ML16035A501
| ML16035A501 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 01/27/2016 |
| From: | Calabrese D Entergy Nuclear Operations |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML16041A216 | List: |
| References | |
| 2.16.003 | |
| Download: ML16035A501 (2) | |
Text
-
En tergy Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth-, MA 02360 January 27, 2016 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
SUBJECT:
PNPS Emergency Plan Revision and-Emergency Plan Implementing Procedure Revision Pilgrim Nuclear Power Station Docket No. 50-293 License No. DPR-35 LETTER NUMBER: 2.16.003
Dear Sir or Madam:
In accordance with 10 Code of Federal Regulations (CFR) 50.4, Entergy Nuclear Operations, Inc. is providing the latest revision to the PNPS Emergency Plan EP-PP-01 and Entergy EP-IP-440. The plan and procedure revisions were reviewed in accordance with 10 CER 50.54(q). The 50.54(q) reviews are also provided in the letter attachment.
The PNPS Emergency Plan continues to meet the planning standards outlined in 10 CER 50.47, the effectiveness of the emergency plan is not reduced, and the changes did not require prior U.S. Nuclear Regulatory Commission approval.
There are no commitments contained in this letter.
If you have any questions or require additional information, please contact me at (508) 830-8227.
Donna Calabl6's&-
Emergency Planning Manager KLS/jc
Attachment:
- 1. EP-PP-01, Revision 45 procedure and associated 50.54(q) Review
- 2. EP-IP-440, Revision 11 procedure and associated 50.54(q) Review
Entergy Nuclear Operations, Ine.
Pilgrim Nuclear Power Station CC:
Director of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555 Letter No. 2.16. 003 Page 2 U.S. Nuclear Regulatory Commission Region 1 - Incident Response Center 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 NRC Resident Inspector Pilgrim Nuclear Power Station
En tergy Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth-, MA 02360 January 27, 2016 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
SUBJECT:
PNPS Emergency Plan Revision and-Emergency Plan Implementing Procedure Revision Pilgrim Nuclear Power Station Docket No. 50-293 License No. DPR-35 LETTER NUMBER: 2.16.003
Dear Sir or Madam:
In accordance with 10 Code of Federal Regulations (CFR) 50.4, Entergy Nuclear Operations, Inc. is providing the latest revision to the PNPS Emergency Plan EP-PP-01 and Entergy EP-IP-440. The plan and procedure revisions were reviewed in accordance with 10 CER 50.54(q). The 50.54(q) reviews are also provided in the letter attachment.
The PNPS Emergency Plan continues to meet the planning standards outlined in 10 CER 50.47, the effectiveness of the emergency plan is not reduced, and the changes did not require prior U.S. Nuclear Regulatory Commission approval.
There are no commitments contained in this letter.
If you have any questions or require additional information, please contact me at (508) 830-8227.
Donna Calabl6's&-
Emergency Planning Manager KLS/jc
Attachment:
- 1. EP-PP-01, Revision 45 procedure and associated 50.54(q) Review
- 2. EP-IP-440, Revision 11 procedure and associated 50.54(q) Review
Entergy Nuclear Operations, Ine.
Pilgrim Nuclear Power Station CC:
Director of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555 Letter No. 2.16. 003 Page 2 U.S. Nuclear Regulatory Commission Region 1 - Incident Response Center 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-2713 NRC Resident Inspector Pilgrim Nuclear Power Station