ML17311A947: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:ENCLOSURE 2 REVISED PAGE FOR THE APRIL 1995 MONTHLYOPERATING REPORTS 950bib0353 950b08 PDR  4DOCK 05000528(
R              PDR
 
4 0
A 17
 
SHUTDOWNS AND POWER REDUCTIONS April 1995 DOCKET NO UNIT NAME            ~V95='I.
DATE                  Q555lK COMPLETED BY          ~DUHQIl aullaa21 Outage                Method of Duration            Shutting Down                        System Component      Cause and Corrective Action Date        Type"      Hours    Reason2    Reactor3            LER No.        Code4    Code5        to Prevent Occurrence 95-01      04/01/95        S        719.9                                        N/A            N/A    N/A          Rx manually tripped to begin the 5th refueling outage.
"F-Forced            2R                                      3Method:                                  4Exhibit F - Instructions for Preparation S-Scheduled            A-Equipment Failure(Explain)            1-Manual                                  of the Data Entry Sheets for Licensee B-Maintenance or Test                    2-Manual Scram                            Event Report (LER) File (NUREG 0161)
C-Refueling                              3-Automatic Scram D-Regulatory Restriction                4-Continuation from Previous Month E-Operator Training 8 License          5-Reduction of 20% or Greater in the    Exhibit H-Same Source Examination                              Past 24 Hours F-Administrative                        9-Other-(Explain)
G-Operational Error H-Other (Explain)
                                                                            }}

Latest revision as of 08:15, 29 October 2019

Revised Monthly Operating Rept for Apr 1995 for PVNGS
ML17311A947
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 04/30/1995
From:
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17311A945 List:
References
NUDOCS 9506160353
Download: ML17311A947 (4)


Text

ENCLOSURE 2 REVISED PAGE FOR THE APRIL 1995 MONTHLYOPERATING REPORTS 950bib0353 950b08 PDR 4DOCK 05000528(

R PDR

4 0

A 17

SHUTDOWNS AND POWER REDUCTIONS April 1995 DOCKET NO UNIT NAME ~V95='I.

DATE Q555lK COMPLETED BY ~DUHQIl aullaa21 Outage Method of Duration Shutting Down System Component Cause and Corrective Action Date Type" Hours Reason2 Reactor3 LER No. Code4 Code5 to Prevent Occurrence 95-01 04/01/95 S 719.9 N/A N/A N/A Rx manually tripped to begin the 5th refueling outage.

"F-Forced 2R 3Method: 4Exhibit F - Instructions for Preparation S-Scheduled A-Equipment Failure(Explain) 1-Manual of the Data Entry Sheets for Licensee B-Maintenance or Test 2-Manual Scram Event Report (LER) File (NUREG 0161)

C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Continuation from Previous Month E-Operator Training 8 License 5-Reduction of 20% or Greater in the Exhibit H-Same Source Examination Past 24 Hours F-Administrative 9-Other-(Explain)

G-Operational Error H-Other (Explain)