the situation and response as necessary.
  • Activation of the PNPS Emergency Response Organization which includes activation of the TSC, OSC, EOF, Media Center and Corporate Emergency Response Group.

Radiation Monitoring Teams are sent to staging areas or dispatched to monitor for releases of radiation to the environment.

  • Notification of the NRC immediately after notification of the appropriate Commonwealth and local agencies and not later than an hour after classification.

The emergency organization has personnel available to consult with the NRC on planned actions at the Station.

  • Keeping offsite authorities informed of plant status by providing one hour updates to include meteorological data and projected or actual doses for any releases which have occurred.

D-3 Revision 27

PNPS EMERGENCY PLAN

  • Issuance , as a minimum, based upon plant conditions, initial protective action recommendations to affected EPZ sub-areas. Section J.7 provides a detail description of the possible recommendations that may be issued at the General Emergency classification including the consideration of administering potassium iodide (KI) to the general public.
  • Consideration of relocating the Media Center to its alternate site, based upon radiological or other conditions, such as a Commonwealth-directed evacuation of subarea 7.
  • Reassessment of PARs as necessary.
  • When the event is terminated, close-out is performed over communication links followed by an Initial Incident Report to offsite authorities participating in response (i.e., NRC, State, local) within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
2. Emergency Action Levels: The symptoms and events outlined in Table D-1 encompass the example conditions from Appendix 1 of NUREG-0654, OCriteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness at Nuclear Power Plants" as well as the conditions indicative of postulated accidents from the Station's Final Safety Analysis Report (FSAR). The specific Emergency Action Levels detailed in the Implementing Procedures are utilized to classify emergency conditions and provide the control room operator with the indications characteristic of one or more of the symptoms or events specified.
3. Offsite Classification Systems: PNPS works with the Commonwealth of Massachusetts and local authorities to ensure consistency between classification schemes. The content of the Emergency Action Levels is reviewed with the Commonwealth and local authorities on an annual basis.
4. Offsite Emergency Procedures: PNPS works with the Commonwealth of Massachusetts and local authorities to ensure that procedures are in place that provide for emergency actions to be taken which are consistent with the protective actions recommended by PNPS accounting for local offsite conditions that exist at the time of the emergency.

D-4 Revision 27

EXAMPL~ PNPS EMERL.-NCY PLAN ( AMPLE Table D-1 Symptoms and Events Requiring Emergency Classification SYMPTOM/EVENT l l CATEGORY GENERALEMERGENCY SITEAREAEMERGENCY ALERT UNUSUAL EVENT 1.0 REACTOR FUEL 1.1 Coolant Activity Coolant activity indicating core Coolant activity > 10 times Coolant activity > technical specification melt technical specification limit limit 1.2 Off-gas Activity Off-gas activity > 10 times Off-gas activity > technical specification technical specification limit limit requiring shutdown 1.3 Thermal Limits MCPR < Tech. Spec. Fuel Clad Integrity Safety Limit 1.4 Radiation Monitors Containment radiation levels Containment radiation levels Radiation monitors indicating a indicating core melt indicating fuel failure fuel handling accident 2.0 REACTOR PRESSURE VESSEL 2.1 Reactor Water Level Sustained RPV water level RPV water level cannot be Inability to determine RPV water RPV water level cannot be restored and

< Minimum Zero-injection RPV maintained > Top of Active Fuel level maintained > Low Level Scram Setpoint Water Level and no sources of (TAF)

RPV injection available Inability to assure adequate core cooling via injection Into the RPV 2.2 Reactor Pressure Reactor pressure above the Loss of reactor pressure control functions safety limit _

2.3 Reactor Power Failure to SCRAM with excessive Boron injection initiated to Failure of the reactor to shutdown heat addition to containment shutdown the Reactor following a SCRAM signal 3.0 PRIMARY CONTAINMENT I 3.1 Drywell Temperature Inability to restore and maintain Bulk drywell temperature cannot be bulk drywell temperature < maintained < normal maximum operating design temperature as value determined by the Procedure. _

3.2 Torus Water Inability to maihtain sufficient Torus water temperature above that Temperature torus water heat capacity _ requiring reactor scram 3.3 Containment Water Inability to maintain torus water Torus water level cannot be Drywell leakage > technical specification Level level within limits beyond which maintained < 180 in. limit threaten the pressure suppression function of the Inability to maintain torus water level containment within technical specification limits Torus water level cannot be maintained > 90 in.

D-5 Revision 27

EXAMPLL PNPS EMERQ -NCY PLAN .AMPLE Table D-1 Symptoms and Events Requiring Emergency Classification SYMPTOM/EVENT l l l CATEGORY I GENERAL EMERGENCY I SITE AREA EMERGENCY ALERT UNUSUAL EVENT 3.4 Primary Containment Inability to maintain torus bottom Torus bottom pressure cannot be Inability to maintain containment Pressure pressure below that which maintained below the 'Pressure pressure below the scram threatens containment structural Suppression Pressure" (PSP) setpoint integrity (prior to initiation of (except during testing such as containment venting). ILRT,etc.)

3.5 Primary Containment Drywell or torus H2 and 02 Significant drywell or torus Significant drywell or torus H2 and 02 concentrations above deflagrable hydrogen and oxygen hydrogen concentration Concentrations levels or inability to determine concentrations they are below these levels 4.0 SECONDARY CONTAINMENT 4.1 Secondary Excessive secondary containment Excessive secondary containment area Containment Water area water levels caused by a water levels Level primary system discharging into the area 4.2 Secondary Excessive secondary containment Excessive secondary containment area Containment area temperatures caused by a temperatures Temperatures primary system discharging into the area 4.3 Secondary Excessive secondary containment General area radiation levels Containment area radiation levels caused by a which increase dramatically due Radiation Levels primary system discharging into to airborne radioactivity the area 5.0 RADIOACTIVITY RELEASE 5.1 Effluent Monitors Main stack effluent monitor Main stack effluent monitor Gaseous effluent monitor Gaseous or liquid effluent monitor readings corresponding to lower readings corresponding to 100 readings indicative of a significant readings indicating releases approaching level PAGs projected at the site mrem w.b. or 500 mrem thyroid degradation of radioactivity technical specifications boundary or beyond projected at the site boundary or containment systems beyond 5.2 Dose Projection and Dose projection or environmental Dose projection or environmental Environmental measurements which indicate measurements which indicate Measurements doses in excess of lower level doses in excess of 100 mrem w.b.

PAGs at the site boundary or or 500 mrem thyroid at the site beyond boundary or beyond Dose projection or environmental measurements which indicate dose rates in excess of 1 rem/hr w.b. or 5 rem/hr thyroid at the site boundary or beyond D-6 Revision 27

EXAMPLE PNPS EMERL A4CY PLAN AMPLE Table D-1 Symptoms and Events Requiring Emergency Classification SYMPTOM/EVENT I I I l CATEGORY GENERAL EMERGENCY SITE AREA EMERGENCY l ALERT UNUSUAL EVENT I 5.3 Contaminated Injury Transportation of a contaminated injured person to an offsite medical facility.

6.0 INTERNAL EVENTS 6.1 Technical A required Technical Specification Specifications Shutdown is not completed within allowed LCO Action Statement Time.

6.2 Safety System Evacuation of control room Loss of control room habitability Failure of a SRV to close following Failures without establishing control within reduction of applicable pressure 15 minutes from remote shutdown Inability to establish cold stations shutdown conditions Steam line break outside primary containment without Isolation Inability to immediately isolate any main steam line following a valid isolation signal _

6.3 Electrical System Sustained loss of all AC power Loss of all AC power capability Loss of all vital onsite AC power capability Failures capability Loss of all 125 VDC power Loss of all vital offsite AC power capability Sustained loss of all 125 VDC capability power capabili*i 6.4 Loss of Indication, Complete loss of Plant Process Loss of indication or alarms which cause Alarm or Computer and a significant loss of assessment capability Communication Loss of most or all Control Room Capability Annunciators and Loss of ability to communicate with or Reactor coolant temperature is adequately activate the PNPS Emergency

> 212 deg. F. Response Organization 7.0 EXTERNAL EVENTS 7.1 Security Threats Security compromise which in the Security compromise which in the Any security compromise as Attempted unauthorized entry into the judgment of the Shift Manager judgment of the Shift Manager determined by the Station Protected Area has lead to loss of physical may lead to the loss ofphysical Security Force control of the plant control of the plant Indication of attempted sabotage Receipt of a credible Security threat as determined by the Station Security Force D-7 Revision 27

EXAMPLE PNPS EMERL A4CY PLAN ( AMPLE Table D-1 Symptoms and Events Requiring Emergency Classification SYMPTOWEVENT I CATEGORY l GENERAL EMERGENCY l SITE AREA EMERGENCY ALERT UNUSUALEVENT 7.2 Fire Fire affecting the ability of two or Fire burning out of control in a Fire within the Protected Area lasting >10 more safety systems to perform plant vital area minutes from the time Fire Brigade fire their intended function and posing fighting efforts begin or fire requiring a significant potential for release offsite fire fighting assistance of radioactivity 7.3 Man-made Events Any of the following which has Any of the following occurring Any of the following events occurring affected the ability of two or more which affect plant operation: onsite: Aircraft Crash, Explosion, Toxic or safety systems to perform their Aircraft Crash, Explosion, Toxic or Flammable Gas Release intended function and posing a Flammable Gas Release significant potential for release of radioactivity: Aircraft Crash, Explosion, Toxic or Flammable Gas Release 7.4 Natural Events Any natural phenomena which Any natural event which causes Sustained hurricane force winds has affected the ability of two or observed damage to permanent more safety systems to perform plant structures or equipment Report of a tornado onsite their intended function and posing affecting plant operation a significant potential for release Any earthquake detected by station of radioactivity Any earthquake > OBE seismic instruments and Any earthquake > SSE Ground motion is felt by one or more plant

.____________________________ operations personnel.

8.0 OTHER In the opinion of the Shift In the opinion of the Shift Any event which in the opinion of Any event which in the opinion of the Manager or Emergency Director Manager or Emergency Director the Shift Manager or Emergency Shift Manager or Emergency Director events are in progress which events are in progress or have Director could or has caused could or has lead to a potential indicate actual or imminent core occurred which indicate actual or actual substantial degradation of degradation of the level of safety of the damage and the potential for a likely failures of plant systems the level of safety of the plant plant large release of radioactive needed to protect the public and material outside the site boundary pose a significant radioa#tivity Any event which in the opinion of the Shift release potential Manager or the Emergency Director warrants the prompt notification of state and local authorities and precautionary notification of Emergency Response Organization personnel D-8 Revision 27

PNPS EMERGENCY PLAN Section E: Notification Methods and Procedures This section describes the notification of Commonwealth and local response organizations and PNPS emergency response personnel. It outlines the content of initial and follow-up messages to response organizations within the Pilgrim Nuclear Power Station (PNPS) Plume Exposure Pathway Emergency Planning Zone (EPZ).

1. Response Organization Notification: PNPS, in cooperation with Commonwealth and local authorities, has established mutually agreeable methods for notification of response organizations consistent with the emergency classification and action level scheme.

When an emergency is declared, reclassified, or terminated, the Emergency Director ensures notifications are promptly made to first-line offsite support agencies. These first-line notification contacts are:

  • The local communities within the Plume Exposure EPZ and reception communities are notified by dedicated phone and facsimile equipment, with BECONS or commercial telephone as backups. These communities are Plymouth, Carver, Duxbury, Kingston, Marshfield, Bridgewater and Taunton.
  • The Nuclear Regulatory Commission (NRC) is notified bQ a dedicated telephone system called the Emergency Notification System (ENS), or for backup, by commercial telephone. Initial notification occurs from the Control Room.
2. Notification and Mobilization of Emergency Response Personnel: At the Unusual Event classification, select portions of the PNPS Emergency Response Organization are notified and may be activated at the discretion of the Emergency Director. At the Alert, Site Area Emergency, or General Emergency classification level, activation of the Emergency Response Organization and related facilities is required. If the nature of the event threatens the safety of the ERO, personnel may be directed to the Chiltonville Staging Area or requested to remain in place until the security of the site is restored.

Announcements are made from the Control Room over the plant public address system to notify on-site personnel of plant-related emergency response information. In addition to the public address system, emergency organization personnel are notified by pagers or telephone calls using the Computerized Automated Notification System (CANS). Backup systems to CANS include the combination of using BEEPS if available (group pager number), and/or initiating telephone call-outs of emergency response personnel.

E-1 Revision 27

PNPS EMERGENCY PLAN CANS is also capable of transmitting notification of a "Non-Emergency Response" in an undeclared event. Under this event type, the ERO may be placed on a state of heightened readiness with or without directions to respond to the Emergency Response Facilities, staging area, or to remain in place. Section F.1 provides more details on the ERO notification and mobilization process.

3. Initial Notification: The initial emergency message form includes information about:
  • authenticity, i.e. "This is a Drill" or "This is an Actual Event.'
  • identity of caller and receiver of call
  • emergency classification
  • emergency action level identification and whether a release is in progress
  • wind direction and speed
  • whether protective measures may be necessary
  • the date and time of classification and notification Initial notifications are delivered to the Commonwealth and local communities within fifteen (15) minutes of classification of an event. In a General Emergency the initial notification will also include protective action recommendations to the affected EPZ sub-areas. Section J.7 provides a detail description of the possible recommendations that may be issued at the General Emergency classification.
4. Follow-up Messages: The Emergency Director ensures communications are maintained with the offsite authorities through periodic follow-up messages. The follow-up messages include the following, as appropriate:
a. Location of incident and name of caller and receiver of call, whether a drill or not a drill.
b. Time and date of the incident.
c. Class of emergency.
d. Type of actual or potential radiological release (airborne, waterborne, surface spill).
e. Whether or not [estimate of quantity ofn radioactive material has been released or is being released and the points and heights of releases.
f. Radiological release information, including estimates of the relative quantities and concentrations of noble gases, halogens, and particulates.
g. Meteorological conditions at appropriate levels (wind speed, direction to and from, stability, precipitation).
h. Actual or projected dose rates at the site boundary, projected integrated dose at site boundary.

E-2 Revision 27

PNPS EMERGENCY PLAN

i. Projected dose rates and integrated dose at the projected peak and at 2, 5, and 10 miles, including subarea(s) affected.
j. Estimate of any surface contamination In-plant, onsite, or offsite.
k. Plant emergency response actions underway.

I. Recommended emergency actions, Including protective measures.

m. Request for any needed onsite support by offsite organizations.
n. Prognosis for worsening or termination of event based on plant information.
5. Commonwealth and Local Information Dissemination: Commonwealth and local government organizations, in cooperation with PNPS, have established a system for disseminating appropriate information to the public. The system includes notification through appropriate broadcast media, e.g. the Emergency Alert System (EAS).
6. Notification of the Public: The Towns of Plymouth, Carver, Kingston, Duxbury and Marshfield have the capability for providing an alert signal to their population within fifteen (15) minutes following the decision to notify the public.

PNPS, In cooperation with the Commonwealth of Massachusetts and local agencies, has developed the Prompt Alert and Notification System (PANS). PANS is the primary method of notifying the public. This system consists of one hundred and twelve (112) large scale electronic sirens and four (4) primary radio stations covering the Plume Exposure Pathway EPZ. The sirens alert the public to tune their radios to pre-designated EAS stations to receive Instructional messages. The EAS includes the following radio stations:

  • WBMX (FM) 98.5 Boston
  • WPLM (FM) 99.1 Plymouth
  • WPLM (AM) 1390 Plymouth

The siren system Is equipped with public address capability. This capability Is utilized for early notification to the beach and resident population of the Saquish/Gumet area. It may also be utilized by any of the towns at any time.

E-3 Revision 27

PNPS EMERGENCY PLAN As a backup means of public notification, route alert teams, using public address systems, drive through areas where a siren failure has been indicated and broadcast an alert message which instructs the public to tune to an EAS station. Maps and instructions have been developed for each siren coverage area.

Severely hearing-impaired residents are called by the Town Emergency Response Organization using Teletypewriter (TTY) equipment.

Schools, major employers with 50 employees or more, transient shelters, health care facilities, and recreation areas are notified by tone alert radios activated by the EAS tone.

The public and commercial boating population receive notification from the Harbor Master and U. S. Coast Guard boats equipped with public address systems. Additional notification is also completed by marine and citizen band (CB) radios to those boats that are radio equipped.

Beach and pond visitors are notified by personnel from the Police Department or Public Works Department driving public address system equipped vehicles.

7. Messages to the Public: The Commonwealth has developed draft EAS and News Advisory messages that are intended for the public.- These draft messages are included as part of the Commonwealth plan and procedures and contain Instructions with regard to specific protective actions to be taken by occupants and visitors of affected areas such as: take shelter and go indoors, close windows and doors, turn off ventilation systems; directions given for evacuation; directions to stay tuned to specific stations for further information and instructions, ad hoc respiratory protection (fg. handkerchief over mouth), etc. The Commonwealth of Massachusetts maintains a stockpile of KI to be made available to emergency workers, institutionalized persons who cannot be evacuated, and the general public. The MDPHtnd MEMA provide information about the use of KI and how and where to obtain it. PNPS also provides supporting information for messages through the MEMA.

E-4 Revision 27

PNPS EMERGENCY PLAN Section F: Emer-iency Communications This section describes the emergency communications equipment available to support the Pilgrim Nuclear Power Station (PNPS) Emergency Response Organization. It outlines the available communications equipment to:

  • Notify the PNPS Emergency Response Organization.
  • Provide Initial Notification to Offsite governmental agencies.
  • Communicate among the PNPS Emergency Response Facilities.
  • Communicate with the Nuclear Regulatory Commission (NRC) and other Federal, Commonwealth, and local response agencies.
  • Communicate with hospitals, ambulances, and other agencies providing offsite assistance to PNPS.

This section further outlines the program for insuring that the communications equipment is tested on a regular schedule, and that methods are in place to ensure rapid and reliable repair of any equipment found not operational.

1. Communications/Notifications: Pilgrim Nuclear Power Station maintains the capability to make Initial notifications to both the PNPS Emergency Response Organization and designated offsite agencies on a 24-hour per day basis. Figure F-1 depicts the Initial Notification paths and the organizational titles from PNPS to local and Commonwealth emergency response organizations. Those links that are manned 24-hours per day are indicated on Figure F-1. Table F-1 depicts the primary and alternate method of communicating between various PNPS facilities, with offsite facilities, and with the Commonwealth of Massachusetts. Table F-1 also depicts the provisions for communications with Commonwealth and utility radiological monitoring teams. Table F-2 shows available communications equipment within each of the PNPS emergency response facilities.

PNPS maintains a Computerized Automated Notification System (CANS) to rapidly notify members of the PNPS Emergency Response Organization. CANS consist of a micro-computer supporting modem equipment, which Is capable of initiating and receiving telephone calls. When CANS receives an Incoming telephone call, it requests a security identification and then responds with a computerized voice message giving the caller emergency Information. Upon CANS activation, one of the calls made by CANS is to the BEEPS, a computerized, commercial quality paging system that activates personal pagers belonging to members of the PNPS Emergency Response Organization. In addition to the call to BEEPS, CANS will also simultaneously Initiate telephone calls to notify emergency response personnel based on reporting priority to respond to the plant. The decision process used to activate CANS Is specified In appropriate Emergency Plan Implementing Procedures.

If CANS should fail, Emergency Preparedness Implementing Procedures specify the course of action to be taken. These procedures require a combination of using BEEPS, if available, and/or Initiating individual telephone call-outs of emergency response personnel.

F-11 Revision 27

PNPS EMERGENCY PLAN Dedicated telephone equipment, such as the Emergency Notification System (ENS), is in place in the Control Room (CR), Technical Support Center (TSC), and the Emergency Operations Facility (EOF). This allows direct communications to the NRC and other Federal emergency response organizations. The ENS Is the primary notification system used for NRC notification. In addition to the ENS, administratively dedicated telephones serving as the Health Physics Network (HPN) are used in the Control Room, TSC, and EOF for the transmittal of radiological information to the NRC. It is under the Federal Radiological Emergency Response Plan (FRERP) that PNPS requests assistance from Federal agencies.

Additional arrangements have been made to allow for the establishment of NRC communications equipment at the EOF.

a. PNPS Radio Communications System: A comprehensive communications network with backup capabilities has been provided to assure reliable onsite and offsite communications between various emergency facilities and agencies as follows:
  • Pilgrim Alert Radio: This radio system, used on a daily basis, provides backup for communications among PNPS facilities. It Is a backup notification method from the Station to Massachusetts State Police and Middleboro barracks.
  • PNPS Security Radio: This radio system is used at PNPS exclusively for security purposes, It also serves as a backup communications link between PNPS Emergency Response Facilities.
  • Nuclear Incident Assessment Team (NIAT) Radio: This repeater system is used by

-the Commonwealth to direct radiological teams from the EOF.

  • PNPS Radiological Monitorina Team Radio: This repeater radio frequency is used on a daily basis for the normal dispatch of PNPS personnel, and during emergencies for the exclusive use of the monitoring teams to communicate with the EOF.
  • BECONS: BECONS Is a dedicated VHF high band radio repeater system.

BECONS is used by PNPS as the backup notification method to the DNN. BECONS is also used for the transmittal of administrative Information among offsite authorities and as the primary method of notification for siren activation.

b. PNPS Telecommunications Systems: In addition to the above radio systems, the following phone systems are In place to support the emergency efforts:
  • PNPS Telephone System: A private telephone system connecting all PNPS offices.

At PNPS and the EOF, portions of the telephone system are powered by uninterruptible power supply (UPS) and generator backup power.

  • Local Commercial Telephone System: This system provides standard commercial telephone service through the Verizon Infrastructure, consisting of central offices and the wire line and microwave carrier.

F-2 Revision 27

PNPS EMERGENCY PLAN

  • Fixed Cellular Telephone: This system is provided in the Shift Manager's office in the Control Room, the TSC, the OSC and the Primary Gate as a backup to the local commercial telephone system.
c. Special Communication Links: Separate communications methods exist among the various emergency response facilities in order to Insure reliable and timely exchange of information. These methods consist of the following:
  • Dedicated Notification Network (DNN): The DNN is a dedicated voice notification and facsimile network that provides a notification link from PNPS (Control Room and EOF) to each offsite agency. The DNN is the primary notification method from PNPS to offsite authorities. Figure F-4 depicts the initial notification scheme.

BECONS is the backup for the DNN.

  • Ring-down - Plymouth Police Degarttnent: A dedicated, automatic Ring-down telephone circuit between PNPS and the Plymouth Police Department, Intended primarily to rapidly secure law enforcement assistance.
  • Ring-down - Plymouth Fire Department: A dedicated, automatic Ring-down telephone circuit between the Control Room and the Plymouth Fire Department Intended to provide rapid fire fighting support.
  • EOF - Media Center: Designated telephone circuits between the EOF and the Media Center have been provided to ensure a rapid dissemination of information to Media representatives. Telecommunications equipment has been provided for each of the EPZ com 9 unities to contact the Media Center.
  • Plant Data Phone (PDP): An administratively dedicated telephone that provides conferencing capability among the Control Room, TSC, EOF and the Alternate EOF.

The PDP is used to transmit Station data for status boards located in each of the emergency facilities.

  • Emergency Conference Line (ECL): An administratively dedicated telephone that provides conferencing capability among the Control Room, TSC, EOF, AEOF, and the primary conference room at PNPS for use by management personnel located in each of the facilities.
  • Health Physics Network (HPN): Federally provided telephone circuits used to provide communications to and from the NRC radiological section.
  • Emergency Notification System (ENS): Federally provided dedicated telephone circuits between the Control Room, the TSC, and the EOF to NRC facilities. ENS utilizes the Federal Telephone System (FTS) to provide reliable communication capabilities. The ENS Is the primary notification method to the NRC. Additional FTS service Is available In the TSC and EOF for use by Federal agency responders.
  • Facsimile Equipment: Facsimile equipment located in each of the onsite and offsite Station and governmental emergency response facilities for the transmission and receipt via wire line of Information, texts, pictures or diagrams In hard copy form.

This equipment is In addition to the facsimile equipment associated with the DNN.

  • PNPS Mitigation Line: An administratively dedicated telephone that provides conferencing capability among the Control Room, TSC, EOF and alternate EOF.

F-3 Revision 27

PNPS EMERGENCY PLAN

  • Onsite Gaitronics Page S&stem: A public address system, -separate from any telephone system, which consists of handset stations, loud speakers, and desk set units. The Gaitronics Page System provides five Station channels, one of which is dedicated to operations/emergency use only.
2. Medical Communications: PNPS establishes communications with the primary medical hospital, Jordan Hospital, and the backup hospital via commercial telephone which is accessed by Station personnel either via commercial onsite telephone or by a PNPS telephone. A direct, dedicated ring-down telephone Into the Plymouth Fire Department (the ambulance Dispatcher) provides for a coordinated communications link to the ambulances responding to PNPS or transporting personnel from the Station. Figure F-3 depicts this coordinated communications link.
3. Communications Drills: Communications drills between PNPS and state and local governments are conducted In accordance with criteria contained in Section N.2. Also, at least monthly, PNPS personnel conduct a surveillance to determine the working condition and availability of each piece of communications equipment. This surveillance Includes a check of the units operability and general condition. Deficiencies are identified and corrected. The PNPS Electronics Laboratory maintains a large number of spare units to rapidly replace non-operational equipment.

F-4 Revision 27

PNPS EMERGENCY PLAN Figure F-1: Initial Notification PNPS Control Room

  • Shift Manager!

Communicator OR

  • Indicates 24-hour operation PNPS To Each Offsite Agency
1. DNN (Dedicated Notification Network)
2. BECONS
3. Commercial Telephone F-5 Revision 27

( PNPS EMERGENCY PLAN

( C Tabli F * *.

C'nmmi inicatinns Matriv

_ w ., l uw w wev^sev c g .w.> .^

Communications Mtrix Coto Room TSO OSC EOF AEOF IMe Center 77 _ __ er T1771""TT" FsC5 -- tz eir

-Se~ 4>,!

V -W.7 OSC. 2.A F 7 9a or a 91 k, .j .kf ;k EOF 1ZS,5,7,9,10.15,19.219247 12,4,9,10.15,1.,19Z4z7, ,9,10 IN 7I . -I. I.tu I - s 1.1-Ia-I.- I .* 1-.i4z.S. =4iu.

AEOF 12,7,10,15,16,1%24 12,4,10,15,10,24 17,9.10 1  :~I~i.r~ed.S

........... t Me Center 10.19 10.19 10 1014.19 1. 10 W4*A-Copoat 10,19 !10,19 10o 10,9 10 10I ,- 7" Pdmei Gaet 1.2.6.9.1028 1.2.6.928 2.9.10.28 112.9.10.28 1.10.28 110 10 15,10.12,13,19.27.28 110_--- 1_____ ~I r7 1,5g0,19 10,19 10 i10,12,13 rTow 5,101927.28 10 J_ 19JJ,19 10 110 MdMA 1.5.10,11.1927.28 10 10 3.5IO.11.1920.22.2627 5.10.19 11019 10 10.11 Rhods Islawd 10 _,_,_______ .1019 _.__ 10.19 NRBC 910,17,18,19,232 10,17,18.23 l1023 110,17,18,19,23 110,19 11019 10 10 b FHospql_ _ 10 1_0 O_ 10 10 10 10 10 RUT. +/-428 148 148 4A 4.28 J 28 EPZ Towns Reception COTowns Rhoda leland NRC Jordan Hospitl IRMTs Donibl AmP Mm I...._

rsC 4ff lte e - -l ISr.1 1 v i I electoral A41-71K-M-A, kdRlo, EOF

  • 1 l _/ i \  !# >*%i; __UA v;Zz:v#ewrom

=-< m . s.-es-.n I 7 I St: ,

,ti , , , ,Q, S,,S{rs,>m,~~~~~~~a maed Center -~l~14-ix-

____________. ~

S______a___s* I0 , .1 -!- I i tlZ1,71",Z,."RIrl9tI "I'lill-,4--14,11i-aZ"C-5 s..Nlh077$s 1~t'.@,7r tz, 5.f;. i15" s-PdvAt= . .._... tt>,'itttt~~mS~I.4  ?.t .wX.f.+wfffI<¢6t.$tM'>;

4a w 'w ] "ZU~S. Ite

$ <4>n

~

._.t - _ .

I X X->Se...

!4,4-..

Irs iown b.10 N.> i-, fi"i'S > A I.,i-!:.>44 ttt,1M.1$ >

CwtrTr 15,10.20.22 5.10,20.22 X 1$~" z ig4S-Y1~kW-14y 1 zi<3-g, F ~~~5.10,19.2O2 195,10,19,2022 1r- >2~9<AX~

bbdeIland 110 110 110 ;tW;.ii >t*W tv~frfr, z. ta; .?spS;',

-~~~~i - ---

. 1._' 1-"r,

-U, 0I 10 10 n

1 1

&l_ _.

10.21 10.21 10 10 ;Ir $

=._

RMT& };i=77,77-7-1 1- I- 28 14,28

1. Pilrm Alert Reo & Reeerd 15. Plant Daft Phone 22. Amaetw Rado (440 MHZ)
2. Securly Redo 9. PNPS Telphone Syterm 18. Emergency Confeence Line 23. Fedral Teleomiiunllone System

&M Ro 10. Loca1 Teepon Syatam 17. Health Phyalce Network 24. PNPS Mitelon Line

4. RMT Rafb I1. Rkgdow S ratP 18. Emegency Notification NetwA 25. OperatorWalldown Redo
5. BECONS 12. hgdown.Plymoub Pol 19. Faceimile Equpwn 26 MAT Redo
0. FW9 Buged Redo 13. RFgdown-Plymmih Fie 20. Amateur Redo (2Me" 27. Dedteld Nodlicealon Network
7. Red DalK Phone 14. EOF.Meda Center 21. Medel Redo 28. Celdlar Telephone ag0I1 F-6 Revision 27

PNPS EMERGENCY PLAN Tohla

. >Uuv FP-0

. -o. Communications Eauioment U~~~~~~~L

-o co oU. C 0U Pilgrim Alert Radio - X0 0 0 Security Radio 0 0 0 MR MEMA Operational Radio 0 O NiAT Radio 0 PNPS Rad. Monitoring Team Radio I3 0 0 BECONS 0 0 0 RACES Radio 2 Meter 0 0 RACES Radio 440 0 Dedicated NotIfication Network(DNN) 0 .

PNPS System 0 0 0 0 0 Cellular Telephone System [E I 0I

$ Local Commercial Bell System [E 0 I0 MR 0 0 I Auto Ringdown Plymouth PD 0 0

( Auto Rlngdown Plymouth Fire u Department Plant Data Phone (PDP) 0 0 0 0 Emergency Conference Une (ECL) 0 0 0 0 ENS 0 0 0 HPN 0 0 0 r Plant Page System @ 0 0 w

Facsimile Equipment 0 0 0 0 0 0 Mitigation Une 0 0 0 F-7 Revision 27

PNPS EMERGENCY PLAN FIGURE F-2: DELETED NOTE The decision process to activate CANS is specified In appropriate Emergency Plan Implementing Procedures.

F-8 Revision 27

PNPS EMERGENCY PLAN Figure F-3: PNPS - Medical Communications PNPS Control Roc)m Direct Commerca Backup Ringdown Telephone Hospitals Telephone Town of Plymouth Fire Departrr ient Fire Department Jordon Ambulance Hospital Dispatch (Primary)

Frequency Plymouth CMed r Ambulance/lHospital American Medical Frequency

Response

Ambulance I CMED Frequency Plymouth Mutual Aid Frequency County CMED F-9 Revision 27

PNPS EMERGENCY PLAN Figure F-4: Initial Notification Scheme Initial Notification Dedicated Notification Network Voice Announcement I

PNPS MEMA, Framingham Control State Police Middleboro Room/EOF EPZ/Host Towns I.

Initial Notification Dedicated Notification Network Facsimilie F-10 Revision 27

PNPS EMERGENCY PLAN Section G: Public Education and Information This section describes the Pilgrim Nuclear Power Station (PNPS) public education and information program. It outlines the methods for distributing public information materials on an annual basis and describes how the public is informed in the event of an emergency.

1. Public Information Publication: The emergency public information publication for PNPS is an annual calendar which is developed In coordination with the Massachusetts Emergency Management Agency, the Massachusetts Department of Public Health (MDPH), and local communities. It is distributed by mail to all residents and businesses within the Plume Exposure Pathway Emergency Planning Zone (EPZ). The contents of the calendar include the following:
a. Educational information on radiation;
b. Commonwealth and EPZ community contacts for additional information;
c. Definitions of protective measures as well as written descriptions of evacuation routes, locations of reception centers, steps to follow when sheltering or evacuating;
d. Special needs of the handicapped, and
e. Relocation points for school children.
2. Public Education Materials: In addition to the emergency public Information calendar, placards are posted throughout the EPZ communities. The placards provide Information to visitors about what to do when the sirens sound, evacuation routes and where to obtain additional emergency information. Emergency Information and instructions are also provided in local telephone directories.
3. Media Center
a. The Media Center, located at the Entergy Industrial Park Training Center In Plymouth, provides a location for the news media to receive information from all Involved agencies and companies during an emergency and provide it to the general public. Work areas are set up for the news media and telephones are installed for their use. If, due to radiological or other conditions, the Media Center is found to be uninhabitable, it will be relocated to the Alternate Media Center at Bridgewater State College In Bridgewater.

Comparable facilities both for Media Center staff and media representatives are available at the alternate facility.

b. During an emergency, the Emergency Director may approve tours of the Emergency Operations Facility to a limited number of news media. Tours may take place at an Unusual Event or during the Recovery phase. Tours normally originate from the Media Center, when activated, and are coordinated by the Media Center Supervisor. If the emergency facilities are not activated, tours are coordinated by the Nuclear Information Office.

G,1 G-1 Revision 27

PNPS EMERGENCY PLAN

4. Coordination of Public Information
a. The PNPS Company Spokesperson is the primary spokesperson for PNPS during an emergency. The Company Spokesperson has direct access to all necessary information (see Section B.5).
b. The Media Center is staffed by Federal and Commonwealth emergency management agencies and PNPS to assure timely exchange and coordination of information.

Representatives coordinate information prior to distributing news releases and prior to news briefings.

c. Rumors or misinformation are Identified during an emergency by the Media Monitor and Media Phone Team responders located at the Media Center. They respond to media calls and broadcasts and reports of misinformation or rumors are forwarded to the Media Center Supervisor for an appropriate response by Media Center staff. Rumor control Is also provided for by the Commonwealth of Massachusetts Emergency Management Agency.
5. Media Orientation: The annual PNPS Media Orientation is coordinated with offsite agencies to acquaint the news media with emergency plans, basics of nuclear power operation and radiation fundamentals. The news media typically are provided a tour of the Media Center or other emergency response facilities. Reporters receive information about Media Center activation and accessibility during a declared emergency at PNPS.

G-2 Revision 27

PNPS EMERGENCY PLAN Section H: Emergency Facilities and Eguipment This section describes the emergency facilities and equipment used by the Pilgrim Nuclear Power Station (PNPS) Emergency Response Organization. It outlines the facilities and equipment requirements which aid in the timely and accurate response by the PNPS Emergency Response Organization. It also describes the surveillance programs used to monitor and insure that these facilities and equipment are maintained in a high degree of constant readiness.

1. Technical Support Center (TSC). Operations Support Center (OSC). and the Control Room:

PNPS has established an onsite Technical Support Center (TSC) and Operations Support Center (OSC). The TSC and OSC are activated upon declaration of an Alert or above or at the discretion of the Emergency Director (ED) or Shift Manager. Until they become operational, required functions of these facilities are performed in the Control Room.

The Control Room is located on the 37' elevation of the Turbine Building. The Control Room is the focal point for all plant operational activities. The Control Room contains the instrumentation, control devices and displays necessary for operation of the reactor and turbine generator under normal and emergency situations.

The Control Room is staffed by Ucensed Nuclear Plant Operators and Senior Ucensed Nuclear Plant Operators. All plant-related operations are directed from the Control Room and supervised by the Shift Manager. During emergency operating conditions, only those personnel who are required for the safe operation of the plant are allowed access to the Control Room.

The TSC and OSC along with the Emergency Operations Facility (EOF) are the primary emergency response facilities in support of the Control Room. The primary emergency response facilities have been designed and built to withstand the most adverse conditions reasonably expected during the design life of the plant including adequate capabilities for earthquakes, high winds and floods. Each facility is equipped with fire alarm and suppression systems, and back-up diesel generated electrical power.

The TSC is located within the Protected Area on the ground floor of the Operations and Maintenance Building. The TSC provides facilities near the Control Room for technical, engineering and management support of operations personnel during emergency conditions. It also permits direct Interface of-management personnel with the plant operators, if necessary.

The TSC has a large working area with space sufficient to accommodate the pre-designated TSC staff. The TSC is also able to accommodate seven (7) NRC representatives. Working areas are available and a desk has been provided for NRC use. The TSC is the primary communications link between the Control Room and the EOF. It also acts as an onsite communications center for the plant during an emergency.

A subset of the TSC is the Engineering Support/Technical Assessment Group (TAG). This group is made up of personnel from the Nuclear Engineering Staff. Specific personnel assignments are determined at the time of the emergency by the TSC Supervisor and the Engineering Support/Technical Assessment Group Coordinator based on the type of incident occurring at the Station.

H-1 Revision 27

PNPS EMERGENCY PLAN The OSC is located on the ground floor of the Operations and Maintenance Building next to the TSC. The OSC is an onsite assembly area separated from the Control Room and the TSC where pre-designated support personnel report in an emergency. All personnel dispatched into the Plant in an emergency are coordinated through the OSC after its activation. Response teams dispatched from the OSC include Post Accident Sampling Teams, Radiological Protection Re-entry Teams, Damage Control Teams, Maintenance personnel, search and rescue, and Emergency Medical personnel.

2. Emergency Operations Facility (EOFR: PNPS has established an Emergency Operations Facility (EOF) in the basement of the Plymouth County Sheriffs facility on the grounds of the Plymouth County House of Correction in Plymouth, Massachusetts approximately four (4) miles west of PNPS. The building Is shielded and equipped with a filtered ventilation system and backup electrical supply system. The EOF is the central facility for the evaluation and coordination of all licensee activities in response to an emergency. Here information is provided to representatives of Federal, Commonwealth, and local authorities who respond to an emergency at PNPS.

The EOF is a PNPS controlled and operated facility. The EOF is equipped with an intrusion detection system. Security personnel are assigned to control EOF access.

During an emergency, the EOF is staffed and equipped to provide for the overall management of the Station's emergency response; coordination of radiological and environmental assessment; coordination of corporate support; development of protective action recommendations for the general public; and coordination of emergency response activities with Federal, Commonwealth and local agencies.

The EOF consists of an Operations Room, a Communication Room, conference rooms and several office areas. In addition to the pre-designated PNPS emergency response organization staff, the EOF has space to accommodate twelve (12) NRC representatives as well as representatives from FEMA, MDPH, and MEMA and key local authorities. If necessary, the EOF may be used to accommodate outside technical support groups.

In the event an EOF evacuation becomes necessary, operations can be transferred to the Alternate Emergency Operations Facility (AEOF). The AEOF is located in the Town Hall, Carver, MA. and is approximately 1i0. miles west of PNPS. The AEOF has accommodation for up to 40 people. It is equipped with site maps, office fumriture, supplies and back-up communication systems.

3. Emergency Operations Centers (EOC): Emergency Operations Centers In each of the communities supporting a response to an Incident at PNPS have been established to perform direction and control of response functions. PNPS provides support for the local communities in the design and maintenance of their facilities.

H-2 Revision 27

PNPS EMERGENCY PLAN The Town of Plymouth EOC is located in the Plymouth Town Hall. The EOC serves as command and control headquarters for local emergency response activities as well as a center for the coordination of communications to local field units and to the Commonwealth and MEMA Area 11EOCs. The EOC has the equipment necessary, (such as facsimile machines, telecommunications equipment, radio gear, photocopiers, wall maps, etc.) to carry out its emergency responsibilities. The other plume exposure EPZ communities of Kingston, Duxbury, Carver, and Marshfield, all In Massachusetts, are similarly equipped. In addition, the Reception Center communities are equipped with similar facilities and equipment.

The Commonwealth EOC is located at MEMA headquarters in Framingham, Massachusetts and serves as the command and control center for offsite emergency response. The Commonwealth EOC is capable of continuous (24-hour) operations for a protracted period.

The center contains sufficient communications (radio, telephone and teletype) equipment, maps, emergency plans, and status boards to provide the necessary interfaces with other Commonwealth, local, Federal and PNPS emergency facilities.

The Media Center is located at the Entergy Industrial Park Training Center in Plymouth, approximately 6.5 miles north west of PNPS. The Media Center is staffed by PNPS and government public information representatives who will be the source of public Information during an emergency at PNPS. The Media Center is activated upon declaration of an Alert.

If, due to radiological or other conditions, the Media Center is found to uninhabitable, it will be relocated to the Alternate Media Center at Bridgewater State College in Bridgewater.

The MEMA Area 11EOC is located at MEMA Area 11Headquarters in Bridgewater, Massachusetts. The EOC is located near the plume exposure EPZ and serves as the local liaison with the Commonwealth EOC to coordinate emergency operations among local communities.

The State Police Troop D Headquarters, located in Middleboro, Massachusetts is the primary Commonwealth notification point. Continuous communication coverage is provided by dispatcher on a 24-hour basis.

4. Activation: PNPS has put into place plans and procedures to insure the timely activation of its emergency response facilities. Although the response time will vary due to factors such as weather and traffic conditions, a goal of thirty (30) minutes for minimum staffing and one (1) hour for full manning has been established for onsite emergency facilities Including the EOF. Plans have been developed to insure timely functional activation and staffing of the Media Center.
5. Monitoring Equipment for Classification: PNPS has Identified and installed onsite monitoring systems that are utilized to assess the Incident and make determinations on the proper emergency measures to be Implemented. This equipment includes but Is not limited to the following:

H-3 Revision 27

PNPS EMERGENCY PLAN

a. PNPS has two meteorological towers equipped with instrumentation for continuous reading of wind speed, wind direction, air temperature, and difference in air temperature (160' to 33' and 220' to 33'). PNPS has the indirect capability of locally monitoring hydrological data by use of instrumentation installed on process water systems.

Seismic monitors are located throughout the plant, data from these monitors is recorded in the Control Room.

b. Installed radiological monitors indicate the status of the plant and any radiological release that may have occurred. The Control Room is equipped with plant radiation monitoring instrumentation for use In both normal and emergency conditions. The Containment High Radiation Monitoring System is designed to measure post-accident radiation levels in the drywell and the torus during accident conditions. The range of these monitors is 1 to 1.0E+7 R/hr. The Main Stack, the Reactor Building Exhaust Ventilation and the Turbine Building are equipped with high range radiation monitoring systems designed to measure elevated radiation levels.

A Post-Accident Sampling System (PASS) provides a mechanism to monitor the Integrity of the reactor fuel and cladding during and following an accident. The PASS, through the appropriate valve lineup, Is capable of drawing gas and liquid samples from the primary containment system (i.e., reactor, the drywell and the torus) and secondary containment air samples.

PASS samples provide information on reactor core integrity; the types and quantities of fission products released into the primary containment environment; the reactor coolant chemistry and the hydrogen concentration In the containment. The samples can be collected without incurring excessive radiation exposures to any Individual. Samples are obtained at a shielded sampling station and diluted as necessary. Portable shielding is also provided to reduce anticipated radiation dose rates.

c. The Control Room and applicable redundant backup locations are equipped with extensive plant process monitors for use in both normal and emergency conditions.

These indications Include but are not limited to reactor coolant system pressure and temperature, containment pressure and temperature, liquid levels, flow rates, status or lineup of equipment components. This Instrumentation provides the basis for initiation of corrective actions.

d. The PNPS has Installed fire and combustion detection equipment at PNPS in compliance with 10CFR50 Appendix R.
6. Offsite Monitoring Equipment: PNPS has made provisions to perform offsite monitoring during emergency situations.
a. Offsite sources of information pertaining to geophysical phenomena Include the National Weather Service located at Logan Airport In Boston for meteorological data, and local marine forecast data and Coast Guard facilities provide hydrological data, and Weston Observatory provides seismic activity.

H-4 Revision 27

PNPS EMERGENCY PLAN

b. PNPS has established radiological and environmental radiation sampling and monitoring stations at PNPS and nearby areas as part of the Radiological Environmental Monitoring Program. These Stations are used for continuous long-term radiological background assessment of the environs surrounding PNPS. These Stations monitor a variety of media and pathways including gaseous and particulate sampling equipment and thermoluminescent dosimeters (TLDs), which may be used in an emergency for accident assessment. The locations and specific capabilities of these Stations are contained in the PNPS Offsite Dose Calculation Manual.
c. In addition to the analytical capabilities of the EOF, outside analytical assistance may be requested from Commonwealth and Federal agencies and other utilities if necessary.

PNPS has access to additional laboratory facilities through agreements with the Framatome ANP DE&S and the Department of Energy (DOE) Brookhaven Area office (located in Upton, New York). It is estimated that these laboratories will be able to respond within eight (8) hours from Initial notification.

The Framatome ANP DE&S environmental laboratory is located in Westboro, Massachusetts. The laboratory has the capability of analyzing terrestrial, marine and air samples. Their Instrumentation Includes:

1. HPGe detectors
2. Beta-Gamma units (1-131 analysis)
3. Beta-Beta anti-coincidence unit (Sr-90 analysis)
4. Gas proportional counters (gross alpha-beta)
5. Liquid scintillation counter The DOE, through the Interagency Radiological Assistance Program (IRAP) has access to any national laboratory with Bell Lab contract (i.e., Brookhaven, Oak Ridge, Lawrence Livermore, etc.). _
7. Offsite Monitoring Equipment Storage: The EOF has been designated as the central point for storing offsite radiological monitoring equipment. Additional equipment is available at PNPS and other facilities (i.e., Warehouse, Commonwealth and local facilities), if needed.

The EOF contains portable survey, counting, and air sampling instrumentation and other radiological monitoring equipment and supplies to be used by PNPS and Nuclear Incident Advisor Team (NIAT) offsite monitoring teams. Table H.1 illustrates examples of the types of equipment available for offsite monitoring.

Monitoring team equipment is capable of detecting and measuring radiolodine concentrations in air as low as 1.OE-7 gCVcc under field conditions. Interference from the presence of noble gas and background radiation will be minimized by ensuring that monitoring teams move to areas of low background prior to analyzing the sample cartridge.

H-5 Revision 27

PNPS EMERGENCY PLAN

8. Meteorological Monitoring: PNPS has installed two meteorological towers equipped with instrumentation for continuous reading of the wind speed, wind direction, air temperature and delta air temperature at 33 foot and either the 160 or 220 foot elevations. The 220 and 160 foot meteorological towers record information and report this data locally at the meteorological tower and the 220 foot also reports information to the Control Room.

Meteorological data is also sent to and retrieved from the PNPS meteorological computer system.

PNPS has the capability for making remote interrogation of the atmospheric measurements and predictions. Additional capabilities are available to obtain representative current meteorological Information from other sources, such as the National Weather Service.

9. OSC Equipment: The TSC, OSC, and EOF are equipped with ventilation systems similar to the Control Room ventilation system. The ventilation systems use both High Efficiency Particulate and charcoal filters.

Radiological monitoring is performed in each emergency response facility. Radiation dose rates and airborne radioactivity concentrations are measured Inside each facility while it is in use during an emergency. This monitoring will detect adverse conditions that may affect the habitability of the facility. Equipment is available which can distinguish the presence of radioiodine at concentrations as low as 1.OE-07 itCicc.

Radiation protection equipment (i.e., protective clothing, respiratory protection gear and other health physics equipment and supplies) is stored and maintained at each emergency response facility. Table H.2 illustrates the equipment typically available to each facility.

This equipment is for re-entry team activities. If necessary, this equipment will be used for emergency response personnel within the facility to allow them to function during the presence of low-level airborne radioactivity or radioactive surface contamination. Sufficient potassium iodide is available for use by Control Room, TSC, and OSC, and EOF personnel.

One-hour self-contained breathing apparatus (SCBA) packs and bottles have been placed at strategic points within the Station. A cascade air compressor Is maintained onsite. A back-up compressor Is located at Plymouth Fire Department headquarters approximately 2.5 miles from the site. Arrangements exist to permit PNPS 24-hour access to this back-up compressor if the station compressor is inoperable, or if the air in station environs is contaminated.

The Medical Building, located near the main parking lot, Is supplied with an assortment of first aid and medical treatment equipment and supplies that are used on a daily basis.

Emergency medical treatment equipment and supplies are also stored In the primary Emergency Assembly Area. In addition to normal Station decontamination equipment, the EOF is equipped with personnel decontamination supplies and a decontamination shower for use in an emergency. The EOF Is also equipped with a holding tank to secure contaminated materials. Table H.3 and H.4 illustrate the supplies found in the medical and decontamination kits.

H-6 Revision 27

PNPS EMERGENCY PLAN Damage Control Equipment is available in the OSC and additionally in maintenance shops or PNPS warehouses located Inside the Protected Area. This equipment Includes items such as portable lighting and portable communications equipment. See Table F.1 for the matrix of communications capability. For a complete description of communications equipment available during an emergency, refer to Section F of this Emergency Plan.

10. Facility and Equipment Readiness: Emergency facilities and equipment are inspected and inventoried in accordance with departmental administrative procedures. The inspection includes an operational check of instruments and equipment. Equipment, supplies and parts which have a shelf-life are identified, checked and replaced as necessary. Sufficient reserves of instruments/equipment are maintained to replace those which are removed from emergency kits or lockers for calibration or repair. Dedicated communications equipment between Federal, Commonwealth and local government agencies within the plume exposure pathway EPZ are checked periodically in accordance with Section N.2.

The results of tests, inventories, and inspections conducted In accordance with PNPS Procedures, are submitted to the Emergency Preparedness Manager for review. The Emergency Preparedness Manager Is responsible for the evaluation of these results and assignment of corrective actions for deficiencies Identified, if any.

The Emergency Preparedness Manager will be informed of select system inoperability determinations resulting from any tests, inventories or inspections conducted on the systems identified in Table H-5, as the availability of these systems can have significant impact on the Emergency Plan. When notified of a Table H-5 system inoperability, the Emergency Preparedness Manager will Inform the Nuclear Assessment Director within one business day of the Inoperable condition, as well as of compensatory measures taken, If any.

11. General Use Emeraenov EquIpment: Tables H.1, H.2, H.3, and H.4 identifysy general category the equipment that typically make up emergency kits used In an emergency situation. Table F.1 shows available communications equipment. PNPS cooperates with local and Commonwealth officials to insure that sufficient and appropriate emergency kits are made available.
12. Colldction Point for Field Samples: The EOF has been designated as the central point for the receipt and analysis of radiological field monitoring samples. Sampling and analysis equipment is available for activity determination of these samples. Sufficient field monitoring equipment is maintained at the EOF for Initial sampling. Monthly surveillance and maintenance is performed to Insure the readiness of field monitoring equipment.

Instrumentation and equipment utilized for activity determination are routinely calibrated to insure timely availability.

H-7 Revision 27

PNPS EMERGENCY PLAN Table H-1: TyDical Offsite Monitoring Eguipment PRM-4A Coveralls HP 240 Hand Probe Hoods TLDs Rubber Gloves Pocket Dosimeters 0-500 mR Cotton Gloves Pocket Dosimeters 0-1 R Paper Pads Dosimeter Chargers Pens Smears Bullhorn Filter Paper Scissors Silver Zeolite Cartridges Screwdriver Air Sampler Pliers Sample Timer Flashlight Sample Labels Allen Wrench Set Plastic Bags Health Physics Procedures Batteries 9 V Area Maps Batteries 1.5 V Cs-1 37 Check Source Contaminated Materials Stickers Full Face Respirators Masking Tape Portable Radio Petri Dishes Clipboard Portable Generator SAM-2 Counting System Pocket Knife H-8 Revision 27

PNPS EMERGENCY PLAN I GOLL11W W-1_0 TIMhAM I I-jr..

Tumifsa I Oneflaii~nI Dre~fjmeivn I V WI%^AI I & I Iw Peri WLIWI I -M-.

inmant RO2A or Equivalent Coveralls 120 V Air Sampler Hoods RAS Air Sampler Rubber Boots E-520 or Equivalent Rubber Gloves TLDs Cotton Gloves Pocket Dosimeters 0-1 R Plastic Slip-Ons Pocket Dosimeters 0-5R Pens Dosimeter Chargers Paper Pads Smears & Folders Clipboards Air Sample Filter paper Masking Tape Sample Timer Radiation Waming Tape Sample Labels Radiation Waming Signs Plastic Bags Area Maps Batteries 9 V Cs-1 37 Check Source Batteries 1.5 V Health Physics Procedure H-9 Revision 27

PNPS EMERGENCY PLAN

. .-v.

. cools W Tahla .R- Tvniral Medical Eauinment Penlight Thermometer Gauze Pads, 4x4, Sterile Surgical Brush Gauze Pads, 3x3, Sterile Scalpels (size 15, 11 and 10)

Gauze Pads, 2x2, Sterile Scalpel Handle Alcohol Prep Swabs Normal Saline Solution ABD Pads #11 Blades Airway Bandage Scissors Cotton Tip Swabs Adult Airway Arm Splints Stethoscope Leg Splints 3" Ace Bandage Tincture of Green Soap 4" Ace Bandage Specimen Jars Large Straight Scissors Sanitary Pads Ophthalmoscope Kit w/batteries H-10 Revision 27

PNPS EMERGENCY PLAN Tahbl H-4. Tvnical Decontamination Eauioment Plastic Tub Bottle for Liquid Radioactive Waste Caps Masking Tape Masks Paper Pad Gauze Pads, 4x4, Sterile Pens & Pencils Non-allergic Tape Clipboard Disposable Paper Lab Coats Scissors Plastic Slip-Ons Plastic Bags Rubber Gloves Plastic Wrap Cotton Gloves Surgeon Brushes Decontamination Soap Normal Saline Solution Radiological Health Handbook Towels Potassium Permanganate Solution Titanium Dioxide Paste H-I11 Revision 27

PNPS EMERGENCY PLAN Table H-5 Pilgrim Station Systems requiring Emergency Preparedness Notification I Technical Support Center Diesel Generator Technical Support Center HVAC System Pilgrim Station Gaitronics System Pilgrim process computer (EPICISPDS)

Technical Support Center Electrical System (including UPS)

H-12 Revision 27

PNPS EMERGENCY PLAN Section 1: Accident Assessment To effectively coordinate and direct all facets of the response to an emergency situation at Pilgrim Nuclear Power Station (PNPS), diligent accident assessment efforts are required throughout the emergency. All four emergency classifications have similar assessment methods, however, each classification requires a greater magnitude of assessment effort dependent upon the plant symptoms and/or initiating event(s).

1. Plant Parameters and Corresponding Emergency Classification
  • Plant system and effluent parameter values are utilized in the determination of accident severity and subsequent emergency classification. Environmental and meteorological events are also determining factors in emergency classification.
  • An emergency condition can be the result of just one parameter or condition change, or the combination of several. The specific symptoms, parameter values or events for each level of emergency classification are detailed In the PNPS Emergency Plan Implementing Procedures.
  • In order to adequately assess the emergency condition, each emergency facility has the necessary equipment and Instrumentation installed to make available essential plant information on a continuous basis. The detailed instrumentation and equipment capabilities available for each emergency4acility are described in Section H of the PNPS Emergency Plan.
2. Onsite Accident Assessment Capabilities
  • Post Accident Samglina System - The Post Accident Sampling System (PASS) allows for the remote sampling and analysis of containment and drywell gas, and reactor and torus liquid. The-results of the PASS sample are decay and volume corrected and then utilized to determine fuel and cladding integrity. Once the amount of core damage is determined, the total curie inventory available can be ascertained. The inventory available can be determined for any estimated amount of core damage, since there is a finite number of curies available for release to the coolant.
  • Area Radiation & Process Radiation Monitors - PNPS has Area Radiation Monitors (ARM) for the direct measurement of In-plant exposure rates and Process Radiation Monitors (PRM) for the measurement of noble gas and radioactive iodine concentrations in plant effluents. The ARM readings allow In-plant exposure rate determinations to be made remotely without requiring local hand-held meter surveys.

This information may be used, Initially, to aid In the determination of plant area accessibility. The Process Radiation Monitors provide an immediate indication of a radiological release of effluents. The PRM readings can be used as an input into the Dose Assessment and Protective Action Recommendation (DAPAR) computer code which displays the projected whole body and thyroid exposures to the populace in the plume exposure pathway.

1-1 Revision 27

PNPS EMERGENCY PLAN

  • Containment Radiation Monitors - Containment High Range Radiation Monitors (CHRMS) can be provided as an early indicator of core damage. The monitor readings are utilized as an altemate method for core damage determination. This is accomplished through use of established graphs. The core damage estimate obtained from the nomograms may also be used to confirm the core damage results obtained through use of the PASS system. High range monitors for both the drywell and torus allow for the evaluation of a potential radiological release.
3. Release Source Term Determination
a. The potential for release of radioactive material and the magnitude of the release can be assessed through use of the Containment High Range Monitoring System (CHRMS) and Process Monitors. The Containment High Range Monitoring System readings can be used to estimate the percentage of core damage and establish the total number of curies available for release.
b. If a liquid or gaseous release occurs, the routine or high range process monitors will indicate the release rate in counts per second or Roentgens per hour. If the release is from an unmonitored point, technicians will take grab samples to be analyzed.

Routine and high range monitors are located on the Main Stack and the Reactor Building. A high range monitor is located in the Turbine Building. The readings obtained from these monitors are converted to actual release rates through the use of the Dose Assessment and Protective Action Recommendation (DAPAR) computer code.

4. Effluent Monitor Data and DAPAR: The correlation between effluent monitor data and onsite and offsite exposure rates Is accomplished through use of the Dose Assessment and Protective Action Recommendation (DAPAR) computer code. DAPAR Is a computer code which allows for the direct input of effluent monitor and meteorological data. The computer will generate release rates, projected dose rates and doses to the whole body and thyroid as well as downwind halogen and particulate concentrations via the plume exposure pathway. Dose projections may also be performed without the use of a computer through a series of hand calculations.
5. Meteorological Information: Meteorological data are available from two meteorological towers, a 220 foot primary and a 160 foot back-up. The data available includes wind speed, wind direction, temperature, and delta temperature. These data are utilized by the utility, Commonwealth and NRC to provide near real-time predictions of the atmospheric effluent transport and diffusion.

Meteorological data from the 220 foot tower Is available to the Control Room, the Technical Support Center SPDS, and Emergency Operations Facility SPDS. Meteorological data Is available from the 160 foot tower via local readout.

6. Unmonitored Release: If during an actual release, via an unmonitored flow path or In situations In which effluent monitors are either off-scale or inoperative, dose projections can be made through use of actual sample data.

1-2 Revision 27

PNPS EMERGENCY PLAN

7. Field Monitoring: In the event of an airborne or liquid release, PNPS maintains the resources and capabilities to take air, soil, water, and vegetation samples as well as to directly measure gamma dose rates. Samples are taken at locations specified by the Oftsite Radiological Supervisor. Environmental measurements are utilized as an aid in the determination of protective and recovery actions for the general public.
8. Radiation Monitoring Teams: Radiation Monitoring Teams (RMTs) are available at an Alert or higher classification to make rapid assessments of the actual or potential magnitude and location of any radiological hazards from the liquid or gaseous release pathways. RMTs are composed of two Individuals, at least one of whom is a qualified Radiation Protection technician.

RMTs establish and maintain direct radio communications with the Emergency Operations Facility (EOF). The teams are controlled by the Radiation Laboratory and Monitoring Team Coordinator in the EOF. The RMTs locate and monitor the radioactive plume while taking air samples as directed.

Survey data from RMTs are used to define affected areas, verify or modify dose projections and protective action recommendations, and assess the extent and significance of a release.

9. Iodine Monitoring: RMTs collect air samples while in the plume exposure pathway. The teams carry procedures and equipment for sampling and measuring radioiodine concentrations in air as low as 1.OE-7 micro curies per cubic centimeter in the presence of noble gases.
10. Dose Estimates:' Specific procedures exist for the correlation of air activity levels to dose rate for key isotopes. Provisions have been established for estimating integrated dose from the projected and actua1dose rates and for the comparison of these estimates with the protective action guides.
11. Commonwealth Monitoring Capabilities: The Commonwealth of Massachusetts has the ability to dispatch its own field monitoring teams to track the airborne radioactive plume.

The Commonwealth also has the ability and resources to Interpret radiological data as well as coordinating with federal and utility monitoring teams to compare sample results.

1-3 Revision 27

PNPS EMERGENCY PLAN Section J: Protective Response Protective response consists of emergency actions, taken during or after an emergency situation, which are intended to minimize or eliminate hazards to the health and safety of the public and/or Station personnel. A range of protective actions has been developed for emergency workers and the general public In the plume exposure pathway Emergency Planning Zone (EPZ). Additionally, guidelines have been established to aid in choosing protective actions during an emergency that are consistent with federal guidance. PNPS is responsible for onsite actions, while the responsibility for offsite actions rests with the Commonwealth of Massachusetts, local authorities and other offsite response agencies.

1. Notification of Onsite Personnel: For all emergency classifications, all personnel within the Protected Area are notified of the declaration, escalation or termination of an emergency by alarms and verbal announcements over the Station Public Address System (Gai-tronics).

Announcements include the emergency classification and response actions to be taken by site personnel.

Upon declaration of an Alert or higher classification, if open, public access areas are closed and persons advised, by dispatching a security officer(s) to evacuate those areas.

2. Evacuation Locations: If Protected Area evacuation is required, personnel are directed to evacuate to an assembly area. The Support Building cafeteria is designated as the primary assembly area. Should conditions warrant, personnel may be directed to evacuate via personal automobiles to the alternate assembly area, the Chiltonville Training Center. The assembly area Is chosen on the basis of wind direction. Visitors to the station assemble with their escorts.
3. Radiological Monitoring: In the event of Protected Area evacuation, radiation protection personnel are dispatched to the designated assembly area, to provide radiological monitoring and, ifinecessary, decontamination of evacuees.
4. Evacuation: Evacuation is the primary protective action anticipated for onsite personnel not having emergency response assignments. Contractors who do not have emergency responsibilities, visitors, and handicapped personnel are evacuated immediately at the Alert or higher classification.

Evacuation of non-essential PNPS personnel is initiated upon declaration of either a Site Area Emergency or General Emergency. The shorefront recreation area Is closed at the declaration of an Alert or higher classification, and visitors asked to leave.

5. Accountability: At the declaration of Site Area Emergency, all non-essential personnel are evacuated. All individuals onsite are accounted for and the names of missing individuals are ascertained within 30 minutes of the Initiation of accountability. Once established, accountability within the Protected Area is maintained throughout the course of the event.

Should missing personnel be identified, search and rescue operations are initiated.

Accountability is coordinated by the Emergency Security Supervisor and the results forwarded to the Emergency Plant Manager.

J-1 Revision 27

PNPS EMERGENCY PLAN

6. Provisions for Onsite Personnel: PNPS maintains an inventory of respiratory protection equipment, anti-contamination clothing, and radioprotective drugs which are made available to emergency workers remaining onsite should conditions warrant.
a. Self-contained breathing apparatus (SCBAs) are used as the primary method of respiratory protection in an emergency. Emergency response personnel use SCBAs in any environment involving exposure to high level gaseous activity or oxygen deficient atmosphere, or where air quality is in doubt. In the presence of airborne particulates, emergency response personnel may be directed by radiation protection personnel to use full-face filter type respirators.
b. Anti-contamination clothing, located in the Operations Support Center (OSC) lockers and dress out area, is available for use by onsite re-entry personnel.
c. Procedures are In place for the use of thyroid-blocking agents by emergency response personnel. Administration of such agents may be authorized only by the Emergency Director or by the Emergency Plant Manager when authority has been delegated by the Emergency Director.
7. Protective Action Recommendations for the General Public: Plant conditions, projected doses, and/or field monitoring data are evaluated to develop protective action recommendations for the purpose of preventing or minimizing exposure to the general public. Protective action recommendations for the plume exposure pathway are based on the Environmental Protection Agency (EPA) Protective Action Guides (PAGs) discussed in EPA-400-R-92-001 - "Manual of Protective Action Guides and Protective Actions for Nuclear Incidents' and the NRCIFEMIA guidance in Supplement 3 to NUREG-0654/FEMA-REP t Criteria for Protective Action Recommendations for Severe Accidents."

Protective:action recommendations are made directly to the Commonwealth agencies who are responsible for implementing protective actions for the general public within the plume exposure EPZ. Protective action recommendations are made by the Emergency Director to MEMA, through the MDPH EOF Liaison. In an emergency which requires immediate protective actions be taken prior to activation of emergency facilities, notification is given by the Emergency Director in the Control Room directly to the Commonwealth, EPZ, and reception communities via the DNN network.

The possible Protective Action Recommendations (PARs) issued by PNPS at a General Emergency include:

  • At a minimum, based on plant conditions, evacuation of the 2 mile ring and 5 miles downwind of the affected EPZ sub-areas along with sheltering of all other EPZ sub-areas and considering the administration of potassium Iodide (KI) for the general public will be recommended; or J-2 Revision 27

PNPS EMERGENCY PLAN If plant conditions indicate that substantial core damage is imminent or has occurred and a significant emergency release of reactor coolant Into the containment is imminent or has occurred and containment failure is imminent or has occurred, then evacuation of the five (5) mile ring and ten (10) miles downwind of the affected EPZ sub-areas along with sheltering of all other EPZ sub-areas and considering the administration of potassium iodide (KI) for the general public will be recommended.

In addition to the plant-condition PARs, off-site dose projections will be used to determine whether plant-condition PARs are adequate. This will include evaluating the off-site dose projection results in accordance with the threshold for dose-based evacuation PARs. Table J-1 summarizes the PNPS PARs for the general public based on projected dose to the population-at-risk.

8. Evacuation Time Estimates: An independent evacuation time study has been performed to provide estimates, by subarea, of the time required to evacuate resident and transient populations surrounding Pilgrim Station under favorable and adverse conditions (see Appendix 5). These evacuation time estimates are used to determine an exposure period for the calculation of dose projections.
9. Protective Measure Implementation: The responsibility for implementing protective measures based on protective action guides rests with Commonwealth and local agencies.
10. Factors Affecting Protective Measure Implementation The PNPS, Commonwealth, and local emergency plans used V Implement the protective measures for the plume exposure pathway take numerous factors into consideration. Among these considerations are:
a. Wlost of the evacuating population will travel Intheir own vehicles, leaving the EPZ via designated evacuation routes. Figures J-1 through J-5 are maps showing the evacuation routes, evacuation subareas, reception centers in host areas, and mass care shelters. Pre-selected sampling and monitoring points are presented in Table J-2.
b. The population distribution around Pilgrim Nuclear Power Station is presented In the Evacuation Time Estimate, Appendix 5.
c. As indicated in Section 7, offsite agencies are notified in the event the Emergency Plan is activated. Commonwealth and local agencies have the capability to notify all members of the transient and resident population within the plume exposure EPZ.
d. Means for protecting those persons whose mobility may be impaired due to such factors as institutional or other confinement are described in Commonwealth and local plans and procedures
e. Provisions for the use of radioprotective drugs, particularly for emergency workers and Institutionalized persons within the plume exposure EPZ whose immediate evacuation may be infeasible or very difficult, Including quantities, storage, and means of distribution are described In Commonwealth and local plans and procedures.

J-3 Revision 27

PNPS EMERGENCY PLAN

f. Commonwealth and local plans Include the method by which decisions are made by the Massachusetts Department of Public Health for administering radioprotective drugs to emergency workers and the general public.
g. Means of relocation of the general public are described in Commonwealth and local plans and procedures.
h. Relocation centers in host areas which are at least 5 miles, and preferably 10 miles, beyond the boundaries of the plume exposure emergency planning zone are described in Commonwealth and local plans and procedures.

I. Projected traffic capacities of evacuation routes under emergency conditions are described in Appendix 5, the Evacuation Time Estimate.

j. Control of access to evacuated areas and organization responsibilities for such control are described in Commonwealth and local plans and procedures and in Appendix 5, the evacuation time estimate.
k. Identification of and means for dealing with potential impediments to use of evacuation routes, (e.g., seasonal Impassability of roads) and contingency measures are described in Commonwealth and local plans and procedures I. Time estimates for evacuation of various sectors and distances based on a dynamic analysis (time-motion study under various conditions) for the plume exposure pathway emergency planning zone have been performed and are contained in Appendix 5, the Evacuation Time Estimate.
m. The basis for dose driven protective action recommendations are as follows:
  • If projected doses exceed minimum EPA PAGs evacuation is considered for affected subareas and sheltering is considered for remaining subareas.
  • PNPS personnel normally do not have the necessary information to determine whether off site conditions would require sheltering instead of an evacuation. An effort to base Protective Action Recommendations on external factors (such as road conditions, traffictraffic control, weather or offsite emergency response capabilities) is usually performed by the Commonwealth.
11. Ingestion Pathway Protective Measures: The responsibility for specifying protective measures to be used for the ingestion pathway rests with the Commonwealth of Massachusetts and the State of Rhode Island. These measures include the methods for protecting the public from consumption of contaminated water and foodstuffs.
12. Monitoring of Evacuees: The Commonwealth and local organizations have the capability to register and monitor evacuees at reception centers. This capability includes personnel and equipment capable of monitoring residents and transients evacuating from the plume exposure EPZ and arriving at the reception centers, In accordance with FEMA guidelines.

J-4 Revision 27

PNPS EMERGENCY PLAN Table J-1: Protective Action Recommendation Decision Chart IF: THEN:

1. Projected dose is: No actions are necessary.

< 1 Rem Whole Body (EPA TEDE) and

< 5 Rem Thyroid (EPA CDE)

2. Projected dose is: Evacuate
  • 2 1 Rem Whole Body (EPA TEDE) Consider the administration of KI to the or general public t 2 5 Rem Thyroid (EPA CDE)
  • PNPS personnel normally do not have the necessary information to determine whether off site conditions would require sheltering instead of an evacuation. An effort to base Protective Action Recommendations on external factors (such as road conditions, traffic/traffic control, weather or offsite emergency response capabilities) is usually performed by the Commonwealth.

t Consideration of administering KI to the general public would be recommended by PNPS at the General Emergency classification as a minimum based on plant conditions.

J-5 Revision 27

PNPS EMERGENCY PLAN Fiaure J-1: Evacuation Routes Al I~~It SAW

  1. MIOle Revision 27

PNPS EMERGENCY PLAN Fiaure J-2: 10-Mile EPZ With Subareas J-7 Revision 27

( (

PNPS EMERGENCY PLAN

- -- -- - J-3:

Fiaure - -- ------ - ---- Shelter Mass Care -- - and Recention Center Locatiods

-9 J-8 Revision 27

PNPS EMERGENCY PLAN Figure J-4: Reception Center and Host Schools/Mass Care Shelters. Town of Bridgewater I

J-9 Revision 27

( 4n C PNPS EMERGENCY PLAN Figure J-5: Braintree Reception Center and Host SchoolMass Care Shelters Brainree Reception Center and: Mass Are Shelters Z

4. #ft-VdVSch

,,,,. m

' fllW I~~~~~~~C~~~4 efeti Mm J-1o Revision 27

PNPS EMERGENCY PLAN Section K: Radiological Exposure Control This section of the plan describes the means for controlling emergency worker radiological exposures during an emergency, as well as the measures that are used by PNPS to provide necessary assistance to persons Injured or exposed to radiation and/or radioactive materials.

Exposure guidelines in this section are consistent with EPA Emergency Worker and Lifesaving Activity Protective Action Guides, EPA 400-R-92-001.

1. Emergency Exposure Guidelines: Radiation exposure In an emergency is controlled, taking every reasonable effort to minimize exposure. However, circumstances may warrant exposure in excess of the EPA-400 general activities limit (5 Rem). Situations in which actions are taken to save vital equipment or property, circumvent substantial exposure to the general public or to save a life are examples of conditions which may necessitate extended emergency exposure authorization. The following are the exposure guidelines for emergency worker activities:

Dose Limit* ActvItv Conditldns 5 All 10 Protecting valuable property. Lower dose not practical.

25 Life saving or protection of large Lower dose not practical.

populations.

>25 Life saving or protection of large Only on a voluntary basis to populations. persons fully aware of the risks involved.

  • EPA TEDE values for non-pregnant adults from exposure and intake during an emergency situation in Rem. Workers performing services during emergencies should limit dose to the eyes to three times the listed value and dose to any other organ (including skin and body extremities) to ten times the listed value.
2. Emergency Radiation Protection Program: The Radiological Supervisors ensure that proper personnel radiological monitoring equipment is provided for all personnel during emergencies, that exposure accountability is maintained and that personnel are not sent into known or potential high radiation areas (radiation, contamination or airborne) without adequate protection and exposure controls.

Periodic habitability surveys of emergency facilities are performed during an emergency. If the facility is determined to be uninhabitable, the facility is evacuated in order to prevent or minimize personnel exposures.

Assembly areas (or alternate assembly areas) are established to relocate and monitor evacuated personnel.

K-1 Revision 27

PNPS EMERGENCY PLAN The authority to allow radiation exposure above the EPA-400 limits is held by the Emergency Director through recommendations from the Onsite Radiological Supervisor for onsite ERO personnel and the Offsite Radiological Supervisor for offsite (outside the protected area) ERO personnel. The responsibility for authorization of extended exposures for onsite ERO personnel may be delegated to the Emergency Plant Manager but may not be delegated further.

In any emergency response action requiring greater exposure than 10CFR20 limits, volunteers over forty-five years of age are considered first. Females of childbearing age shall not be permitted to receive exposures in excess of 10CFR20 limits.

Access to high radiation areas is only permitted with prior approval of the applicable Onsite or Offsite Radiological Supervisor. Prior to entry into a suspected high radiation area, the individual's current year exposure Is evaluated based upon previous thermoluminescent dosimeter (TLD) readings, and self-indicating dosimeter estimates since the last TLD reading.

3. Personnel Monitoring
a. A TLD badge is issued to all emergency response personnel in the protected area. All Level 11GET responders are badged every work day; Level I GET responders are badged at their onsite emergency facilities upon activation. This, in addition to both low and high range self-indicating dosimetry, Is used to monitor emergency workers exposure during an accident. The capability exists for the emergency processing of TLDs on a 24-hour per day basis, if necessary, through Framatome ANP DE&S.

Emergency workers are instructed to read self-indicating dosimeters frequently, and TLDs may be processed with Increased periodicity.

b. Emergency worker dose records are maintained in accordance with Station Radiation Protection Procedures.
4. Non-PNPS Personnel Exposure Authorization: The responsibility for authorizing non-PNPS emergency workers (i.e. Commonwealth and local agency emergency workers) and visitors to receive exposures in excess of the EPA General Public Protective Action Guides rests with the Commonwealth and local organization, except when such emergency workers and visitors are onsite. Authorization of exposures in excess,of EPA General Public Protective Action Guides, in this latter instance, rests with the Emergency Director or the Emergency Plant Manager (when delegated by the Emergency Director).
5. Decontamination and First Aid
a. Normal contamination control limits apply in emergency conditions. However, these limits may be modified by the applicable Onsite or Offsite Radiological Supervisor should conditions warrant.

K-2 Revision 27

PNPS EMERGENCY PLAN

b. Decontamination materials and portable first-aid kits, stored in the Engineering and Support Building and Medical Building, are available. A personnel injury onsite involving possible radioactive contamination Is Initially treated by an on-shift EMT. Prompt attention is given to life endangering Injuries such as extensive burns, serious wounds or fractures, in preference to decontamination. If the injury permits, all reasonable effort is made to decontaminate the Individual prior to movement. If decontamination is impractical, the patient is covered In such a manner as to minimize the spread of contamination until medical aid can be obtained or the patient can be hospitalized.

The ambulance service contracted to the Plymouth Fire Department provides prompt transportation of persons requiring medical attention from the Pilgrim Nuclear Power Station to area hospitals. This service is available on a 24-hour per day basis. For accidents involving contamination, Radiation Protection (RP) personnel accompany the patient to the hospital to assist and advise ambulance personnel.

Patients requiring Emergency Room care, laboratory work, X-rays or lifesaving procedures are transported to the Jordan Hospital (primary) or to Morton Hospital (backup). Hospital personnel have been trained and hospitals are equipped to handle contaminated or radiation injured individuals. Medical personnel may recommend transportation to other medical facilities equipped for long term or intensive care for radiation injuries. RP personnel are available to assist medical personnel with decontamination, radiation exposure and contamination control.

6. Contamination Control
a. Areas in the plant found to be contaminated are isolated as restricted areas with appropriate radiological protection and access control as directed by the Onsite Radiological Supervisor.
b. In order to preclude the spread of contamination from restricted areas, all personnel and equipment are monitored for radioactive contamination prior to exiting the restricted areas. Contaminated personnel are decontaminated. Emergency supplies of food and drinking water are stored in sealed containers to prevent contamination. Eating, drinking and smoking are prohibited In all Emergency Response facilities until such time as habitability surveys Indicate that such activities are permissible.
c. Restricted areas will be returned to normal use when contamination levels have been returned to acceptable levels.
7. Decontamination of Relocated Personnel: Non-essential onsite personnel and non-PNPS personnel are evacuated to the Engineering and Support Building cafeteria, as discussed in Section J, 'Protective Response". RP personnel at that location monitor evacuees and perform decontamination, as needed. Provisions for extra clothing, as well as suitable decontaminants are available. If radiological or plant conditions warrant evacuation of onsite personnel to the offsite assembly area, Chiltonville Training Center will be used.

Radiation Protection personnel are dispatched to the assembly area to monitor for personnel contamination.

K-3 Revision 27

PNPS EMERGENCY PLAN Section L: Medical and Public Health Support This section describes Pilgrim Nuclear Power Station (PNPS) arrangements for medical services for contaminated injured individuals sent from the Station.

1. Hospital Services: Jordan Hospital Is the primary care facility for treatment of contaminated injured persons, and evaluation of radiation exposure and radionuclide uptake. Jordan Hospital is located in Plymouth, Massachusetts, and five miles from PNPS.

Morton hospital, located in Taunton, Massachusetts is designated as a back-up to Jordan Hospital. This hospital is equipped and trained to handle contaminated injured individuals (See Appendix 3 for Sample Letters of Agreement.)

2. Onsite First Aid Capabilitv: Personnel Injuries involving possible radioactive contamination are initially treated by an on-shift EMP. Prompt attention is given to life endangering injuries in preference to decontamination. (See Section 0 for training requirements).
3. Medical Service Facilities: The Commonwealth of Massachusetts maintains a list of public, private and military hospitals and other emergency medical facilities considered capable of providing medical support for any contaminated injured individuals.
4. Medical Transportation: PNPS has arranged with a local ambulance service for transporting victims of radiological accidents to medical support facilities. This service is contracted through the Plymouth Fire Department and is continuously available. (See Appendix 3 for Sample Letters of Agreement).

L-1 Revision 27

PNPS EMERGENCY PLAN Section M: Reentry and Recovery Planning This section describes the measures to be taken for reentry into the areas of Pilgrim Nuclear Power Station (PNPS) which have been evacuated as a result of an accident. It also outlines the PNPS Recovery Organization and its concepts of operation.

1. Reentry: During an emergency, immediate actions are directed toward limiting the consequences of the accident, so as to afford maximum protection to Station personnel and the general public. Once corrective measures have been taken and effective control of the plant has been re-established, a more methodical approach to reentry is taken. This Emergency Plan therefore divides reentry Into two separate categories:
a. Plant damage control, mitigation, repair and rescue activities are conducted during the emergency phase of accident. This category of reentry is performed using emergency exposure controls and limits. Briefings for task activities and radiological controls may be provided verbally to dispatched personnel and documented afterwards. Procedures provided to dispatched personnel for emergency activities can be taken from existing plant documents or developed on a case basis for the task.

All personnel dispatched from the onsite emergency facilities are authorized by the Emergency Plant Manager and coordinated through the Operations Support Center Supervisor, the assigned Team Coordinator and the Onsite Radiological Supervisor if necessary.

The following items are considered when planning the dispatch of personnel during an emergency:

  • Team composition which considers:
  • Previous non-emergency exposure for ALARA considerations.
  • Exposure accumulated during the course of the emergency.
  • Experience with the assigned task.
  • Familiarity with any existing procedures or processes.
  • Physical capacity to perform the task.
  • Nature of the task including applicable procedures if available.
  • Equipment, tools, Instrumentation and materials necessary for the task.
  • Physical location where the task is performed.
  • Safety precautions pertaining to both the task and to personnel.
  • Communications equipment, channels, backup and reporting expectations.

M-1I Revision 27

PNPS EMERGENCY PLAN

  • Any special instructions applicable to the task or evolution.
  • Radiological controls associated with the activity.
b. Plant control, restoration, repair and maintenance activities are conducted during the recovery phase of an accident. This category of reentry is performed using exposure controls based on 10 CFR 20 limits and normal PNPS levels. Either existing procedures or procedures developed specifically for the task (developed, reviewed and approved through the normal plant administrative control process) are utilized for all recovery activities.

All personnel dispatched Into hazardous areas, radiological or otherwise, during the recovery phase are authorized by the Recovery Plant Manager. The dispatch of personnel is coordinated through the applicable organizational structure (recovery or normal plant organization depending on the extent of the recovery).

2. Recovery: Recovery is defined as those steps taken to return the plant to its pre-accident condition. The Emergency Director, with concurrence from the Emergency Offsite Manager and the Emergency Plant Manager, has the responsibility for determining when an emergency situation is stable and the Station is ready to enter the recovery phase. Prior to terminating an emergency and entering the recovery phase, the following conditions are considered:
  • Do conditions still meet an Emergency Action Level? If so, does It appear unlikely that conditions will deteriorate?
  • Radioactive releases are under control and are no longer in excess of Technical Specification limits.
  • The radioactive plume has dissipated and plume tracking Is no longer required. The only environmental assessment activities in progress are those necessary to assess the extent of deposition resulting from passage of the plume.
  • In-plant radiation levels are stable or decreasing, and acceptable, given the plant conditions.

e The potential for uncontrolled radioactive release is acceptably low.

  • The reactor is in a stable shutdown condition and long-term core cooling is available.
  • Drywell pressure is within Technical Specification limits.
  • Any fire, flood, earthquake or similar emergency condition no longer exists.
  • All required notifications have been made.
  • Discussions have been held with Federal, Commonwealth and local agencies and agreement has been reached to terminate the emergency.
  • At an Alert or higher classification (non-transitory classification), the Emergency Response Organization is In place and emergency facilities are activated.

M-2 Revision 27

PNPS EMERGENCY PLAN

  • Any contaminated injured person has been treated and/or transported to a medical care facility.
  • Offsite conditions do not unreasonably limit access of outside support to the station.

It is not necessary that all conditions listed above be met; however, all items must be considered prior to entering the recovery phase. For example, it is possible after a severe accident that some conditions remain which exceeds an Emergency Action Level, but entry into the recovery phase is appropriate.

Once the decision is made to enter the recovery phase, the extent of the staffing required for the PNPS Recovery Organization is determined.

  • For events of a minor nature, (i.e. for UNUSUAL EVENT classifications) the normal on shift organization is normally adequate to perform necessary recovery actions.
  • For events where damage to the plant has been significant, but no offsite releases have occurred and/or protective actions were not performed, (i.e. for ALERT classifications) the PNPS Emergency Response Organization, or portions thereof, should be adequate to perform the recovery tasks prior to returning to the normal Station organization.
  • For events involving major damage to systems required to maintain safe shutdown of the plant and offsite radioactive releases have occurred, (i.e. for SITE AREA EMERGENCY or GENERAL EMERGENCY classifications) the PNPS Recovery and Corporate organization Is put in place.

The specific members of the PNPS Recovery organization are selected based on the sequence of events that preceded the recovery activities as well as the requirements of the recovery phase. The basic framework of the PNPS Recovery Organization is as follows:

a. The Recovery Director is charged with the responsibility for directing the activities of the PNPS Recovery organization. These responsibilities include:
  • Ensuring that sufficient personnel from PNPS and other organizations are available to support recovery.
  • Directing the development of a recovery plan and procedures.
  • Ensuring that adequate engineering activities to restore the plant, are properly reviewed and approved.
  • Deactivating any of the PNPS Emergency Response Organization which was retained to aid in recovery, in the appropriate manner. Depending upon the type of accident and the onsite and offsite affects of the accident, portions of the PNPS Emergency Response Organization may remain in place after initiation of the recovery phase.
  • Coordinating the integration of available Federal and Commonwealth assistance into onsite recovery activities.
  • Coordinating the integration of PNPS support with Federal, Commonwealth and local authorities into required offsite recovery activities.

M-3 Revision 27

PNPS EMERGENCY PLAN

  • Approving information released by the public information organization which pertains to the emergency or the recovery phase of the accident.
  • Determining when the recovery phase is terminated.

The Senior Nuclear Executive or a designated alternate is the Recovery Director.

b. The Recovery Plant Manaaer reports to the Recovery Director and is responsible for:
  • Coordinating the development and implementation of the recovery plan and procedures.
  • Directing all onsite activities in support of the recovery of PNPS.
  • Designating other PNPS recovery positions required in support of onsite recovery activities.

The Operations and Plant Manager or a designated alternate will become the Recovery Plant Manager.

c. The Recovery Offsite Manager reports to the Recovery Director and is responsible for:
  • Providing liaison with offsite agencies and coordinating PNPS assistance for offsite recovery activities.
  • Coordinating PNPS ingestion exposure pathway EPZ sampling activities and the development of an offsite accident analysis report.
  • Developing a radiological release report.
  • Designating other PNPS recovery positions required in support of offsite recovery activities.

A senior Nuclear Assessment Group Management individual or a designated altemte is the Recovery Offsite Manager.

d. The Company Spokesperson reports to the Recovery Director and is responsible for:
  • Functioning as the official spokesperson to the press for PNPS on all matters relating t6 the accident or recovery.
  • Coordinating non-PNPS public information groups (Federal, Commonwealth, local, etc.).
  • Coordinating media monitoring and rumor control.
  • Determining what public Information portions of the PNPS Emergency Response Organization will remain activated.

A senior PNPS management individual Is designated as the Company Spokesperson.

The remainder of the PNPS Recovery Organization is established and an initial recovery plan developed at the end of the emergency phase or just after entry Into the recovery phase. Consideration Is given to recovery activity needs and use of the normal PNPS organizations. Individual recovery supervisors may be designated in any or all of the following areas:

M-4 Revision 27

PNPS EMERGENCY PLAN

  • Training
  • Radiation Protection

. Chemistry

  • Technical Support
  • Engineering Support
  • Quality Assurance
  • Operations
  • Security

. Maintenance

  • Special Offsite Areas (Community Representatives, Environmental Samples, Investigations, etc.)
3. Recovery Phase Notifications: When the decision Is made to enter the recovery phase, all members of the PNPS Emergency Response Organization are informed of the change. All personnel in the PNPS Nuclear Organization are instructed of the PNPS Recovery Organization and their responsibilities to the recovery effort.
4. Total Population Exposure: A method has been developed for estimating the total population exposure resulting from the accident. Total population exposure calculations are performed during the recovery phase of an accident. Cumulative data are collected from PNPS Emergency Response Organization records and release pathway filter analyses to estimate the source term. Data are obtained from offsite agencies to estimate the total exposed population. Environmental TLDs will be analyzed to provide additional data.

M-5 Revision 27

PNPS EMERGENCY PLAN Section N: Drill and Exercise ProQram This section describes the Drill and Exercise Program that PNPS has implemented to:

  • Develop, maintain and evaluate the capabilities of the PNPS Emergency Response Organization to respond to emergency conditions and safeguard the health and safety of Station personnel and the general public.
  • Identify deficiencies in the PNPS Emergency Plan and the associated procedures, or in the training of response personnel, and ensure that they are promptly corrected.
  • Ensure the continued adequacy of emergency facilities, supplies and equipment, including communications networks.
1. Exercises/Drills
a. Exercises are conducted biennially which involve implementation of the participants' emergency plan(s) and activation of major portions of participating emergency organizations. Where full participation by offsite agencies occurs, the sequence of events simulates an emergency that results In the release of radioactivity to the offsite environs, sufficient in magnitude to warrant a response by offsite authorities. For exercises involving only partial participation by these agencies, emphasis Is placed on development and conduct of an exercise that is more mechanistically and operationally realistic. Players will be able, by implementing appropriate procedures and corrective actions, to determine the outcome of the scenario to a greater extent than when core damage and the release of radioactivity are prerequisites for demonstration of all objectives.
b. Exercises/Drills provide an opportunity to evaluate the ability of participating organizations to implement a coordinated response to postulated emergency conditions.

In accordance with the PNPS Six-Year DrilVExercise Plan, drills and exercises are conducted to ensure that all major elements of the emergency plan and preparedness

-program are demonstrated at least once In each six-year period. At least one drillexercise every six years is started off-hours. Drills/Exercises are scheduled to be conducted at different times of the year. An unannounced drill/exercise is included in the Six-Year Plan.

2. Specialized Drills: PNPS conducts specialized drills for the purpose of testing, developing and maintaining the proficiency of emergency responders. The specialized drills may include, but are not limited to the following:
a. Communication Drills: Communications capabilities with the Commonwealth of Massachusetts and local emergency operating centers (Carver, Kingston, Duxbury, Marshfield, and Plymouth) are tested monthly.

Operability of communication equipment between PNPS and the State of Rhode Island are tested -quarterly.

NA1 Revision 27

PNPS EMERGENCY PLAN Communications between PNPS and the PNPS Radiological Monitoring Teams are tested annually.

Other communication checks/drills are conducted in accordance with 10CFR50, Appendix E.IV.E.

Each of these drills includes provisions to ensure that all participants in the test are able to understand the content of the messages (e.g. by requesting repeat-backs of information or verification of message transmittal forms).

b. Fire Drills: Drills for the PNPS Fire Brigade are conducted in accordance with Nuclear Organization and Station procedures.
c. Medical Emeraencv Drills: Medical emergency drills, involving an individual who is simulated to be injured and contaminated, are conducted at least annually. These drills include participation by an ambulance service and at least one hospital who has agreed to provide assistance to PNPS in the event of an emergency at the Station.
d. Radiological Monitoring Team Drills: Radiological Monitoring Team (RMT) drills are conducted at least annually and include provisions for the collection and analysis of environmental sample media (e.g. water, snow, vegetation, soil, and air), and the monitoring of radiological conditions outside the PNPS Protected Area. These drills include provisions for communications and record keeping.
e. Health Phvsics Drills: At least semi-annually, drills are conducted which involve response to, and analysis of, simulated airborne and liquid samples with elevated levels of activity. These drills also involve direct measurements of radiation levels in the Station. Normal station health physics rules and procedures are followed.

At.least annually, drills are conducted which involve use of the Post-Accident Sampling System (PASS) to obtain fluid samples for use in assessing the extent of core/cladding damage. These drills Involve the simulated drawing and transport of a PASS sample and are scheduled so that each of the five potential sample points is tested at least once in each six year period.

f. Auamentation Drills: At least semi-annually, drills are conducted to test the ability to augment the on-shift organization. These drills are conducted using the following methods:
  • Activation of the Computerized Automated Notification system (CANS) with responders calling in their anticipated arrival times. The anticipated arrival times are then checked to confirm that the PNPS Emergency Response Organization could have been activated In a reasonable amount of time.
  • Activation of CANS, with actual response to Emergency Response Facilities.
g. Combined Functional Drills: Periodically, drills are conducted to test the interfacility coordination, communication, and operation among emergency facilities Including the EOF, TSC, OSC, Media Center, and Entergy Nuclear Northeast.

N-2 Revision 27

PNPS EMERGENCY PLAN

3. Conduct of Drills and Exercises: For each emergency preparedness exercise or drill conducted, a scenario package Is developed which Includes at least the following information:
  • The objectives to be demonstrated during the drill or exercise,
  • Evaluation criteria to be used in determining the success of the drill or exercise,
  • Date(s), time(s), and place(s) of postulated events,
  • Scope of the drill or exercise and list of participating organizations,
  • The simulated sequence of events and the estimated schedule for major events
  • A narrative summary which Includes at least the following information:

- Events that are postulated to occur

- Extent of simulation (e.g. will protective clothing be worn or simulated? Will offsite support be simulated? To what extent will the public information organization be exercised?)

- Briefing materials to be provided to official observers and Information on arrangements made for them.

Prior approval of appropriate PNPS management is obtained for all drills and exercises conducted in support of the Emergency Preparedness Program.

4. Criteria and Evaluation: At the conclusion of each drill or exercise, a critique is conducted to evaluate the ability of the participants to implement the PNPS emergency plan and procedures. For drills or exercises involving only partial participation by offsite agenciel, PNPS conducts a full, self-evaluation of activities; NRC representatives may be requested to observe these drills or exercises. For full participation exercises both the NRC and FEMA will observe and evaluate.
5. Resolution of Drill and Exercise Findings: The critique and evaluation process Is used to identify areas of the PNPS emergency preparedness program, which require Improvement.

The Nuclear Assessment Director or his designee Is responsible for evaluation of all recommendations and comments, and the determination regarding which of the Items is to be incorporated into the Emergency Preparedness Program. Items identified for incorporation will be tracked through resolution using the appropriate station action tracking system.

N-3 Revision 27

PNPS EMERGENCY PLAN Section 0: Emeraencv Response Training This section describes the emergency response training that is provided to those who may be called upon in an emergency. It outlines the training provided by PNPS to both its employees and offsite support personnel requiring site access.

1. Assurance of Training: PNPS assures the training of appropriate company personnel through implementation of the Emergency Organization Training portion of the PNPS Nuclear Training Manual. The required training for the PNPS Emergency Response Organization (ERO) positions that are defined in Section B is described here.

Offsite training is provided to support organizations who may be called upon to provide assistance Inthe event of an emergency. The following outlines the training received by these organizations:

a. Specialized training Is offered to the following offsite agencies who may be called upon to provide onsite assistance in the event of an emergency:
  • Plymouth Fire Department
  • Plymouth Police Department
  • American Medical Response Ambulance Service Training consists of the following:
  • Notification Process Training
  • Site Orientation Training
  • Basic Radiation Protection Training
  • Specific Interface Training In addition, the individual in the PNPS Emergency Response Organization who controls the support activities Is Identified by position and title. These courses do not qualify offsite personnel for unescorted access. Escorts are provided to assist support personnel.
b. PNPS offers training support, as requested, for Commonwealth and local agencies whose function Is to provide assistance during an emergency at PNPS. Training Is offered on an annual basis, or as needed.
2. Classroom and Hands-On Training: Members of the PNPS Emergency Response Organization receive general and specialized classroom and hands-on emergency response training. Hands-on training Is provided using one or more of the following methods:
  • Familiarization Sessions: A familiarization session is an informal, organized tabletop discussion of predetermined objectives.
  • Walkthrough Sessions: Consists of a facility walk through to familiarize PNPS Emergency Response Organization personnel with procedures, communications equipment and facility layout. Walkthrough Sessions also provide the opportunity to discuss facility activities, responsibilities and procedures with an instructor.

0-1 Revision 27

PNPS EMERGENCY PLAN Drills: A drill is a supervised instruction period aimed at testing, developing and maintaining skills in a particular operation. Drills described in Section N of this Plan are a part of training. These drills allow each individual to demonstrate ability to perform assigned emergency functions. During drills, on-the-spot correction of erroneous performance may be made and a demonstration of the proper performance offered by the Controller.

3. First Aid Response: On-shift Emergency Medical Personnel (individuals qualified as EMTs; RNs, First Responders, and Paramedics) are trained to respond to medical emergencies.
4. PNPS Emergency Response Organization Training Program: PNPS Emergency Response Organization personnel who are responsible for implementing this Plan receive initial, specialized and annual requalification training. Table 0-1 is a sample training matrix. The detailed training matrix Is maintained in the PNPS Nuclear Training Manual.

Commonwealth and local EOC personnel receive training as outlined in the MEMA Training Program for the PNPS Emergency Planning Zone, with support provided by PNPS.

PNPS emergency response position assignments are based upon an individual's normal daily function and area(s) of expertise. Position-specific training provides the Individual with the skills and knowledge to satisfactorily perform emergency assignments.

New PNPS Emergency Response Organization personnel receive an Initial overview course which familiarizes them with the Plan by providing basic Information in the following areas as well as specific information as delineated In the sections below:

  • Planning Basis
  • Emergency Classifications
  • PNPS Emergency Response Organization and Responsibilities
  • Callout of Emergency Organization
  • Emergency Response Facilities
  • Communications Protocol/Emergency Public Information
  • Offsite Organizations Annual requalification training Is provided to ensure personnel are informed of changes in the Plan, procedures, organization and facilities.
a. Personnel Responsible for Management of an Emergency Emergengv Director. Emergency Offsite Manager. Emergency Plant Manager These positions receive specialized training In the areas of:
  • Notifications
  • Emergency Classifications 0-2 Revision 27

PNPS EMERGENCY PLAN

  • Protective Action Recommendations
  • Emergency Action Levels
  • Emergency Exposure Control
b. Personnel Responsible for Accident Assessment: The skills and knowledge required to perform plant stabilization and mitigation are a normal function of specific Nuclear Operation's positions, as Identified in Section B of this Plan. Power changes, planned and unplanned reactor shutdowns are handled on a normal operation basis.

Subsequent plant stabilization and restoration is pursued utilizing normal operating procedures. Licensed Nuclear Plant Operators receive routine classroom and simulator training to ensure proficiency in this area.

To remove peripheral duties from the Nuclear Operations shift, those Emergency Organization positions responsible for accident assessment, corrective actions, protective actions, and related activities receive training as follows:

Core Damage Assessment: During an emergency when core/cladding damage is suspected, a specialized group of trained Individuals perform core damage assessment.

At a minimum, personnel responsible for core damage assessment receive classroom and hands-on training In the following areas:

  • Isotopic Assessment and Interpretation
  • Available Instrumentation and Equipment
  • Computerized and Manual Core Damage Assessment Post Accident Samplina: Post accident sampling and analysis is performed by Radio -

Chemistry Technicians who receive the following specialized training:

  • Post Accident Sampling Overview
  • Operation of the Post Accident Sampling System (PASS)
  • Post Accident Sample Analysis
c. Radiological Monitoring Teams and Radiological Analysis Personnel Offsite Radiological Monitoring Offsite radiological monitoring is performed by trained individuals who provide samples and direct readings for dose assessment calculations.

Radiological Monitoring Team (RMT) members receive classroom and hands-on training in the following areas:

  • Equipment and Equipment Checks
  • Communications 0-3 Revision 27

PNPS EMERGENCY PLAN

  • Plume Tracking Techniques Personnel Monitoring: Personnel monitoring is performed by trained individuals who monitor Station personnel and their vehicles for contamination during an emergency.

Personnel Monitoring Team members receive classroom and hands-on training in the following areas:

  • Personnel Monitoring Equipment and Techniques
  • Decontamination Techniques for Personnel
  • Decontamination Techniques for Vehicles Dose Assessment: Dose Assessment training includes the skills and knowledge necessary for calculation and interpretation of an offsite release and is impact on the environment under any meteorological condition. Individuals responsible for performing dose assessment are trained in the following areas:
  • Computerized and Manual Dose Assessment
  • Protective Action Recommendations
  • Radiological Monitoring Team Interface
  • Protective Action Guidelines associated with offsite plume exposure doses
  • Basic Meteorology
d. Police, Security and Fire Fighting Personnel Local Police and Fire Fighting Personnel: The Plymouth Police and Fire Departments are invited to receive training as outlined in Part 1.a of this section.

Security: The PNPS emergency security response is based upon a normal daily security function which is to safeguard the site. Security personnel receive specialized training in the following areas:

  • Accountability
  • Evacuation
  • Search and Rescue
  • Emergency Response Facility Activation and Access Control
  • Radiation Protection for Security Outpost Additionally, security management receive specialized training In the areas of:
  • Interfacing with Outside Support 0-4 Revision 27

PNPS EMERGENCY PLAN

  • Organizational Interface Onsite Fire Fighting Personnel: Onsite fire fighting personnel are selected from the Operations and Security sections and receive their emergency response training as part of those groups.
e. Repair and Damage ControVCorrective Action Teams: Repair and damage control team members receive emergency team training specific to reentry.
f. First Aid and Rescue Personnel: First aid and rescue team members receive training as outlined in Part 3 of this section.
g. Local Support Service Personnel: Local support service personnel providing assistance during an emergency are invited to receive training as outline in Parts 1.a and 1.b of this section.
h. Medical Support Personnel: Onsite medical personnel receive specialized training in the handling of contaminated victims and hospital interface.
i. Communications Personnel: PNPS Emergency Response Organization personnel receive training on communications protocol as a part of the initial Emergency Response Overview Course. Personnel using specialized communications equipment that is not part of their normal daily function receive initial and requalification training on the equipment. Personnel involved in notifications offsite agencies receive specialized training Inthe notification process.
j. Corporate Support Personnel: Entergy Nuclear Aortheast corporate personnel responsible for responding to requests from Pilgrim Station receive training in accordance with existingsggrporate emergency response procedures and appropriate elements of the PNPS Emergency Plan and Implementing Procedures.
5. General. Initial and Annual Training Program Maintenance
a. General Employee Training (GET): GET provides initial training and annual requalification training on the basic elements of the PNPS Emergency Plan for all personnel working at PNPS. These elements include:
  • Station emergency alarms and their meaning
  • Assembly areas
  • Site evacuation procedure
  • Special precautions and limitations during an emergency
  • Role of the worker during an emergency
  • Related Industry events 0-5 Revision 27

PNPS EMERGENCY PLAN

b. Initial Training: Prior to becoming a qualified PNPS Emergency Response Organization member, personnel receive a first-time course that provides introductory knowledge to new members of the organization. PNPS provides initial emergency response overview and specific training to assigned PNPS Emergency Response Organization members as outlined in the Emergency Organization Section of the PNPS Nuclear Training Manual.

Additionally, PNPS offers Initial training to those offsite organizations who provide onsite support, as discussed in Part 1.a of this Section.

When a PNPS employee successfully completes the training requirements for an assigned emergency position, training is documented and the employee's name placed in the PNPS Emergency Response Organization Training Matrix. The completed training documents certify that the Individual is qualified to perform their emergency functions.

c. Requalification Training: Annual requalification training is provided to PNPS Emergency Response Organization personnel. Requalification training consists of one or more of the following:
  • Annual Requalification Test
  • Classroom and/or hands-on training addressing changes to the PNPS Emergency Response organization, facilities, procedures and equipment
  • Drill participation
d. Update Trainin: In some cases, It may be-Vecessary to provide additional training prior to the annual requalification training. Changes to this Plan, PNPS Emergency Response Organization, procedures, facilities or equipment may require training in an effort to maintain a-proficient PNPS Emergency Response Organization.

Program changes or deficiencies Identified during drills, exercises or audits may require training to be performed prior to annual requalification training. Emergency Preparedness management evaluates the impact of these changes or deficiencies upon the effectiveness of the organization. As a result of this evaluation process, one or more of the following may occur:

  • Specialized Classroom Training
  • Hands-On Training
  • Required Reading
  • Drills (56 Revision 27

PNPS EMERGENCY PLAN Table 0-1 a: Emergency Preparedness Training Modules Sample Matrix Module Curriculum File No. Module Title 08 T-ER-01 08 OSC Pool 09 T-ER-01-01-09 Senior Emergency Management Training 10 T-ER-01-01-10 Emergency Response Organization Overview 11 T-ER-01 11 Ops Specific 12 T-EP-01-01-12 Termination and Recovery 13 T-ER-01 13 Public Information 15 T-ER-01 15 Contaminated Injured Person 16 T-EP-01 16 Hospital Interface 30 T-ER-01 30 Classifications 38 T-ER-01-01-38 PASS/Core Damage Summary 41 T-EP-01 41 Reentry Management 43 T-ER-01 43 Radiation Monitoring Teams 48 T-ER-01 48 Personnel Monitoring 50 T-EP-01-01-50 Communications/Notification 51 T-ER-01-01 -51 CANS 58 T-ER-01 58 Security 60 T-ER-01 60 Facility Familiarization 70 T-ER-01-01-70 Core Damage 80 T-EP-01 80 Dose Assessment/PARs 81 T-ER-01-01-81 DAtPARs Overview 85 T-ER-01-01-85 SPDS Int duction b

0-7 Revision 27

PNPS EMERGENCY PLAN Table 0-1 b: Emergency Response Organization Training Requirements Sample Matrix Position Module # Training Required Dose Assessment Engineer 10 Overview 80 Dose Assessment/PARs 43 RMT Electrical Engineer 10 Overview Electrical Pool 10 Overview Electrical Supervisor 10 Overview Emergency Communications Supv 10 Overview 50 Communications/Notifications Emergency Director 09 Senior Emergency Management Training Emergency Director Admin Asst. 10 Overview Emergency Offsite Manager 09 Senior Emergency Management Training Emergency Offsite Mgr. Admin 10 Overview Asst.

0-8 Revision 27

PNPS EMERGENCY PLAN Section P: Responsibilitv for the MaIntenance of the Planning Effort This section describes the responsibilities for development, review and distribution of the Pilgrim Nuclear Power Station (PNPS) Emergency Plan and actions which must be performed to maintain the PNPS Emergency Preparedness Program. It also outlines the criteria for insuring that personnel who perform the planning are properly trained.

Emergency Preparedness Staff.

1. At least once each calendar year all members of the Emergency Preparedness staff are involved in at least one of the following activities:
  • Training courses related to emergency preparedness management, such as problem solving, stress management or confrontation/media relations courses.
  • Observation of or participation in drills and/or exercises at other utilities.
  • Participation In industry review and evaluation programs.
  • PNPS training courses In related areas, such as systems, operations, or radiological protection training.
2. Authority for Emergency Preparedness Effort: The Senior Nuclear Executive has overall authority and responsibility for the PNPS Emergency Preparedness Program. This includes the-authority to provide the necessary resources to ensure the continuous state of readiness for the PNPS Emergency Response Organization.
3. Nuclear Assessment Director: The Nuclear Assessment Director is responsible for the maintenance of the PNPS Emergency Preparedness Program. In maintaining the program, the Nuclear Assessment Director ensures the following:
  • Development, maintenance and revision of the PNPS Emergency Plan and implementing procedures Is accomplished in accordance with applicable regulations and Industry standards.
  • Ensures the proper amount of PNPS support is provided to ensure the maintenance of offsite emergency response plans and procedures for the Commonwealth of Massachusetts and the local communities involved in response to an Incident at Pilgrim Station.
  • The training program for offsite response personnel Is properly supported by PNPS.
  • Development and maintenance of a strong working relationship with Commonwealth and local authorities responsible for Emergency Preparedness.
  • Consistency is maintained between this plan and Its implementing procedures and the emergency plans and procedures of the Commonwealth and local authorities.

P-1 Revision 27

PNPS EMERGENCY PLAN

  • Preparation for and conduct of the Station's drill and exercise program, and ensuring the program meets all regulations and guidelines of the NRC.
  • Emergency Response Facilities are maintained in a constant state of readiness.
  • Appropriate files are maintained to document the activities of the Emergency Preparedness Program as required by law and regulations.
  • PNPS is appropriately represented at Commonwealth and local meetings by a representative empowered to represent PNPS in emergency preparedness matters.
  • Alert and notification systems are maintained and tested in accordance with approved procedures.
  • Emergency Preparedness staff is Involved in a program to maintain sufficient knowledge of state of the art planning techniques and the latest applications of emergency equipment and supplies.
  • Adequate PNPS and EP staff support Is provided to support Pilgrim and Offsite emergency response plans.

The Nuclear Assessrqent Director is assisted in these responsibilities by the following Emergency Preparedness staff.

Emernency Preparedness Staff

a. The Emeraency Preparedness Manager is responsible for the development, implementation, and maintenance of the PNPS Emergency Preparedness Program.

Specifically, this position Is responsible for:

  • Overseeing the development and maintenance of this Plan and its implementing procedures while ensuring that regulatory guidance and industry standards are met.
  • Developing and maintaining administrative procedures and manuals required to
  • Ensuring the resolution of emergency preparedness deficiencies discovered through drills, audits, and training.
  • Interfacing with Nuclear Training to ensure that an adequate number of personnel are trained and qualified to respond to an emergency at PNPS.

P-2 Revision 27

PNPS EMERGENCY PLAN

  • Coordinating the development and annual distribution of the public information publication.
  • Maintaining the PNPS Emergency Telephone Directory.
  • Maintaining emergency radio and telephone communications systems between PNPS and offsite emergency response facilities including the Prompt Alert and Notification System (PANS).
  • Maintaining PNPS emergency response facilities.
  • Providing assistance to local and Commonwealth officials In their emergency plan/procedure development and revision efforts.
  • Assisting Inthe development, Implementation and revision of the local and Commonwealth training program.
  • Scheduling the conduct of the biennial exercise in cooperation with local and Commonwealth officials.

Emeraency Preparedness Staff

b. Emergency Preparedness staff members are responsible both for maintaining the operational readiness of the station Emergency Preparedness program and the local offsite and related emergency preparedness programs. Emergency Preparedness staff report to the Emergency Preparedness Manager.

Operational readiness activities Include:

  • Audits the Emergency Preparedness Training Program and provides staff support as required to ensure quality Emergency Organization Training.
  • Acts as a training coordinator for the Offsite Emergency Preparedness Training Program regarding onsite interface.
  • Assists in developing onsite training materials for the Local and Commonwealth Radiological Emergency Preparedness Training Programs.
  • Analyzes manpower needs and implements necessary actions to ensure sufficient resources are available to maintain the Emergency Preparedness Program.
  • Oversees the construction, maintenance, and surveillance of the local emergency operation centers and reception centers.
  • Acts as the PNPS Manager In charge of Pilgrim Station's emergency communications equipment.
  • Oversees the operation and maintenance of Pilgrim Nuclear Power Station's emergency communications equipment.

P-3 Revision 27

PNPS EMERGENCY PLAN

  • Oversees the operational readiness of PNPS emergency response Facilities (i.e.,

Emergency Operations Facility (EOF), Operations Support Center (OSC), Technical Support Center (TSC), Media Center (MC), Alternate Emergency Operations Facility (AEOF), and Alternate Media Center (AMC).

  • Oversees the development and maintenance of the Nuclear Organization Emergency Notification List (ENL).
  • Oversees the maintenance and readiness of Station Prompt Alert Notification System (Sirens).
  • Acts as Lead Controller for, and develops and conducts the Station Drill and Exercise Program.
  • Investigates and develops summary reports for incidents at the Station classifiable in accordance with the Station's Emergency Plan (i.e., Notification of Unusual Event, Alert, and higher).

Local offsite and related activities include:

  • Oversees the development and maintenance of the Pilgrim Nuclear Power Station Emergency Plan and Implementing Procedures.
  • Ensures that the Pilgrim Nuclear Power Station Emergency Plan and Procedures re maintained and consistent with related Commonwealth and local Emergency Response Plans and Procedures.
  • Coordinates the development and maintenance of administrative procedures and manuals required to assure the maintenance of the Station's Emergency Preparedness Program.
  • Ensures that the Emergency Public Information Program is developed and maintained to achieve consistency and compatibility with the Pilgrim Nuclear Power Station program.
  • Oversees local and Commonwealth training program development, implementation, and revision.
  • Coordinates the review and distribution of the Emergency Public Information and notification materials.
  • Ensures compliance with terms of Local Civil Defense Grant agreements between the Company and towns.
  • Establishes and maintains liaison with elected and appointed local and Commonwealth officials by representing the PNPS Emergency Preparedness Department at meeting and functions.

P-4 Revision 27

PNPS EMERGENCY PLAN

  • Ensures that the Emergency Preparedness Manager is aware of trends and relationships in community activities and actions.
  • Coordinates the development and maintenance of corporate emergency response procedures and training materials with the Entergy Nuclear Northeast Director of Emergency Programs.
  • Develops and maintains with the State of Rhode Island Emergency Management Agency Radiological Emergency Plans and Procedures for the Ingestion Pathway.

Emergency Preparedness Staff Members report to the Emergency Preparedness Manager and are selected based upon qualifications that meet those outlined In position descriptions maintained in Emergency Preparedness Department files.

4. PNPS Emergency Plan Revisions: This plan is reviewed and updated as necessary, on an annual basis. The annual update Includes required changes identified during training, drills and exercises. The Nuclear Assessment Director Is responsible for determining which recommended changes are incorporated into the Plan.

Minor changes in the Emergency Plan such as a change In wording or set point that do not affect the intent of the original statement are incorporated in an annual update of the plan.

Changes in this plan, which add or remove a requirement to or from the Emergency Plan or change the intent of the Emergency Plan require consideration for an Immediate update to the plan.

Revisions to the Plan are reviewed by the Onsite Safety Review Committee (OSRC) and all organizations affected by the change prior to approval.

Changes to the Plan are made without NRC approval only if such changes do not decrease the effectiveness of the Plan, and the Plan as changed continues to meet the standards of I OCFR50.47(b) and 10CFR50, Appendix E, and other licensing documents. Proposed changes that decrease or have a potential to decrease the effectiveness of the approved Plan are not implemented without prior approval by the NRC.

5. Emergency Plan Distribution: Controlled copies of the PNPS Emergency Plan are issued to all appropriate organizational heads In the PNPS Nuclear Organization, the Commonwealth of Massachusetts and the Nuclear Regulatory Commission. Controlled copies of the Plan and Implementing Procedures are also provided In all appropriate Emergency Response Facilities. An Emergency Preparedness Administrative Procedure (in conjunction with Station Procedures) controls the distribution of changes to the Plan. Procedure requirements include use of revision bars and required page identifications (i.e. section of plan, revision number, etc.).
6. Supporting Emergency Response Plans: Other plans which support this Plan are:
  • Federal Radiological Emergency Response Plan
  • Commonwealth of Massachusetts Radiological Emergency Response Plan p 5 Revision 27

PNPS EMERGENCY PLAN

  • Commonwealth of Massachusetts Radiological Emergency Response Plan Area II
  • Town of Plymouth Radiological Emergency Response Plan
  • Town of Carver Radiological Emergency Response Plan
  • Town of Duxbury Radiological Emergency Response Plan
  • Town of Kingston Radiological Emergency Response Plan
  • Town of Marshfield Radiological Emergency Response Plan
  • Town of Bridgewater Radiological Emergency Response Plan
  • Town of Braintree Reception Community Radiological Emergency Response Plan
  • City of Taunton Radiological Emergency Response Plan
  • State of Rhode Island Nuclear Power Plant Incident Ingestion Exposure Pathway Emergency Response Plan
  • Framatome ANP DE&S Emergency Mutual Assistance Agreement Each of these plans has associated Implementing Procedures.
7. Imrlementing and Supportina Procedures: Appendix 2 of this Plan contains a listing, by number and title, of those procedures which implement this Plan during an emergency.

This appendix also provides a cross-referenced listing of PNPS Administrative Procedures to applicable PNPS Emergency Plan sections that help maintain the PNPS Emergency Preparedness Program.

All of these procedures are periodically reviewed and approved In accordance with document control requirements established In PNPS procedures and Entergy Quality Assurance Program Manual.

8. Cross Reference to Planning Criteria: The Plan is formatted In the same manner as NUREG-0654, FEMA-REP-1, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in support of Nuclear Power Plants",

Revision 1. This allows for ease In auditing evaluation criteria and eliminates the need for a cross-reference.

9. PNPS Emergency Preparedness Program Review: The Nuclear Assessment Director ensures that a review Is performed on the PNPS Emergency Preparedness Program in accordance with the audit methodology described In Entergy Quality Assurance Program Manual. This review Is performed by a competent organization, either internal or external to PNPS, which has not been involved In maintenance of the Program for at least two years.

Included in the review are the following:

  • The readiness of the PNPS Emergency Response Organization to perform its function.

P-6 Revision 27

PNPS EMERGENCY PLAN

  • The readiness of facilities and equipment to perform as outlined in the Plan and procedures.
  • The interface function between the Station and the Commonwealth and offsite local governmental agencies pertaining to the overall PNPS Emergency Preparedness Program.

Results of this review are submitted for review to the Safety Review Committee and the Senior Nuclear Executive. The Nuclear Assessment Director ensures that any findings which deal with offsite interfaces are reviewed with the appropriate agencies. Records of the review are maintained for at least five years.

10. Maintenance of PNPS Emergency Telephone Directory: The PNPS Emergency Telephone Directory contains telephone numbers used by the PNPS Emergency Response Organization during an emergency. An Emergency Preparedness Administrative Procedure provides for verifying and updating these numbers at least quarterly.

P-7 Revision 27

PNPS EMERGENCY PLAN Appendix 1: References 1 10CFR50.47, Emergency Plans

2. 10CFR50 Appendix E, Emergency Planning and Preparedness for Production and Utilization Facilities
3. 10CFR20, Standards for Protection Against Radiation
4. NUREG-0654, FEMA-REP-1, Revision 1, Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants
5. NUREG-0696, Revision 1, Functional Criteria for Emergency Response Facilities
6. EPA-400-B-92-001, Manual of Protective Action Guides and Protective Actions for Nuclear Incidents
7. FEMA-Guidance Memorandum, MS-1 Medical Serviceso
8. PNPS FSAR
9. PNPS Tech Specs
10. Reg. Guide 1.101, "Emergency Planning & Preparedness for Nuclear Power Plants
11. Entergy Nuclear Northeast Corporate Emergency Response/Recovery
12. 10CFR50, Appendix R
13. SANDIA 77-1725
14. PNPS Nuclear Training Manual
15. INPO Emergency Resources Manual
16. Nuclear Organization Procedure 88A4, "Assignment of Responsibilities in Support of the PNPS Emergency Preparedness Program"
17. Federal Radiological Emergency Response Plan (FRERP)
18. Interagency Radiological Assessment Program (IRAP)
19. Entergy Quality Assurance Program Manual
20. PNPS Offsite Dose Calculation Manual (ODCM)
21. USNRC Generic Letter 82-33 dated 12117/1982
22. ANSI N 18.7 -1976, American National Standard, Administrative Controls and Quality Assurance for the Operational Phase of Nuclear Power Plants
23. Federal Register Notice Final Rule, "Consideration of Potassium Iodide in Emergency Plans", Volume 66, Number 13, page 5427, dated January 19, 2001
24. FEMA Guidance Memorandum, "R1-TH-88-19, "Unannounced and Off-hours REP Exercises", dated August 2, 1988
25. Supplement 3,"Criteria for Protective Action Recommendations for Severe Accidents -

Draft Report for Interim Use and Comment to NUREG-0654/FEMA REP-1, Rev.1,issued July 1983 Appendices 1 Revision 27

PNPS EMERGENCY PLAN Appendix 2: Procedure Cross-Reference to Sections of the Plan Number Title PNPS Emergency Plan Section(s)

EP-IP-100 Emergency Classification and Notification D.1, D.2, Table D-1, E.1, E.2, E.3, E.4, J.1 EP-IP-100.1 Emergency Action Levels (EALs) Table D-1 I EP-IP-200 On-Call Emergency Director B.2 B.3, B.4, Table B-1 EP-IP-201 Emergency Plant Manager B.5, Table B-1 EP-IP-202 Company Spokesperson B.5 EP-IP-210 Control Room Augmentation B.5, Table B-1 EP-IP-220 TSC Activation and Response B.5, Table B-1 EP-IP-225 Severe Accident Management Support 1.1 EP-IP-229 TSC/OSC Equipment Operation B.5, Table B-1 EP-IP-230 OSC Activation and Response B.5, Table B-1 EP-IP-231 Onsite Radiation Protection B.5, Table B-1 EP-IP-240 Emergency Security Organization Activation and B.5, Table B-1

Response

EP-IP-250 EOF Activation and Response B.5, C.2.b, Table B-1 EP-IP-251 Offsite Radiation Protection B.5, Table B-1 EP-IP-252 Facilities Support B.5, Table B-1 EP-IP-253 Relocation of the EOF H.2 EP-IP-254 Communication Support B.5, F.1 EP-IP-259 EOF Equipment Operation B.5, Table B-1 EP-IP-300 Offsite Radiological Dose Assessment 1.3,1.4 EP-IP-310 Radiation Monitoring Team Activation and 1.7,1.8,1.9

Response

EP-IP-315 Offsite Personnel Monitoring Team Activation J.3 and Response EP-IP-330 Core Damage 1.2 EP-IP-400 Protective Action Recommendations E.3 J.7, J.8 EP-IP-410 Evacuation/Assembly J.2, J.4, J.5, K.3 EP-IP-420 Search and Rescue J.5 EP-IP-440 Emergency Exposure Controls J.6, K.1, K.2 EP-IP-501 Transport of Contaminated Injured Personnel K.5, L.1, L.4 EP-IP-520 Transition and Recovery M.1, M.2, M.3, M.4 EP-PI-XXX Emergency Public Information Procedure Set G.3, G.4 Appendices 2 Revision 27

PNPS EMERGENCY PLAN Appendix 2: Procedure Cross-Reference to Sections of the Plan (Cont.)

Number Title PNPS Emergency Plan Section(s)

EP-AD-xxx Emergency Preparedness Administrative The following procedures do Procedure Set not implement the Emergency Plan, but do outline maintenance of the program for the applicable sections of the Plan.

I EP-AD-100 Emergency Preparedness Controlled Documents P.4 EP-AD-1 10 Emergency Preparedness Department P.1, P.2, P.3 Organization and Responsibilities EP-AD-120 Emergency Preparedness Activity Scheduling N.5 System EP-AD-122 Maintenance of the Emergency Telephone P.10 Directory EP-AD-133 Emergency Public Information Program G-1, G-2 I EP-AD-200 Planning and Scheduling of Drills and Exercises N.1.b, N.2.a, N.2.c, N.2.e.1, N.2.e.2 EP-AD-201 Preparation, Conduct, and Evaluation of N.1.b, N.2.a, N.2.c, N.2.e.1, Emergency Preparedness Drills and Exercises N.2.e.2 Facilities and Equipment Surveillances F.3, H.10 3.M.EP-301 EP-AD-411 Testing of the CANS E.1, E.2 Emergency Communications Test F.3, N.2.a 3.M.EP-412 Surveillance, Maintenance, and Calibration of the H.8 PNPS MeDAP Equipment 8.E.71 .

EP-AD-600 Emergency Action Levels Technical Basis D.1, D.2,1.1,1.4, J.7 IDocument II Appendices 3 Revision 27

PNPS EMERGENCY PLAN Apnendix 3: Sample Coples of Letters of Agreements: Duke Engineering and Services Emergency Mutual Assistance Agreement Signature Page

  • ~~ ~ ~~Pg .

igrl~ce oPttion S

Th: =dA ved Wn}pay a= tD become apart to and be bound by all offhe teW and contions of dis DE&S fMeral -W= Agmt

- I

,--/. 4Lv

-- ;t zz_

IPilgim NwklarPwer StAtoD f

&-P Om= SiPK=

Appendices 4 Revision 27

PNPS EMERGENCY PLAN Appendix 3: Sample Copies of Letters of Agreements: Jordan Hospital PARM at Pb*, nd. sm sc Ih U iaN 4 wsteatebodbYmffo d rs $ " Z~~~~~~~~t mitkeeny recyz o =ad= odcum -

mdhi Cy aP tmwsa doi df drt ac amEy timdbwCb = Wy fLMbe SVClO

.pccdaa1ykspbi of ffieUhw al tlp~i giaffmc Iso hus& andotdlatlon x&dt Pda" uz itimdetSe or h=itMpra Is uOWM l ektiestdm npdloblcai aIxy gon em Umepzeamuasyb~Mink tIn tv ceAftilnral~h e bsbcenirse 13ie hmmi~k udWein imoi ha~hs ro ~l ~mI&=ih Ioddnaa ww~ bIC915 h MI& z , dcamm d~~ n~a~uammn anig ad Mtlm hePsetim Q

hampanesgzat pid Tb. X upes uimctskLe es and isirdpzwlmm fOACH~~nSzo a zcnukaeWue omb~~d permiuci Imnimg 5t3*ft WM te dw*ug um~~e&

Utbllng Wzia.In gldenftsnt 4ofpii! CrreLdw~eta O(

eltd1 itm t hoqft Str all inp ud jad f awnd tWJ=1 dut4ingN dohs Ruatdlo~!usplsdziptlwfbtv~~dn The udpmykoby W.1 ID3 rmlfy. 4 megudWd bmku Joidan Nptr nadibmeac veeus =Plwe and s1= hoer lIS a and ahe EaWbty.

U ma es. lmd ) e4sw d c sd c pC derznzdcudbye1tdft=rbyfd~emw)i *acqpk7 ftig5Or~~

wbuftroemw kpUf n dc Oay bdlig.kuathmbd3 5h1 of~.

Ut hospitzal. *=t a raymd gba, (1)t cmmtea Um~gbz =i tzart afft Losyma orazmy

  • MD t ID Ethha ompany er Sn ied*c Gam fi . dyw.

EE*?yWcmeazciC3w~ JUipi .c I

' V- _ ka i"~ (.'

Appendices 5 Revision 27

PNPS EMERGENCY PLAN Appendix 3: Sample Copies of Letters of Agreements: Morton Hospital ENTERGY NUCLEAR GENERATION COMPANY EXPENSE REEMBURSEMENT AGREENBlT Ihis aprement is entred into by and bween Entey Nuclear Generation Company (the

'Tompanyf) mnd te Moro Ho*pitl and Medical =CInc. (fthe 'Contoor).

The Company owns and operates the Pgim.Nuclear Power S=a n Cilgrim Station'), widch is located In Plymouth, --- t, aind as such has an interet M pre r and I amenIon of plans developed to smpond to udidaogicul emergenies dt the Pilgrim Station.

The Cotractor has agreed to pardc~pat In te Radiological Emergency Plan for th Pilwm Station. Such participation ill reqmire that the Conractor or its cmploytes, Incoordination with variou .AI CMes Ambulance Se. Pr Iuth FeDepartment) provide supil vEme in the care and rmet con ted aId njured personnel sent fm Pilgrim Sriaon. Such participation includes tning and dulls RDinlnnaemen hfor material used in the course of tet co mnared and iNured personnel fom Pilgrim Sttion will be hugh the normal billbng prcssms. Wh iasn con ;ideaon of the Contacor or ce end tatme of contaminated and ird P_sornd for training end drills, the Company i C5to reimburse the Contractor for r1l MadwL Ale anid equipmert ued In decnamination urid tenatrut. RAdiOOgical supplies aent wl be inventozid and replaced by the Cqmpany.

It shall be te responsibility of the Comactor io compile. review and approve in witin& all requests for payment of materal and equipmct dcsdibed herein and to submit said requests to the Company on a monthy b . All rcq shall hdsude the name(s) of individualW t otd.

moon G.C.. ftnin. dAnl, meai st of all matedal used durig ucamnt that ai fatent) has to be replaced. The Company shall ruz payment to the Cntract widhn forty-five (45) days of its reeidpt of Om Coonractor, rquest for payment The Contraor acknowleds tWat ft obligation of th Company Is lmited to rimanament of expenses in tm manner and m n the tms set forth In this Agreement. Nothing Inthis Agrec; nor any act of efthertfe Company rathe Contactor. shall be deemed or construed by either of dernXorbythuvd peasons, (1) to crafte any relationship whatsoevwr Involving the Company

t lImited to, employment, ageucy or ccntractor relationships between the Conmpan ad an e loyee izd eestuive of the Contractor, or expept as provided above, to mrte any rIght on the paut of fe Contac=tr or any r peson wt respect to the Company and its property.

1NYW1NSS WrEREO*Der o set their respective bands this

- 07W day 200.

ENTERGY NU.JRJ 0 MORTONH SITALAND BYM .- t r/r W

.. , C. ._ _

Appendices 6 Revision 27

PNPS EMERGENCY PLAN Appendix 3: Sample Coples of Letters of Agreements: Plymouth Police TOWN OF PLYMOUTH POLICE DEPARTMENT

£0 Log Pon R\

Pymth. M 60 FAX 1) 83-4227 MM 630-4218 May 15, 2W1 Mr. 3aicexander Nudear Assessment Diretor Entergy Plymouth, MA 02360

Dear Mr. Alexander:

The Pymouth Polioe Deparnwt agrees Wrespond to the request of the Pilgrim Nuclear Power Station operatng permel InOhe lwing areas:

1. Carl fand mlt access to e Townrdsthe Ue steInduding In v1dny of the feftion of bariers on Roxky Hill Road,
2. Asstst InevacaWn of the public from he 0fe,
3. Provde locations off site for emeeny equiprne.

Chief of Police cc: EergW Folder Appendices 7 Revision 27

PNPS EMERGENCY PLAN Appendix 3: Sample Coples of Letters of Agreements: Plymouth Fire Department TOWN OF PLYMOUTH FIRE DEPARTMENT 114 Sandwich Stiet Plymouth. MavachueM 02360 rAx (508) 830-41T4 (506) 8s0-4213 AGREEMENT BETWEEN PLYMOUTH FIRE DEPARTMENT AND ENTERGY NUCLEAR GENERAMON COMPANY (ENTERGY NUCLEAR)

IN THE EVENT OF AN INCIDET AT PILGRIM NUCLEAR POWER STATION.

%%e 727mouth rae Dftpartm2t andtMEterrgy Xucia= herewith agee to the following:

1. Plymouth Fire Department wvii provide Flire Protection Assistance for the Pilgrim Station site.

(a) While providing rire Pzotection Assistance the Senior Plymouth Fire Department Officer and the Pilgrinm Station Fire Brigade Leader shall remain in continuous co munications to co-ordinate fire fighting activities.

n p-ractice, this means that Pl=.ri= Station i 1L defer to Plymouth Fire Drpar-bmnt ea.rtloo and authorlty -

for Mire Tlihtinq activitiee anl Plymouth Liro Departmaet wi1l defaer to PftlSw3 Station eapertise and athority inVolving ceactor plant safety.

2. Plymouth Fire Department will provide rescue assistance for the site area.
3. Plymouth Fire Department wlll provide emergency ambulance service.

I cf 2 Utn a" r Appendices 8 Revision 27

PNPS EMERGENCY PLAN Appendix 3: Sample Copies of Letters of Agreements: Plymouth Fire Department (Cont.)

AGREEMENT- Page 2 of 2 Plymouth Fire DepartmnntEntergy Nuclear

4. Plymouth Fire Department will provide storage facilities off site for emergency equipment supplied by Entergy Nuclear.

(a) This is intended to include all equipment currenty stored. Any additional equipment storage needs will be subject to negotiation between Plymouth Fire Department and Entergy Nuclear.

APPROV'D MnTM= UUCZPM APPROVED PLA!HOUTB ME DEPT.

NaLMUe"mmPWRV=(

Da t Zs1 11 agreeEN. TF/lkwpp, Appendices 9 Revision 27

PNPS EMERGENCY PLAN Aopendix 3: Sample Cooles of Letters of Agreements: Town of Carver q~,~jj~f B04Td nf~oi~riin~~,n o8af Sefixftm Richard J.La FOWi FTownAdrnlarator Carver, aSSaBustS 02330 Jeanne L. Roby cUAVY.&4 IUEI fffiMB-3400

  • Fax 64664213 AdmInlsfatfve Assstant Jack AMxder Director, Mdear Assessmw POimNukdearPowr Saon 600 Rocky 111 leoad Plymouth, MA 02360

Dear Mr. Aleumder:

Tbe Town of Csw as to inlow Pgrim Nudw Power Statiou (PS) Emcy Resos peronel to udn a com'ee zo= Indw basement ofCo Town e Ha for an Aternte Eergency Operan Facifity (AEOF). in case the lNPS dwy SOF locAWeIiPymout Isdeclared ulnbabhe fr any eso. e Town aMofCuwric fher Arees to:

I. Mow for mweofNP equipmM in e*ncto 'wthte Cam mE=ency Managmet Aevy WEOC% ad 2 PeX k igrim Stmfo Emergazy Preparedns Dptment peronel as to the AEOF equpmt for u m and and_

3. Ifacrsay, proide Pffgdm Stton Emzpec pparess Dqetmn=

peowd Oif-hour ac to activae th AEF.

TWs ageemnt w comfim crti dtber the Town ofCrver or Pngdm Wad= Power Staion provides a 60day write notie tt ft can ho lonr Wppot dis agreeme.

Dat. JI-,-1 Appendices 10 Revision 27

PNPS EMERGENCY PLAN Appendix 3: Sample Copies of Letters of Agreements: Brldcewater State College

/

BSC BaDGWSU" IrAT OUG July 13,2000 Mr. Jack Alexander Diretor, Nuclei A ssmnt Pilgiim Nuclear Power Slation 4W0Rocky Hill Road Plymouth, W'O2360 Sucbjct: Letter of Agrment

Dear Mr. Alea:

d Bridgewater State=ollge aus Jlo wlboWgrim NvelearPowpr Statfoa:(PPS)

Emzegency Response personnto inize the toaium aod two confe c toms in the John Joseph Moadecy Center fPr an Alternate Meda Center (AMC) In the event the P S pimry Medi&Centerlocatedin Plymot. M tbe relocated during an emegency. BtdgewaterS Collegefrtheroagres

1. Allow for'feuse of eiistvg equ* met Mesonst the falacity;
2. necessry proi dgtimtaonE encyResponep on el off-hoUrs aess tosctdvatc the A rnate MediatCenter.

This *grcemnnt wilt cotinuetlnithrBidgewater Swe ollege or Pgnm tuclear Power Station provides a 60-day wittninoice that-it can no longer support this

.p~ement.

Sincerely, A-' atXc~denfor Adminisration &Finance ovA amnunx t4 Fwmq 4oyoD4 HALL. Rom wo Otiacw 8=WnAmThTI C*Ugcr 8.tgVrATr..MASSACWuArm 2y2J (kc8 pr-Ro?' SA {~iwS) tlz-6z7 Appendices 11 Revision 27

PNPS EMERGENCY PLAN Appendix 4: Glossary of Terms Any abbreviation followed by a lower case 's denotes the plural form of the term.

ac ...... alternating current AEOF ..... Alternate Emergency Operations Facility ALARA ..... as low as reasonably achievable AN! ..... American Nuclear Insurers ANSI .. . . . American National Standards Institute ARM ..... Area Radiation Monitor BECONS. ... PNPS Community Offsite Notification System BEEPS.................................................................................... Emergency PNPS Paging System BWR ....... boiling water reactor CANS ..... Computerized Automated Notification System CB ..... citizen band cc ..... cubic centimeter CERP ... Commonwealth of Massachusetts Comprehensive Emergency Response Plan CFR .. . Code of Federal Regulations CHRMS.................................................................. Containment High Range Monitoring System cm2 .. . square centimeter CR ... Control Room Cs ... Cesium DAPAR ... Dose Assessment and Protective Action Recommendation dc ... direct current DNN .. . Dedicated Notification Network DOE................................................................................................U. S. Department of Energy DOT .U. S. Department of Transportation dpm. disintegration per minute EAL .Emergency Action Level EAS .Emergency Alert System ENN . Entergy Nuclear Northeast ENS ...... NRC Emergency Notification System EOC .... Emergency Operating Center EOF .. . . Emergency Operations Facility EOP .... Emergency Operating Procedure

'EPA .... U. S. Environmental Protection Agency EPZ .... Emergency Planning Zone E&S....................................................................................................... Engineering and Support EWMDS .... Emergency Worker Monitoring Decontamination Station FEMA .... Federal Emergency Management Agency FRERP... . Federal Radiological Emergency Response Plan FSAR .. . . inal Safety Analysis Report Ge .... Germanium GET .... General Employee Training HEPA .... high efficiency particulate air HPN .... NRC Health Physics Network hr .. hour Appendices 12 Revision 27

PNPS EMERGENCY PLAN Appendix 4: Glossary of Terms (Cont.}

I... Iodine INPO ... Institute of Nuclear Power Operations IRAP .. . Interagency Radiological Assistance Program Li ... Lithium LOCA ... Loss of Coolant Accident MDPH ..... Massachusetts Department of Public Health MEMA ... Massachusetts Emergency Management Agency mR........................................................................................................................... milliroentgen NOP .. . Nuclear Organization Procedure NRC .. . U. S. Nuclear Regulatory Commission OSC .. . Operations Support Center OSRC .. . Onsite Safety Review Committee PAG .. . Protective Action Guide PANS ..... Prompt Alert and Notification System PAR .. . Protective Action Recommendation PASS .. . Post Accident Sampling System PDP ..... Plant Data Phone PNPS ... Pilgrim Nuclear Power Station R .... oentgen RACES ... Radio Amateur Civil Emergency Services RERP ... Radiological Emergency Response Plan RMT .. . Radiation Monitoring Team SCBA ... self-contained breathing apparatus SGTS .. . Standby Gas TreatmentSystem SPDS .. Safety Parameter Display System Sr .Strontium TAG Technical Assessment Group TrY........................................................................................................................ Teletypewriter TLD .Thermoluminescent Dosimeter TSC .Technical Support Center ACi .microcuries Appendices 13 Revision 27

PNPS EMERGENCY PLAN Appendix 5: Evacuation Time Estimates THIS APPENDIX IS CONTAINED IN ANOTHER VOLUME AND HAS LIMITED DISTRIBUTION j Appendices 14 Revision 27